Public Works Department Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Public Works Department - PWD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date25 Sep 2024
Closing Date9 Oct 2024
Tender Amount₹ 1,50,24,46,287 
Notes
Download

Costs

  • EMD

    ₹ 75,12,300
  • Document Cost

    ₹ 5,900
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹57,500/MT*
Maharashtra

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means

1483.65

-

-

... More
5.B Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift from 1.5m to 3m). By Mechanical Means ( Ground Floor )

2967.3

-

-

... More
6.B Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift from3m To 4.5m). By Mechanical Means ( Ground Floor )

1983.45

-

-

... More
Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per One Square Metre of surface area covering ten years guarantee on bond paper.

4207

-

-

... More
8.B Providing preconstructional antitermite treatment as per I.S. 6313 (Part-I) to the soil along the external face of building by punching holes of 1.2 of 1.5 C.M. diametre about 30 -60 cm deep at 15 cm c/c as close to the wall as possible and to inject 0.5 percent of aldrin or clorophyrifos at the rate of 7.5 litres per hole and sealing the same with proper filling and covering 10 years guarantee on bond paper. ( Ground Floor )

255

-

-

... More
Filling in plinth and floors with approved excavated material in 15cm. to 20cm. Layers including watering and compacting etc. complete.

4416.21

-

-

... More
Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete.

910.56

-

-

... More
Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete.

1047.14

-

-

... More
12.B Conveyance of material/debris at a distance of 10 Km as directed by the Engineer-In-Charge.(Lead charges of 'Rubish' as per Lead statement C-1, Page-559 of SSR 22-23 for 10 Kms) ( Ground Floor )

1920.6

-

-

... More
Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 3.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary)

5760

-

-

... More
Providing and fixing 20 to 25 mm thick rough shahabad box type waterproofing for basement or underground floor on a base of Cement concrete 1:3:6, including sub base of 2.50 centimeter thick Cement mortar 1:3 with conceal, secrete (RMW), Algae proof or other alike waterproofing liquids, raking of joints upto 35 mm depth, filling the joints with 6 mm size crushed metal, hand grouting with cement slurry, curing and cleaning, with 7 years guarantee on court fee stamp of Rs. 100/- with ponding test etc complete. (excluding Cement concrete 1:3:6 base concrete )

1149.98

-

-

... More
Providing and fixing 20 to 25 mm thick rough shahabad box type waterproofing treatment to vertical outside faces of Reinforced Cement concrete walls of basement or underground floor including filling the gap of 25 mm between rough shahabad and R.C.C. walls with cement grout mixed with water proofing liquid Algae proof or other alike with one tile lift method, brushing the joints horizontally with cement slurry mixed with water proofing liquid for width 30 to 35 mm and sloping coping over topmost tile with cement mortar 1:3, butting the bottom most with Cement concrete 1:2:4 mixed with water proofing liquid, curing, with 7 years guarantee on court fee stamp of Rs.100/- with ponding test etc complete. (excluding Cement concrete 1:3:6 base concrete)

1168.4

-

-

... More
16.A Smart Care Preapply HDPE 80 for Raft- Supplying and Installing of Asian Paints Smarteare 1.50 mm thick pro applied HDPE fully bonded membrane or equivalent make having puncture resistance of HOON as per ASIMI 154), tensile strength of 21 Mpa, and hydrostatic head resistance not less than zom water head as per ASTM D 545 elongation of 500% as per ASTM D412, peel adhesion to concrete of 1200 N/m as per ASTM D 901, Lap peel adhesion 450N/m as per ASTM D1876. The size of the membrane should be 1.2m x 20m. The pre-applied, fully bonded HDPE sheet membrane shall be loosely laid on PCC and gets bonded to the underneath of the poured concrete of base/ raft slab and confined retaining wall. The fully bonded HDPE sheet membrane shall consist of a high performance PE film, self adhesive polymer layer and unique particulate layer with pressure sensitive adhesive, which bonds fully to the poured concrete of base slab/confined retaining wall. The membrane shall have minimum of 75 mm side laps and end laps which shall be sealed with double sided adhesive tape, plc complete as per manufactures specification and Instructions. This shall include cleaning & removal of all the dust, dirt, oll, grease, coment laltance, loose particle & prepare the P.C.C. Substrate for laying of waterproofing system, as directed by Engineer Incharge and covering 10 years Guarantee against leakages on Court fee stamp paper of Rs. 500/- etc. complete ( Basement Floor )

1149.98

-

-

... More
17.A Smart Care Ultron (Hybrid Polyurea) for Retaining Walls -Providing and laying liquid based Asian Paints Smartcare Ultron or equivalent make (Polyurea-Polyurethane seamless/jointless treatment) for waterproofing on the Un-confined vertical surface by cleaning the external surface, removal of loose concrete and filling cracks with polymer modified mortar & treatment of tie rod holes, bracing angle etc with plugging mortar, as per manufacturers' recommendation, thereafter, providing & applying one coat of two component solvent free epoxy primer @ 0.15-0.20 kg/m2, followed by providing & applying 2 component high performance hybrid polyurea elastomeric waterproofing coating cold applied of spray / brush applied, liquid membrane with an elongation of 600% and tensile strength of 12.6 N/mm2 as per ASTM D 2370, crack bridging ability of 3mm as per ASTM C1305, shore A Hardness of min. 75 as per ASTM D 2240. The system includes final base preparation, epoxy primer application and applying in two coats at 1.5 kg per Sqm etc, complete as per Manufacturer specifications. HDPE Termination at Raft with Aluminium strip of width min. 75mm, with the turnkey execution to be done by the manufacturer through its in house subsidiary execution company and as directed by Engineer incharge with covering 10 years Guarantee against leakages on Court fee stamp paper of Rs. 500/- etc. complete. ( Basement Floor )

1168.4

-

-

... More
18.B Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. ( Ground Floor )

574.2

-

-

... More
18.C Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. ( First Floor )

574.2

-

-

... More
18.D Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. ( Second Floor )

574.2

-

-

... More
18.E Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. ( Third Floor )

783

-

-

... More
18.F Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. ( Fourth Floor )

783

-

-

... More
18.GProviding and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. ( Fifth Floor )

261

-

-

... More
19.B Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for foundation and bedding / steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

1393

-

-

... More
20.B Providing and laying Cast in situ/Ready Mix cement concrete M-35 of trap / granite/quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C. columns and steel stanchions etc. columns as per detailed designs and drawing or as directed including Steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

2317.69

-

-

... More
21.B Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

484.72

-

-

... More
21.C Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( First Floor )

301.56

-

-

... More
21.D Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Second Floor )

411.83

-

-

... More
21.E Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Third Floor )

320.22

-

-

... More
21.F Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fourth Floor )

340.81

-

-

... More
21.G Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fifth Floor )

340.81

-

-

... More
21.H Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Sixth Floor )

340.81

-

-

... More
21.I Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Terrace Floor )

164.97

-

-

... More
22.B Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

223.26

-

-

... More
22.C Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( First Floor )

183.96

-

-

... More
22.D Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Second Floor )

200.31

-

-

... More
22.E Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Third Floor )

183.96

-

-

... More
22.F Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fourth Floor )

183.96

-

-

... More
22.G Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fifth Floor )

183.96

-

-

... More
22.H Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Sixth Floor )

172.64

-

-

... More
22.I Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Terrace Floor )

114.13

-

-

... More
23.B Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

701.41

-

-

... More
23.C Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( First Floor )

341.44

-

-

... More
23.D Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Second Floor )

504.3

-

-

... More
23.E Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Third Floor )

341.44

-

-

... More
23.F Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fourth Floor )

341.44

-

-

... More
23.G Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fifth Floor )

341.44

-

-

... More
23.H Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Sixth Floor )

341.44

-

-

... More
23.I Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Terrace Floor )

34.62

-

-

... More
24.B Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

588.38

-

-

... More
24.C Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( First Floor )

537.67

-

-

... More
24.D Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Second Floor )

796.79

-

-

... More
24.E Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Third Floor )

291.68

-

-

... More
24.F Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fourth Floor )

291.68

-

-

... More
24.G Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fifth Floor )

291.68

-

-

... More
24.H Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Sixth Floor )

291.68

-

-

... More
24.I Providing and laying Cast in situ/Ready Mix cement concrete M-40 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Terrace Floor )

46.38

-

-

... More
25.C Providing and laying Cast in situ/Ready Mix C.C. M-40 of trap metal for RCC rectangular grid beam with slab as per detailed design and drawing or as directed including dewatering if necessary, steel centering, formwork, cover blocks, laying/pumping,compacting, finishing the form surface with C.M. 1:3 of sufficient minimum thickness to give smooth and even surface or roughening them if special finish is to be provided and curing complete (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( First Floor )

136.63

-

-

... More
25.D Providing and laying Cast in situ/Ready Mix C.C. M-40 of trap metal for RCC rectangular grid beam with slab as per detailed design and drawing or as directed including dewatering if necessary, steel centering, formwork, cover blocks, laying/pumping,compacting, finishing the form surface with C.M. 1:3 of sufficient minimum thickness to give smooth and even surface or roughening them if special finish is to be provided and curing complete (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Second Floor )

136.63

-

-

... More
25.E Providing and laying Cast in situ/Ready Mix C.C. M-40 of trap metal for RCC rectangular grid beam with slab as per detailed design and drawing or as directed including dewatering if necessary, steel centering, formwork, cover blocks, laying/pumping,compacting, finishing the form surface with C.M. 1:3 of sufficient minimum thickness to give smooth and even surface or roughening them if special finish is to be provided and curing complete (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Third Floor )

672.3

-

-

... More
25.F Providing and laying Cast in situ/Ready Mix C.C. M-40 of trap metal for RCC rectangular grid beam with slab as per detailed design and drawing or as directed including dewatering if necessary, steel centering, formwork, cover blocks, laying/pumping,compacting, finishing the form surface with C.M. 1:3 of sufficient minimum thickness to give smooth and even surface or roughening them if special finish is to be provided and curing complete (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fourth Floor )

672.3

-

-

... More
25.G Providing and laying Cast in situ/Ready Mix C.C. M-40 of trap metal for RCC rectangular grid beam with slab as per detailed design and drawing or as directed including dewatering if necessary, steel centering, formwork, cover blocks, laying/pumping,compacting, finishing the form surface with C.M. 1:3 of sufficient minimum thickness to give smooth and even surface or roughening them if special finish is to be provided and curing complete (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fifth Floor )

672.3

-

-

... More
25.H Providing and laying Cast in situ/Ready Mix C.C. M-40 of trap metal for RCC rectangular grid beam with slab as per detailed design and drawing or as directed including dewatering if necessary, steel centering, formwork, cover blocks, laying/pumping,compacting, finishing the form surface with C.M. 1:3 of sufficient minimum thickness to give smooth and even surface or roughening them if special finish is to be provided and curing complete (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Sixth Floor )

672.3

-

-

... More
26.B Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap / quartzite/granite /gneiss metal for R.C.C. Waist slab, and steps of staircases as per detailed design and drawings or as directed including steel centering, plywood/ steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding einforcement, including cover block).(Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

15.02

-

-

... More
26.C Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap / quartzite/granite /gneiss metal for R.C.C. Waist slab, and steps of staircases as per detailed design and drawings or as directed including steel centering, plywood/ steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding einforcement, including cover block).(Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( First Floor )

15.02

-

-

... More
26.D Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap / quartzite/granite /gneiss metal for R.C.C. Waist slab, and steps of staircases as per detailed design and drawings or as directed including steel centering, plywood/ steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding einforcement, including cover block).(Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Second Floor )

18.59

-

-

... More
26.E Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap / quartzite/granite /gneiss metal for R.C.C. Waist slab, and steps of staircases as per detailed design and drawings or as directed including steel centering, plywood/ steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding einforcement, including cover block).(Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Third Floor )

15.02

-

-

... More
26.F Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap / quartzite/granite /gneiss metal for R.C.C. Waist slab, and steps of staircases as per detailed design and drawings or as directed including steel centering, plywood/ steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding einforcement, including cover block).(Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fourth Floor )

15.02

-

-

... More
26.G Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap / quartzite/granite /gneiss metal for R.C.C. Waist slab, and steps of staircases as per detailed design and drawings or as directed including steel centering, plywood/ steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding einforcement, including cover block).(Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fifth Floor )

15.02

-

-

... More
26.H Providing and laying Cast in situ/Ready Mix cement concrete in M-40 of trap / quartzite/granite /gneiss metal for R.C.C. Waist slab, and steps of staircases as per detailed design and drawings or as directed including steel centering, plywood/ steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding einforcement, including cover block).(Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Sixth Floor )

15.02

-

-

... More
27.B Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap / granite/quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C. columns and steel stanchions etc. including bailing out water, Steel centering, formwork ,cover blocks, laying/pumping, compaction and curing roughening the surface if special finish is to be provided (Excluding reinforcement and structural steel) etc. complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

362.44

-

-

... More
28.B Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

74.38

-

-

... More
29.B Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

102.22

-

-

... More
30.B Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

104.54

-

-

... More
31.B Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

344.89

-

-

... More
32.B Providing and laying Cast in situ/Ready Mixcement concrete M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. chajja as per detailed design and drawings including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

3.24

-

-

... More
32.C Providing and laying Cast in situ/Ready Mixcement concrete M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. chajja as per detailed design and drawings including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( First Floor )

36

-

-

... More
32.D Providing and laying Cast in situ/Ready Mixcement concrete M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. chajja as per detailed design and drawings including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Second Floor )

36

-

-

... More
32.E Providing and laying Cast in situ/Ready Mixcement concrete M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. chajja as per detailed design and drawings including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Third Floor )

36

-

-

... More
32.F Providing and laying Cast in situ/Ready Mixcement concrete M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. chajja as per detailed design and drawings including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fourth Floor )

36

-

-

... More
32.G Providing and laying Cast in situ/Ready Mixcement concrete M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. chajja as per detailed design and drawings including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Fifth Floor )

36

-

-

... More
32.H Providing and laying Cast in situ/Ready Mixcement concrete M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. chajja as per detailed design and drawings including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Sixth Floor )

36

-

-

... More
33.B Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap / quartzite/granite /gneiss metal for R.C.C. Waist slab, and steps of staircases as per detailed design and drawings or as directed including steel centering, plywood/ steel formwork, steel props, laying/pumping, compaction, finishing uneven and honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding einforcement, including cover block).(Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) ( Ground Floor )

5.78

-

-

... More
34.B Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. ( Ground Floor )

561.87

-

-

... More
34.C Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. ( First Floor )

234.28

-

-

... More
34.D Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. ( Second Floor )

350.06

-

-

... More
34.E Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. ( Third Floor )

334.37

-

-

... More
34.F Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. ( Fourth Floor )

334.37

-

-

... More
34.G Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. ( Fifth Floor )

334.37

-

-

... More
34.H Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. ( Sixth Floor )

334.37

-

-

... More
34.I Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. ( Terrace Floor )

90.56

-

-

... More
35.B Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. ( Ground Floor )

6.5

-

-

... More
35.C Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. ( First Floor )

6

-

-

... More
35.D Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. ( Second Floor )

6

-

-

... More
35.E Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. ( Third Floor )

24

-

-

... More
35.F Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. ( Fourth Floor )

71.65

-

-

... More
35.G Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. ( Fifth Floor )

62.65

-

-

... More
35.H Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. ( Sixth Floor )

1

-

-

... More
35.I Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. ( Terrace Floor )

1

-

-

... More
36.B Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates etc. as per detailed designs and drawings or as directed including cutting, fabricating, hoisting, erecting fixing in position, Making riveted/ bolted/ welded connection and one coat of anticorrosive paint and over it 2 coats of oil painting approved quality and shade etc. complete. ( Ground Floor )

0.2

-

-

... More
36.C Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates etc. as per detailed designs and drawings or as directed including cutting, fabricating, hoisting, erecting fixing in position, Making riveted/ bolted/ welded connection and one coat of anticorrosive paint and over it 2 coats of oil painting approved quality and shade etc. complete. ( First Floor )

0.1

-

-

... More
36.D Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates etc. as per detailed designs and drawings or as directed including cutting, fabricating, hoisting, erecting fixing in position, Making riveted/ bolted/ welded connection and one coat of anticorrosive paint and over it 2 coats of oil painting approved quality and shade etc. complete. ( Second Floor )

0.1

-

-

... More
36.E Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates etc. as per detailed designs and drawings or as directed including cutting, fabricating, hoisting, erecting fixing in position, Making riveted/ bolted/ welded connection and one coat of anticorrosive paint and over it 2 coats of oil painting approved quality and shade etc. complete. ( Third Floor )

0.1

-

-

... More
36.F Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates etc. as per detailed designs and drawings or as directed including cutting, fabricating, hoisting, erecting fixing in position, Making riveted/ bolted/ welded connection and one coat of anticorrosive paint and over it 2 coats of oil painting approved quality and shade etc. complete. ( Fourth Floor )

0.1

-

-

... More
36.G Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates etc. as per detailed designs and drawings or as directed including cutting, fabricating, hoisting, erecting fixing in position, Making riveted/ bolted/ welded connection and one coat of anticorrosive paint and over it 2 coats of oil painting approved quality and shade etc. complete. ( Fifth Floor )

0.1

-

-

... More
36.H Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates etc. as per detailed designs and drawings or as directed including cutting, fabricating, hoisting, erecting fixing in position, Making riveted/ bolted/ welded connection and one coat of anticorrosive paint and over it 2 coats of oil painting approved quality and shade etc. complete. ( Sixth Floor )

6

-

-

... More
36.I Providing structural steel work in trusses, other similar trussed purlins and members with all bracing, gusset plates etc. as per detailed designs and drawings or as directed including cutting, fabricating, hoisting, erecting fixing in position, Making riveted/ bolted/ welded connection and one coat of anticorrosive paint and over it 2 coats of oil painting approved quality and shade etc. complete. ( Terrace Floor )

6

-

-

... More
37.B Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 20 mm diameter reinforcement bar ( Ground Floor )

2000

-

-

... More
37.C Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 20 mm diameter reinforcement bar ( First Floor )

2000

-

-

... More
37.D Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 20 mm diameter reinforcement bar ( Second Floor )

2000

-

-

... More
37.E Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 20 mm diameter reinforcement bar ( Third Floor )

2000

-

-

... More
37.F Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 20 mm diameter reinforcement bar ( Fourth Floor )

2000

-

-

... More
37.G Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 20 mm diameter reinforcement bar ( Fifth Floor )

2000

-

-

... More
37.H Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 20 mm diameter reinforcement bar ( Sixth Floor )

2000

-

-

... More
37.I Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 20 mm diameter reinforcement bar ( Terrace Floor )

200

-

-

... More
38.B Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 25 mm diameter reinforcement bar ( Ground Floor )

2000

-

-

... More
38.C Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 25 mm diameter reinforcement bar ( First Floor )

2000

-

-

... More
38.D Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 25 mm diameter reinforcement bar ( Second Floor )

2000

-

-

... More
38.E Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 25 mm diameter reinforcement bar ( Third Floor )

2000

-

-

... More
38.F Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 25 mm diameter reinforcement bar ( Fourth Floor )

2000

-

-

... More
38.G Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 25 mm diameter reinforcement bar ( Fifth Floor )

2000

-

-

... More
38.H Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 25 mm diameter reinforcement bar ( Sixth Floor )

2000

-

-

... More
38.I Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 25 mm diameter reinforcement bar ( Terrace Floor )

200

-

-

... More
39.B Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 32 mm diameter reinforcement bar ( Ground Floor )

2000

-

-

... More
39.C Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 32 mm diameter reinforcement bar ( First Floor )

2000

-

-

... More
39.D Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 32 mm diameter reinforcement bar ( Second Floor )

2000

-

-

... More
39.E Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 32 mm diameter reinforcement bar ( Third Floor )

2000

-

-

... More
39.F Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 32 mm diameter reinforcement bar ( Fourth Floor )

2000

-

-

... More
39.G Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 32 mm diameter reinforcement bar ( Fifth Floor )

2000

-

-

... More
39.H Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 32 mm diameter reinforcement bar ( Sixth Floor )

2000

-

-

... More
39.I Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineer- in-Charge. Coupler for 32 mm diameter reinforcement bar ( Terrace Floor )

200

-

-

... More
Providing fly ash brick masonry with conventional / I.S. type fly ash bricks in C.M. 1:6 in foundation and plinth including bailing out water manually striking joints, racking out joints watering and scaffolding etc. complete.

779.35

-

-

... More
41.B Providing 38 cm thick Composit masonary corner stone with 23 centimeter thick ashlar fine tooled/close punched/chisel dressed masonary of trap/granite/quartzite/gneiss stones of size (0.45m (L) x 0.30m (H) and minimum thickness of 0.23m) in cement mortar 1:6 in superstructure including striking joints watering and scaffolding complete for facing and 15 centimeter thick Autoclaved Areated Concrete Blocks of Ecolite or equivalent mech. of size (600x150x150)mm in masonry in extra fine jointing mortar of fixoblock of UltraTech or equivalent for backing including 2mm sunk pointing nessesary through stone and proper interlocking as shown in drawing, in superstructure including striking joints, raking out joints, watering etc. Complete. Specification: As Directed by Engineer In Charge. ( Ground Floor )

312.61

-

-

... More
41.B Providing 38 cm thick Composit masonary corner stone with 23 centimeter thick ashlar fine tooled/close punched/chisel dressed masonary of trap/granite/quartzite/gneiss stones of size (0.45m (L) x 0.30m (H) and minimum thickness of 0.23m) in cement mortar 1:6 in superstructure including striking joints watering and scaffolding complete for facing and 15 centimeter thick Autoclaved Areated Concrete Blocks of Ecolite or equivalent mech. of size (600x150x150)mm in masonry in extra fine jointing mortar of fixoblock of UltraTech or equivalent for backing including 2mm sunk pointing nessesary through stone and proper interlocking as shown in drawing, in superstructure including striking joints, raking out joints, watering etc. Complete. Specification: As Directed by Engineer In Charge. ( Ground Floor )

200.64

-

-

... More
42.B Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972) ( Ground Floor )

236.28

-

-

... More
42.C Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972) ( First Floor )

422.02

-

-

... More
42.D Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972) ( Second Floor )

394.49

-

-

... More
42.E Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972) ( Third Floor )

661.84

-

-

... More
42.F Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972) ( Fourth Floor )

647.28

-

-

... More
42.G Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972) ( Fifth Floor )

661.84

-

-

... More
42.H Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972) ( Sixth Floor )

1135.22

-

-

... More
43.B Providing and casting in situ / ready mix PCC M15 grade of trap metal for coping to head walls / parapet including centering, form work, compaction and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) ( Ground Floor )

25.73

-

-

... More
43.C Providing and casting in situ / ready mix PCC M15 grade of trap metal for coping to head walls / parapet including centering, form work, compaction and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) ( First Floor )

6.2

-

-

... More
43.D Providing and casting in situ / ready mix PCC M15 grade of trap metal for coping to head walls / parapet including centering, form work, compaction and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) ( Second Floor )

9.28

-

-

... More
43.E Providing and casting in situ / ready mix PCC M15 grade of trap metal for coping to head walls / parapet including centering, form work, compaction and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) ( Third Floor )

80.35

-

-

... More
43.F Providing and casting in situ / ready mix PCC M15 grade of trap metal for coping to head walls / parapet including centering, form work, compaction and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) ( Fourth Floor )

56.96

-

-

... More
43.G Providing and casting in situ / ready mix PCC M15 grade of trap metal for coping to head walls / parapet including centering, form work, compaction and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) ( Fifth Floor )

57.06

-

-

... More
43.H Providing and casting in situ / ready mix PCC M15 grade of trap metal for coping to head walls / parapet including centering, form work, compaction and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) ( Sixth Floor )

71.01

-

-

... More
44.B Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete. ( Ground Floor )

5500

-

-

... More
44.C Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete. ( First Floor )

2800

-

-

... More
44.D Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete. ( Second Floor )

4480

-

-

... More
44.E Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete. ( Third Floor )

4480

-

-

... More
44.F Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete. ( Fourth Floor )

5200

-

-

... More
44.G Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete. ( Fifth Floor )

2800

-

-

... More
44.H Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete. ( Sixth Floor )

1645.45

-

-

... More
45.B Providing expansion joints in reinforced cement concrete framed structure (interior columns) with plain premoulded filler with confirming to IS 1838,1961, 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate finishing etc. complete as directed ( Ground Floor )

2.48

-

-

... More
45.C Providing expansion joints in reinforced cement concrete framed structure (interior columns) with plain premoulded filler with confirming to IS 1838,1961, 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate finishing etc. complete as directed ( First Floor )

2.48

-

-

... More
45.D Providing expansion joints in reinforced cement concrete framed structure (interior columns) with plain premoulded filler with confirming to IS 1838,1961, 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate finishing etc. complete as directed ( Second Floor )

3.38

-

-

... More
45.E Providing expansion joints in reinforced cement concrete framed structure (interior columns) with plain premoulded filler with confirming to IS 1838,1961, 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate finishing etc. complete as directed ( Third Floor )

3.38

-

-

... More
45.F Providing expansion joints in reinforced cement concrete framed structure (interior columns) with plain premoulded filler with confirming to IS 1838,1961, 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate finishing etc. complete as directed ( Fourth Floor )

3.38

-

-

... More
45.G Providing expansion joints in reinforced cement concrete framed structure (interior columns) with plain premoulded filler with confirming to IS 1838,1961, 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate finishing etc. complete as directed ( Fifth Floor )

3.38

-

-

... More
45.H Providing expansion joints in reinforced cement concrete framed structure (interior columns) with plain premoulded filler with confirming to IS 1838,1961, 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate finishing etc. complete as directed ( Sixth Floor )

3.38

-

-

... More
46.B Providing expansion joints in R.C.C. framed structure (exterior column) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate and finishing etc. complete. ( Ground Floor )

0.99

-

-

... More
46.C Providing expansion joints in R.C.C. framed structure (exterior column) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate and finishing etc. complete. ( First Floor )

0.99

-

-

... More
46.D Providing expansion joints in R.C.C. framed structure (exterior column) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate and finishing etc. complete. ( Second Floor )

1.35

-

-

... More
46.E Providing expansion joints in R.C.C. framed structure (exterior column) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate and finishing etc. complete. ( Third Floor )

1.35

-

-

... More
46.F Providing expansion joints in R.C.C. framed structure (exterior column) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate and finishing etc. complete. ( Fourth Floor )

1.35

-

-

... More
46.G Providing expansion joints in R.C.C. framed structure (exterior column) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate and finishing etc. complete. ( Fifth Floor )

1.35

-

-

... More
46.H Providing expansion joints in R.C.C. framed structure (exterior column) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate and finishing etc. complete. ( Sixth Floor )

1.35

-

-

... More
47.B Providing expansion joints in R.C.C. framed structure (at floor level) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plat and finishing etc. complete. ( Ground Floor )

0.9

-

-

... More
47.C Providing expansion joints in R.C.C. framed structure (at floor level) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plat and finishing etc. complete. ( First Floor )

0.9

-

-

... More
47.D Providing expansion joints in R.C.C. framed structure (at floor level) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plat and finishing etc. complete. ( Second Floor )

0.9

-

-

... More
47.E Providing expansion joints in R.C.C. framed structure (at floor level) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plat and finishing etc. complete. ( Third Floor )

0.9

-

-

... More
47.F Providing expansion joints in R.C.C. framed structure (at floor level) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plat and finishing etc. complete. ( Fourth Floor )

0.9

-

-

... More
47.G Providing expansion joints in R.C.C. framed structure (at floor level) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plat and finishing etc. complete. ( Fifth Floor )

0.9

-

-

... More
47.H Providing expansion joints in R.C.C. framed structure (at floor level) with plain premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plat and finishing etc. complete. ( Sixth Floor )

0.9

-

-

... More
48.I Providing expansion joints in R.C.C. framed structure (at Terrace level) with premoulded filler 75 mm thick with 125 mm wide and 1 mm thick stainless steel plate as required, bitumen poured filler and finishing etc. complete as directed. ( Terrace Floor )

0.9

-

-

... More
49.B Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C framed structure (at floor level / at terrace level / interior columns) for overlapping of closed cell foam joints, applying TP- 40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYDEE-41 highly flexible sealant and covering the joint with Polydee-LM, 150 mm width in 2 coats etc. complete. ( Ground Floor )

20

-

-

... More
49.C Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C framed structure (at floor level / at terrace level / interior columns) for overlapping of closed cell foam joints, applying TP- 40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYDEE-41 highly flexible sealant and covering the joint with Polydee-LM, 150 mm width in 2 coats etc. complete. ( First Floor )

20

-

-

... More
49.D Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C framed structure (at floor level / at terrace level / interior columns) for overlapping of closed cell foam joints, applying TP- 40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYDEE-41 highly flexible sealant and covering the joint with Polydee-LM, 150 mm width in 2 coats etc. complete. ( Second Floor )

20

-

-

... More
49.E Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C framed structure (at floor level / at terrace level / interior columns) for overlapping of closed cell foam joints, applying TP- 40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYDEE-41 highly flexible sealant and covering the joint with Polydee-LM, 150 mm width in 2 coats etc. complete. ( Third Floor )

20

-

-

... More
49.F Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C framed structure (at floor level / at terrace level / interior columns) for overlapping of closed cell foam joints, applying TP- 40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYDEE-41 highly flexible sealant and covering the joint with Polydee-LM, 150 mm width in 2 coats etc. complete. ( Fourth Floor )

20

-

-

... More
49.G Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C framed structure (at floor level / at terrace level / interior columns) for overlapping of closed cell foam joints, applying TP- 40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYDEE-41 highly flexible sealant and covering the joint with Polydee-LM, 150 mm width in 2 coats etc. complete. ( Fifth Floor )

20

-

-

... More
49.H Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C framed structure (at floor level / at terrace level / interior columns) for overlapping of closed cell foam joints, applying TP- 40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYDEE-41 highly flexible sealant and covering the joint with Polydee-LM, 150 mm width in 2 coats etc. complete. ( Sixth Floor )

20

-

-

... More
50.B Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C. framed structure (Exterior column) with closed cell foam , applying TP-40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYSEAL, highly flexible sealant and covering the joint with Polydee- LM, 150 mm width in 2 coats and fixing the aluminium plate of 125 mm wide and 3 mm thick on external face of column etc. complete. ( Ground Floor )

327

-

-

... More
50.B Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C. framed structure (Exterior column) with closed cell foam , applying TP-40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYSEAL, highly flexible sealant and covering the joint with Polydee- LM, 150 mm width in 2 coats and fixing the aluminium plate of 125 mm wide and 3 mm thick on external face of column etc. complete. ( Ground Floor )

5

-

-

... More
50.C Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C. framed structure (Exterior column) with closed cell foam , applying TP-40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYSEAL, highly flexible sealant and covering the joint with Polydee- LM, 150 mm width in 2 coats and fixing the aluminium plate of 125 mm wide and 3 mm thick on external face of column etc. complete. ( First Floor )

5

-

-

... More
50.D Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C. framed structure (Exterior column) with closed cell foam , applying TP-40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYSEAL, highly flexible sealant and covering the joint with Polydee- LM, 150 mm width in 2 coats and fixing the aluminium plate of 125 mm wide and 3 mm thick on external face of column etc. complete. ( Second Floor )

5

-

-

... More
50.E Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C. framed structure (Exterior column) with closed cell foam , applying TP-40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYSEAL, highly flexible sealant and covering the joint with Polydee- LM, 150 mm width in 2 coats and fixing the aluminium plate of 125 mm wide and 3 mm thick on external face of column etc. complete. ( Third Floor )

5

-

-

... More
50.F Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C. framed structure (Exterior column) with closed cell foam , applying TP-40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYSEAL, highly flexible sealant and covering the joint with Polydee- LM, 150 mm width in 2 coats and fixing the aluminium plate of 125 mm wide and 3 mm thick on external face of column etc. complete. ( Fourth Floor )

5

-

-

... More
50.G Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C. framed structure (Exterior column) with closed cell foam , applying TP-40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYSEAL, highly flexible sealant and covering the joint with Polydee- LM, 150 mm width in 2 coats and fixing the aluminium plate of 125 mm wide and 3 mm thick on external face of column etc. complete. ( Fifth Floor )

5

-

-

... More
50.H Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C. framed structure (Exterior column) with closed cell foam , applying TP-40 PRIMER on both the sides of concrete surface, filling the 75 mm x 25 mm gap with the POLYSEAL, highly flexible sealant and covering the joint with Polydee- LM, 150 mm width in 2 coats and fixing the aluminium plate of 125 mm wide and 3 mm thick on external face of column etc. complete. ( Sixth Floor )

5

-

-

... More
51.B Providing water proof bedding for flooring of Bath and WC 25 mm thick in C.M. 1:3 including using approved water proofing compound in specified proportion as per manufacturers specifications for per bag of cement including leveling, curing and covering 10 years guarantee on court fee stamp paper of Rs.500/- including ponding test etc. complete. ( Ground Floor )

65.45

-

-

... More
51.C Providing water proof bedding for flooring of Bath and WC 25 mm thick in C.M. 1:3 including using approved water proofing compound in specified proportion as per manufacturers specifications for per bag of cement including leveling, curing and covering 10 years guarantee on court fee stamp paper of Rs.500/- including ponding test etc. complete. ( First Floor )

109.23

-

-

... More
51.D Providing water proof bedding for flooring of Bath and WC 25 mm thick in C.M. 1:3 including using approved water proofing compound in specified proportion as per manufacturers specifications for per bag of cement including leveling, curing and covering 10 years guarantee on court fee stamp paper of Rs.500/- including ponding test etc. complete. ( Second Floor )

153.48

-

-

... More
51.E Providing water proof bedding for flooring of Bath and WC 25 mm thick in C.M. 1:3 including using approved water proofing compound in specified proportion as per manufacturers specifications for per bag of cement including leveling, curing and covering 10 years guarantee on court fee stamp paper of Rs.500/- including ponding test etc. complete. ( Third Floor )

145.35

-

-

... More
51.F Providing water proof bedding for flooring of Bath and WC 25 mm thick in C.M. 1:3 including using approved water proofing compound in specified proportion as per manufacturers specifications for per bag of cement including leveling, curing and covering 10 years guarantee on court fee stamp paper of Rs.500/- including ponding test etc. complete. ( Fourth Floor )

145.35

-

-

... More
51.G Providing water proof bedding for flooring of Bath and WC 25 mm thick in C.M. 1:3 including using approved water proofing compound in specified proportion as per manufacturers specifications for per bag of cement including leveling, curing and covering 10 years guarantee on court fee stamp paper of Rs.500/- including ponding test etc. complete. ( Fifth Floor )

145.35

-

-

... More
51.H Providing water proof bedding for flooring of Bath and WC 25 mm thick in C.M. 1:3 including using approved water proofing compound in specified proportion as per manufacturers specifications for per bag of cement including leveling, curing and covering 10 years guarantee on court fee stamp paper of Rs.500/- including ponding test etc. complete. ( Sixth Floor )

145.35

-

-

... More
52.B Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete. ( Ground Floor )

11.69

-

-

... More
52.C Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete. ( First Floor )

18.41

-

-

... More
52.D Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete. ( Second Floor )

11.06

-

-

... More
52.E Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete. ( Third Floor )

29.05

-

-

... More
52.F Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete. ( Fourth Floor )

29.05

-

-

... More
52.G Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete. ( Fifth Floor )

29.05

-

-

... More
52.H Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete. ( Sixth Floor )

29.05

-

-

... More
53.B Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete. ( Ground Floor )

345.79

-

-

... More
53.E Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete. ( Third Floor )

167.82

-

-

... More
53.F Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete. ( Fourth Floor )

167.82

-

-

... More
53.G Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete. ( Fifth Floor )

167.82

-

-

... More
53.H Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete. ( Sixth Floor )

167.82

-

-

... More
53.I Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete. ( Terrace Floor )

4035.9

-

-

... More
54.B Providing groove to required size at specified location as directed by Engineer, at junction of brick masonry wall and R.C.C beams or Column, at junction of composite masonry, including scaffolding, finishing, curing etc. complete. ( Ground Floor )

400

-

-

... More
54.C Providing groove to required size at specified location as directed by Engineer, at junction of brick masonry wall and R.C.C beams or Column, at junction of composite masonry, including scaffolding, finishing, curing etc. complete. ( First Floor )

200

-

-

... More
54.D Providing groove to required size at specified location as directed by Engineer, at junction of brick masonry wall and R.C.C beams or Column, at junction of composite masonry, including scaffolding, finishing, curing etc. complete. ( Second Floor )

200

-

-

... More
54.E Providing groove to required size at specified location as directed by Engineer, at junction of brick masonry wall and R.C.C beams or Column, at junction of composite masonry, including scaffolding, finishing, curing etc. complete. ( Third Floor )

200

-

-

... More
54.F Providing groove to required size at specified location as directed by Engineer, at junction of brick masonry wall and R.C.C beams or Column, at junction of composite masonry, including scaffolding, finishing, curing etc. complete. ( Fourth Floor )

200

-

-

... More
54.G Providing groove to required size at specified location as directed by Engineer, at junction of brick masonry wall and R.C.C beams or Column, at junction of composite masonry, including scaffolding, finishing, curing etc. complete. ( Fifth Floor )

200

-

-

... More
54.H Providing groove to required size at specified location as directed by Engineer, at junction of brick masonry wall and R.C.C beams or Column, at junction of composite masonry, including scaffolding, finishing, curing etc. complete. ( Sixth Floor )

200

-

-

... More
54.I Providing groove to required size at specified location as directed by Engineer, at junction of brick masonry wall and R.C.C beams or Column, at junction of composite masonry, including scaffolding, finishing, curing etc. complete. ( Terrace Floor )

200

-

-

... More
55.B Providing internal cement plaster 12mm thick in single coat in cement mortar 1:3 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc. complete. ( Ground Floor )

1729.2

-

-

... More
55.C Providing internal cement plaster 12mm thick in single coat in cement mortar 1:3 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc. complete. ( First Floor )

2747.16

-

-

... More
55.D Providing internal cement plaster 12mm thick in single coat in cement mortar 1:3 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc. complete. ( Second Floor )

2608

-

-

... More
55.E Providing internal cement plaster 12mm thick in single coat in cement mortar 1:3 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc. complete. ( Third Floor )

7111.23

-

-

... More
55.F Providing internal cement plaster 12mm thick in single coat in cement mortar 1:3 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc. complete. ( Fourth Floor )

7111.23

-

-

... More
55.G Providing internal cement plaster 12mm thick in single coat in cement mortar 1:3 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc. complete. ( Fifth Floor )

7111.23

-

-

... More
55.H Providing internal cement plaster 12mm thick in single coat in cement mortar 1:3 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc. complete. ( Sixth Floor )

7111.23

-

-

... More
55.I Providing internal cement plaster 12mm thick in single coat in cement mortar 1:3 without neeru finish to concrete or brick surfaces, in all position including scaffolding and curing etc. complete. ( Terrace Floor )

120

-

-

... More
56.B Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. ( Ground Floor )

1729.2

-

-

... More
56.C Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. ( First Floor )

2747.16

-

-

... More
56.D Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. ( Second Floor )

2608

-

-

... More
56.E Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. ( Third Floor )

7111.23

-

-

... More
56.F Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. ( Fourth Floor )

7111.23

-

-

... More
56.G Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. ( Fifth Floor )

7111.23

-

-

... More
56.H Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. ( Sixth Floor )

7111.23

-

-

... More
56.I Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete. ( Terrace Floor )

120

-

-

... More
57.B Providing and applying Two coats of wall care Putty on plastered surface and Ceiling and Walls to prepare surface even and smooth of approved make, etc complete. ( Ground Floor )

1729.2

-

-

... More
57.C Providing and applying Two coats of wall care Putty on plastered surface and Ceiling and Walls to prepare surface even and smooth of approved make, etc complete. ( First Floor )

2747.16

-

-

... More
57.D Providing and applying Two coats of wall care Putty on plastered surface and Ceiling and Walls to prepare surface even and smooth of approved make, etc complete. ( Second Floor )

2608

-

-

... More
57.E Providing and applying Two coats of wall care Putty on plastered surface and Ceiling and Walls to prepare surface even and smooth of approved make, etc complete. ( Third Floor )

7111.23

-

-

... More
57.F Providing and applying Two coats of wall care Putty on plastered surface and Ceiling and Walls to prepare surface even and smooth of approved make, etc complete. ( Fourth Floor )

7111.23

-

-

... More
57.G Providing and applying Two coats of wall care Putty on plastered surface and Ceiling and Walls to prepare surface even and smooth of approved make, etc complete. ( Fifth Floor )

7111.23

-

-

... More
57.H Providing and applying Two coats of wall care Putty on plastered surface and Ceiling and Walls to prepare surface even and smooth of approved make, etc complete. ( Sixth Floor )

7111.23

-

-

... More
57.I Providing and applying Two coats of wall care Putty on plastered surface and Ceiling and Walls to prepare surface even and smooth of approved make, etc complete. ( Terrace Floor )

120

-

-

... More
58.B Providing and applying Royale Luxury Emulsion of approved make on internal wall surface as detailed below Scrapping for surface with emery paper and wipe clean for area. wall primer with brush by adding mineral turpentine oil by 8 to 10 % or water by 15 to 20% allowing to dry for 6 to 8 hoursAfter applying acrylic wall putty with appropriate prpportion of water of allow to dry for period of 4 to 6 hours of activity. Scrapping with emery paper and wipe clean Applying paints Royale Luxury emulsion 1st coat with brush water content water 40 to 45% or 65 to 70% by role Applying paints Royale luxury emulsion 2nd coat with brush with water content 40 to 45% or 65 to 70 % by roller. (With prior approval of S.E.) ( Ground Floor )

1729.2

-

-

... More
58.C Providing and applying Royale Luxury Emulsion of approved make on internal wall surface as detailed below Scrapping for surface with emery paper and wipe clean for area. wall primer with brush by adding mineral turpentine oil by 8 to 10 % or water by 15 to 20% allowing to dry for 6 to 8 hoursAfter applying acrylic wall putty with appropriate prpportion of water of allow to dry for period of 4 to 6 hours of activity. Scrapping with emery paper and wipe clean Applying paints Royale Luxury emulsion 1st coat with brush water content water 40 to 45% or 65 to 70% by role Applying paints Royale luxury emulsion 2nd coat with brush with water content 40 to 45% or 65 to 70 % by roller. (With prior approval of S.E.) ( First Floor )

2747.16

-

-

... More
58.D Providing and applying Royale Luxury Emulsion of approved make on internal wall surface as detailed below Scrapping for surface with emery paper and wipe clean for area. wall primer with brush by adding mineral turpentine oil by 8 to 10 % or water by 15 to 20% allowing to dry for 6 to 8 hoursAfter applying acrylic wall putty with appropriate prpportion of water of allow to dry for period of 4 to 6 hours of activity. Scrapping with emery paper and wipe clean Applying paints Royale Luxury emulsion 1st coat with brush water content water 40 to 45% or 65 to 70% by role Applying paints Royale luxury emulsion 2nd coat with brush with water content 40 to 45% or 65 to 70 % by roller. (With prior approval of S.E.) ( Second Floor )

2608

-

-

... More
58.E Providing and applying Royale Luxury Emulsion of approved make on internal wall surface as detailed below Scrapping for surface with emery paper and wipe clean for area. wall primer with brush by adding mineral turpentine oil by 8 to 10 % or water by 15 to 20% allowing to dry for 6 to 8 hoursAfter applying acrylic wall putty with appropriate prpportion of water of allow to dry for period of 4 to 6 hours of activity. Scrapping with emery paper and wipe clean Applying paints Royale Luxury emulsion 1st coat with brush water content water 40 to 45% or 65 to 70% by role Applying paints Royale luxury emulsion 2nd coat with brush with water content 40 to 45% or 65 to 70 % by roller. (With prior approval of S.E.) ( Third Floor )

7111.23

-

-

... More
58.F Providing and applying Royale Luxury Emulsion of approved make on internal wall surface as detailed below Scrapping for surface with emery paper and wipe clean for area. wall primer with brush by adding mineral turpentine oil by 8 to 10 % or water by 15 to 20% allowing to dry for 6 to 8 hoursAfter applying acrylic wall putty with appropriate prpportion of water of allow to dry for period of 4 to 6 hours of activity. Scrapping with emery paper and wipe clean Applying paints Royale Luxury emulsion 1st coat with brush water content water 40 to 45% or 65 to 70% by role Applying paints Royale luxury emulsion 2nd coat with brush with water content 40 to 45% or 65 to 70 % by roller. (With prior approval of S.E.) ( Fourth Floor )

7111.23

-

-

... More
58.G Providing and applying Royale Luxury Emulsion of approved make on internal wall surface as detailed below Scrapping for surface with emery paper and wipe clean for area. wall primer with brush by adding mineral turpentine oil by 8 to 10 % or water by 15 to 20% allowing to dry for 6 to 8 hoursAfter applying acrylic wall putty with appropriate prpportion of water of allow to dry for period of 4 to 6 hours of activity. Scrapping with emery paper and wipe clean Applying paints Royale Luxury emulsion 1st coat with brush water content water 40 to 45% or 65 to 70% by role Applying paints Royale luxury emulsion 2nd coat with brush with water content 40 to 45% or 65 to 70 % by roller. (With prior approval of S.E.) ( Fifth Floor )

7111.23

-

-

... More
58.H Providing and applying Royale Luxury Emulsion of approved make on internal wall surface as detailed below Scrapping for surface with emery paper and wipe clean for area. wall primer with brush by adding mineral turpentine oil by 8 to 10 % or water by 15 to 20% allowing to dry for 6 to 8 hoursAfter applying acrylic wall putty with appropriate prpportion of water of allow to dry for period of 4 to 6 hours of activity. Scrapping with emery paper and wipe clean Applying paints Royale Luxury emulsion 1st coat with brush water content water 40 to 45% or 65 to 70% by role Applying paints Royale luxury emulsion 2nd coat with brush with water content 40 to 45% or 65 to 70 % by roller. (With prior approval of S.E.) ( Sixth Floor )

6948.87

-

-

... More
58.I Providing and applying Royale Luxury Emulsion of approved make on internal wall surface as detailed below Scrapping for surface with emery paper and wipe clean for area. wall primer with brush by adding mineral turpentine oil by 8 to 10 % or water by 15 to 20% allowing to dry for 6 to 8 hoursAfter applying acrylic wall putty with appropriate prpportion of water of allow to dry for period of 4 to 6 hours of activity. Scrapping with emery paper and wipe clean Applying paints Royale Luxury emulsion 1st coat with brush water content water 40 to 45% or 65 to 70% by role Applying paints Royale luxury emulsion 2nd coat with brush with water content 40 to 45% or 65 to 70 % by roller. (With prior approval of S.E.) ( Terrace Floor )

120

-

-

... More
59.B Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. ( Ground Floor )

6106.48

-

-

... More
59.C Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. ( First Floor )

1573.31

-

-

... More
59.D Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. ( Second Floor )

1834.31

-

-

... More
59.E Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. ( Third Floor )

676.43

-

-

... More
59.F Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. ( Fourth Floor )

676.43

-

-

... More
59.G Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. ( Fifth Floor )

676.43

-

-

... More
59.H Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. ( Sixth Floor )

676.43

-

-

... More
59.I Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. ( Terrace Floor )

1584

-

-

... More
60.B Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist. ( Ground Floor )

2947.48

-

-

... More
60.C Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist. ( First Floor )

1573.31

-

-

... More
60.D Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist. ( Second Floor )

1105.33

-

-

... More
60.E Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist. ( Third Floor )

676.43

-

-

... More
60.F Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist. ( Fourth Floor )

676.43

-

-

... More
60.G Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist. ( Fifth Floor )

676.43

-

-

... More
60.H Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist. ( Sixth Floor )

676.43

-

-

... More
60.I Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist. ( Terrace Floor )

1584

-

-

... More
61.B Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. ( Ground Floor )

2232

-

-

... More
61.C Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. ( First Floor )

1116

-

-

... More
61.D Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. ( Second Floor )

1105.33

-

-

... More
61.E Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. ( Third Floor )

676.43

-

-

... More
61.F Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. ( Fourth Floor )

676.43

-

-

... More
61.G Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. ( Fifth Floor )

676.43

-

-

... More
61.H Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. ( Sixth Floor )

676.43

-

-

... More
61.I Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. ( Terrace Floor )

288

-

-

... More
62.B Providing and applying texture plaster of STONETEX - TRAVERTINE SERIES - ST-2002 special luxurious stone finish coating (3 product type – 6 coat system) for exteriors and interiors. Texture midcoat incorporating natural stone granules like natural Sandstone, Granite, Limestone, Ceramic chips, natural sand etc. including grooves to be provide as per design and drawings. Apply two coats of under coat primer by roller or brush then apply masking tape to create grooves as per design and drawings. First coat of texture midcoat finish by spray gun, evenly over the entire surface. Apply second coat of texture midcoat finish by spray sprinkle method, evenly on the whole sea of the previously dried first coat. Apply two coats of top protective coat evenly on the surface including grooves with roller or brush. It should be water based and ecofriendly product including preparing the surface, scaffolding etc. complete as directed by Engineer in-charge. ( Ground Floor )

1116

-

-

... More
62.C Providing and applying texture plaster of STONETEX - TRAVERTINE SERIES - ST-2002 special luxurious stone finish coating (3 product type – 6 coat system) for exteriors and interiors. Texture midcoat incorporating natural stone granules like natural Sandstone, Granite, Limestone, Ceramic chips, natural sand etc. including grooves to be provide as per design and drawings. Apply two coats of under coat primer by roller or brush then apply masking tape to create grooves as per design and drawings. First coat of texture midcoat finish by spray gun, evenly over the entire surface. Apply second coat of texture midcoat finish by spray sprinkle method, evenly on the whole sea of the previously dried first coat. Apply two coats of top protective coat evenly on the surface including grooves with roller or brush. It should be water based and ecofriendly product including preparing the surface, scaffolding etc. complete as directed by Engineer in-charge. ( First Floor )

1116

-

-

... More
62.D Providing and applying texture plaster of STONETEX - TRAVERTINE SERIES - ST-2002 special luxurious stone finish coating (3 product type – 6 coat system) for exteriors and interiors. Texture midcoat incorporating natural stone granules like natural Sandstone, Granite, Limestone, Ceramic chips, natural sand etc. including grooves to be provide as per design and drawings. Apply two coats of under coat primer by roller or brush then apply masking tape to create grooves as per design and drawings. First coat of texture midcoat finish by spray gun, evenly over the entire surface. Apply second coat of texture midcoat finish by spray sprinkle method, evenly on the whole sea of the previously dried first coat. Apply two coats of top protective coat evenly on the surface including grooves with roller or brush. It should be water based and ecofriendly product including preparing the surface, scaffolding etc. complete as directed by Engineer in-charge. ( Second Floor )

1105.33

-

-

... More
62.E Providing and applying texture plaster of STONETEX - TRAVERTINE SERIES - ST-2002 special luxurious stone finish coating (3 product type – 6 coat system) for exteriors and interiors. Texture midcoat incorporating natural stone granules like natural Sandstone, Granite, Limestone, Ceramic chips, natural sand etc. including grooves to be provide as per design and drawings. Apply two coats of under coat primer by roller or brush then apply masking tape to create grooves as per design and drawings. First coat of texture midcoat finish by spray gun, evenly over the entire surface. Apply second coat of texture midcoat finish by spray sprinkle method, evenly on the whole sea of the previously dried first coat. Apply two coats of top protective coat evenly on the surface including grooves with roller or brush. It should be water based and ecofriendly product including preparing the surface, scaffolding etc. complete as directed by Engineer in-charge. ( Third Floor )

676.43

-

-

... More
62.F Providing and applying texture plaster of STONETEX - TRAVERTINE SERIES - ST-2002 special luxurious stone finish coating (3 product type – 6 coat system) for exteriors and interiors. Texture midcoat incorporating natural stone granules like natural Sandstone, Granite, Limestone, Ceramic chips, natural sand etc. including grooves to be provide as per design and drawings. Apply two coats of under coat primer by roller or brush then apply masking tape to create grooves as per design and drawings. First coat of texture midcoat finish by spray gun, evenly over the entire surface. Apply second coat of texture midcoat finish by spray sprinkle method, evenly on the whole sea of the previously dried first coat. Apply two coats of top protective coat evenly on the surface including grooves with roller or brush. It should be water based and ecofriendly product including preparing the surface, scaffolding etc. complete as directed by Engineer in-charge. ( Fourth Floor )

676.43

-

-

... More
62.G Providing and applying texture plaster of STONETEX - TRAVERTINE SERIES - ST-2002 special luxurious stone finish coating (3 product type – 6 coat system) for exteriors and interiors. Texture midcoat incorporating natural stone granules like natural Sandstone, Granite, Limestone, Ceramic chips, natural sand etc. including grooves to be provide as per design and drawings. Apply two coats of under coat primer by roller or brush then apply masking tape to create grooves as per design and drawings. First coat of texture midcoat finish by spray gun, evenly over the entire surface. Apply second coat of texture midcoat finish by spray sprinkle method, evenly on the whole sea of the previously dried first coat. Apply two coats of top protective coat evenly on the surface including grooves with roller or brush. It should be water based and ecofriendly product including preparing the surface, scaffolding etc. complete as directed by Engineer in-charge. ( Fifth Floor )

676.43

-

-

... More
62.H Providing and applying texture plaster of STONETEX - TRAVERTINE SERIES - ST-2002 special luxurious stone finish coating (3 product type – 6 coat system) for exteriors and interiors. Texture midcoat incorporating natural stone granules like natural Sandstone, Granite, Limestone, Ceramic chips, natural sand etc. including grooves to be provide as per design and drawings. Apply two coats of under coat primer by roller or brush then apply masking tape to create grooves as per design and drawings. First coat of texture midcoat finish by spray gun, evenly over the entire surface. Apply second coat of texture midcoat finish by spray sprinkle method, evenly on the whole sea of the previously dried first coat. Apply two coats of top protective coat evenly on the surface including grooves with roller or brush. It should be water based and ecofriendly product including preparing the surface, scaffolding etc. complete as directed by Engineer in-charge. ( Sixth Floor )

676.43

-

-

... More
62.I Providing and applying texture plaster of STONETEX - TRAVERTINE SERIES - ST-2002 special luxurious stone finish coating (3 product type – 6 coat system) for exteriors and interiors. Texture midcoat incorporating natural stone granules like natural Sandstone, Granite, Limestone, Ceramic chips, natural sand etc. including grooves to be provide as per design and drawings. Apply two coats of under coat primer by roller or brush then apply masking tape to create grooves as per design and drawings. First coat of texture midcoat finish by spray gun, evenly over the entire surface. Apply second coat of texture midcoat finish by spray sprinkle method, evenly on the whole sea of the previously dried first coat. Apply two coats of top protective coat evenly on the surface including grooves with roller or brush. It should be water based and ecofriendly product including preparing the surface, scaffolding etc. complete as directed by Engineer in-charge. ( Terrace Floor )

288

-

-

... More
63.B Providing and laying in position flooring of telephone black / Amba White / Cat bary brown / Ruby red / Ocean Brown granite stone of approved shade and size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete. ( Ground Floor )

595.95

-

-

... More
63.C Providing and laying in position flooring of telephone black / Amba White / Cat bary brown / Ruby red / Ocean Brown granite stone of approved shade and size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete. ( First Floor )

252.62

-

-

... More
63.D Providing and laying in position flooring of telephone black / Amba White / Cat bary brown / Ruby red / Ocean Brown granite stone of approved shade and size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete. ( Second Floor )

405.83

-

-

... More
63.E Providing and laying in position flooring of telephone black / Amba White / Cat bary brown / Ruby red / Ocean Brown granite stone of approved shade and size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete. ( Third Floor )

1379.08

-

-

... More
63.F Providing and laying in position flooring of telephone black / Amba White / Cat bary brown / Ruby red / Ocean Brown granite stone of approved shade and size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete. ( Fourth Floor )

945.06

-

-

... More
63.G Providing and laying in position flooring of telephone black / Amba White / Cat bary brown / Ruby red / Ocean Brown granite stone of approved shade and size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete. ( Fifth Floor )

945.06

-

-

... More
63.H Providing and laying in position flooring of telephone black / Amba White / Cat bary brown / Ruby red / Ocean Brown granite stone of approved shade and size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete. ( Sixth Floor )

875.43

-

-

... More
63.I Providing and laying in position flooring of telephone black / Amba White / Cat bary brown / Ruby red / Ocean Brown granite stone of approved shade and size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete. ( Terrace Floor )

4

-

-

... More
64.B Providing and laying full body vitrified matt finish tiles of RAK/ Kajaria/ Nitco/ Asian or equivalent make having size 1800 mm x 1200 mm and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement mortar including neat cement float, with spacers of 4 to 6mm with filling joints with epoxy grout, curing and cleaning complete as directed by Engineer in Charge (Tile & epoxy grout sample must be approved by the Project Architect before execution on site) ( Ground Floor )

144.05

-

-

... More
64.C Providing and laying full body vitrified matt finish tiles of RAK/ Kajaria/ Nitco/ Asian or equivalent make having size 1800 mm x 1200 mm and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement mortar including neat cement float, with spacers of 4 to 6mm with filling joints with epoxy grout, curing and cleaning complete as directed by Engineer in Charge (Tile & epoxy grout sample must be approved by the Project Architect before execution on site) ( First Floor )

983.95

-

-

... More
64.D Providing and laying full body vitrified matt finish tiles of RAK/ Kajaria/ Nitco/ Asian or equivalent make having size 1800 mm x 1200 mm and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement mortar including neat cement float, with spacers of 4 to 6mm with filling joints with epoxy grout, curing and cleaning complete as directed by Engineer in Charge (Tile & epoxy grout sample must be approved by the Project Architect before execution on site) ( Second Floor )

1158.64

-

-

... More
64.E Providing and laying full body vitrified matt finish tiles of RAK/ Kajaria/ Nitco/ Asian or equivalent make having size 1800 mm x 1200 mm and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement mortar including neat cement float, with spacers of 4 to 6mm with filling joints with epoxy grout, curing and cleaning complete as directed by Engineer in Charge (Tile & epoxy grout sample must be approved by the Project Architect before execution on site) ( Third Floor )

2106.61

-

-

... More
64.F Providing and laying full body vitrified matt finish tiles of RAK/ Kajaria/ Nitco/ Asian or equivalent make having size 1800 mm x 1200 mm and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement mortar including neat cement float, with spacers of 4 to 6mm with filling joints with epoxy grout, curing and cleaning complete as directed by Engineer in Charge (Tile & epoxy grout sample must be approved by the Project Architect before execution on site) ( Fourth Floor )

2274.34

-

-

... More
64.G Providing and laying full body vitrified matt finish tiles of RAK/ Kajaria/ Nitco/ Asian or equivalent make having size 1800 mm x 1200 mm and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement mortar including neat cement float, with spacers of 4 to 6mm with filling joints with epoxy grout, curing and cleaning complete as directed by Engineer in Charge (Tile & epoxy grout sample must be approved by the Project Architect before execution on site) ( Fifth Floor )

2274.34

-

-

... More
64.H Providing and laying full body vitrified matt finish tiles of RAK/ Kajaria/ Nitco/ Asian or equivalent make having size 1800 mm x 1200 mm and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement mortar including neat cement float, with spacers of 4 to 6mm with filling joints with epoxy grout, curing and cleaning complete as directed by Engineer in Charge (Tile & epoxy grout sample must be approved by the Project Architect before execution on site) ( Sixth Floor )

2613.77

-

-

... More
65.B Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete. ( Ground Floor )

58.42

-

-

... More
65.C Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete. ( First Floor )

91.96

-

-

... More
65.D Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete. ( Second Floor )

55.31

-

-

... More
65.E Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete. ( Third Floor )

145.35

-

-

... More
65.F Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete. ( Fourth Floor )

145.35

-

-

... More
65.G Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete. ( Fifth Floor )

145.35

-

-

... More
65.H Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete. ( Sixth Floor )

145.35

-

-

... More
66.B Providing and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete. ( Ground Floor )

33.7

-

-

... More
66.C Providing and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete. ( First Floor )

16.85

-

-

... More
66.D Providing and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete. ( Second Floor )

1177.21

-

-

... More
66.E Providing and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete. ( Third Floor )

894.64

-

-

... More
66.F Providing and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete. ( Fourth Floor )

894.64

-

-

... More
66.G Providing and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete. ( Fifth Floor )

894.64

-

-

... More
66.H Providing and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete. ( Sixth Floor )

895.14

-

-

... More
67.B Providing and laying machine cut machine Polished Kota stone flooring 25mm to 30mm thick and required width in plain/ diamond pattern on bed of 1:6 C. M. including cement float, filling joints with neat cement slurry, curing, polishing and cleaning etc. complete. ( Ground Floor )

35

-

-

... More
67.C Providing and laying machine cut machine Polished Kota stone flooring 25mm to 30mm thick and required width in plain/ diamond pattern on bed of 1:6 C. M. including cement float, filling joints with neat cement slurry, curing, polishing and cleaning etc. complete. ( First Floor )

100

-

-

... More
67.D Providing and laying machine cut machine Polished Kota stone flooring 25mm to 30mm thick and required width in plain/ diamond pattern on bed of 1:6 C. M. including cement float, filling joints with neat cement slurry, curing, polishing and cleaning etc. complete. ( Second Floor )

100

-

-

... More
67.E Providing and laying machine cut machine Polished Kota stone flooring 25mm to 30mm thick and required width in plain/ diamond pattern on bed of 1:6 C. M. including cement float, filling joints with neat cement slurry, curing, polishing and cleaning etc. complete. ( Third Floor )

100

-

-

... More
67.F Providing and laying machine cut machine Polished Kota stone flooring 25mm to 30mm thick and required width in plain/ diamond pattern on bed of 1:6 C. M. including cement float, filling joints with neat cement slurry, curing, polishing and cleaning etc. complete. ( Fourth Floor )

100

-

-

... More
67.G Providing and laying machine cut machine Polished Kota stone flooring 25mm to 30mm thick and required width in plain/ diamond pattern on bed of 1:6 C. M. including cement float, filling joints with neat cement slurry, curing, polishing and cleaning etc. complete. ( Fifth Floor )

25

-

-

... More
67.H Providing and laying machine cut machine Polished Kota stone flooring 25mm to 30mm thick and required width in plain/ diamond pattern on bed of 1:6 C. M. including cement float, filling joints with neat cement slurry, curing, polishing and cleaning etc. complete. ( Sixth Floor )

5

-

-

... More
67.I Providing and laying machine cut machine Polished Kota stone flooring 25mm to 30mm thick and required width in plain/ diamond pattern on bed of 1:6 C. M. including cement float, filling joints with neat cement slurry, curing, polishing and cleaning etc. complete. ( Terrace Floor )

5

-

-

... More
68.B Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete. ( Ground Floor )

2847.61

-

-

... More
68.C Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete. ( First Floor )

1823.35

-

-

... More
68.D Providing and laying in situ cement concrete M20 with tremix treatment for 100 mm thickness for flooring with groove cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete. ( Second Floor )

3646.7

-

-

... More
69.B Providing and fixing machine cut machine polished 18 mm to 20 mm thick telephone black / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone for treads and risers of steps and staircases of approved colour and shade with full moulding and three grooved line for the treads on bed of 1:4 Cement mortar including float filling joints with neat cement slurry curing polishing and cleaning etc. complete. ( Ground Floor )

117.08

-

-

... More
69.C Providing and fixing machine cut machine polished 18 mm to 20 mm thick telephone black / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone for treads and risers of steps and staircases of approved colour and shade with full moulding and three grooved line for the treads on bed of 1:4 Cement mortar including float filling joints with neat cement slurry curing polishing and cleaning etc. complete. ( First Floor )

234.15

-

-

... More
69.D Providing and fixing machine cut machine polished 18 mm to 20 mm thick telephone black / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone for treads and risers of steps and staircases of approved colour and shade with full moulding and three grooved line for the treads on bed of 1:4 Cement mortar including float filling joints with neat cement slurry curing polishing and cleaning etc. complete. ( Second Floor )

117.08

-

-

... More
69.E Providing and fixing machine cut machine polished 18 mm to 20 mm thick telephone black / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone for treads and risers of steps and staircases of approved colour and shade with full moulding and three grooved line for the treads on bed of 1:4 Cement mortar including float filling joints with neat cement slurry curing polishing and cleaning etc. complete. ( Third Floor )

136.95

-

-

... More
69.F Providing and fixing machine cut machine polished 18 mm to 20 mm thick telephone black / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone for treads and risers of steps and staircases of approved colour and shade with full moulding and three grooved line for the treads on bed of 1:4 Cement mortar including float filling joints with neat cement slurry curing polishing and cleaning etc. complete. ( Fourth Floor )

136.95

-

-

... More
69.G Providing and fixing machine cut machine polished 18 mm to 20 mm thick telephone black / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone for treads and risers of steps and staircases of approved colour and shade with full moulding and three grooved line for the treads on bed of 1:4 Cement mortar including float filling joints with neat cement slurry curing polishing and cleaning etc. complete. ( Fifth Floor )

136.95

-

-

... More
69.H Providing and fixing machine cut machine polished 18 mm to 20 mm thick telephone black / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone for treads and risers of steps and staircases of approved colour and shade with full moulding and three grooved line for the treads on bed of 1:4 Cement mortar including float filling joints with neat cement slurry curing polishing and cleaning etc. complete. ( Sixth Floor )

136.95

-

-

... More
70.B Providing leather finished polishing to Granite Stone slab by continuous grinding in 4 coats of different bits to receive rough and matt finish including buffing process before laying and fixing of stone as per drawing and design, including cleaning, washing and finishing etc. complete. ( Ground Floor )

243.08

-

-

... More
70.C Providing leather finished polishing to Granite Stone slab by continuous grinding in 4 coats of different bits to receive rough and matt finish including buffing process before laying and fixing of stone as per drawing and design, including cleaning, washing and finishing etc. complete. ( First Floor )

234.15

-

-

... More
70.D Providing leather finished polishing to Granite Stone slab by continuous grinding in 4 coats of different bits to receive rough and matt finish including buffing process before laying and fixing of stone as per drawing and design, including cleaning, washing and finishing etc. complete. ( Second Floor )

