Scheduled Tribes And Scheduled Castes Development Department Tender
... More
The Scheduled Tribes And Scheduled Castes Development Department has issued a formal invitation for competitive bids for Construction Of Ict Education And Smart Learning Centre At Govt. (ssd) Girls High School,gurundia Under Gurundia Block in Sundergarh, Odisha, with an estimated contract value of Rs. 12,28,195. The bid opening date for this tender is 05-11-2024 and the last date for bid submission is 16-11-2024. Interested bidders for Scheduled Tribes And Scheduled Castes Development Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Scheduled Tribes And Scheduled Castes Development Department Tender
Opening Date5 Nov 2024
Closing Date16 Nov 2024
Tender Amount₹ 12,28,195
Costs
EMD
₹ 12,282Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_STSCD_106367_5Tender No
01/ ITDA BNIOF 2024-25Tender Authority
Scheduled Tribes And Scheduled Castes Development Department ViewPurchaser Address
-Website
http://http://stscodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
9" thick Fly Ash Bricks in cement mortar (1:4) in superstructure having crushing strength not less than 75.00 kg/cm2 immersing the bricks in water not less than six hours before use in masonary including watering and curing for required period with all cost conveyance, royality, taxes of all materials etc. complete as per the direction of Engineer-in-Charge.
-
-
-
... More
Painting two coats of Asian/Burger or equivalent synthetic enamel paints over a coat of primer to Iron work after smoothening the surface by sand papering and filling the neet and holes with best quality of putty with cost, conveyanc, royality, taxes of all materials labours etc. complete as per the direction of Engineer-in-Charge.
7.56
208
1579.21
... More
16 mm thick cement plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering curing for seven days with cost, conveyance, royality taxes of all materials, labour, T & P required for the work etc. Complete as per the direction of Engineer-in-Charge.
100.78
224
22604.95
... More
Supplying,Fitting and fixing of two track UPVC sliding windows of approved make with 6mm thick glass of approved quality etc complete with frame shutters and all fittings fixtures including the cost of all materials and labour etc. complete as per direction of Engineer-in-Charge.
12.6
4960
62508.22
... More
Priming wall surface One coat with water bound or wall primer over plastered surface including cost conveyance, royality taxes of all materials, labour, T & P required for the work etc. complete and as per direction of Engineer-in-charge
318.54
66
21284.84
... More
Rainforced cement concret M-20 grade using 20mm and down graded size crusher broken hard granite chips of approved quality including mixing with concrete mixture, including hoisting and laying in position & compacting with vibrateor to proper design section indlucing all the cost, conveyance, royality & taxes of all materials, labour, rigid smooth centering, shuttering and dismantling the same after 28 days of casting, watering, curing etc. complete.
-
-
-
... More
Cement concrete (1:4:8) with 4cm size hard granite metal of approved quality including mixing with concrete mixture, lowering & laying in layers not exceeding 300 mm. in depth, ramming compacting to proper thickness, watering, curing for required period including all cost, conveyance, royality, taxes of all materials etc. complete as per the direction of Engineer-in-Charge.
14.05
5548
77963.31
... More
Supplying HYSD/Tor steel reinforcement from SAIL,VIZAG STEEL OR TATA STEEL brand of required diameter of approved quality including Labour charges for cutting, bending, binding and tying the grills and placing in position including cost, conveyance & taxes of reinforcements confirming to ISI standard and binding wire 18 to 20 gauge and as per drawing, design etc. complete as per the direction of Engineer-in-Charge.
30.3
8868
268724.94
... More
Chajjas
6.53
1174
7669.42
... More
Supplying,Fitting and fixing of openable UPVC doorswith door frame of approved make with 6mm thick glass of approved quality etc complete with frame shutters and all fittings fixtures including the cost of all materials and labour etc. complete as per direction of Engineer-in-Charge.
2.52
8682
21878.94
... More
Wall painting two coat with plastic emulsion paint of approved shade on old work to give an even shade properly including cost conveyance, royalty taxes of all materials, labour, T & P required for the work etc. complete and as per direction of Engineer-in-charge,
181.3
89
16159.27
... More
Column Base and Footing
5.85
6812
39850.55
... More
Providing and fixing of M.S Grill with frames made of ISI Marked standard M.S. Angles 40X40X6 mm anglar sections as per drawing and specification including the cost of all material, and MS fittings such as, hinges, T & P etc. including the cost of all materials and labour etc. complete as per direction of Engineer-in-Charge.
407.16
72
29315.52
... More
Earth work in all kinds of soil within 50 M initial lead and 1.5 M initial lift including rough dressing and breaking clods to maximum 5cm to 7cm. And laying in layers not exceeding 0.3 M in depth and as per direction of the Engineer-in-charge
42.83
228
9774.23
... More
Column and Beam
6.59
14695
96844.07
... More
12 mm thick cement plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering curing for seven days with cost, conveyance, royalty taxes of all materials, labour, T & P required for the work etc. Complete as per the direction of Engineer-in-Charge.
137.24
157
21627.65
... More
Round Lintel
1.26
13957
17586.79
... More
Finishing wall surface of walls with Acrylic wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes, labour T&P etc. complete.and as per direction of Engineer-in-charge,
181.3
76
13932.91
... More
Roof Slabs
10.37
13318
138111.81
... More
Supplying, fitting and fixing vertified tile in floors of size 600mm x 600mm ( Coloured or Printed ) of approved make laid on 20mm thick cement mortor (1:4) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc required for the work. as per the direction of Engineer-in-Charge.
76.02
1133
86186.91
... More
Foundation and Plinth
12.85
5278
67822.43
... More
Filling in foundation and Plinth with sand well watered and rammed & dressed & level to proper gradient including all cost, conveyance, royality taxes of all materials, labour, T & P required for the work etc. complete and as per direction of Engineer in Charge
36.29
727
26401.7
... More
Plinth Band
3.53
7642
26976.37
... More
9" thick Fly Ash Bricks in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 kg/cm2 immersing the bricks in water not less than six hours before use in masonary including watering and curing for required period with all cost conveyance, royality, taxes of all materials etc. complete as per the direction of Engineer-in-Charge.
-
-
-
... More
Super Structure
19.65
5069
99610.96
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements