Tourism And Cultural Affairs Department Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Tourism And Cultural Affairs Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date4 Mar 2024
Closing Date11 Mar 2024
Tender Amount₹ 5,50,46,029 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building / structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.

27.21

8350

306.9

... More
Numbering the monument elements in proper order before lowering down with approved colour and shade as directed by Engineer in-charge, including ladder, scaffolding etc. complete.

136.42

7893

57.86

... More
Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete.

229.18

411790

1796.8

... More
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means

306.14

80484

262.9

... More
Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete.

153.59

4239391

27602

... More
Providing soling using 80 mm size trap metal in 15cm. Layer including filling voids with Crushed sand/grit, ramming, watering etc. complete.

306.14

4536563

14818.59

... More
Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mannual Means

2.53

3638

1438

... More
Providing/Re-setting Un-coursed Rubble Masonry of reuse-stones in lime mortar 1:1½, in foundation and plinth as per detailed specifications and drawings or as directed including the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, bailing out water, watering and all exposed masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete

16.88

214771

12723.45

... More
Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in foundation and plinth as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, bailing out water, watering and all exposed masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.

409.11

11582480

28311.41

... More
Providing/Re-setting Ashlar Rough-tooled Masonry of reuse-stones in lime mortar 1:1½ in superstructure as per detailed specifications and drawings or as directed including all beds or joints, which shall not exceed 6 mm. (¼″), the stones shall be set in mortar, the stone shall be laid in regular course, the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.

180.95

2108860

11654.38

... More
Providing Ashlar Rough-tooled Masonry of trap / granite stones in lime mortar 1:1½ with size of stone 70 cm. x 55 cm. x 40 cm. in superstructure as per detailed specifications and drawings or as including the stones be of approved quality, colour, hard and free from defect of any kind, the faces exposed to view shall have fine dressed chisel draft, 25 mm. (1″) wide all around the edges and rough tooled between the drafts, and on all beds or joints, which shall not exceed 6 mm. (¼″), the stones shall be set in mortar, the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.

271.12

18066081

66635

... More
Providing Ashlar Rough-tooled Masonry of trap / granite stones in lime mortar 1:1½ with size of stone 230 cm. x 50 cm. x 45 cm. in superstructure as per detailed specifications and drawings or as including the stones be of approved quality, colour, hard and free from defect of any kind, the faces exposed to view shall have fine dressed chisel draft, 25 mm. (1″) wide all around the edges and rough tooled between the drafts, and on all beds or joints, which shall not exceed 6 mm. (¼″), the stones shall be set in mortar, the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.For Ceiling stone

1.93

166997

86527

... More
Providing Block In Course Stone Steps of trap / granite stones in lime mortar 1:1½ with size of stone 70 cm. x 55 cm. x 40 cm. as per detailed specifications and drawings or as directed the stones be of approved quality, colour, hard and free from defect of any kind, the stones shall be of exact size and shape, the shall be rough-tooled on exposed surface, holes for balusters should be cut in the steps before they are laid, each stone shall rest at least 3.8 cm. (1½″) on that below it, the beds or joints being in no case more than 3 mm. (⅛″), preparing the lime mortar in lime miller, watering and all steps work when handed over to be perfectly clean and free from all mortar stains etc. complete.

24.01

1525475

63535

... More
Providing and fixing Stone Paving, Second Sort in lime mortar 1:1, with size of stone 60 cm. x 45 cm. x 15 cm., as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be very finely chisel-dressed on the surface and the course to be of prescribed width, the joints running true, the stones to be laid with joints not exceeding 6 mm. (¼″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete.

1009.08

10045391

9955

... More
Providing Lime Pointing to stone work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete

2080.72

994584

478

... More
Providing and laying cast in situ 1:1:4 Lime Concrete of broken brick metal for coping or waterproofing as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required, with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate or surkhi in drum mixer, the concrete must be bitten for two days with pouring water as per specifications, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete.

6.28

157468

25074.65

... More
Providing Coursed Rubble Masonry Second Sort of trap / granite stones in lime mortar 1:1½, in superstructure as per detailed specifications and drawings or as directed including the stones shall be laid in horizontal course, the face of the stones to be hammered and bushing not to be project more than 3.8 cm. (1½″), all stones to be set full in mortar, all side joints shall be vertical and beds horizontal and not joints shall be more than 12.5 mm. (½″), the through stones shall be inserted 5 and 6 feet apart in every course, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete

1.69

60272

35664

... More
Providing and grouting with lime and fine screened sand slurry in proporation of (1 : 1) with a proper jet pump pressure including cleaning and washing and packing the existing crack / holes in the brick or stone masnory with lime and finesand paste in proporation of (1:1) properly from down side, filling the slurry in cracks or holes including all necessary actions and required tools and machineries, scaffolding, curing etc. complete.

115.44

18719

162.16

... More
Providing and fixing of retro-reflectorised informatory sign board rectangular / Square in shape having area less than 0.9 square meter made out of 2 mm aluminum sheet bonded with white retroreflective sheeting of Class (Type IV High intensity micro-prismatic grade sheeting-HIP) having pressure sensitive /heat activated adhesive retoreflective specified background, border and back side retoreflctive symbols, letters, numerals, arrow as per IRC:67-2012 Table No 8.3, supported with back support frame 25 mm x 25 mm x 3 mm duly painted on back side with two coats of grey stove enamel paint and supported on one Number mild steel angle iron post 75 mm x 75 mm x 6 mm, 3.5 mt long firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing The angle iron post shall be duly painted with one coat of epoxy primer and two coats of epoxy finish paint having alternate black and white bands of 25 cm width including GI fixures and transportation etc. complete. The nutbolts of board with angle iron post / supporting structure after fixing at site has to be electrically welded. Class B (Type IV High intensity micro-prismatic grade sheeting-HIP) sheeting shall have 7 years written warranty from the manufacturer and authorised distributor / convert or issued for field performance including the screen printed areas and cut-out sheeting and cut-out durable transparent overlay film and this warranty certificate in original should be submitted to the Engineer in charge by the contractor/supplier.

10

106337

10633.7

... More
Preparing and carrying out videography, Documentary & Shooting of still photographs of Extra copies - 5" X 7" Size outdoor and indoor of roads, bridges, other structures and programme, including preliminarys survey, still shots moving shooting, necessary board for video shooting hiring of vehicle, equipment for video shoot­ing, transportation of all equipment, persons, required for shooting, lighting arrangement as may be necessary, editing, mixing, titling, lettering, sounding including cost of coloured cassette of approved quality etc. complete.

1

200000

200000

... More
Book Designing, Publishing and Printing: The work involves printing of a book / guidebook on the fort / monuments and its various aspects, which would provide authentic and precise tourism oriented information. This work involves important photographs of the site, art objects, antiquities, inscriptions etc., which would be useful for educating the masses of the rich cultural heritage of the site, region and state. providing 100 pages coloured books as directed by engineer in charge / ADA

500

325000

650

... More
Carrying out Chemical Analysis of Existing material used in the construction of Monument etc. complete

1

19500

19500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.