117.08

-

-

... More
70.E Providing leather finished polishing to Granite Stone slab by continuous grinding in 4 coats of different bits to receive rough and matt finish including buffing process before laying and fixing of stone as per drawing and design, including cleaning, washing and finishing etc. complete. ( Third Floor )

136.95

-

-

... More
70.F Providing leather finished polishing to Granite Stone slab by continuous grinding in 4 coats of different bits to receive rough and matt finish including buffing process before laying and fixing of stone as per drawing and design, including cleaning, washing and finishing etc. complete. ( Fourth Floor )

136.95

-

-

... More
70.G Providing leather finished polishing to Granite Stone slab by continuous grinding in 4 coats of different bits to receive rough and matt finish including buffing process before laying and fixing of stone as per drawing and design, including cleaning, washing and finishing etc. complete. ( Fifth Floor )

136.95

-

-

... More
70.H Providing leather finished polishing to Granite Stone slab by continuous grinding in 4 coats of different bits to receive rough and matt finish including buffing process before laying and fixing of stone as per drawing and design, including cleaning, washing and finishing etc. complete. ( Sixth Floor )

136.95

-

-

... More
71.B Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing/moulding the sharp edges wherever necessary, curing, etc. complete. ( Ground Floor )

246.69

-

-

... More
71.C Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing/moulding the sharp edges wherever necessary, curing, etc. complete. ( First Floor )

326.1

-

-

... More
71.D Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing/moulding the sharp edges wherever necessary, curing, etc. complete. ( Second Floor )

745.85

-

-

... More
71.E Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing/moulding the sharp edges wherever necessary, curing, etc. complete. ( Third Floor )

506.28

-

-

... More
71.F Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing/moulding the sharp edges wherever necessary, curing, etc. complete. ( Fourth Floor )

482.97

-

-

... More
71.G Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing/moulding the sharp edges wherever necessary, curing, etc. complete. ( Fifth Floor )

563.1

-

-

... More
71.H Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing/moulding the sharp edges wherever necessary, curing, etc. complete. ( Sixth Floor )

335.63

-

-

... More
72.D Providing and laying matt finish ceramic tiles of having size 30 cm x 30 cm confirming to I.S.15622/2006 (group D II-A) and 7 to 8 mm thick for flooring in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with white/colour cement slurry cleaning curing etc. complete. ( Second Floor )

218.39

-

-

... More
72.E Providing and laying matt finish ceramic tiles of having size 30 cm x 30 cm confirming to I.S.15622/2006 (group D II-A) and 7 to 8 mm thick for flooring in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with white/colour cement slurry cleaning curing etc. complete. ( Third Floor )

218.39

-

-

... More
72.F Providing and laying matt finish ceramic tiles of having size 30 cm x 30 cm confirming to I.S.15622/2006 (group D II-A) and 7 to 8 mm thick for flooring in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with white/colour cement slurry cleaning curing etc. complete. ( Fourth Floor )

321.49

-

-

... More
72.G Providing and laying matt finish ceramic tiles of having size 30 cm x 30 cm confirming to I.S.15622/2006 (group D II-A) and 7 to 8 mm thick for flooring in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with white/colour cement slurry cleaning curing etc. complete. ( Fifth Floor )

218.39

-

-

... More
72.H Providing and laying matt finish ceramic tiles of having size 30 cm x 30 cm confirming to I.S.15622/2006 (group D II-A) and 7 to 8 mm thick for flooring in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with white/colour cement slurry cleaning curing etc. complete. ( Sixth Floor )

259.93

-

-

... More
73.D WOODEN FLOORING: Providing and laying 10mm thick solid ENGINEERING WOODEN FLOORING including SKIRTING of same material and design of Armstrong, Egger or equivalent (matt finish) consisting of panels of size 1200mm x 200mm or as per manufacturer specification. The panels having a click system tongue and groove joint to secure a long lasting joint with the edges duly impregnated with paraffin. The Floating wooden flooring shall be laid over a 0.20mm thick polythene film to form a vapor barrier and 2mm to 3mm thick approved FOAM. The panels used shall be of high solidity, high impact strength, high temperature resistance without change in shape). Each panel shall have click system (tongue and groove profile) and to be laid in approved pattern with suitable glue if required as per manufacturers specifications including alround suitable egde profile alround/wherever required for firm end locking. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site. Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge. ( Second Floor )

218.39

-

-

... More
73.E WOODEN FLOORING: Providing and laying 10mm thick solid ENGINEERING WOODEN FLOORING including SKIRTING of same material and design of Armstrong, Egger or equivalent (matt finish) consisting of panels of size 1200mm x 200mm or as per manufacturer specification. The panels having a click system tongue and groove joint to secure a long lasting joint with the edges duly impregnated with paraffin. The Floating wooden flooring shall be laid over a 0.20mm thick polythene film to form a vapor barrier and 2mm to 3mm thick approved FOAM. The panels used shall be of high solidity, high impact strength, high temperature resistance without change in shape). Each panel shall have click system (tongue and groove profile) and to be laid in approved pattern with suitable glue if required as per manufacturers specifications including alround suitable egde profile alround/wherever required for firm end locking. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site. Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge. ( Third Floor )

218.39

-

-

... More
73.F WOODEN FLOORING: Providing and laying 10mm thick solid ENGINEERING WOODEN FLOORING including SKIRTING of same material and design of Armstrong, Egger or equivalent (matt finish) consisting of panels of size 1200mm x 200mm or as per manufacturer specification. The panels having a click system tongue and groove joint to secure a long lasting joint with the edges duly impregnated with paraffin. The Floating wooden flooring shall be laid over a 0.20mm thick polythene film to form a vapor barrier and 2mm to 3mm thick approved FOAM. The panels used shall be of high solidity, high impact strength, high temperature resistance without change in shape). Each panel shall have click system (tongue and groove profile) and to be laid in approved pattern with suitable glue if required as per manufacturers specifications including alround suitable egde profile alround/wherever required for firm end locking. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site. Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge. ( Fourth Floor )

321.49

-

-

... More
73.G WOODEN FLOORING: Providing and laying 10mm thick solid ENGINEERING WOODEN FLOORING including SKIRTING of same material and design of Armstrong, Egger or equivalent (matt finish) consisting of panels of size 1200mm x 200mm or as per manufacturer specification. The panels having a click system tongue and groove joint to secure a long lasting joint with the edges duly impregnated with paraffin. The Floating wooden flooring shall be laid over a 0.20mm thick polythene film to form a vapor barrier and 2mm to 3mm thick approved FOAM. The panels used shall be of high solidity, high impact strength, high temperature resistance without change in shape). Each panel shall have click system (tongue and groove profile) and to be laid in approved pattern with suitable glue if required as per manufacturers specifications including alround suitable egde profile alround/wherever required for firm end locking. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site. Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge. ( Fifth Floor )

218.39

-

-

... More
73.H WOODEN FLOORING: Providing and laying 10mm thick solid ENGINEERING WOODEN FLOORING including SKIRTING of same material and design of Armstrong, Egger or equivalent (matt finish) consisting of panels of size 1200mm x 200mm or as per manufacturer specification. The panels having a click system tongue and groove joint to secure a long lasting joint with the edges duly impregnated with paraffin. The Floating wooden flooring shall be laid over a 0.20mm thick polythene film to form a vapor barrier and 2mm to 3mm thick approved FOAM. The panels used shall be of high solidity, high impact strength, high temperature resistance without change in shape). Each panel shall have click system (tongue and groove profile) and to be laid in approved pattern with suitable glue if required as per manufacturers specifications including alround suitable egde profile alround/wherever required for firm end locking. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site. Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge. ( Sixth Floor )

259.93

-

-

... More
74.C Providing and constructing granite kitchen platform with fixing of stainless steel sink 600 mm x 450 mm size as per detailed drawing including vertical both side polished kadappah stone 25 to 30 mm thick supports with kadappah top 35 to 40 mm thick and polished granite 16 to 20 mm top with side strips of granite at front and both sides of platform raised with two vertical granite supports 15 cm height and top granite of 75 x 40 cm including cutting, opening for sink of required size in kadappah as well as granite etc. complete. (Platform top size 5.00 m x 0.60 m and height is 0.75 m) ( First Floor )

33.4

-

-

... More
74.D Providing and constructing granite kitchen platform with fixing of stainless steel sink 600 mm x 450 mm size as per detailed drawing including vertical both side polished kadappah stone 25 to 30 mm thick supports with kadappah top 35 to 40 mm thick and polished granite 16 to 20 mm top with side strips of granite at front and both sides of platform raised with two vertical granite supports 15 cm height and top granite of 75 x 40 cm including cutting, opening for sink of required size in kadappah as well as granite etc. complete. (Platform top size 5.00 m x 0.60 m and height is 0.75 m) ( Second Floor )

7.5

-

-

... More
74.E Providing and constructing granite kitchen platform with fixing of stainless steel sink 600 mm x 450 mm size as per detailed drawing including vertical both side polished kadappah stone 25 to 30 mm thick supports with kadappah top 35 to 40 mm thick and polished granite 16 to 20 mm top with side strips of granite at front and both sides of platform raised with two vertical granite supports 15 cm height and top granite of 75 x 40 cm including cutting, opening for sink of required size in kadappah as well as granite etc. complete. (Platform top size 5.00 m x 0.60 m and height is 0.75 m) ( Third Floor )

35.3

-

-

... More
74.F Providing and constructing granite kitchen platform with fixing of stainless steel sink 600 mm x 450 mm size as per detailed drawing including vertical both side polished kadappah stone 25 to 30 mm thick supports with kadappah top 35 to 40 mm thick and polished granite 16 to 20 mm top with side strips of granite at front and both sides of platform raised with two vertical granite supports 15 cm height and top granite of 75 x 40 cm including cutting, opening for sink of required size in kadappah as well as granite etc. complete. (Platform top size 5.00 m x 0.60 m and height is 0.75 m) ( Fourth Floor )

35.3

-

-

... More
74.G Providing and constructing granite kitchen platform with fixing of stainless steel sink 600 mm x 450 mm size as per detailed drawing including vertical both side polished kadappah stone 25 to 30 mm thick supports with kadappah top 35 to 40 mm thick and polished granite 16 to 20 mm top with side strips of granite at front and both sides of platform raised with two vertical granite supports 15 cm height and top granite of 75 x 40 cm including cutting, opening for sink of required size in kadappah as well as granite etc. complete. (Platform top size 5.00 m x 0.60 m and height is 0.75 m) ( Fifth Floor )

43.11

-

-

... More
74.H Providing and constructing granite kitchen platform with fixing of stainless steel sink 600 mm x 450 mm size as per detailed drawing including vertical both side polished kadappah stone 25 to 30 mm thick supports with kadappah top 35 to 40 mm thick and polished granite 16 to 20 mm top with side strips of granite at front and both sides of platform raised with two vertical granite supports 15 cm height and top granite of 75 x 40 cm including cutting, opening for sink of required size in kadappah as well as granite etc. complete. (Platform top size 5.00 m x 0.60 m and height is 0.75 m) ( Sixth Floor )

21.3

-

-

... More
75.D Providing, fabricating, assembling & installing at all levels and in required profile consisting of 1.2 mm thick galvanized deck sheet conforming to IS 277:1992 of yield strength 550 MPa used as permanent shuttering including shear studs as specified in drawing and edge trim covered with concrete. This metal deck will be supported on structural steel beam with shear studs. ( Structural steel like beam,column, joists etc paid seperetely) etc complete all as approved by the Engineer in Charge ( Second Floor )

135

-

-

... More
75.E Providing, fabricating, assembling & installing at all levels and in required profile consisting of 1.2 mm thick galvanized deck sheet conforming to IS 277:1992 of yield strength 550 MPa used as permanent shuttering including shear studs as specified in drawing and edge trim covered with concrete. This metal deck will be supported on structural steel beam with shear studs. ( Structural steel like beam,column, joists etc paid seperetely) etc complete all as approved by the Engineer in Charge ( Third Floor )

135

-

-

... More
75.F Providing, fabricating, assembling & installing at all levels and in required profile consisting of 1.2 mm thick galvanized deck sheet conforming to IS 277:1992 of yield strength 550 MPa used as permanent shuttering including shear studs as specified in drawing and edge trim covered with concrete. This metal deck will be supported on structural steel beam with shear studs. ( Structural steel like beam,column, joists etc paid seperetely) etc complete all as approved by the Engineer in Charge ( Fourth Floor )

700

-

-

... More
75.G Providing, fabricating, assembling & installing at all levels and in required profile consisting of 1.2 mm thick galvanized deck sheet conforming to IS 277:1992 of yield strength 550 MPa used as permanent shuttering including shear studs as specified in drawing and edge trim covered with concrete. This metal deck will be supported on structural steel beam with shear studs. ( Structural steel like beam,column, joists etc paid seperetely) etc complete all as approved by the Engineer in Charge ( Fifth Floor )

700

-

-

... More
76.B Providing and fixing sky light in R.C.C. roof including frame made of M.S. angle 50 x 50 x 6 mm with hold fast, sheet glass 12 mm thick, Chicken mesh 24 gauge with all accessories and required fixtures and fastening fitting including painting etc. complete. ( Ground Floor )

263

-

-

... More
76.C Providing and fixing sky light in R.C.C. roof including frame made of M.S. angle 50 x 50 x 6 mm with hold fast, sheet glass 12 mm thick, Chicken mesh 24 gauge with all accessories and required fixtures and fastening fitting including painting etc. complete. ( First Floor )

263

-

-

... More
76.D Providing and fixing sky light in R.C.C. roof including frame made of M.S. angle 50 x 50 x 6 mm with hold fast, sheet glass 12 mm thick, Chicken mesh 24 gauge with all accessories and required fixtures and fastening fitting including painting etc. complete. ( Second Floor )

263

-

-

... More
76.E Providing and fixing sky light in R.C.C. roof including frame made of M.S. angle 50 x 50 x 6 mm with hold fast, sheet glass 12 mm thick, Chicken mesh 24 gauge with all accessories and required fixtures and fastening fitting including painting etc. complete. ( Third Floor )

263

-

-

... More
76.F Providing and fixing sky light in R.C.C. roof including frame made of M.S. angle 50 x 50 x 6 mm with hold fast, sheet glass 12 mm thick, Chicken mesh 24 gauge with all accessories and required fixtures and fastening fitting including painting etc. complete. ( Fourth Floor )

263

-

-

... More
76.G Providing and fixing sky light in R.C.C. roof including frame made of M.S. angle 50 x 50 x 6 mm with hold fast, sheet glass 12 mm thick, Chicken mesh 24 gauge with all accessories and required fixtures and fastening fitting including painting etc. complete. ( Fifth Floor )

263

-

-

... More
76.H Providing and fixing sky light in R.C.C. roof including frame made of M.S. angle 50 x 50 x 6 mm with hold fast, sheet glass 12 mm thick, Chicken mesh 24 gauge with all accessories and required fixtures and fastening fitting including painting etc. complete. ( Sixth Floor )

263

-

-

... More
77.E Providing and fixing invisible grill as per the detailed drawing including hinges, locking arrangements and coating of approved colour and shade etc. complete. As directed by Engineer- in-charge. Product Sample must be approved by the Project Architect before execution on site ( Third Floor )

135

-

-

... More
77.F Providing and fixing invisible grill as per the detailed drawing including hinges, locking arrangements and coating of approved colour and shade etc. complete. As directed by Engineer- in-charge. Product Sample must be approved by the Project Architect before execution on site ( Fourth Floor )

135

-

-

... More
77.G Providing and fixing invisible grill as per the detailed drawing including hinges, locking arrangements and coating of approved colour and shade etc. complete. As directed by Engineer- in-charge. Product Sample must be approved by the Project Architect before execution on site ( Fifth Floor )

91

-

-

... More
77.H Providing and fixing invisible grill as per the detailed drawing including hinges, locking arrangements and coating of approved colour and shade etc. complete. As directed by Engineer- in-charge. Product Sample must be approved by the Project Architect before execution on site ( Sixth Floor )

91

-

-

... More
78.B GRC Type-01: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 60% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipmen with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Ground Floor )

28.7

-

-

... More
78.C GRC Type-01: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 60% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipmen with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( First Floor )

24

-

-

... More
78.D GRC Type-01: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 60% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipmen with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Second Floor )

41.1

-

-

... More
78.E GRC Type-01: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 60% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipmen with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Third Floor )

23

-

-

... More
78.F GRC Type-01: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 60% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipmen with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fourth Floor )

5

-

-

... More
78.G GRC Type-01: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 60% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipmen with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fifth Floor )

125

-

-

... More
78.H GRC Type-01: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 60% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipmen with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Sixth Floor )

125

-

-

... More
79.B GRC Type-02: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 50% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Ground Floor )

28.7

-

-

... More
79.C GRC Type-02: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 50% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( First Floor )

24

-

-

... More
79.D GRC Type-02: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 50% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Second Floor )

41.1

-

-

... More
79.E GRC Type-02: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 50% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Third Floor )

23

-

-

... More
79.F GRC Type-02: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 50% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fourth Floor )

5

-

-

... More
79.G GRC Type-02: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 50% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fifth Floor )

125

-

-

... More
79.H GRC Type-02: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 50% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Sixth Floor )

125

-

-

... More
80.B GRC Type-03: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 40% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Ground Floor )

28.7

-

-

... More
80.C GRC Type-03: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 40% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( First Floor )

24

-

-

... More
80.D GRC Type-03: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 40% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Second Floor )

41.1

-

-

... More
80.E GRC Type-03: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 40% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Third Floor )

23

-

-

... More
80.F GRC Type-03: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 40% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fourth Floor )

5

-

-

... More
80.G GRC Type-03: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 40% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fifth Floor )

125

-

-

... More
80.H GRC Type-03: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 40% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Sixth Floor )

125

-

-

... More
81.B GRC Type-04: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 30% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Ground Floor )

28.7

-

-

... More
81.C GRC Type-04: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 30% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( First Floor )

24

-

-

... More
81.D GRC Type-04: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 30% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Second Floor )

41.1

-

-

... More
81.E GRC Type-04: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 30% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Third Floor )

23

-

-

... More
81.F GRC Type-04: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 30% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fourth Floor )

5

-

-

... More
81.G GRC Type-04: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 30% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fifth Floor )

125

-

-

... More
81.H GRC Type-04: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 30% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Sixth Floor )

125

-

-

... More
82.B GRC Type-05: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 20% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Ground Floor )

28.7

-

-

... More
82.C GRC Type-05: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 20% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( First Floor )

24

-

-

... More
82.D GRC Type-05: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 20% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Second Floor )

41.1

-

-

... More
82.E GRC Type-05: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 20% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Third Floor )

23

-

-

... More
82.F GRC Type-05: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 20% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fourth Floor )

5

-

-

... More
82.G GRC Type-05: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 20% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fifth Floor )

125

-

-

... More
82.H GRC Type-05: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 20% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Sixth Floor )

125

-

-

... More
83.B GRC Type-06: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 10% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Ground Floor )

28.7

-

-

... More
83.C GRC Type-06: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 10% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( First Floor )

24

-

-

... More
83.D GRC Type-06: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 10% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Second Floor )

41.1

-

-

... More
83.E GRC Type-06: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 10% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Third Floor )

23

-

-

... More
83.F GRC Type-06: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 10% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fourth Floor )

5

-

-

... More
83.G GRC Type-06: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 10% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fifth Floor )

125

-

-

... More
83.H GRC Type-06: Design, Supply and Installation of 3 dimensional GRC Jali (Glass Fiber Reinforced Concrete) of thickness 25mm to 30 mm, with opening perforations of 10% and panel size as per approved architectural drawing and design with detailed technical specifications. Jali is protruded Inside & outside as per drawings. The Jali is supported by integrated MS structures & embedded MS brackets inside the GRC structure. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Sixth Floor )

125

-

-

... More
84.B Design, Supply and Installation of 3 dimensional GRC Fin (Glass Fiber Reinforced Concrete) of thickness Width 100mm at midlevel Embedded by MS steel structure to support the dead load of the fins & Also supporting the Jali adjacent to it with integrated MS. The fin is mirrored & protruding Inside & outside identical sizes as per the drawings. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Ground Floor )

36

-

-

... More
84.C Design, Supply and Installation of 3 dimensional GRC Fin (Glass Fiber Reinforced Concrete) of thickness Width 100mm at midlevel Embedded by MS steel structure to support the dead load of the fins & Also supporting the Jali adjacent to it with integrated MS. The fin is mirrored & protruding Inside & outside identical sizes as per the drawings. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( First Floor )

45

-

-

... More
84.D Design, Supply and Installation of 3 dimensional GRC Fin (Glass Fiber Reinforced Concrete) of thickness Width 100mm at midlevel Embedded by MS steel structure to support the dead load of the fins & Also supporting the Jali adjacent to it with integrated MS. The fin is mirrored & protruding Inside & outside identical sizes as per the drawings. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Second Floor )

225

-

-

... More
84.E Design, Supply and Installation of 3 dimensional GRC Fin (Glass Fiber Reinforced Concrete) of thickness Width 100mm at midlevel Embedded by MS steel structure to support the dead load of the fins & Also supporting the Jali adjacent to it with integrated MS. The fin is mirrored & protruding Inside & outside identical sizes as per the drawings. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Third Floor )

230

-

-

... More
84.F Design, Supply and Installation of 3 dimensional GRC Fin (Glass Fiber Reinforced Concrete) of thickness Width 100mm at midlevel Embedded by MS steel structure to support the dead load of the fins & Also supporting the Jali adjacent to it with integrated MS. The fin is mirrored & protruding Inside & outside identical sizes as per the drawings. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fourth Floor )

42.5

-

-

... More
84.G Design, Supply and Installation of 3 dimensional GRC Fin (Glass Fiber Reinforced Concrete) of thickness Width 100mm at midlevel Embedded by MS steel structure to support the dead load of the fins & Also supporting the Jali adjacent to it with integrated MS. The fin is mirrored & protruding Inside & outside identical sizes as per the drawings. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Fifth Floor )

