Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Ministry Of Railways

  • Opening Date

    05 Aug 2019

  • Closing Date

    12 Aug 2019

  • Tender Amount

    Refer document

  • EMD

    -

Reminder

Follow

Download
Are you Looking for Joint Venture Partners, Contractor Consortium, Project Financiers for this tender?
We will help YOU to find the right match for FREE!
Summary

Air Conditioner

Are you looking for Materials and Services for this tender?
We will help YOU to find the right partner for your needs for FREE!
BOQ Items

No BOQs Available

Bid Number: GEM/2019/B/309363 Dated: 05-08-2019 Bid Document Bid Details Bid End Date/Time 12-08-2019 16:00:00 Bid Life Cycle (From Publish Date) 90 (Days) Bid Offer Validity (From End Date) 45 (Days) Ministry/State Name Ministry Of Railways Department Name Na Organisation Name N/a Office Name Office Of The Principal Chief Materials Manager, East Coast Railway, North Block, 2nd Floor, Chandrasekharpur, Bhubaneswar-751017. Total Quantity 28 Item Category Air Conditioner MSE Exemption For Years Of Experience And Turnover Yes Startup Exemption For Years Of Experience And Turnover Yes Bid to RA enabled Yes Air Conditioner ( 28 pieces ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) CAPACITY / GENERIC Type of Air conditioner High wall Split AC High wall Split AC Technology of AC Inverter (Variable Speed) Inverter (Variable Speed) Nominal cooling capacity in Ton / (kcal/hr) 2.0 Ton / 6000 kcal/hr 2.0 Ton / 6000 kcal/hr Coil Material Copper Copper Eco-friendly refrigerant Yes Yes 1 / 4 Minimum length of copper pipe and suitable connecting electrical cable for installation and commissioning 5 metre 5 metre Packing LIst - * Any other Features - * CONFORMITY / CERTIFICATION BEE Star Rating 5 5 Conformity to Indian Standard IS 1391 latest * WARRANTY Warranty on Machine 1 1.0 Warranty on Compressor 5 5, 6, 7, 8, 9, 10 Or higher INSTALLATION Installation and commissioning With Installation and Commissioning With Installation and Commissioning * Bold specifications are the golden parameters. * Bidders may note that In respect of non-golden Parameters, the specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer. Consignees/Reporting Officer and Quantity S.No. Consignee/Reporti ng Officer Address Quantity Delivery Days 1 SANJAY KUMAR ROUT 751017,Office of the Chief Administrative Officer, Rail Sadan, 2nd-3rd Floor, North Block, East Coast Railway, Bhubaneswar. 28 60 EMD Detail Required No ePBG Detail Required No Splitting Bid splitting not applied. Special terms and conditions for category Air Conditioner 1) Scope of installation and Commissioning for Cassette AC 2) Following are not included in the scope of supply for Cassette AC: 3) Scope of installation and Commissioning for Floor Standing Split AC 2 / 4 4) Following are not included in the scope of supply for Floor Standing Split AC 5) Buyers shall ensure that wherever they opt for Air Conditioner 'with installation at Extra Cost', they have to select separately priced installation at extra cost. Similarly, the buyers may also order separately priced accessories for Air Conditioners such as Metallic mount, Set of Hanging Rods for Cassette AC, Drain pipe, Extra Refrigerant Pipe, Extra Electric Cable. 6) In addition to general terms and conditions of the GeM following special T&C shall be applicable: Buyer Specific Additional Terms and Conditions 1.Additional Terms and conditions would also be applicable.Please click here to view the Additional Terms and conditions. 2.Additional Terms and conditions would also be applicable for VSS Project. Please click here to view the Additional Terms and conditions. 3.Additional Terms and conditions would also be applicable for KIOSK under RailWire Saathi Project. click here to view the Additional Terms and conditions. 4. Inspection charges shall be borne by the supplier and it shall not be reimbursed by indenter to them at any point in time. Cost of inspection shall be factored in by the supplier in the cost of the product itself while submitting bid. The inspection agency will conduct the inspection and submit the certificate to the supplier as well as the buyers and consignees. The bidder will be solely responsible for pre- inspected material for Quality Assurance including pre-despatch inspection/ te

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.