Water Corporation Of Odisha Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 32,000Document Cost
₹ 7,080Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WPDS_107155_1Bid Award Id
ViewTender No
06/ Project/WATCO/SBP/ 2024-25 Dated 12.11.2024Tender Authority
Water Corporation Of Odisha ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
On completion of construction of 1500 mm internal dia upto 2.65 M depth RCC-cum-Brick Man hole Chamber including Supplying all materials ,labour,T&P as per approved design & specification, including earthwork in excavation,fixing MH cover & frame and leakage testing of chambers etc complete. As per standard specification & direction of the Engineer-in-charge
8
68871
550975.2
1500 mm dia manhole for each additional Depth of 100 mm above the 2.65 M depth.
16
2773
44368
On completion of construction of 1200 mm internal dia upto 2.35 M depth RCC-cum-Brick Man hole Chamber including Supplying all materials ,labour,T&P as per approved design & specification, including earthwork in excavation, ,fixing MH cover & frame and leakage testing of chambers etc complete. As pe standard specification & direction of the Engineer-in-charge
8
31058
248470.4
1200 mm dia manhole for each additional Depth of 100 mm above the 2.35 M depth.
15
2054
30810
Supplying PVC/HDPE pipes & fittings and specials, jointing materials of different diameter and all labour & T&P and laying and jointing the pipes including excavation of trench with damaged PVC/HDPE pipe lines, refilling the trenches with excavated materials and removing the surplus excavated materials and disposing them at identified locations within 5km radius. As per standard specification & direction of the Engineer-in-charge.
-
-
-
20 mm PVC/HDPE pipe
120
60
7230
25 mm PVc/HDPE pipe
120
89
10698
100 mm PVC/HDPE pipe
100
394
39400
Supplying D/I pipes fittings and specials, jointing materials of different diameter and all labour & T&P and laying and jointing the pipes including excavation of trench with damaged D/I pipe lines, refilling the trenches with excavated materials and removing the surplus excavated materials and disposing them at identified locations within 5km radius. As per standard specification & direction of the Engineer-in-charge.
-
-
-
200 mm dia D/I Clamp
10
5799
57992
300 mm dia D/I Clamp
6
10201
61207.2
Reinstatement of Municipality Drain damaged during sewer construction work stacking the useful material for reuse and disposal of debris. As per standard specification & direction of the Engineer-in-charge.
8
4156
33248
Construction of House Sewers (100mm dia RCC Pipes, Class NP3) as per approved drawings and specification. As per standard specification & direction of the Engineer-in-charge.
145
500
72616
Provision for dewatering during laying of sewer line and construction of Manhole chamber
250
386
96550
Towards shoring and shuttering of sewer trench and MH portion trench
300
293
87990
Provision for differenctial cost for exacavtion of disintegrated rock over all kind of soil as per site condtion.(20% of total excavation qty.)
-
-
-
0.0mtr To 1.5 Mtr
102
241
24653.4
1.5Mtr To 3.0 Mtr
110
362
39880.5
Supplying all materials labour T&P for filling Crusher dust and compacting with watering
-
-
-
For filling in trenches of sewer line
1685.08
475
801929.57
For filling in Manhole chambers
519.87
475
247406.13