735

-

-

... More
84.H Design, Supply and Installation of 3 dimensional GRC Fin (Glass Fiber Reinforced Concrete) of thickness Width 100mm at midlevel Embedded by MS steel structure to support the dead load of the fins & Also supporting the Jali adjacent to it with integrated MS. The fin is mirrored & protruding Inside & outside identical sizes as per the drawings. Quote Rate Including Design supply & Installation with necessary Scaffolding & access Equipment with all necessery supporting Fabrication work including all MS Material. as directed by Engineer-In-Charge. Product sample must be approved by Project Architect before execution ( Sixth Floor )

100

-

-

... More
85.B Supply & Fixing of Rectified Porcelain Stoneware Tiles for Ventilated Facades of Specified size as per specification/ site drawings having 6 mm and 9 mm thickness with factory made Kerfs (grooves) as per need and size 600/1200 and 800/1600. The Rectified Porcelain Stoneware Tiles shall possess properties having Water absorption 0.5% Bending Strength 40 N/mm2 and are resistant to : UV Light, chemicals, smog, thermal shocks & bacteria. The facade will be made from Nexion Rectified Porcelain Stoneware Tiles (Sintered Compact Surfaces) specified as per ISO 13006 : Annex G- EN 14411 : Annex G : Dry Pressed Ceramic Tiles and all the tests carried out by Italian labs accredited according to ISO/ IEC 17025 : 2005. The Terramilano Fixing sub structure will confirm to Norme Tec niche per le Costruzioni NTC/8 (Technical Standard for construction) guidelines for construction in Italy, Eurocode 0 " Information on the method of semi-probabilistic limit states and safety factor " Euro coad 1 " Determination and calculation of actions on structure " Euro 9 " Project aluminum structures " UNI 11018 and ETAG 034 The Substructure will consists of Upright extruded aluminum profile TruSt80, alloy 6060 T5 thickness equal to 1.5 to 2 mm and dimension 80 x 110 mm, inter axis 80 cm of Length 3660 mm, 8085 Aluminum box Section of 1 x 3 inch,1x2inch and 1x 5 inch of length 3660 mm and thickness 1.5 to 2 mm as per need. Brackets St80 galvanized steel and aluminum of 80 mm x 60 mm, aluminum L bracket size 1.5 x 1.5 inch and 1 x 2.5 inch thickness 3 mm that allow to anchor the vertical stand to the Building, 9 mm/6mm S10 Hooks Harmonic Stainless Steel AISI 304 which supports the weight of the Tiles; Bossong/Hilti Mechanical Fasteners and Nylon Anchor Fastner; and Structural Sealant of 3M for Ventilated Facade. Packing of Edges and corner with window seal with ACP of appoved make for water Proofing and alteration. Inclusive of scaffolding and fixing. The installation method differ according to the structure of building and design. For EXTERNAL AND INTERNAL CLADDING OF STRUCTURE. with prior approval of concerned Superitending Engineer. ( Ground Floor )

42

-

-

... More
85.C Supply & Fixing of Rectified Porcelain Stoneware Tiles for Ventilated Facades of Specified size as per specification/ site drawings having 6 mm and 9 mm thickness with factory made Kerfs (grooves) as per need and size 600/1200 and 800/1600. The Rectified Porcelain Stoneware Tiles shall possess properties having Water absorption 0.5% Bending Strength 40 N/mm2 and are resistant to : UV Light, chemicals, smog, thermal shocks & bacteria. The facade will be made from Nexion Rectified Porcelain Stoneware Tiles (Sintered Compact Surfaces) specified as per ISO 13006 : Annex G- EN 14411 : Annex G : Dry Pressed Ceramic Tiles and all the tests carried out by Italian labs accredited according to ISO/ IEC 17025 : 2005. The Terramilano Fixing sub structure will confirm to Norme Tec niche per le Costruzioni NTC/8 (Technical Standard for construction) guidelines for construction in Italy, Eurocode 0 " Information on the method of semi-probabilistic limit states and safety factor " Euro coad 1 " Determination and calculation of actions on structure " Euro 9 " Project aluminum structures " UNI 11018 and ETAG 034 The Substructure will consists of Upright extruded aluminum profile TruSt80, alloy 6060 T5 thickness equal to 1.5 to 2 mm and dimension 80 x 110 mm, inter axis 80 cm of Length 3660 mm, 8085 Aluminum box Section of 1 x 3 inch,1x2inch and 1x 5 inch of length 3660 mm and thickness 1.5 to 2 mm as per need. Brackets St80 galvanized steel and aluminum of 80 mm x 60 mm, aluminum L bracket size 1.5 x 1.5 inch and 1 x 2.5 inch thickness 3 mm that allow to anchor the vertical stand to the Building, 9 mm/6mm S10 Hooks Harmonic Stainless Steel AISI 304 which supports the weight of the Tiles; Bossong/Hilti Mechanical Fasteners and Nylon Anchor Fastner; and Structural Sealant of 3M for Ventilated Facade. Packing of Edges and corner with window seal with ACP of appoved make for water Proofing and alteration. Inclusive of scaffolding and fixing. The installation method differ according to the structure of building and design. For EXTERNAL AND INTERNAL CLADDING OF STRUCTURE. with prior approval of concerned Superitending Engineer. ( First Floor )

262.5

-

-

... More
85.D Supply & Fixing of Rectified Porcelain Stoneware Tiles for Ventilated Facades of Specified size as per specification/ site drawings having 6 mm and 9 mm thickness with factory made Kerfs (grooves) as per need and size 600/1200 and 800/1600. The Rectified Porcelain Stoneware Tiles shall possess properties having Water absorption 0.5% Bending Strength 40 N/mm2 and are resistant to : UV Light, chemicals, smog, thermal shocks & bacteria. The facade will be made from Nexion Rectified Porcelain Stoneware Tiles (Sintered Compact Surfaces) specified as per ISO 13006 : Annex G- EN 14411 : Annex G : Dry Pressed Ceramic Tiles and all the tests carried out by Italian labs accredited according to ISO/ IEC 17025 : 2005. The Terramilano Fixing sub structure will confirm to Norme Tec niche per le Costruzioni NTC/8 (Technical Standard for construction) guidelines for construction in Italy, Eurocode 0 " Information on the method of semi-probabilistic limit states and safety factor " Euro coad 1 " Determination and calculation of actions on structure " Euro 9 " Project aluminum structures " UNI 11018 and ETAG 034 The Substructure will consists of Upright extruded aluminum profile TruSt80, alloy 6060 T5 thickness equal to 1.5 to 2 mm and dimension 80 x 110 mm, inter axis 80 cm of Length 3660 mm, 8085 Aluminum box Section of 1 x 3 inch,1x2inch and 1x 5 inch of length 3660 mm and thickness 1.5 to 2 mm as per need. Brackets St80 galvanized steel and aluminum of 80 mm x 60 mm, aluminum L bracket size 1.5 x 1.5 inch and 1 x 2.5 inch thickness 3 mm that allow to anchor the vertical stand to the Building, 9 mm/6mm S10 Hooks Harmonic Stainless Steel AISI 304 which supports the weight of the Tiles; Bossong/Hilti Mechanical Fasteners and Nylon Anchor Fastner; and Structural Sealant of 3M for Ventilated Facade. Packing of Edges and corner with window seal with ACP of appoved make for water Proofing and alteration. Inclusive of scaffolding and fixing. The installation method differ according to the structure of building and design. For EXTERNAL AND INTERNAL CLADDING OF STRUCTURE. with prior approval of concerned Superitending Engineer. ( Second Floor )

262.5

-

-

... More
85.E Supply & Fixing of Rectified Porcelain Stoneware Tiles for Ventilated Facades of Specified size as per specification/ site drawings having 6 mm and 9 mm thickness with factory made Kerfs (grooves) as per need and size 600/1200 and 800/1600. The Rectified Porcelain Stoneware Tiles shall possess properties having Water absorption 0.5% Bending Strength 40 N/mm2 and are resistant to : UV Light, chemicals, smog, thermal shocks & bacteria. The facade will be made from Nexion Rectified Porcelain Stoneware Tiles (Sintered Compact Surfaces) specified as per ISO 13006 : Annex G- EN 14411 : Annex G : Dry Pressed Ceramic Tiles and all the tests carried out by Italian labs accredited according to ISO/ IEC 17025 : 2005. The Terramilano Fixing sub structure will confirm to Norme Tec niche per le Costruzioni NTC/8 (Technical Standard for construction) guidelines for construction in Italy, Eurocode 0 " Information on the method of semi-probabilistic limit states and safety factor " Euro coad 1 " Determination and calculation of actions on structure " Euro 9 " Project aluminum structures " UNI 11018 and ETAG 034 The Substructure will consists of Upright extruded aluminum profile TruSt80, alloy 6060 T5 thickness equal to 1.5 to 2 mm and dimension 80 x 110 mm, inter axis 80 cm of Length 3660 mm, 8085 Aluminum box Section of 1 x 3 inch,1x2inch and 1x 5 inch of length 3660 mm and thickness 1.5 to 2 mm as per need. Brackets St80 galvanized steel and aluminum of 80 mm x 60 mm, aluminum L bracket size 1.5 x 1.5 inch and 1 x 2.5 inch thickness 3 mm that allow to anchor the vertical stand to the Building, 9 mm/6mm S10 Hooks Harmonic Stainless Steel AISI 304 which supports the weight of the Tiles; Bossong/Hilti Mechanical Fasteners and Nylon Anchor Fastner; and Structural Sealant of 3M for Ventilated Facade. Packing of Edges and corner with window seal with ACP of appoved make for water Proofing and alteration. Inclusive of scaffolding and fixing. The installation method differ according to the structure of building and design. For EXTERNAL AND INTERNAL CLADDING OF STRUCTURE. with prior approval of concerned Superitending Engineer. ( Third Floor )

337.5

-

-

... More
85.F Supply & Fixing of Rectified Porcelain Stoneware Tiles for Ventilated Facades of Specified size as per specification/ site drawings having 6 mm and 9 mm thickness with factory made Kerfs (grooves) as per need and size 600/1200 and 800/1600. The Rectified Porcelain Stoneware Tiles shall possess properties having Water absorption 0.5% Bending Strength 40 N/mm2 and are resistant to : UV Light, chemicals, smog, thermal shocks & bacteria. The facade will be made from Nexion Rectified Porcelain Stoneware Tiles (Sintered Compact Surfaces) specified as per ISO 13006 : Annex G- EN 14411 : Annex G : Dry Pressed Ceramic Tiles and all the tests carried out by Italian labs accredited according to ISO/ IEC 17025 : 2005. The Terramilano Fixing sub structure will confirm to Norme Tec niche per le Costruzioni NTC/8 (Technical Standard for construction) guidelines for construction in Italy, Eurocode 0 " Information on the method of semi-probabilistic limit states and safety factor " Euro coad 1 " Determination and calculation of actions on structure " Euro 9 " Project aluminum structures " UNI 11018 and ETAG 034 The Substructure will consists of Upright extruded aluminum profile TruSt80, alloy 6060 T5 thickness equal to 1.5 to 2 mm and dimension 80 x 110 mm, inter axis 80 cm of Length 3660 mm, 8085 Aluminum box Section of 1 x 3 inch,1x2inch and 1x 5 inch of length 3660 mm and thickness 1.5 to 2 mm as per need. Brackets St80 galvanized steel and aluminum of 80 mm x 60 mm, aluminum L bracket size 1.5 x 1.5 inch and 1 x 2.5 inch thickness 3 mm that allow to anchor the vertical stand to the Building, 9 mm/6mm S10 Hooks Harmonic Stainless Steel AISI 304 which supports the weight of the Tiles; Bossong/Hilti Mechanical Fasteners and Nylon Anchor Fastner; and Structural Sealant of 3M for Ventilated Facade. Packing of Edges and corner with window seal with ACP of appoved make for water Proofing and alteration. Inclusive of scaffolding and fixing. The installation method differ according to the structure of building and design. For EXTERNAL AND INTERNAL CLADDING OF STRUCTURE. with prior approval of concerned Superitending Engineer. ( Fourth Floor )

337.5

-

-

... More
85.G Supply & Fixing of Rectified Porcelain Stoneware Tiles for Ventilated Facades of Specified size as per specification/ site drawings having 6 mm and 9 mm thickness with factory made Kerfs (grooves) as per need and size 600/1200 and 800/1600. The Rectified Porcelain Stoneware Tiles shall possess properties having Water absorption 0.5% Bending Strength 40 N/mm2 and are resistant to : UV Light, chemicals, smog, thermal shocks & bacteria. The facade will be made from Nexion Rectified Porcelain Stoneware Tiles (Sintered Compact Surfaces) specified as per ISO 13006 : Annex G- EN 14411 : Annex G : Dry Pressed Ceramic Tiles and all the tests carried out by Italian labs accredited according to ISO/ IEC 17025 : 2005. The Terramilano Fixing sub structure will confirm to Norme Tec niche per le Costruzioni NTC/8 (Technical Standard for construction) guidelines for construction in Italy, Eurocode 0 " Information on the method of semi-probabilistic limit states and safety factor " Euro coad 1 " Determination and calculation of actions on structure " Euro 9 " Project aluminum structures " UNI 11018 and ETAG 034 The Substructure will consists of Upright extruded aluminum profile TruSt80, alloy 6060 T5 thickness equal to 1.5 to 2 mm and dimension 80 x 110 mm, inter axis 80 cm of Length 3660 mm, 8085 Aluminum box Section of 1 x 3 inch,1x2inch and 1x 5 inch of length 3660 mm and thickness 1.5 to 2 mm as per need. Brackets St80 galvanized steel and aluminum of 80 mm x 60 mm, aluminum L bracket size 1.5 x 1.5 inch and 1 x 2.5 inch thickness 3 mm that allow to anchor the vertical stand to the Building, 9 mm/6mm S10 Hooks Harmonic Stainless Steel AISI 304 which supports the weight of the Tiles; Bossong/Hilti Mechanical Fasteners and Nylon Anchor Fastner; and Structural Sealant of 3M for Ventilated Facade. Packing of Edges and corner with window seal with ACP of appoved make for water Proofing and alteration. Inclusive of scaffolding and fixing. The installation method differ according to the structure of building and design. For EXTERNAL AND INTERNAL CLADDING OF STRUCTURE. with prior approval of concerned Superitending Engineer. ( Fifth Floor )

337.5

-

-

... More
85.H Supply & Fixing of Rectified Porcelain Stoneware Tiles for Ventilated Facades of Specified size as per specification/ site drawings having 6 mm and 9 mm thickness with factory made Kerfs (grooves) as per need and size 600/1200 and 800/1600. The Rectified Porcelain Stoneware Tiles shall possess properties having Water absorption 0.5% Bending Strength 40 N/mm2 and are resistant to : UV Light, chemicals, smog, thermal shocks & bacteria. The facade will be made from Nexion Rectified Porcelain Stoneware Tiles (Sintered Compact Surfaces) specified as per ISO 13006 : Annex G- EN 14411 : Annex G : Dry Pressed Ceramic Tiles and all the tests carried out by Italian labs accredited according to ISO/ IEC 17025 : 2005. The Terramilano Fixing sub structure will confirm to Norme Tec niche per le Costruzioni NTC/8 (Technical Standard for construction) guidelines for construction in Italy, Eurocode 0 " Information on the method of semi-probabilistic limit states and safety factor " Euro coad 1 " Determination and calculation of actions on structure " Euro 9 " Project aluminum structures " UNI 11018 and ETAG 034 The Substructure will consists of Upright extruded aluminum profile TruSt80, alloy 6060 T5 thickness equal to 1.5 to 2 mm and dimension 80 x 110 mm, inter axis 80 cm of Length 3660 mm, 8085 Aluminum box Section of 1 x 3 inch,1x2inch and 1x 5 inch of length 3660 mm and thickness 1.5 to 2 mm as per need. Brackets St80 galvanized steel and aluminum of 80 mm x 60 mm, aluminum L bracket size 1.5 x 1.5 inch and 1 x 2.5 inch thickness 3 mm that allow to anchor the vertical stand to the Building, 9 mm/6mm S10 Hooks Harmonic Stainless Steel AISI 304 which supports the weight of the Tiles; Bossong/Hilti Mechanical Fasteners and Nylon Anchor Fastner; and Structural Sealant of 3M for Ventilated Facade. Packing of Edges and corner with window seal with ACP of appoved make for water Proofing and alteration. Inclusive of scaffolding and fixing. The installation method differ according to the structure of building and design. For EXTERNAL AND INTERNAL CLADDING OF STRUCTURE. with prior approval of concerned Superitending Engineer. ( Sixth Floor )

337.5

-

-

... More
86.B Providing & fixing 1200 high GLASS RAILING matt finished stainless steel (Grade 304) railing with 60mm x 40mm and 1.6 mm thick rectangular pipe as handrail at top having slot for fixing of 12mm thick toughened glass panels of 1200mm length, 100mm x 90mm matt finished bracket supports spaced at 600mm center to center at bottom of glass including buffing, fabricating and fixture & fastening erecting, necessary welding, grinding, finishing, including base or cover plate of appropriate size all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories etc. complete. ( Ground Floor )

60.75

-

-

... More
86.C Providing & fixing 1200 high GLASS RAILING matt finished stainless steel (Grade 304) railing with 60mm x 40mm and 1.6 mm thick rectangular pipe as handrail at top having slot for fixing of 12mm thick toughened glass panels of 1200mm length, 100mm x 90mm matt finished bracket supports spaced at 600mm center to center at bottom of glass including buffing, fabricating and fixture & fastening erecting, necessary welding, grinding, finishing, including base or cover plate of appropriate size all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories etc. complete. ( First Floor )

52.05

-

-

... More
86.D Providing & fixing 1200 high GLASS RAILING matt finished stainless steel (Grade 304) railing with 60mm x 40mm and 1.6 mm thick rectangular pipe as handrail at top having slot for fixing of 12mm thick toughened glass panels of 1200mm length, 100mm x 90mm matt finished bracket supports spaced at 600mm center to center at bottom of glass including buffing, fabricating and fixture & fastening erecting, necessary welding, grinding, finishing, including base or cover plate of appropriate size all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories etc. complete. ( Second Floor )

104.1

-

-

... More
86.E Providing & fixing 1200 high GLASS RAILING matt finished stainless steel (Grade 304) railing with 60mm x 40mm and 1.6 mm thick rectangular pipe as handrail at top having slot for fixing of 12mm thick toughened glass panels of 1200mm length, 100mm x 90mm matt finished bracket supports spaced at 600mm center to center at bottom of glass including buffing, fabricating and fixture & fastening erecting, necessary welding, grinding, finishing, including base or cover plate of appropriate size all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories etc. complete. ( Third Floor )

231.99

-

-

... More
86.F Providing & fixing 1200 high GLASS RAILING matt finished stainless steel (Grade 304) railing with 60mm x 40mm and 1.6 mm thick rectangular pipe as handrail at top having slot for fixing of 12mm thick toughened glass panels of 1200mm length, 100mm x 90mm matt finished bracket supports spaced at 600mm center to center at bottom of glass including buffing, fabricating and fixture & fastening erecting, necessary welding, grinding, finishing, including base or cover plate of appropriate size all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories etc. complete. ( Fourth Floor )

270.99

-

-

... More
86.G Providing & fixing 1200 high GLASS RAILING matt finished stainless steel (Grade 304) railing with 60mm x 40mm and 1.6 mm thick rectangular pipe as handrail at top having slot for fixing of 12mm thick toughened glass panels of 1200mm length, 100mm x 90mm matt finished bracket supports spaced at 600mm center to center at bottom of glass including buffing, fabricating and fixture & fastening erecting, necessary welding, grinding, finishing, including base or cover plate of appropriate size all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories etc. complete. ( Fifth Floor )

270.99

-

-

... More
86.I Providing & fixing 1200 high GLASS RAILING matt finished stainless steel (Grade 304) railing with 60mm x 40mm and 1.6 mm thick rectangular pipe as handrail at top having slot for fixing of 12mm thick toughened glass panels of 1200mm length, 100mm x 90mm matt finished bracket supports spaced at 600mm center to center at bottom of glass including buffing, fabricating and fixture & fastening erecting, necessary welding, grinding, finishing, including base or cover plate of appropriate size all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories etc. complete. ( Terrace Floor )

278.49

-

-

... More
87.B Providing and fixing in position (as per 1868 / 1982) Aluminium sliding window of three tracks with rectangular pipe 95 x 38.10 x 0.90 mm at weight 0.637 Kilogram/One Running Metre. with window frame bottom track section 92 x 31.75 x 1.30 mm at weight 1.070 Kilogram/One Running Metre.. Top and side track section 92 x 31.75 x 1.30 mm at weight 0.933 Kilogram/Running metre. The shutter should be of bearing bottom 40 x 18 x 1.25 mm at weight 0.417 Kilogram/One Running Metre. Inter locking section 40 x 18 x 1.10 mm at weight 0.469 Kilogram/Running metre. and handle and top section 40 x 18 x 1.25 mm at weight 0.417 Kilogram/Running metre. As per detailed drawings and as directed by Engineerincharge with all necessary Aluminium sections fixtures and fastenings such as roller bearing in nylon casting and self locking catch fitted in vertical section of shutter including 5 mm thick plain glass and aluminium mosquito net shutter with stainless steel jail with all required screws and nuts etc, complete. With powder coating without box ( Ground Floor )

64

-

-

... More
88.B Providing and fixing rolling shutter fabricated from steel laths of minimum thickness 0.9 mm with lock plate of 3.15 mm thickness reinforced with 35 x 35 x 5 mm angle section fitted with sliding bolts and handles for both sides, deep M.S. channel section of depth and thickness not less than 65 mm and 3.15 mm respectively with hold fast arrangements, M.S. Bracket plate 300 x 300 x 3.15 mm minimum size and shape with square bar, suspension shaft of minimum 32 mm diameter, hood cover of M.S. sheet not less than 0.9 mm thickness and of any size at top and safety devices including mechanical gear operation arrangement consisting of worm gear wheels and worms of high grade cast iron or mild steel and one coat of red lead primer etc. complete. (I.S. 62481979) (Without mechanical gear) ( Ground Floor )

24

-

-

... More
89.B Providing and fixing mild steel grill gate with angle iron frame 65mm x 65mm x 10mm with iron bars at 150mm C/C and diagonal flats as per the detailed drawing including hinges, pivot block locking arrangement, welding riveting and oil painting of three coats of approved shade Weight of gate 35 Kilogram/Smt. ( Ground Floor )

24

-

-

... More
90.B Providing and erecting chain link fencing 1.6 M. height with G.I. chain link of size 50 x 50 mm, 8 gauge thick and fixed 75 mm above ground level on vertical M.S. Angles of 40 x 40 x 6 mm size, includind excavating pits for foundation and embedded in C.C. block of 1:4:8 mix of size 450 x 450 x 670 mm. at 1.75 M. c/c with iron bar 16mm dia as hold fast including welding link with angle frame at 30 cm c/c with nuts and bolts and horizontal M.S. Angles at top and bottom of 25 x 25 x 5 mm size and vertical M.S. flat 35 x 5 mm and 25 x 5 mm horizontal including cross support of 40 x 40 x 6 mm angles both side at every corner or bend embedded in concrete blocks of 1:4:8 of size 450 x 450 x 670 mm including 3 coats of oil painting etc. complete. ( Ground Floor )

20

-

-

... More
91.B ALLUMINIUM LOGO: Providing and fixing Aluminium anodised logo of required size name including all fittings and fixing as per selction of project Architect. Logo image must be approved and verified by project Architect. etc complete as per direction of the Engineer-in-Charge, RATE APPROVED FOR 5.5M X3.5M SIZE LOGO Providing and fixing Aluminium anodised logo of required size name including all fittings and fixing as per selction of project Architect. Logo image must be approved and verified by project Architect. etc complete as per direction of the Engineer-in-Charge. ( Ground Floor )

200

-

-

... More
92.B Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid plain flush door shutter (35mm thick) of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural libers (wood powder rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 N (Face) & 900 N (Edge). minimum compressive strength 50 N/mm2, modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/ barer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws, all as per direction of Engineer-In-Charge (Note: stainless steel butt hinges and necessary S.S screws shall be paid separately) ( Ground Floor )

70.13

-

-

... More
92.C Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid plain flush door shutter (35mm thick) of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural libers (wood powder rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 N (Face) & 900 N (Edge). minimum compressive strength 50 N/mm2, modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/ barer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws, all as per direction of Engineer-In-Charge (Note: stainless steel butt hinges and necessary S.S screws shall be paid separately) ( First Floor )

102.38

-

-

... More
92.D Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid plain flush door shutter (35mm thick) of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural libers (wood powder rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 N (Face) & 900 N (Edge). minimum compressive strength 50 N/mm2, modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/ barer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws, all as per direction of Engineer-In-Charge (Note: stainless steel butt hinges and necessary S.S screws shall be paid separately) ( Second Floor )

71.62

-

-

... More
92.E Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid plain flush door shutter (35mm thick) of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural libers (wood powder rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 N (Face) & 900 N (Edge). minimum compressive strength 50 N/mm2, modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/ barer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws, all as per direction of Engineer-In-Charge (Note: stainless steel butt hinges and necessary S.S screws shall be paid separately) ( Third Floor )

71.62

-

-

... More
92.F Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid plain flush door shutter (35mm thick) of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural libers (wood powder rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 N (Face) & 900 N (Edge). minimum compressive strength 50 N/mm2, modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/ barer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws, all as per direction of Engineer-In-Charge (Note: stainless steel butt hinges and necessary S.S screws shall be paid separately) ( Fourth Floor )

71.62

-

-

... More
92.G Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid plain flush door shutter (35mm thick) of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural libers (wood powder rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 N (Face) & 900 N (Edge). minimum compressive strength 50 N/mm2, modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/ barer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws, all as per direction of Engineer-In-Charge (Note: stainless steel butt hinges and necessary S.S screws shall be paid separately) ( Fifth Floor )

41.62

-

-

... More
92.H Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid plain flush door shutter (35mm thick) of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural libers (wood powder rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 N (Face) & 900 N (Edge). minimum compressive strength 50 N/mm2, modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/ barer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws, all as per direction of Engineer-In-Charge (Note: stainless steel butt hinges and necessary S.S screws shall be paid separately) ( Sixth Floor )

41.62

-

-

... More
93.B Aluminium System Color Anodized Fixed Window - Providing and fixing alummtum system color anodized fixed window of various sizes Casement will he made from Geeta Malwin/Lexitr Brandson, 40 min serres or equivalent System windows will be of specialls extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits Track frame will be fixed to the masonry opening of windows with S S 202 wood screws Fixed glass casement will be made from specially extruded ahkuminen section, glass considered is 5 mm clear toughened glass All shutter will be having 45 degree joints, joints will be fixed with necialis developed clits to form uniform hairline joint. All fixing screws will be of S S 202 Windows will be sealed with weather sealant From outter periphery, etc complete. ( Ground Floor )

50.4

-

-

... More
93.C Aluminium System Color Anodized Fixed Window - Providing and fixing alummtum system color anodized fixed window of various sizes Casement will he made from Geeta Malwin/Lexitr Brandson, 40 min serres or equivalent System windows will be of specialls extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits Track frame will be fixed to the masonry opening of windows with S S 202 wood screws Fixed glass casement will be made from specially extruded ahkuminen section, glass considered is 5 mm clear toughened glass All shutter will be having 45 degree joints, joints will be fixed with necialis developed clits to form uniform hairline joint. All fixing screws will be of S S 202 Windows will be sealed with weather sealant From outter periphery, etc complete. ( First Floor )

125.64

-

-

... More
93.D Aluminium System Color Anodized Fixed Window - Providing and fixing alummtum system color anodized fixed window of various sizes Casement will he made from Geeta Malwin/Lexitr Brandson, 40 min serres or equivalent System windows will be of specialls extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits Track frame will be fixed to the masonry opening of windows with S S 202 wood screws Fixed glass casement will be made from specially extruded ahkuminen section, glass considered is 5 mm clear toughened glass All shutter will be having 45 degree joints, joints will be fixed with necialis developed clits to form uniform hairline joint. All fixing screws will be of S S 202 Windows will be sealed with weather sealant From outter periphery, etc complete. ( Second Floor )

105.84

-

-

... More
93.E Aluminium System Color Anodized Fixed Window - Providing and fixing alummtum system color anodized fixed window of various sizes Casement will he made from Geeta Malwin/Lexitr Brandson, 40 min serres or equivalent System windows will be of specialls extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits Track frame will be fixed to the masonry opening of windows with S S 202 wood screws Fixed glass casement will be made from specially extruded ahkuminen section, glass considered is 5 mm clear toughened glass All shutter will be having 45 degree joints, joints will be fixed with necialis developed clits to form uniform hairline joint. All fixing screws will be of S S 202 Windows will be sealed with weather sealant From outter periphery, etc complete. ( Third Floor )

64.8

-

-

... More
93.F Aluminium System Color Anodized Fixed Window - Providing and fixing alummtum system color anodized fixed window of various sizes Casement will he made from Geeta Malwin/Lexitr Brandson, 40 min serres or equivalent System windows will be of specialls extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits Track frame will be fixed to the masonry opening of windows with S S 202 wood screws Fixed glass casement will be made from specially extruded ahkuminen section, glass considered is 5 mm clear toughened glass All shutter will be having 45 degree joints, joints will be fixed with necialis developed clits to form uniform hairline joint. All fixing screws will be of S S 202 Windows will be sealed with weather sealant From outter periphery, etc complete. ( Fourth Floor )

34.2

-

-

... More
93.G Aluminium System Color Anodized Fixed Window - Providing and fixing alummtum system color anodized fixed window of various sizes Casement will he made from Geeta Malwin/Lexitr Brandson, 40 min serres or equivalent System windows will be of specialls extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits Track frame will be fixed to the masonry opening of windows with S S 202 wood screws Fixed glass casement will be made from specially extruded ahkuminen section, glass considered is 5 mm clear toughened glass All shutter will be having 45 degree joints, joints will be fixed with necialis developed clits to form uniform hairline joint. All fixing screws will be of S S 202 Windows will be sealed with weather sealant From outter periphery, etc complete. ( Fifth Floor )

64.08

-

-

... More
93.H Aluminium System Color Anodized Fixed Window - Providing and fixing alummtum system color anodized fixed window of various sizes Casement will he made from Geeta Malwin/Lexitr Brandson, 40 min serres or equivalent System windows will be of specialls extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits Track frame will be fixed to the masonry opening of windows with S S 202 wood screws Fixed glass casement will be made from specially extruded ahkuminen section, glass considered is 5 mm clear toughened glass All shutter will be having 45 degree joints, joints will be fixed with necialis developed clits to form uniform hairline joint. All fixing screws will be of S S 202 Windows will be sealed with weather sealant From outter periphery, etc complete. ( Sixth Floor )

64.08

-

-

... More
94.B Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim series or equivalent Systern. Window will be of specially extruded aluminium 3Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will he fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Ground Floor )

234.66

-

-

... More
94.C Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim series or equivalent Systern. Window will be of specially extruded aluminium 3Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will he fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( First Floor )

75.08

-

-

... More
94.D Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim series or equivalent Systern. Window will be of specially extruded aluminium 3Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will he fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Second Floor )

65.63

-

-

... More
94.E Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim series or equivalent Systern. Window will be of specially extruded aluminium 3Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will he fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Third Floor )

342.56

-

-

... More
94.F Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim series or equivalent Systern. Window will be of specially extruded aluminium 3Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will he fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Fourth Floor )

342.56

-

-

... More
94.G Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim series or equivalent Systern. Window will be of specially extruded aluminium 3Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will he fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Fifth Floor )

296.12

-

-

... More
94.H Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim series or equivalent Systern. Window will be of specially extruded aluminium 3Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will he fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Sixth Floor )

296.12

-

-

... More
95.B Two Track Two Glass Shutter Window: Providing and fixing aluminium color anodized system sliding window of various sizes. Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim scries or equivalent System. Windows will be of specially extruded aluminium 2 Track - 2 Glass shutter window/ ventilator, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Ground Floor )

5

-

-

... More
95.C Two Track Two Glass Shutter Window: Providing and fixing aluminium color anodized system sliding window of various sizes. Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim scries or equivalent System. Windows will be of specially extruded aluminium 2 Track - 2 Glass shutter window/ ventilator, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( First Floor )

5

-

-

... More
95.D Two Track Two Glass Shutter Window: Providing and fixing aluminium color anodized system sliding window of various sizes. Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim scries or equivalent System. Windows will be of specially extruded aluminium 2 Track - 2 Glass shutter window/ ventilator, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Second Floor )

5

-

-

... More
95.E Two Track Two Glass Shutter Window: Providing and fixing aluminium color anodized system sliding window of various sizes. Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim scries or equivalent System. Windows will be of specially extruded aluminium 2 Track - 2 Glass shutter window/ ventilator, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Third Floor )

5

-

-

... More
95.F Two Track Two Glass Shutter Window: Providing and fixing aluminium color anodized system sliding window of various sizes. Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim scries or equivalent System. Windows will be of specially extruded aluminium 2 Track - 2 Glass shutter window/ ventilator, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Fourth Floor )

5

-

-

... More
95.G Two Track Two Glass Shutter Window: Providing and fixing aluminium color anodized system sliding window of various sizes. Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim scries or equivalent System. Windows will be of specially extruded aluminium 2 Track - 2 Glass shutter window/ ventilator, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Fifth Floor )

5

-

-

... More
95.H Two Track Two Glass Shutter Window: Providing and fixing aluminium color anodized system sliding window of various sizes. Window will be made from Geeta / Malwin/Lexil/Brandson, 25 to 27 mm slim scries or equivalent System. Windows will be of specially extruded aluminium 2 Track - 2 Glass shutter window/ ventilator, track joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed with specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have single point self pressing lock. All fixing screws will be of SS ( Sixth Floor )

5

-

-

... More
96.C Aluminium System Color Anodized Partly Fixed partly Openable Window : Providing and fixing aluminium system color anodized Partly Fixed partly Openable window of various sizes. Casement will be made from Geeta/Malwin/Lexil/Brandson, 40 min series or equivalent System. Windows will be of specially extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with S S 202 wood screws. Fixed glass casement will be made from specially extruded aluminum section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joots joints will be fixed with specially developed clits to form uniform hairline joint. All fixing screws will be of S S 202. Windows will The sealed with weather sealant from outer periphery, etc. all complete as per architectural drawings and the directions of the engineers-in-charge ( First Floor )

10.08

-

-

... More
96.D Aluminium System Color Anodized Partly Fixed partly Openable Window : Providing and fixing aluminium system color anodized Partly Fixed partly Openable window of various sizes. Casement will be made from Geeta/Malwin/Lexil/Brandson, 40 min series or equivalent System. Windows will be of specially extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with S S 202 wood screws. Fixed glass casement will be made from specially extruded aluminum section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joots joints will be fixed with specially developed clits to form uniform hairline joint. All fixing screws will be of S S 202. Windows will The sealed with weather sealant from outer periphery, etc. all complete as per architectural drawings and the directions of the engineers-in-charge ( Second Floor )

13.86

-

-

... More
96.E Aluminium System Color Anodized Partly Fixed partly Openable Window : Providing and fixing aluminium system color anodized Partly Fixed partly Openable window of various sizes. Casement will be made from Geeta/Malwin/Lexil/Brandson, 40 min series or equivalent System. Windows will be of specially extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with S S 202 wood screws. Fixed glass casement will be made from specially extruded aluminum section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joots joints will be fixed with specially developed clits to form uniform hairline joint. All fixing screws will be of S S 202. Windows will The sealed with weather sealant from outer periphery, etc. all complete as per architectural drawings and the directions of the engineers-in-charge ( Third Floor )

6.3

-

-

... More
96.F Aluminium System Color Anodized Partly Fixed partly Openable Window : Providing and fixing aluminium system color anodized Partly Fixed partly Openable window of various sizes. Casement will be made from Geeta/Malwin/Lexil/Brandson, 40 min series or equivalent System. Windows will be of specially extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with S S 202 wood screws. Fixed glass casement will be made from specially extruded aluminum section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joots joints will be fixed with specially developed clits to form uniform hairline joint. All fixing screws will be of S S 202. Windows will The sealed with weather sealant from outer periphery, etc. all complete as per architectural drawings and the directions of the engineers-in-charge ( Fourth Floor )

6.3

-

-

... More
96.G Aluminium System Color Anodized Partly Fixed partly Openable Window : Providing and fixing aluminium system color anodized Partly Fixed partly Openable window of various sizes. Casement will be made from Geeta/Malwin/Lexil/Brandson, 40 min series or equivalent System. Windows will be of specially extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with S S 202 wood screws. Fixed glass casement will be made from specially extruded aluminum section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joots joints will be fixed with specially developed clits to form uniform hairline joint. All fixing screws will be of S S 202. Windows will The sealed with weather sealant from outer periphery, etc. all complete as per architectural drawings and the directions of the engineers-in-charge ( Fifth Floor )

2.52

-

-

... More
96.H Aluminium System Color Anodized Partly Fixed partly Openable Window : Providing and fixing aluminium system color anodized Partly Fixed partly Openable window of various sizes. Casement will be made from Geeta/Malwin/Lexil/Brandson, 40 min series or equivalent System. Windows will be of specially extruded aluminium section, joints will be of 45 degree joints, joints will be fixed with specially developed clits. Track frame will be fixed to the masonry opening of windows with S S 202 wood screws. Fixed glass casement will be made from specially extruded aluminum section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joots joints will be fixed with specially developed clits to form uniform hairline joint. All fixing screws will be of S S 202. Windows will The sealed with weather sealant from outer periphery, etc. all complete as per architectural drawings and the directions of the engineers-in-charge ( Sixth Floor )

2.52

-

-

... More
97.B Openable Shutters/Windows in Structural/Curtain Glazing: Providing and fixing openable shutter in structural glazing work of 5mmtk tented toughened glass with frame work made of aluminum RHS of size 64mm x 58ınm color anodized as per design and drawing, aluminum sections should be confirming IS 63400, glass pasted to frame work with 3M VHB tape and DOW CORNING 995 silicon sealant and gaps between glass panels should be filled by clear Dow CORNING 789 silicon weather proofing sealant, with good quality SS friction hinges, rubber gaskets handles all necessary fasteners and accessories complete including With 24" Heavy S.S. Friction Hinges, Heavy Handles & 1" window Handle Section of approved make, shade all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories complete ( Ground Floor )

82.5

-

-

... More
97.C Openable Shutters/Windows in Structural/Curtain Glazing: Providing and fixing openable shutter in structural glazing work of 5mmtk tented toughened glass with frame work made of aluminum RHS of size 64mm x 58ınm color anodized as per design and drawing, aluminum sections should be confirming IS 63400, glass pasted to frame work with 3M VHB tape and DOW CORNING 995 silicon sealant and gaps between glass panels should be filled by clear Dow CORNING 789 silicon weather proofing sealant, with good quality SS friction hinges, rubber gaskets handles all necessary fasteners and accessories complete including With 24" Heavy S.S. Friction Hinges, Heavy Handles & 1" window Handle Section of approved make, shade all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories complete ( First Floor )

75

-

-

... More
97.D Openable Shutters/Windows in Structural/Curtain Glazing: Providing and fixing openable shutter in structural glazing work of 5mmtk tented toughened glass with frame work made of aluminum RHS of size 64mm x 58ınm color anodized as per design and drawing, aluminum sections should be confirming IS 63400, glass pasted to frame work with 3M VHB tape and DOW CORNING 995 silicon sealant and gaps between glass panels should be filled by clear Dow CORNING 789 silicon weather proofing sealant, with good quality SS friction hinges, rubber gaskets handles all necessary fasteners and accessories complete including With 24" Heavy S.S. Friction Hinges, Heavy Handles & 1" window Handle Section of approved make, shade all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories complete ( Second Floor )

112.5

-

-

... More
97.E Openable Shutters/Windows in Structural/Curtain Glazing: Providing and fixing openable shutter in structural glazing work of 5mmtk tented toughened glass with frame work made of aluminum RHS of size 64mm x 58ınm color anodized as per design and drawing, aluminum sections should be confirming IS 63400, glass pasted to frame work with 3M VHB tape and DOW CORNING 995 silicon sealant and gaps between glass panels should be filled by clear Dow CORNING 789 silicon weather proofing sealant, with good quality SS friction hinges, rubber gaskets handles all necessary fasteners and accessories complete including With 24" Heavy S.S. Friction Hinges, Heavy Handles & 1" window Handle Section of approved make, shade all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories complete ( Third Floor )

112.5

-

-

... More
97.F Openable Shutters/Windows in Structural/Curtain Glazing: Providing and fixing openable shutter in structural glazing work of 5mmtk tented toughened glass with frame work made of aluminum RHS of size 64mm x 58ınm color anodized as per design and drawing, aluminum sections should be confirming IS 63400, glass pasted to frame work with 3M VHB tape and DOW CORNING 995 silicon sealant and gaps between glass panels should be filled by clear Dow CORNING 789 silicon weather proofing sealant, with good quality SS friction hinges, rubber gaskets handles all necessary fasteners and accessories complete including With 24" Heavy S.S. Friction Hinges, Heavy Handles & 1" window Handle Section of approved make, shade all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories complete ( Fourth Floor )

112.5

-

-

... More
97.G Openable Shutters/Windows in Structural/Curtain Glazing: Providing and fixing openable shutter in structural glazing work of 5mmtk tented toughened glass with frame work made of aluminum RHS of size 64mm x 58ınm color anodized as per design and drawing, aluminum sections should be confirming IS 63400, glass pasted to frame work with 3M VHB tape and DOW CORNING 995 silicon sealant and gaps between glass panels should be filled by clear Dow CORNING 789 silicon weather proofing sealant, with good quality SS friction hinges, rubber gaskets handles all necessary fasteners and accessories complete including With 24" Heavy S.S. Friction Hinges, Heavy Handles & 1" window Handle Section of approved make, shade all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories complete ( Fifth Floor )

112.5

-

-

... More
97.H Openable Shutters/Windows in Structural/Curtain Glazing: Providing and fixing openable shutter in structural glazing work of 5mmtk tented toughened glass with frame work made of aluminum RHS of size 64mm x 58ınm color anodized as per design and drawing, aluminum sections should be confirming IS 63400, glass pasted to frame work with 3M VHB tape and DOW CORNING 995 silicon sealant and gaps between glass panels should be filled by clear Dow CORNING 789 silicon weather proofing sealant, with good quality SS friction hinges, rubber gaskets handles all necessary fasteners and accessories complete including With 24" Heavy S.S. Friction Hinges, Heavy Handles & 1" window Handle Section of approved make, shade all complete as per architectural drawings and the directions of the engineers-in-charge with all necessary fasteners and accessories complete ( Sixth Floor )

112.5

-

-

... More
98.B Design supply & installation of suspended Spider Glazing system designed to withstand the wind pressure as per IS 875 (Part-III). The Suspended System held with Spider Fittings of SS-316 Grade Steel of approved manufacturer with glass panel having 12 mm thick clear toughened glass held together with SS- 316 Grade Stainless steel Spider & bolt assembly with laminated glass fins 21 mm thick. The Glass fins and glass panel assembly shall be connected to Slab/beams by means of SS- 316 Grade stainless steel brackets & Anchor bolts and at the bottom using SS channel of 50x25x2mm using fastener & anchor bolts, non staining weather sealants of approved make, Teflon/ nylon bushes and separators to prevent bi-metallic contacts, all complete to perform as per specification and approved drawings. The complete system to be designed to accommodate thermal expansion & seismic movements etc. The joints between glass panels (6 to 8 mm) and gaps at the perimeter & in U channel of the assembly to be filled with non staining weather sealant, so as to make the entire system fully water proof & dust proof. The rate shall include all design, Engineering and shop drawing including approval from structural designer, labour, T&P, scaffolding, other incidental charges including wastage, enabling temporary services all fitting fixers nut bolts, washer, Buffer plates, fastener, anchors, SS channel laminated glass etc. all complete. For the purpose of payment, actual elevation area of Glazing including thickness of joints and the portion of Glass panel inside the SS channel shall be measured. ( Ground Floor )

