Opening Date16 Jul 2024
Closing Date29 Jul 2024
Tender Amount₹ 9,88,304 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cleaning smog, black soot, etc with help of Di-ionized soap or suitable solvent

285

-

335.62

... More
Plastering of inner and outer walls 35 to 40mm nominal thickness (two layers) with lime mortar 1:2 in 2 layers (in selected areas) including rough coat (1 lime: 2 river sand/slag sand & well ground in a pan mixer cum grinder with kadukai extract and jiggery solution as per traditional technique and cured for 14 days), finishing the architectural soffits, jambs, sills, mounding, finishing smooth including, curing etc, complete work as per specification and as directed by the engineer-in-charge.

42

-

1705.38

... More
Lime punning with lime putty (unslaked lime at 5kg per 1sqm area) mixed with Gur, Bilgri, Urd and other ingredients followed by grinding to fine paste for smooth finish etc, complete as directed by the engineer-in-charge.

91

-

643.21

... More
Plastering of the dome in lime mortar 1:1:1 (1 Lime: 1 surkh:1 coarse river sand/slag sand) of 100mm thickness

10

-

1988.67

... More
Repairing ornamental plaster works to match with the existing design using lime plaster (1lime putty:1surkhi) complete including disposal of rubbish to the dumping ground within 50m lead.

17

-

4564.46

... More
Flush / Ruled / Struck or Weathered lime pointing 1:1:1 (1 slaked lime: 1 surkhi: 1 fine river sand / slag sand) in Brickwork.

62

-

215.18

... More
Repairing to plaster of thickness 10 mm to 30 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, preparation of mortar by traditional practice (by hand grinder) in 3 course & loi, tamping, beating till the shrinking cracks are disappear disposal of rubbish to the dumping ground within 50 meters lead with lime mortar 1:2 (1lime: 2 surkhi)

10

-

1488.21

... More
Careful removal of existing deteriorated /damaged /weathered lime plaster without damaging the surface below it. Caution Worker have to wear helmet, safety belt and safety gloves.

17

-

87.11

... More
Raking out the joints of country/Nankshahi brick, scooping out dead and decayed mortar very slowly and carefully with scooping rods, then washing complete with hand spray pump. Preparing the surface for replastering including disposal of rubbish within 50m lead.

74

-

176.46

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade - One or more coats on old work

12

-

56.66

... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia .M.S.tube 1.5m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S.tubes, M.S.tube challies,.S.clamps and M.S.staircase system in the scaffolding for working platform etc. and maintaining it in aserviceable condition for the required duration as approved and emoving it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc.complete as approved. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. (Note: This item to be used for maintenance work judicically, necessary deduction for scaffolding in the existing item to be done.)

432

-

202.44

... More
Supplying and stacking of good earth at site including royality and carriage complete (earth measured in stacks will be reduced by 20% for payment)

210

-

197.2

... More
Supplying and stacking of well decayed cow dung manure at site including carriage complete (Cow dung manure measured in stacks will reduced by 8% for payment)

210

-

351.93

... More
Spreading of sludge, dump manure and / or good earth in required thickness (cost of sludge, dump manure and / or good earth to be paid separately)

630

-

37.72

... More
Grassing with selection No.1 grassincluding watering and maintenance of the lawn for 30 days or more till grass forms a thick lawn , free from weeds and fit for mowing including supplying good earth, if needed (the good earth shall be paid for separately) - with grass turf

2100

-

8.43

... More
Disposal of debries / surplus excavated earth including loading, unloading and conveyance to low lying areas within 2km lead as directed by the Engineer in charge.

2

-

139.38



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.