Water Supply And Sanitation

  • Opening Date

    06 Aug 2019

  • Closing Date

    19 Aug 2019

  • Tender Amount

    ₹ 29,71,410

  • EMD

    ₹ 30,000

Are you Looking for Joint Venture Partners, Contractor Consortium, Project Financiers for this tender?
We will help YOU to find the right match for FREE!
Summary

Providing, Erecting And Commissioning Of Solar Power Plants For Various Peri-urban Water Supply Schemes Under Jalswarajya-ii

Are you looking for Materials and Services for this tender?
We will help YOU to find the right partner for your needs for FREE!
BOQ Items

No BOQs Available

Page 6 of 88 SECTION-II INFORMATION AND INSTRUCTION TO BIDDERS Executive Engineer, Maharashtra Jeevan Pradhikaran, on behalf of MJP (the Employer), invites e-tender from eligible bidders for “works” include Design, Manufacture, Supply, Installation, Testing and Commissioning with five years Comprehensive Maintenance of Grid Connected Solar Photo Voltaic (SPV) Power Plant 18, 32 and 15 kWp under / with net metering at ANJANGAON BARI, MANGRUL DASTAGIR AND PATHROAT WATER SUPPLY SCHEMES. (Herein after referred to as the contract of works) and as described in the tender document on 'Turnkey Contracts' under Tender No: --- 1. Scope of Works The Scope of works is as below: • Design, Manufacture, Supply, Installation, Testing and Commissioning with five years comprehensive maintenance of 18, 32 and 15 kWp under / with net metering at on 'Turnkey Contract' and as described in the tender document. All statutory clearances/ permissions/ NOC’s from respective authorities shall be arranged by the Bidder prior to start the work. • Free replacement of defective components of systems within Comprehensive Maintenance period (CMC) of 5 years after commissioning of the project for efficient running of the system. • Successful Bidder will be responsible to register this project on SPIN software of MNRE and ensure that the application is received at MNRE, GoI for availing incentives. The Successful bidder should complete this project in given time to get maximum Incentives to the beneficiary. MJP will not be responsible if no incentives / less incentive is received to the beneficiary due to delay in project work. • Detailed planning for smooth execution of project. • Selected Bidder shall be bound to operate and maintain the system as per the rules, regulations and modalities as prescribed by MNRE and MJP for the effective functioning of the project. • Time is the essence in completing the Works: The successful Bidder will be required to complete the work within the stipulated time as specified in the tender document. The bidder shall ensure that SPV power plant should be commissioned within 120 Days from the date of issue of work order. • Bids shall be complete and cover all works described in the tender. However if any item of works required for completing the project shall be deemed to be included in bidder’s scope; irrespective of whether it is specifically mentioned Page 7 of 88 or not in the tender document. • Bidder should obtain the statutory permissions from statutory bodies wherever required for execution of works. • Partial bids or bids which do not cover the entire scope of the project will be treated as incomplete and not responsive to the terms and conditions of tender are liable to be rejected. 2. Eligibility The bidder shall provide sufficient documentary evidence to satisfy the following conditions: I. Shall manufacture/supply the material (module & inverter) only as per the standards mention in tender document. They should provide valid IEC certificate of SPV Module & Inverter and test report from authorized test centre of MNRE, GoI. II. Shall have experience for installation of cumulative capacity of 18 kWp in which at least one project shall be of 10 kW capacity grid connected SPV system; installed, commissioned & working successfully for at least one year. Demonstration for such installations shall be allowed during pre-bid meeting (individual time slot will not be allowed for more than 10 Minutes). Satisfactory certificate issued by competent authority of any Government/ Semi – Government organization along with contact details of concern authority at installation (Beneficiary/Client) is to be submitted. Representative of MJP &/OR representative of appointed consultant by MJP for this assignment will / may visit such installation. Bidders to arrange necessary permissions. III. Overall Average Annual Turnover of the Company/Firm/ Corporation i

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.