82.5

-

-

... More
98.C Design supply & installation of suspended Spider Glazing system designed to withstand the wind pressure as per IS 875 (Part-III). The Suspended System held with Spider Fittings of SS-316 Grade Steel of approved manufacturer with glass panel having 12 mm thick clear toughened glass held together with SS- 316 Grade Stainless steel Spider & bolt assembly with laminated glass fins 21 mm thick. The Glass fins and glass panel assembly shall be connected to Slab/beams by means of SS- 316 Grade stainless steel brackets & Anchor bolts and at the bottom using SS channel of 50x25x2mm using fastener & anchor bolts, non staining weather sealants of approved make, Teflon/ nylon bushes and separators to prevent bi-metallic contacts, all complete to perform as per specification and approved drawings. The complete system to be designed to accommodate thermal expansion & seismic movements etc. The joints between glass panels (6 to 8 mm) and gaps at the perimeter & in U channel of the assembly to be filled with non staining weather sealant, so as to make the entire system fully water proof & dust proof. The rate shall include all design, Engineering and shop drawing including approval from structural designer, labour, T&P, scaffolding, other incidental charges including wastage, enabling temporary services all fitting fixers nut bolts, washer, Buffer plates, fastener, anchors, SS channel laminated glass etc. all complete. For the purpose of payment, actual elevation area of Glazing including thickness of joints and the portion of Glass panel inside the SS channel shall be measured. ( First Floor )

75

-

-

... More
98.D Design supply & installation of suspended Spider Glazing system designed to withstand the wind pressure as per IS 875 (Part-III). The Suspended System held with Spider Fittings of SS-316 Grade Steel of approved manufacturer with glass panel having 12 mm thick clear toughened glass held together with SS- 316 Grade Stainless steel Spider & bolt assembly with laminated glass fins 21 mm thick. The Glass fins and glass panel assembly shall be connected to Slab/beams by means of SS- 316 Grade stainless steel brackets & Anchor bolts and at the bottom using SS channel of 50x25x2mm using fastener & anchor bolts, non staining weather sealants of approved make, Teflon/ nylon bushes and separators to prevent bi-metallic contacts, all complete to perform as per specification and approved drawings. The complete system to be designed to accommodate thermal expansion & seismic movements etc. The joints between glass panels (6 to 8 mm) and gaps at the perimeter & in U channel of the assembly to be filled with non staining weather sealant, so as to make the entire system fully water proof & dust proof. The rate shall include all design, Engineering and shop drawing including approval from structural designer, labour, T&P, scaffolding, other incidental charges including wastage, enabling temporary services all fitting fixers nut bolts, washer, Buffer plates, fastener, anchors, SS channel laminated glass etc. all complete. For the purpose of payment, actual elevation area of Glazing including thickness of joints and the portion of Glass panel inside the SS channel shall be measured. ( Second Floor )

112.5

-

-

... More
98.E Design supply & installation of suspended Spider Glazing system designed to withstand the wind pressure as per IS 875 (Part-III). The Suspended System held with Spider Fittings of SS-316 Grade Steel of approved manufacturer with glass panel having 12 mm thick clear toughened glass held together with SS- 316 Grade Stainless steel Spider & bolt assembly with laminated glass fins 21 mm thick. The Glass fins and glass panel assembly shall be connected to Slab/beams by means of SS- 316 Grade stainless steel brackets & Anchor bolts and at the bottom using SS channel of 50x25x2mm using fastener & anchor bolts, non staining weather sealants of approved make, Teflon/ nylon bushes and separators to prevent bi-metallic contacts, all complete to perform as per specification and approved drawings. The complete system to be designed to accommodate thermal expansion & seismic movements etc. The joints between glass panels (6 to 8 mm) and gaps at the perimeter & in U channel of the assembly to be filled with non staining weather sealant, so as to make the entire system fully water proof & dust proof. The rate shall include all design, Engineering and shop drawing including approval from structural designer, labour, T&P, scaffolding, other incidental charges including wastage, enabling temporary services all fitting fixers nut bolts, washer, Buffer plates, fastener, anchors, SS channel laminated glass etc. all complete. For the purpose of payment, actual elevation area of Glazing including thickness of joints and the portion of Glass panel inside the SS channel shall be measured. ( Third Floor )

112.5

-

-

... More
98.F Design supply & installation of suspended Spider Glazing system designed to withstand the wind pressure as per IS 875 (Part-III). The Suspended System held with Spider Fittings of SS-316 Grade Steel of approved manufacturer with glass panel having 12 mm thick clear toughened glass held together with SS- 316 Grade Stainless steel Spider & bolt assembly with laminated glass fins 21 mm thick. The Glass fins and glass panel assembly shall be connected to Slab/beams by means of SS- 316 Grade stainless steel brackets & Anchor bolts and at the bottom using SS channel of 50x25x2mm using fastener & anchor bolts, non staining weather sealants of approved make, Teflon/ nylon bushes and separators to prevent bi-metallic contacts, all complete to perform as per specification and approved drawings. The complete system to be designed to accommodate thermal expansion & seismic movements etc. The joints between glass panels (6 to 8 mm) and gaps at the perimeter & in U channel of the assembly to be filled with non staining weather sealant, so as to make the entire system fully water proof & dust proof. The rate shall include all design, Engineering and shop drawing including approval from structural designer, labour, T&P, scaffolding, other incidental charges including wastage, enabling temporary services all fitting fixers nut bolts, washer, Buffer plates, fastener, anchors, SS channel laminated glass etc. all complete. For the purpose of payment, actual elevation area of Glazing including thickness of joints and the portion of Glass panel inside the SS channel shall be measured. ( Fourth Floor )

112.5

-

-

... More
98.G Design supply & installation of suspended Spider Glazing system designed to withstand the wind pressure as per IS 875 (Part-III). The Suspended System held with Spider Fittings of SS-316 Grade Steel of approved manufacturer with glass panel having 12 mm thick clear toughened glass held together with SS- 316 Grade Stainless steel Spider & bolt assembly with laminated glass fins 21 mm thick. The Glass fins and glass panel assembly shall be connected to Slab/beams by means of SS- 316 Grade stainless steel brackets & Anchor bolts and at the bottom using SS channel of 50x25x2mm using fastener & anchor bolts, non staining weather sealants of approved make, Teflon/ nylon bushes and separators to prevent bi-metallic contacts, all complete to perform as per specification and approved drawings. The complete system to be designed to accommodate thermal expansion & seismic movements etc. The joints between glass panels (6 to 8 mm) and gaps at the perimeter & in U channel of the assembly to be filled with non staining weather sealant, so as to make the entire system fully water proof & dust proof. The rate shall include all design, Engineering and shop drawing including approval from structural designer, labour, T&P, scaffolding, other incidental charges including wastage, enabling temporary services all fitting fixers nut bolts, washer, Buffer plates, fastener, anchors, SS channel laminated glass etc. all complete. For the purpose of payment, actual elevation area of Glazing including thickness of joints and the portion of Glass panel inside the SS channel shall be measured. ( Fifth Floor )

112.5

-

-

... More
99.D FULL HEIGHT SINGLE GLAZED PARTITION TILL 2700MM (H)- Fabricating Glass Partitions formed out of the following components. Supply & Installation of proprietary Blk Anodized Aluminum wideline systems of 45 X 25mm thk section on all four sides for the partition using approved section in Horizontals on top & as verticals as Horizontals at bottom  sections or equivalent as per details. Finish of frame : Silver Anodized as approved by architect Glazing: The glazing to be formed out of 10mm thick toughened glass as per details. The glass to be butt jointed with 2 to 3 mm edge chamfer & edge polishing all around. The butt joint of the glass should have the I section of matching to glass thickness. Glass panels for height 2700mm to be single piece as per location. including all required scafolding as directed by Engineer- In- Charge. ( Second Floor )

323

-

-

... More
99.E FULL HEIGHT SINGLE GLAZED PARTITION TILL 2700MM (H)- Fabricating Glass Partitions formed out of the following components. Supply & Installation of proprietary Blk Anodized Aluminum wideline systems of 45 X 25mm thk section on all four sides for the partition using approved section in Horizontals on top & as verticals as Horizontals at bottom  sections or equivalent as per details. Finish of frame : Silver Anodized as approved by architect Glazing: The glazing to be formed out of 10mm thick toughened glass as per details. The glass to be butt jointed with 2 to 3 mm edge chamfer & edge polishing all around. The butt joint of the glass should have the I section of matching to glass thickness. Glass panels for height 2700mm to be single piece as per location. including all required scafolding as directed by Engineer- In- Charge. ( Third Floor )

323

-

-

... More
99.F FULL HEIGHT SINGLE GLAZED PARTITION TILL 2700MM (H)- Fabricating Glass Partitions formed out of the following components. Supply & Installation of proprietary Blk Anodized Aluminum wideline systems of 45 X 25mm thk section on all four sides for the partition using approved section in Horizontals on top & as verticals as Horizontals at bottom  sections or equivalent as per details. Finish of frame : Silver Anodized as approved by architect Glazing: The glazing to be formed out of 10mm thick toughened glass as per details. The glass to be butt jointed with 2 to 3 mm edge chamfer & edge polishing all around. The butt joint of the glass should have the I section of matching to glass thickness. Glass panels for height 2700mm to be single piece as per location. including all required scafolding as directed by Engineer- In- Charge. ( Fourth Floor )

323

-

-

... More
99.G FULL HEIGHT SINGLE GLAZED PARTITION TILL 2700MM (H)- Fabricating Glass Partitions formed out of the following components. Supply & Installation of proprietary Blk Anodized Aluminum wideline systems of 45 X 25mm thk section on all four sides for the partition using approved section in Horizontals on top & as verticals as Horizontals at bottom  sections or equivalent as per details. Finish of frame : Silver Anodized as approved by architect Glazing: The glazing to be formed out of 10mm thick toughened glass as per details. The glass to be butt jointed with 2 to 3 mm edge chamfer & edge polishing all around. The butt joint of the glass should have the I section of matching to glass thickness. Glass panels for height 2700mm to be single piece as per location. including all required scafolding as directed by Engineer- In- Charge. ( Fifth Floor )

25

-

-

... More
99.H FULL HEIGHT SINGLE GLAZED PARTITION TILL 2700MM (H)- Fabricating Glass Partitions formed out of the following components. Supply & Installation of proprietary Blk Anodized Aluminum wideline systems of 45 X 25mm thk section on all four sides for the partition using approved section in Horizontals on top & as verticals as Horizontals at bottom  sections or equivalent as per details. Finish of frame : Silver Anodized as approved by architect Glazing: The glazing to be formed out of 10mm thick toughened glass as per details. The glass to be butt jointed with 2 to 3 mm edge chamfer & edge polishing all around. The butt joint of the glass should have the I section of matching to glass thickness. Glass panels for height 2700mm to be single piece as per location. including all required scafolding as directed by Engineer- In- Charge. ( Sixth Floor )

25

-

-

... More
100.C 75mm thick Gypserra stud or equivalent partition which includes single layer of tapered edge 12.5mm thick Gypboard or equivalent Plain (conforming to IS 2095 Part 1:2011, Certified board) of size 1219x2438mm is screw fixed to C-stud. 48x0.5mm Gypserra or equivalent C-stud (Material-IS 513, Y/S-300Mpa, Finish - AZ150 (IS 15961)) placed at 610mm c/c in 50x0.5mm Gypserra or equivalent (Material- IS 513.Y/S-300Mpa, Finish-AZ150 (IS 15961)) floor and ceiling channel. Floor & Ceiling channel is anchored to the floor & True ceiling using Gyproc or equivalent Rawl plug 08x45mm (Material-IS 513 CRI grade. Zine coating, Pull Out Load-6.8kN for M30 concrete grade) /Hilti X-GN20MX anchor fasteners at 600mm c/c in center line. Floor channel to be wrapped with 70µ Self Adhesive LDPE moisture barrier film to further improve corrosion resistance performance. A Gypserra or equivalent noggin channel (Material-IS 513,Y/S- 300 Mpa, Finish - AZ150 (IS 15961)1 of 48x0.5mm width has to be provided at the horizontal joints of the two boards. Gyproc or equivalent boards to be screw fixed with Gyproc or equivalent drywall screws of 25mm at minimum spacing of 300mm at centre and 150nun at periphery. 25mm Glass wool slab of density 20kg/m' shall be placed in metal framework. Glass wool holding clip should be used to hold Glass wool slab in its position. Finally square and tapered edges of the boards are to be jointed and finished so as to have a flush look which includes filling and finishing with Gyproc or equivalent Pro-Fill Jointing compound (Conforms to ASTM C475), Gyproc Joint Paper tape or fiber uipe. The junction of the partition with masonry & all penetration through the partition has to be treated with Hilti/Pyroplex acoustic sealant. All other detailing and specifications to be followed as per approved drawing of Gyproc or equivalent. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge ( First Floor )

112.83

-

-

... More
100.D 75mm thick Gypserra stud or equivalent partition which includes single layer of tapered edge 12.5mm thick Gypboard or equivalent Plain (conforming to IS 2095 Part 1:2011, Certified board) of size 1219x2438mm is screw fixed to C-stud. 48x0.5mm Gypserra or equivalent C-stud (Material-IS 513, Y/S-300Mpa, Finish - AZ150 (IS 15961)) placed at 610mm c/c in 50x0.5mm Gypserra or equivalent (Material- IS 513.Y/S-300Mpa, Finish-AZ150 (IS 15961)) floor and ceiling channel. Floor & Ceiling channel is anchored to the floor & True ceiling using Gyproc or equivalent Rawl plug 08x45mm (Material-IS 513 CRI grade. Zine coating, Pull Out Load-6.8kN for M30 concrete grade) /Hilti X-GN20MX anchor fasteners at 600mm c/c in center line. Floor channel to be wrapped with 70µ Self Adhesive LDPE moisture barrier film to further improve corrosion resistance performance. A Gypserra or equivalent noggin channel (Material-IS 513,Y/S- 300 Mpa, Finish - AZ150 (IS 15961)1 of 48x0.5mm width has to be provided at the horizontal joints of the two boards. Gyproc or equivalent boards to be screw fixed with Gyproc or equivalent drywall screws of 25mm at minimum spacing of 300mm at centre and 150nun at periphery. 25mm Glass wool slab of density 20kg/m' shall be placed in metal framework. Glass wool holding clip should be used to hold Glass wool slab in its position. Finally square and tapered edges of the boards are to be jointed and finished so as to have a flush look which includes filling and finishing with Gyproc or equivalent Pro-Fill Jointing compound (Conforms to ASTM C475), Gyproc Joint Paper tape or fiber uipe. The junction of the partition with masonry & all penetration through the partition has to be treated with Hilti/Pyroplex acoustic sealant. All other detailing and specifications to be followed as per approved drawing of Gyproc or equivalent. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge ( Second Floor )

412.83

-

-

... More
100.E 75mm thick Gypserra stud or equivalent partition which includes single layer of tapered edge 12.5mm thick Gypboard or equivalent Plain (conforming to IS 2095 Part 1:2011, Certified board) of size 1219x2438mm is screw fixed to C-stud. 48x0.5mm Gypserra or equivalent C-stud (Material-IS 513, Y/S-300Mpa, Finish - AZ150 (IS 15961)) placed at 610mm c/c in 50x0.5mm Gypserra or equivalent (Material- IS 513.Y/S-300Mpa, Finish-AZ150 (IS 15961)) floor and ceiling channel. Floor & Ceiling channel is anchored to the floor & True ceiling using Gyproc or equivalent Rawl plug 08x45mm (Material-IS 513 CRI grade. Zine coating, Pull Out Load-6.8kN for M30 concrete grade) /Hilti X-GN20MX anchor fasteners at 600mm c/c in center line. Floor channel to be wrapped with 70µ Self Adhesive LDPE moisture barrier film to further improve corrosion resistance performance. A Gypserra or equivalent noggin channel (Material-IS 513,Y/S- 300 Mpa, Finish - AZ150 (IS 15961)1 of 48x0.5mm width has to be provided at the horizontal joints of the two boards. Gyproc or equivalent boards to be screw fixed with Gyproc or equivalent drywall screws of 25mm at minimum spacing of 300mm at centre and 150nun at periphery. 25mm Glass wool slab of density 20kg/m' shall be placed in metal framework. Glass wool holding clip should be used to hold Glass wool slab in its position. Finally square and tapered edges of the boards are to be jointed and finished so as to have a flush look which includes filling and finishing with Gyproc or equivalent Pro-Fill Jointing compound (Conforms to ASTM C475), Gyproc Joint Paper tape or fiber uipe. The junction of the partition with masonry & all penetration through the partition has to be treated with Hilti/Pyroplex acoustic sealant. All other detailing and specifications to be followed as per approved drawing of Gyproc or equivalent. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge ( Third Floor )

412.83

-

-

... More
100.F 75mm thick Gypserra stud or equivalent partition which includes single layer of tapered edge 12.5mm thick Gypboard or equivalent Plain (conforming to IS 2095 Part 1:2011, Certified board) of size 1219x2438mm is screw fixed to C-stud. 48x0.5mm Gypserra or equivalent C-stud (Material-IS 513, Y/S-300Mpa, Finish - AZ150 (IS 15961)) placed at 610mm c/c in 50x0.5mm Gypserra or equivalent (Material- IS 513.Y/S-300Mpa, Finish-AZ150 (IS 15961)) floor and ceiling channel. Floor & Ceiling channel is anchored to the floor & True ceiling using Gyproc or equivalent Rawl plug 08x45mm (Material-IS 513 CRI grade. Zine coating, Pull Out Load-6.8kN for M30 concrete grade) /Hilti X-GN20MX anchor fasteners at 600mm c/c in center line. Floor channel to be wrapped with 70µ Self Adhesive LDPE moisture barrier film to further improve corrosion resistance performance. A Gypserra or equivalent noggin channel (Material-IS 513,Y/S- 300 Mpa, Finish - AZ150 (IS 15961)1 of 48x0.5mm width has to be provided at the horizontal joints of the two boards. Gyproc or equivalent boards to be screw fixed with Gyproc or equivalent drywall screws of 25mm at minimum spacing of 300mm at centre and 150nun at periphery. 25mm Glass wool slab of density 20kg/m' shall be placed in metal framework. Glass wool holding clip should be used to hold Glass wool slab in its position. Finally square and tapered edges of the boards are to be jointed and finished so as to have a flush look which includes filling and finishing with Gyproc or equivalent Pro-Fill Jointing compound (Conforms to ASTM C475), Gyproc Joint Paper tape or fiber uipe. The junction of the partition with masonry & all penetration through the partition has to be treated with Hilti/Pyroplex acoustic sealant. All other detailing and specifications to be followed as per approved drawing of Gyproc or equivalent. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge ( Fourth Floor )

343.71

-

-

... More
100.G 75mm thick Gypserra stud or equivalent partition which includes single layer of tapered edge 12.5mm thick Gypboard or equivalent Plain (conforming to IS 2095 Part 1:2011, Certified board) of size 1219x2438mm is screw fixed to C-stud. 48x0.5mm Gypserra or equivalent C-stud (Material-IS 513, Y/S-300Mpa, Finish - AZ150 (IS 15961)) placed at 610mm c/c in 50x0.5mm Gypserra or equivalent (Material- IS 513.Y/S-300Mpa, Finish-AZ150 (IS 15961)) floor and ceiling channel. Floor & Ceiling channel is anchored to the floor & True ceiling using Gyproc or equivalent Rawl plug 08x45mm (Material-IS 513 CRI grade. Zine coating, Pull Out Load-6.8kN for M30 concrete grade) /Hilti X-GN20MX anchor fasteners at 600mm c/c in center line. Floor channel to be wrapped with 70µ Self Adhesive LDPE moisture barrier film to further improve corrosion resistance performance. A Gypserra or equivalent noggin channel (Material-IS 513,Y/S- 300 Mpa, Finish - AZ150 (IS 15961)1 of 48x0.5mm width has to be provided at the horizontal joints of the two boards. Gyproc or equivalent boards to be screw fixed with Gyproc or equivalent drywall screws of 25mm at minimum spacing of 300mm at centre and 150nun at periphery. 25mm Glass wool slab of density 20kg/m' shall be placed in metal framework. Glass wool holding clip should be used to hold Glass wool slab in its position. Finally square and tapered edges of the boards are to be jointed and finished so as to have a flush look which includes filling and finishing with Gyproc or equivalent Pro-Fill Jointing compound (Conforms to ASTM C475), Gyproc Joint Paper tape or fiber uipe. The junction of the partition with masonry & all penetration through the partition has to be treated with Hilti/Pyroplex acoustic sealant. All other detailing and specifications to be followed as per approved drawing of Gyproc or equivalent. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge ( Fifth Floor )

193.71

-

-

... More
100.H 75mm thick Gypserra stud or equivalent partition which includes single layer of tapered edge 12.5mm thick Gypboard or equivalent Plain (conforming to IS 2095 Part 1:2011, Certified board) of size 1219x2438mm is screw fixed to C-stud. 48x0.5mm Gypserra or equivalent C-stud (Material-IS 513, Y/S-300Mpa, Finish - AZ150 (IS 15961)) placed at 610mm c/c in 50x0.5mm Gypserra or equivalent (Material- IS 513.Y/S-300Mpa, Finish-AZ150 (IS 15961)) floor and ceiling channel. Floor & Ceiling channel is anchored to the floor & True ceiling using Gyproc or equivalent Rawl plug 08x45mm (Material-IS 513 CRI grade. Zine coating, Pull Out Load-6.8kN for M30 concrete grade) /Hilti X-GN20MX anchor fasteners at 600mm c/c in center line. Floor channel to be wrapped with 70µ Self Adhesive LDPE moisture barrier film to further improve corrosion resistance performance. A Gypserra or equivalent noggin channel (Material-IS 513,Y/S- 300 Mpa, Finish - AZ150 (IS 15961)1 of 48x0.5mm width has to be provided at the horizontal joints of the two boards. Gyproc or equivalent boards to be screw fixed with Gyproc or equivalent drywall screws of 25mm at minimum spacing of 300mm at centre and 150nun at periphery. 25mm Glass wool slab of density 20kg/m' shall be placed in metal framework. Glass wool holding clip should be used to hold Glass wool slab in its position. Finally square and tapered edges of the boards are to be jointed and finished so as to have a flush look which includes filling and finishing with Gyproc or equivalent Pro-Fill Jointing compound (Conforms to ASTM C475), Gyproc Joint Paper tape or fiber uipe. The junction of the partition with masonry & all penetration through the partition has to be treated with Hilti/Pyroplex acoustic sealant. All other detailing and specifications to be followed as per approved drawing of Gyproc or equivalent. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge ( Sixth Floor )

