Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Bridge And Roof Company India Limited Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date10 Apr 2024
Closing Date7 May 2024
Tender Amount₹ 5,69,12,175
Costs
EMD
₹ 12,65,000Document Cost
₹ 23,600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BandR_803638_1Bid Award Id
ViewTender No
B AND R/HO/40091 / PILLING/PARADIP/NIT/01Tender Authority
Bridge And Roof Company India Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
eNIT-40091-PILLING-DESPATCH-PARADIP
Annexure-D_40091_PILLING_PARADIP
BOQ Items
Earth work in EXCAVATION below ground level for all kinds of works in ALL TYPES OF SOILS EXCEPT SOFT ROCK AND HARD ROCK as classified in specification for a depth beyond 3.0m and upto & inclusive of 4.5m including removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, levelling, grading and ramming of bottoms, dewatering of accumulated water from any source and keeping the surface dry for subsequent works and disposal or stacking of excavated material within a lead of 100m, as directed including providing temporary supports to existing service lines like water pipes, sewage pipes, electric overhead and underground cables etc. all complete, but excluding shoring and strutting.
300
121500
405
Cutting the heads of R.C.C. piles of diameter upto 600mm and a length not exceeding 1500mm including exposing/ cleaning, bending of the reinforcement, making site clean for casting of pile cap and removal of debris to the spoil heaps within the plant boundary etc. all complete as specified & directed. (Excavation; if any, to be measured separately under respective item).
50
157500
3150
Cutting the heads of R.C.C. piles of diameter more than 600mm and a length not exceeding 2000mm including exposing/ cleaning, bending of the reinforcement, making site clean for casting of pile cap and removal of debris to the spoil heaps within the plant boundary etc. all complete as specified & directed. (Excavation; if any, to be measured separately under respective item).
50
175500
3510
GEOTECH
-
-
-
CONSTRUCTION OF BORED CAST-IN-SITU RCC PILES
-
-
-
BORED CAST-IN-SITU ST. SHAFTED PILES (CEMENT including all other meterial , equipments , macheneries BY CONTRACTOR)
-
-
-
Construction of Bored cast-in-situ RCC straight shafted piles as specified in specific requirements and as per items given below by approved techniques to depths specified using stone chips of 20mm and down size, through all types of soil strata, maintaining borehole sides in position by bentonite slurry by suitable method, tremie concreting, supply of necessary material including plastisizers if required, mobilization of piling rigs and other ancillary equipments/accessories as specified including demobilization etc complete, labour & carry out any ancillary work adjunct to piling work, disposal of surplus materials including earth, muck etc beyond specified lead, shifting plant and equipments from one pile location to another, all complete as per specifications, drawings & direction of Engineer-in-charge (Cost of reinforcement is excluded, CEMENT including all other meterial , equipments , macheneries supplied by contractor at his own cost and duly approved by Engineer-in-Charge). Diameter of pile 500 mm, Length below COL 25 M, Grade of concrete M35
10650
46008000
4320
Construction of Bored cast-in-situ RCC straight shafted piles as specified in specific requirements and as per items given below by approved techniques to depths specified using stone chips of 20mm and down size, through all types of soil strata, maintaining borehole sides in position by bentonite slurry by suitable method, tremie concreting, supply of necessary material including plastisizers if required, mobilization of piling rigs and other ancillary equipments/accessories as specified including demobilization etc complete, labour & carry out any ancillary work adjunct to piling work, disposal of surplus materials including earth, muck etc beyond specified lead, shifting plant and equipments from one pile location to another, all complete as per specifications, drawings & direction of Engineer-in-charge (Cost of reinforcement is excluded, CEMENT including all other meterial , equipments , macheneries supplied by contractor at his own cost and duly approved by Engineer-in-Charge). Diameter of pile 500 mm, Length below COL 13 M, Grade of concrete 35
1120
4233600
3780
Rate per meter length in INCREASE in pile length over specified length ( CEMENT including all other meterial , equipments , macheneries Supplied by Contractor at his own cost and duly approved by Engineer-in-Charge) Diameter of pile 500mm,Length of pile 25M
420
1134000
2700
Rate per meter length in INCREASE in pile length over specified length ( cement Supplied by Contractor at his own cost and duly approved by Engineer-in-Charge) Diameter of pile 500mm, Length of pile 13M
80
200000
2500
EMPTY BORING
-
-
-
Boring up to a depth of cut-off level of pile as per the specification & requirement of AFC drawings & carry out any ancillary work adjunct to piling work, disposal of surplus materials including earth, muck etc beyond specified lead, shifting plant and equipments from one pile location to another, all complete as per specifications, drawings & directions of Engineer-In-charge. Diameter of Pile 500 mm
500
675000
1350
STEEL REINFORCEMENT
-
-
-
Steel reinforcement of HYSD bars confirming to IS:1786 (latest version) (steel supplied by B AND R as FIM and duly approved by Engineer in charge)
-
-
-
Placing in position high strength deformed steel bars reinforcement of grade Fe500D conforming to IS:1786, (latest version) for RCC Bored Cast- in -situ piles for full length of pile, straightening, cleaning, decoiling, cutting, bending to required shape & lengths as per details, binding with contractor's own 18 SWG black soft annealed binding wire, supplying and placing with proper cover blocks, supports, chairs, spacers, welding, if required, to form a rigid cage, complete as per instructions of the Engineer-in-Charge (steel supplied by B AND R )
150
1215000
8100
INITIAL PILE LOAD TESTS
-
-
-
Conducting INITIAL PILE LOAD TESTS by direct loading on piles as per specifications and directions of Engineer-in-Charge.
