Works Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 1,700Document Cost
₹ 600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CERWI_98512_10Bid Award Id
ViewTender No
RWNPD-09 (Online) of 2023-24Tender Authority
Works Department ViewPurchaser Address
-Website
http://https://www.worksodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work in excavation in foundation in hard soil with initial leads and lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P and dewatering if required for the work etc. complete as per the direction of the Engineer in charge.
16.2
3417
210.96
Filling Foundation and plinth with Fine course sand of approved quality from approved quarry including watering and ramming with all cost,conveyance,royalty taxes etc.of all materials with all labour T&P required for the work etc.complete as per specification and direction of the Engineer-in-charge.
2.7
1457
539.67
Cement Concrete of proportion (1:3:6) in foundation and plinth using 4cm size clean hard black hand broken granite metal of approved quality from approved quarry including hoisting lowering and laying concrete in layers not exceeding 9" thick to the required level including cost, conveyance and royalty of all materials with all taxes and compacting watering curing and all labour with T&P articles required for the work etc. complete as per specification and direction of the EIC.
2.7
14463
5356.9
Cement Concrete of proportion (1:2:4) in foundation and plinth using 20 cm size clean hard black crusher broken granite chips of approved quality from approved quarry including hoisting lowering and laying concrete to the required level including cost, conveyance and royalty of all materials with all taxes and compacting watering curing and all labour with T&P articles required for the work etc. complete as per specification and direction of the EIC.
0.59
3994
6770.01
Well burnt C.B. brick works in cement mortar (1:6) after immersing brick for six hours in water before use with good quality klin bunt brick of 10"sizes having crushing strength not less than 75Kg./Sqm including splays cutting ,circular moulding and similar such type of work with necessary projections, chamfering and corbelling, watering and curing etc. complete including cost, conveyance , royalties of all materials with cost of all labours,all taxes with T&P articles required for the work etc. complete as per specification and direction of the Engineer-in-charge. (Foundation)
10.94
52743
4821.13
Super-structure
10.78
52331
4854.46
20 mm thick cement plaster (1:6) over Stone work or Brick workin footing with cost of all materials and all labour etc.complete as per the direction of the Engineer in charge.
14.4
3234
224.6
16mm thick cement plaster in Cement mortar (1:6) finished smooth to brick inner walls after racking out the joints of brick work with watering curing and cost, conveyance, royalty and taxes of all materials with all labour T&P etc. complete in all respects as per specification and direction of the EIC.
55.68
12049
216.4
12 mm thick cement plaster in Cement mortar (1:6) finished smooth to outer brick walls after racking out the joints of brick work with watering curing and cost, conveyance, royalty and taxes of all materials with all labour T&P etc. complete in all respects as per specification and direction of the EIC.
40.43
6104
151
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements