Orissa Water Supply And Sewerage Board Tender

... More
The OWSSB has issued a formal invitation for competitive bids for the Orissa Water Supply And Sewerage Board project, for Repair And Restoration Work Of Unnati Bhawan in Bhubaneswar, Odisha, with an estimated contract value of Rs. 67,19,553. The bid opening date for this tender is 14-11-2023 and the last date for bid submission is 30-11-2023. Interested bidders for Orissa Water Supply And Sewerage Board tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Orissa Water Supply And Sewerage Board - OWSSB Tender

Opening Date14 Nov 2023
Closing Date30 Nov 2023
Tender Amount₹ 67,19,553 
Notes
Download

Costs

Summary

Repair And Restoration Work Of Unnati Bhawan

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and providing steel scaffolding , TPT designing, erecting safe platforms to execute the work safely and dismantling the same after completion of the work inclusive of labour cess,etc. all complete as per the direction of Engineer-in-charge.

285

119312

418.64

... More
Wall painting 2 coats with Weather Coat (Asian paints apex ultima with 7 years warranty) of approved shade on new work to give an even shade including cost of all labour, materials T & P with taxes, transportation etc all complete as per direction of Engineer-in-charge.

-

-

-

... More
Priming one coat with Asian Paint primer including cost of all labour, materials T & P with taxes, transportation etc all complete as per direction of Engineer-in-charge.

-

-

-

... More
Solar panel fixing : Solar panels are to be shifted 2 inches from the present position to make fresh holes 12mm dia and 75 mm depth, cleaning charges of the holes and re-fixing charges of the solar panel with new nuts and bolts with chemicals/sealant of reputed make as per the direction of Engineer-In charge. Total solar panels - 368 nos X anchors 4 nos = 1472 nos)

1472

294400

200

... More
Drilling of 12mm dia hole from a depth of 80mm and inserting a RE Bar 8 mm dia with epoxy bonding agent/chemicals including labour, material, etc all complete as per direction of Engineer-in-charge.

5587

542777

97.15

... More
3.03.03 Second floor

243.79

18003

73.85

... More
3.03.02 First floor

243.79

17321

71.05

... More
3.09.04 Third floor

873.63

96571

110.54

... More
Repair, rehabilitation and re-fixing of solar panels including water proofing treatment at top floor (4th) sloped roof of Unnati Bhawan, OWSSB, Bhubaneswar after dismantling of slate tiles and concrete surface.

-

-

-

... More
Priming 1 coat with primer (zinc chromate of asian paint make)including cost of all labours and materials etc all complete.(for steel works) as per direction of Engineer-in charge.

369.7

20071

54.29

... More
Rehabilitation of the cornice portion after dismantling of the damaged cornice of Unnati Bhawan building, OWSSB, Bhubaneswar

-

-

-

... More
Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges upto 5M height etc. all complete as per direction of Engineer-in-charge.

5329.99

27289

5.12

... More
3.09.02 First floor

243.79

25437

104.34

... More
3.03.01 Ground floor

5086.2

347794

68.38

... More
Exterior painting of Unnati Bhawan building, OWSSB, Bhubaneswar including compound wall, basement area and other petty surfaces.

-

-

-

... More
Dismantling & removing old tiled flooring including removing the base course & stacking the useful materials for use and removing the debris within 50mtr lead inclusive of labour, etc all complete as per direction of Engineer-in- charge.

1251

175477

140.27

... More
Painting 2 coats with asian paint plastic emulsion paint on new iron work including cost of all labours and materials etc all complete as per direction of Engineer-in charge.

369.7

58490

158.21

... More
Dismantling & removing cement concrete including stacking the useful materials for re-use and removing the debris within 50m lead inclusive of labour, etc all complete as per direction of Engineer-in- charge.

54.96

45885

834.89

... More
Cement concrite (1.1.5.3) with 12mm size crusher broken hand granite chips for RCC work including hoisting & laying etc all complete as per directin of Engineer-in-charge

54.96

557849

10150.1

... More
Supplying and providing steel scaffolding , TPT designing, erecting safe platforms to execute the work safely and dismantling the same after completion of the work inclusive of labour cess,etc. all complete as per the direction of Engineer-in-charge.

2985.2

1249724

418.64

... More
Dismantling & removing R.C.C chajja, shelves, fins & parapet including stacking the useful materials for re-use & removing the debris within 50 mtr lead as per the direction of Engineer-in-charge.

104.75

18658

178.12

... More
3.09.05 4th floor terrace

1201.46

136822

113.88

... More
Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respect as per the direction of Engineer-in-Charge.

1374

511581

372.33

... More
Rigid & smooth centering & shuttering on three sides of cornice at 3rd floor for holding microconcrete including labour, material, etc all complete as per direction of Engineer-in-charge.

180.55

262832

1455.73

... More
Disposal of debris within 10 km lead including conveyance of materials including loading unloading,etc. as per direction of Engineer-in-charge.

13.09

4465

341.11

... More
Disposal of debris within 10 km lead including conveyance of materials including loading unloading,etc. as per direction of Engineer-in-charge.

86.24

29417

341.11

... More
Supply of epoxy bonding agent two parts (hardener & base) solvent free bonding agent for old and new concrete & mortar to attain excellent adhesive strength and allowing comfortable open time to work , including transportation , loading & unloading the same inclusive of royalties , labour cess, etc complete as per direction of Engineer-in-charge. Application of epoxy bonding agent before pouring microconcrete. Specific gravity: 1.01 +/- 0.02 Pot life one hour at 30 degree Celsius application temp 14 to 35 degree celsius

83.8

35366

422.03

... More
Providing and applying polymer modified micro-concrete supplied in 25 kg moisture resistant bag should possess following properties when mixed with clean water at w:p ratio 0:6, such as compressive strength (ASTM C 109)- 24MPa at 1 day, 45Mpa at 3 days, 55 MPa at days and minimum 60MPa at 28days, Tensile strength- 3.5 Mpa @ 28 Days, Flexural Strength(BS 4551-80)- 10 Mpa at 28 Days, Young’s modulus-28 kN/mm2, Co-efficient of Thermal Expansion - 11X10-6/ ̊C, Fresh wet density (Mixed density @27°C)- 2100 - 2200 kg/m3. Item rate is inclusive of materials all labour, tools and tackles, formwork and transportation etc. complete as per specification and as directed by Engg.-in-charge.

10.47

815382

77878

... More
Finishing wall surface of walls with Acrylic wall putty (Water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T&P etc complete (cracked and damaged plaster surface of building) as per direction of Engineer-in charge.

3824.44

398124

104.1

... More
3.09.03 Second floor

243.79

26173

107.36

... More
3.03.05 4th floor terrace

1201.46

95960

79.87

... More
3.03.04 Third floor

873.63

67086

76.79

... More
Scraping old paint with scrapers, Sand papering and washing with soap water or soda including scaffolding charges upto 5M height and upto 8M height all complete as per direction of Engineer-in-charge.

2318.88

16255

7.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.