Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

CWM/Mech/ PL acting for and on behalf of The President of India invites E-Tenders against Tender No CW-PO-2018-AMC-01-Knorr Closing Date/Time 21/02/2019 14:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored. Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed. 1. NIT HEADER Name of Work Annual Maintenance Contract for Axle mounted Disc Brake System of LHB Coaches (Knorr make). Bidding type Normal Tender Tender Type Single Bidding System Single Packet System Tender Closing Date Time 21/02/2019 14:00 Date Time Of Uploading Tender 31/01/2019 17:13 Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Advertised Value 128177634.00 Tendering Section ESTIMATE Bidding Style Single Rate for Tender Bidding Unit Above/Below/Par Earnest Money (Rs.) 790900.00 Validity of Offer ( Days) 63 Tender Doc. Cost (Rs.) 10000.00 Period of Completion 12 Months Contract Type Works Contract Category Expenditure Bidding Start Date 07/02/2019 Are Joint Venture (JV) firms allowed to bid No Ranking Order For Bids Lowest to Highest 2. SCHEDULE S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule C-GST @ 18% 12685638.00 01 Lump Sum 12685638.00 AT Par 12685638.00 Item Description:- GST on Must Change Items & Labour [@ 18%] S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule D-Condition Basis Items cost. 45016229.00 01 Lump Sum 34576529.00 AT Par 34576529.00 Item Description:- Total charges for replacement on condition basis for A.B. system, Shop Schedule. 02 Lump Sum 10439700.00 AT Par 10439700.00 Item Description:- Total charges for replacement on condition basis for A.B. system, Quarterly Schedule. S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule A1-Must change Material for Shop Schedules {Material for 3rd year AB Schedule} 21441767.00 01 i 115.00 Per Unit 167000.00 19205000.00 AT Par 19205000.00 Item Description:- Cost of material for replacement of Must change items for Air Brake system and WSP of LHB EOG coaches - 3rd year, A.B. schedule (Anx.-B Kit-1) 01 ii 13.00 Per Unit 172059.00 2236767.00 AT Par 2236767.00 Item Description:- Cost of material for replacement of Must change items for Air Brake system and WSP of LHB Power Car coaches - 3rd year, A.B. schedule (Anx.-B Kit-2). S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule A2-Must change Material for Shop Schedules {Material for 6rd year AB Schedule} (Item Directory - Not Applicable) 26260000.00 02 i 58.00 Per Unit 404000.00 23432000.00 AT Par 23432000.00 Item Description:- Cost of material for replacement of Must change items for Brake Cylinder & Caliper of LHB EOG coaches - 6th year A.B. schedule (Anx.-B Kit 3). Page 1 of 3 Run Date/Time: 31/01/2019 17:14:16 CWS-PL-MECHANICAL/WESTERN RLY TENDER DOCUMENT Tender No: CW-PO-2018-AMC-01-Knorr Closing Date/Time: 21/02/2019 14:00 02 ii 7.00 Per Unit 404000.00 2828000.00 AT Par 2828000.00 Item Description:- Cost of material for replacement of Must change items for Brake Cylinder & Caliper of LHB Power Car coaches - 6th year A.B. schedule (Anx.-B Kit 4). S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule B -Labour Charges. 22774000.00 01 01 115.00 Per Unit 118000.00 13570000.00 AT Par 13570000.00 Item Description:- Labour charges for EOG coaches (Comprehensive cost for overhauling of 3rd year shop schedule & Replacement of condition basis items). 02 02 13.00 Per Unit 118000.00 1534000.00 AT Par 1534000.00 Item Description:- Labour charges f

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.