-
-
-
Conducting INITIAL VERTICAL pile load test by direct loading on piles including finishing pile head, supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc. all complete as per specifications and directions of Engineer-in-Charge, analysing the results, making the report and submitting the same in 5 copies (cost of pile is excluded) Diameter of pile 500 mm ,Type of Pile Bored cast-in-situ Safe capacity of pile 70 T
2
450000
225000
Conducting INITIAL VERTICAL pile load test by direct loading on piles including finishing pile head, supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc. all complete as per specifications and directions of Engineer-in-Charge, analysing the results, making the report and submitting the same in 5 copies (cost of pile is excluded) Diameter of pile 500 mm ,Type of Pile Bored Cast In-situ Safe capacity of pile 20 T
2
296000
148000
Conducting INITIAL PULL OUT pile load test by direct loading on piles including finishing pile head, supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc. all complete as per specifications and directions of Engineer-in-Charge, analysing the results, making the report and submitting the same in 5 copies (cost of pile is excluded) Diameter of pile 500 mm, Type of pile Bored Cast In Situ Safe capacity of pile 15 T
2
180000
90000
Conducting INITIAL PULL OUT pile load test by direct loading on piles including finishing pile head, supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc. all complete as per specifications and directions of Engineer-in-Charge, analysing the results, making the report and submitting the same in 5 copies (cost of pile is excluded) Diameter of pile 500 mm, Type of pile Bored Cast In-situ Safe capacity of pile 5 T
2
110000
55000
Conducting INITIAL LATERAL pile load test by direct loading on piles including finishing pile head, supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc. all complete as per specifications and directions of Engineer-in-Charge, analysing the results, making the report and submitting the same in 5 copies (cost of pile is excluded) Diameter of pile 500 mm, Type of pile Bored Safe capacity of pile 2.25 T
4
180000
45000
ROUTINE PILE LOAD TEST
-
-
-
Conducting ROUTINE PILE LOAD TESTS by direct loading on piles as per specifications and directions of Engineer-in-Charge.
-
-
-
Conducting ROUTINE VERICAL pile load test by direct loading on piles including finishing pile head, supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc. all complete as per specifications and directions of Engineer-in-Charge, analysing the results, making the report and submitting the same in 5 copies (cost of pile is excluded) Diameter of pile 500 mm, Type of pile Bored cast-in-situ Safe pile capacity 70 T
3
570000
190000
Conducting ROUTINE VERICAL pile load test by direct loading on piles including finishing pile head, supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc. all complete as per specifications and directions of Engineer-in-Charge, analysing the results, making the report and submitting the same in 5 copies (cost of pile is excluded) Diameter of pile 500 mm, Type of pile Bored Cast In-situ Safe pile capacity 20 T
2
240000
120000
Conducting ROUTINE PULL OUT pile load test by direct loading on piles including finishing pile head, supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc. all complete as per specifications and directions of Engineer-in-Charge, analysing the results, making the report and submitting the same in 5 copies (cost of pile is excluded) Diameter of pile 500 mm, Type of pile Bored Cast In Situ Safe pile capacity 15 T
3
202500
67500
Conducting ROUTINE PULL OUT pile load test by direct loading on piles including finishing pile head, supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc. all complete as per specifications and directions of Engineer-in-Charge, analysing the results, making the report and submitting the same in 5 copies (cost of pile is excluded) Diameter of pile 500 mm, Type of pile Bored Cast In-situ Safe pile capacity 5 T
2
96000
48000
Conducting ROUTINE LATERAL pile load test by direct loading on piles including finishing pile head, supply & erection of kentledge of suitable magnitude, labour, excavation, back filling, compaction etc. all complete as per specifications and directions of Engineer-in-Charge, analysing the results, making the report and submitting the same in 5 copies (cost of pile is excluded) Diameter of pile 500 mm, Type of pile Bored Safe pile capacity 2.25 T
5
202500
40500
INTEGRITY TEST ON PILES
-
-
-
LOW STRAIN INTEGRITY TEST
-
-
-
Conducting Low Strain Integrity Test on piles as per ASTM D 5882, including pile head preparation, mobilisation & demobilisation of testing apparatus/ equipments, skilled personnel, data collection/recording, analyzing the results, preparing comprehensive report and submitting the same in 5 copies, all complete as per specifications and instructions of Engineer-in-Charge. Diameter of pile 500 mm Length below COL 25 M Grade of concrete M35
45
38475
855
Conducting Low Strain Integrity Test on piles as per ASTM D 5882, including pile head preparation, mobilisation & demobilisation of testing apparatus/ equipments, skilled personnel, data collection/recording, analyzing the results, preparing comprehensive report and submitting the same in 5 copies, all complete as per specifications and instructions of Engineer-in-Charge. Diameter of pile 500 mm Length below COL 25 M Grade of concrete M35
10
8100
810
"NOTE:-
THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, FEE, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST.
-
-
-