159.15

-

-

... More
101.D Single Glazed Single Leaf Site Door Supply & Installation of door as per following specifications: SIZE : 1000 MM X 2700 MM, No of Leaves : 01, Door Jamb : 45 X 25 mm Proprietary aluminum Section with Silver Anodized, Action : Single Swing, Construction : 10mm Thk Toughened Glass door with Silver Anodized Stile around the glass, Finish : Silver Anodized, Hinge Type : BB Hinges , Lock Set : Dead Lock with 70mm EPC with one side key one side know , Door Handle : 600mm Double D Pull Handle, Door Closer :O/h Door Closer with Hold open Unit Rack & Pinion type, Door Stopper : Floor Mounted Stopper, Seals : Drop Down Proprietary Seal, Hardware Make : Geze / Dorma / Vedic or equivalent, Security System : Provision of cess control to be given by the vendor whereever required, including all required scafolding as directed by Engineer- In- Charge. ( Second Floor )

134

-

-

... More
101.E Single Glazed Single Leaf Site Door Supply & Installation of door as per following specifications: SIZE : 1000 MM X 2700 MM, No of Leaves : 01, Door Jamb : 45 X 25 mm Proprietary aluminum Section with Silver Anodized, Action : Single Swing, Construction : 10mm Thk Toughened Glass door with Silver Anodized Stile around the glass, Finish : Silver Anodized, Hinge Type : BB Hinges , Lock Set : Dead Lock with 70mm EPC with one side key one side know , Door Handle : 600mm Double D Pull Handle, Door Closer :O/h Door Closer with Hold open Unit Rack & Pinion type, Door Stopper : Floor Mounted Stopper, Seals : Drop Down Proprietary Seal, Hardware Make : Geze / Dorma / Vedic or equivalent, Security System : Provision of cess control to be given by the vendor whereever required, including all required scafolding as directed by Engineer- In- Charge. ( Third Floor )

134

-

-

... More
101.F Single Glazed Single Leaf Site Door Supply & Installation of door as per following specifications: SIZE : 1000 MM X 2700 MM, No of Leaves : 01, Door Jamb : 45 X 25 mm Proprietary aluminum Section with Silver Anodized, Action : Single Swing, Construction : 10mm Thk Toughened Glass door with Silver Anodized Stile around the glass, Finish : Silver Anodized, Hinge Type : BB Hinges , Lock Set : Dead Lock with 70mm EPC with one side key one side know , Door Handle : 600mm Double D Pull Handle, Door Closer :O/h Door Closer with Hold open Unit Rack & Pinion type, Door Stopper : Floor Mounted Stopper, Seals : Drop Down Proprietary Seal, Hardware Make : Geze / Dorma / Vedic or equivalent, Security System : Provision of cess control to be given by the vendor whereever required, including all required scafolding as directed by Engineer- In- Charge. ( Fourth Floor )

134

-

-

... More
101.G Single Glazed Single Leaf Site Door Supply & Installation of door as per following specifications: SIZE : 1000 MM X 2700 MM, No of Leaves : 01, Door Jamb : 45 X 25 mm Proprietary aluminum Section with Silver Anodized, Action : Single Swing, Construction : 10mm Thk Toughened Glass door with Silver Anodized Stile around the glass, Finish : Silver Anodized, Hinge Type : BB Hinges , Lock Set : Dead Lock with 70mm EPC with one side key one side know , Door Handle : 600mm Double D Pull Handle, Door Closer :O/h Door Closer with Hold open Unit Rack & Pinion type, Door Stopper : Floor Mounted Stopper, Seals : Drop Down Proprietary Seal, Hardware Make : Geze / Dorma / Vedic or equivalent, Security System : Provision of cess control to be given by the vendor whereever required, including all required scafolding as directed by Engineer- In- Charge. ( Fifth Floor )

41

-

-

... More
101.H Single Glazed Single Leaf Site Door Supply & Installation of door as per following specifications: SIZE : 1000 MM X 2700 MM, No of Leaves : 01, Door Jamb : 45 X 25 mm Proprietary aluminum Section with Silver Anodized, Action : Single Swing, Construction : 10mm Thk Toughened Glass door with Silver Anodized Stile around the glass, Finish : Silver Anodized, Hinge Type : BB Hinges , Lock Set : Dead Lock with 70mm EPC with one side key one side know , Door Handle : 600mm Double D Pull Handle, Door Closer :O/h Door Closer with Hold open Unit Rack & Pinion type, Door Stopper : Floor Mounted Stopper, Seals : Drop Down Proprietary Seal, Hardware Make : Geze / Dorma / Vedic or equivalent, Security System : Provision of cess control to be given by the vendor whereever required, including all required scafolding as directed by Engineer- In- Charge. ( Sixth Floor )

41

-

-

... More
102.D Single Glazed Single Leaf Glass Door on Hinges Supply & Installation of door as per following specifications: SIZE : 1000 MM X 2700 MM, No of Leaves : 01, Door Jamb : 45 X 25 mm Proprietary aluminum Section with Silver Anodized, Action : Single Swing, Construction : 10mm Thk Toughened Glass door, Finish : Silver Anodized, Hinge Type : lass Door Hinges X 4 Nos , Lock Set : Corner Lock with 60mm EPC both side key, Door Handle : 600mm Double H Type Handle, Door Closer :O/h Door Closer with Hold open Unit Rack & Pinion type with saddle Plate, Door Stopper : Floor Mounted Stopper, Seals : NA, Hardware Make : Geze / Dorma / Vedic or equivalent, Security System : Provision of cess control to be given by the vendor whereever required, including all required scafolding as directed by Engineer- In- Charge. ( Second Floor )

134

-

-

... More
102.E Single Glazed Single Leaf Glass Door on Hinges Supply & Installation of door as per following specifications: SIZE : 1000 MM X 2700 MM, No of Leaves : 01, Door Jamb : 45 X 25 mm Proprietary aluminum Section with Silver Anodized, Action : Single Swing, Construction : 10mm Thk Toughened Glass door, Finish : Silver Anodized, Hinge Type : lass Door Hinges X 4 Nos , Lock Set : Corner Lock with 60mm EPC both side key, Door Handle : 600mm Double H Type Handle, Door Closer :O/h Door Closer with Hold open Unit Rack & Pinion type with saddle Plate, Door Stopper : Floor Mounted Stopper, Seals : NA, Hardware Make : Geze / Dorma / Vedic or equivalent, Security System : Provision of cess control to be given by the vendor whereever required, including all required scafolding as directed by Engineer- In- Charge. ( Third Floor )

134

-

-

... More
102.F Single Glazed Single Leaf Glass Door on Hinges Supply & Installation of door as per following specifications: SIZE : 1000 MM X 2700 MM, No of Leaves : 01, Door Jamb : 45 X 25 mm Proprietary aluminum Section with Silver Anodized, Action : Single Swing, Construction : 10mm Thk Toughened Glass door, Finish : Silver Anodized, Hinge Type : lass Door Hinges X 4 Nos , Lock Set : Corner Lock with 60mm EPC both side key, Door Handle : 600mm Double H Type Handle, Door Closer :O/h Door Closer with Hold open Unit Rack & Pinion type with saddle Plate, Door Stopper : Floor Mounted Stopper, Seals : NA, Hardware Make : Geze / Dorma / Vedic or equivalent, Security System : Provision of cess control to be given by the vendor whereever required, including all required scafolding as directed by Engineer- In- Charge. ( Fourth Floor )

134

-

-

... More
102.G Single Glazed Single Leaf Glass Door on Hinges Supply & Installation of door as per following specifications: SIZE : 1000 MM X 2700 MM, No of Leaves : 01, Door Jamb : 45 X 25 mm Proprietary aluminum Section with Silver Anodized, Action : Single Swing, Construction : 10mm Thk Toughened Glass door, Finish : Silver Anodized, Hinge Type : lass Door Hinges X 4 Nos , Lock Set : Corner Lock with 60mm EPC both side key, Door Handle : 600mm Double H Type Handle, Door Closer :O/h Door Closer with Hold open Unit Rack & Pinion type with saddle Plate, Door Stopper : Floor Mounted Stopper, Seals : NA, Hardware Make : Geze / Dorma / Vedic or equivalent, Security System : Provision of cess control to be given by the vendor whereever required, including all required scafolding as directed by Engineer- In- Charge. ( Fifth Floor )

41

-

-

... More
102.H Single Glazed Single Leaf Glass Door on Hinges Supply & Installation of door as per following specifications: SIZE : 1000 MM X 2700 MM, No of Leaves : 01, Door Jamb : 45 X 25 mm Proprietary aluminum Section with Silver Anodized, Action : Single Swing, Construction : 10mm Thk Toughened Glass door, Finish : Silver Anodized, Hinge Type : lass Door Hinges X 4 Nos , Lock Set : Corner Lock with 60mm EPC both side key, Door Handle : 600mm Double H Type Handle, Door Closer :O/h Door Closer with Hold open Unit Rack & Pinion type with saddle Plate, Door Stopper : Floor Mounted Stopper, Seals : NA, Hardware Make : Geze / Dorma / Vedic or equivalent, Security System : Provision of cess control to be given by the vendor whereever required, including all required scafolding as directed by Engineer- In- Charge. ( Sixth Floor )

41

-

-

... More
103.D ACOUSTIC WORK: Providing & Fixing in position, Acoustical Panelling made up of specifications as mentioned GI Framing: framing is often used to create the structural framework for acoustic panels. It provides a sturdy support structure. Chicken mesh filled with Synthwool. Synthwool - They are designed to absorb sound and improve acoustics in a room. PET PANEL- Pet Panels are highly absorptive acoustic panels with non-woven polyester fibre as its core. They form an effective remedy for reverberation related issues in interior spaces and are customizable to any design as per architectural design and drawings. etc including all lead, lift, required scaffolding completed as directed by Engineer-In-Charge. ( Second Floor )

835.93

-

-

... More
104.D ACOUSTICAL WOODWOOL FALSE CEILING: Providing & fixing of 100% Natural Material- Magnesite (Hygroscopic & biologically sound binding agent) bonded woodwool Heradesign planks of 600Mm*1200Mm *25Mm thickness made out of wood wool fiber of width 1Mm Fiber thickness mixed with Natural water & Magnesite (No-Cement) with open & smooth surface texture, Weight of panel to be 11.3 Kg/m2. A Completely harmless Environment & Human Friendly & also a disposable or recyclable Material & can last for more than 80 Years in building interiors As it has long lifespan & suitable for Indoor conditions with relative air humidity of upto 90%. Magnesite protects the wood cells against ageing & fungal attack. To achieve upto NRC=1.00 it should be a clear gap of 200Mm from wall slab along with the backing of Mineral wool of 50mm thick with 64 kg/m3 density. Ecologically Sound Material with high mechanical strength with Crash test of 90Km/H with Ball Impact Test DIN18032 & EN13964 with flying colors & A sustainable material (PEFC & FSC Certified) along with EPD Certified Acc. to EN ISO 14025 (AUB-Environmental Product declaration). Manufacturing tolerance for nominal size: Length, Width & Thickness ± 1 mm, & In a Standard Climate of 23° C and 50% rel. humidity. FIXING & SUBSTRUCTURE: Impact Resistant According to DIN-18023 or EN13964 to be Fixed on CD Sections Profile framework with Screw 9Pc/Panel & Centre Distance Support of 300Mm & Centre distance of Cross Profile would be at 600Mm & Main Profile at 900Mm CD Profile is made out of GI( Sections Profile 60/27/0.6Mm- 0.6MmThick x 60Mm Width x 0.27Mm height). The Main Profile is in the length of 3000mm & to form a section of 600mm x 1200mm. The CD Profile is to be suspended from soffit with the help of nonius hanger at a center distance of 900mm. UD Profile 28/27/0.6mm to be fixed on wall at the perimeter of the wall. If the main CD profile needs to extended, it needs to be connected with CD profile connector 60/27. The CD profiles to be connected to each other at the intersection by CD cross connector. Heradesign Superfine panels to be fixed to the ceiling with a minimum of 200mm void or gap with Galvanized screws of length 50Mm & Dia 4.5Mm with a backing of Mineral Wool of density 64kg/m3 density (50mm thick). Colour pf Panels : NATURAL BEIGE, Can be Painted to the desired colour (Any- RAL, NCS or StoColor Shades) using water based ( Second Floor )

577

-

-

... More
105.D Providing & Fixing in position Acoustical Doors along with 150 x 150 mm teak wood frame, doors made from 50mm Teak wood frame 600 x600 c to c filled with 1000 Gsm synthetic wool 50mm thick and 3mm Tecsound from both sides, 12mm waterproof ply & veneer from both sides , including 150mm heavy duty SS hinges (Geze / Dorma or eq.) 4 no each leaf, with Door-closer (Dorma / Geze or eq.) including cost of required Cut- Outs, decorative mouldings / finishing-items / melamine polish & Scaffolding as per Architectural & Acoustical Design & Instructions & Complete in all aspects .including all materials labour,finishing etc complete ( Second Floor )

30

-

-

... More
106.D Providing & Fixing in position, Carpet more than 800+ gsm, made with100% stain proof fibres of approved make along with 5mm underlay as per Architectural & Acoustical Design & Instructions & Complete in all aspects including all materials labour,finishing etc complete ( Second Floor )

598.4

-

-

... More
107.B Providing and fixing solid core flush door shutter in single leaf 33 mm thick including block board full pine bwp decorative type of exterior grade as per detailed drawings approved face veneers 4 mm thick as approved on both faces or as directed, all necessary beads, mouldings and lipping, wrought iron hold fasts, chromium plated fixtures and fastenings, with mortise lock. chromium plated handles on both sides, and finishing with melamine polish etc. complete. ( Ground Floor )

15.12

-

-

... More
107.C Providing and fixing solid core flush door shutter in single leaf 33 mm thick including block board full pine bwp decorative type of exterior grade as per detailed drawings approved face veneers 4 mm thick as approved on both faces or as directed, all necessary beads, mouldings and lipping, wrought iron hold fasts, chromium plated fixtures and fastenings, with mortise lock. chromium plated handles on both sides, and finishing with melamine polish etc. complete. ( First Floor )

18.9

-

-

... More
107.D Providing and fixing solid core flush door shutter in single leaf 33 mm thick including block board full pine bwp decorative type of exterior grade as per detailed drawings approved face veneers 4 mm thick as approved on both faces or as directed, all necessary beads, mouldings and lipping, wrought iron hold fasts, chromium plated fixtures and fastenings, with mortise lock. chromium plated handles on both sides, and finishing with melamine polish etc. complete. ( Second Floor )

73.02

-

-

... More
107.E Providing and fixing solid core flush door shutter in single leaf 33 mm thick including block board full pine bwp decorative type of exterior grade as per detailed drawings approved face veneers 4 mm thick as approved on both faces or as directed, all necessary beads, mouldings and lipping, wrought iron hold fasts, chromium plated fixtures and fastenings, with mortise lock. chromium plated handles on both sides, and finishing with melamine polish etc. complete. ( Third Floor )

46.08

-

-

... More
107.F Providing and fixing solid core flush door shutter in single leaf 33 mm thick including block board full pine bwp decorative type of exterior grade as per detailed drawings approved face veneers 4 mm thick as approved on both faces or as directed, all necessary beads, mouldings and lipping, wrought iron hold fasts, chromium plated fixtures and fastenings, with mortise lock. chromium plated handles on both sides, and finishing with melamine polish etc. complete. ( Fourth Floor )

65.76

-

-

... More
107.G Providing and fixing solid core flush door shutter in single leaf 33 mm thick including block board full pine bwp decorative type of exterior grade as per detailed drawings approved face veneers 4 mm thick as approved on both faces or as directed, all necessary beads, mouldings and lipping, wrought iron hold fasts, chromium plated fixtures and fastenings, with mortise lock. chromium plated handles on both sides, and finishing with melamine polish etc. complete. ( Fifth Floor )

65.76

-

-

... More
107.H Providing and fixing solid core flush door shutter in single leaf 33 mm thick including block board full pine bwp decorative type of exterior grade as per detailed drawings approved face veneers 4 mm thick as approved on both faces or as directed, all necessary beads, mouldings and lipping, wrought iron hold fasts, chromium plated fixtures and fastenings, with mortise lock. chromium plated handles on both sides, and finishing with melamine polish etc. complete. ( Sixth Floor )

65.76

-

-

... More
108.D Court Hall Door: Providing and fixing Door at court hall having size of 2.00m Length x 3.5m height of 70 mm thick made up of 19mm and 12mm thick commercial ply BWR grade (IS 303) frame work Aluminium Section 38mm x75mm x4mm finished with 4mm thick veneer finish to ply surface as per detailed drawing, with 12mm thick Toughened glass, wtih Brass Finish Door Handel 50mmx 600mm long, Hydraulic door closer shall be provided, necessory Fevicol, Anti terminete treatment, Nails, Abro tape, Brass Hinges-150 x50x 5mm (Heavy Duty), Tower Bolt Heavy in Brass 1500 mm Long at Top, Tower Bolt Heavy in Brass 300 mm Long at bottom, Dead lock with required labours including all leads and lift etc Complete as per drwing and design.All samples must be approved by the Project Architect and work must be done as directed by Engineer -In-Charge. (Including all taxes excluding GST) ( Second Floor )

73.44

-

-

... More
108.E Court Hall Door: Providing and fixing Door at court hall having size of 2.00m Length x 3.5m height of 70 mm thick made up of 19mm and 12mm thick commercial ply BWR grade (IS 303) frame work Aluminium Section 38mm x75mm x4mm finished with 4mm thick veneer finish to ply surface as per detailed drawing, with 12mm thick Toughened glass, wtih Brass Finish Door Handel 50mmx 600mm long, Hydraulic door closer shall be provided, necessory Fevicol, Anti terminete treatment, Nails, Abro tape, Brass Hinges-150 x50x 5mm (Heavy Duty), Tower Bolt Heavy in Brass 1500 mm Long at Top, Tower Bolt Heavy in Brass 300 mm Long at bottom, Dead lock with required labours including all leads and lift etc Complete as per drwing and design.All samples must be approved by the Project Architect and work must be done as directed by Engineer -In-Charge. (Including all taxes excluding GST) ( Third Floor )

57.6

-

-

... More
108.F Court Hall Door: Providing and fixing Door at court hall having size of 2.00m Length x 3.5m height of 70 mm thick made up of 19mm and 12mm thick commercial ply BWR grade (IS 303) frame work Aluminium Section 38mm x75mm x4mm finished with 4mm thick veneer finish to ply surface as per detailed drawing, with 12mm thick Toughened glass, wtih Brass Finish Door Handel 50mmx 600mm long, Hydraulic door closer shall be provided, necessory Fevicol, Anti terminete treatment, Nails, Abro tape, Brass Hinges-150 x50x 5mm (Heavy Duty), Tower Bolt Heavy in Brass 1500 mm Long at Top, Tower Bolt Heavy in Brass 300 mm Long at bottom, Dead lock with required labours including all leads and lift etc Complete as per drwing and design.All samples must be approved by the Project Architect and work must be done as directed by Engineer -In-Charge. (Including all taxes excluding GST) ( Fourth Floor )

36.48

-

-

... More
108.G Court Hall Door: Providing and fixing Door at court hall having size of 2.00m Length x 3.5m height of 70 mm thick made up of 19mm and 12mm thick commercial ply BWR grade (IS 303) frame work Aluminium Section 38mm x75mm x4mm finished with 4mm thick veneer finish to ply surface as per detailed drawing, with 12mm thick Toughened glass, wtih Brass Finish Door Handel 50mmx 600mm long, Hydraulic door closer shall be provided, necessory Fevicol, Anti terminete treatment, Nails, Abro tape, Brass Hinges-150 x50x 5mm (Heavy Duty), Tower Bolt Heavy in Brass 1500 mm Long at Top, Tower Bolt Heavy in Brass 300 mm Long at bottom, Dead lock with required labours including all leads and lift etc Complete as per drwing and design.All samples must be approved by the Project Architect and work must be done as directed by Engineer -In-Charge. (Including all taxes excluding GST) ( Fifth Floor )

36.48

-

-

... More
108.H Court Hall Door: Providing and fixing Door at court hall having size of 2.00m Length x 3.5m height of 70 mm thick made up of 19mm and 12mm thick commercial ply BWR grade (IS 303) frame work Aluminium Section 38mm x75mm x4mm finished with 4mm thick veneer finish to ply surface as per detailed drawing, with 12mm thick Toughened glass, wtih Brass Finish Door Handel 50mmx 600mm long, Hydraulic door closer shall be provided, necessory Fevicol, Anti terminete treatment, Nails, Abro tape, Brass Hinges-150 x50x 5mm (Heavy Duty), Tower Bolt Heavy in Brass 1500 mm Long at Top, Tower Bolt Heavy in Brass 300 mm Long at bottom, Dead lock with required labours including all leads and lift etc Complete as per drwing and design.All samples must be approved by the Project Architect and work must be done as directed by Engineer -In-Charge. (Including all taxes excluding GST) ( Sixth Floor )

36.48

-

-

... More
109.B Fire Door 55mm 2HR FRL (120/120) 3 Criteria - INTEGRITY / INSULATION/ STABILITY WOODEN DOOR - Fire Door Tested in accordance to IS: 3614 Part 2. Providing of 120 min Fire rated doors system duly tested for 3 criteria - Integrity, Insulation and Stability Criteria as per the IS: 3614 Part 2 and BS: 476 part 22 at National Test House, Govt of India laborator and/or with Central Building Research Institute, Govt of India undertaking with standard heating conditions as specified in IS:3614 Part II 1992 and BS: 476 part 20 & 22 1987 to achieve the required integrity, insulation and stability (i.e. to restrict the heat radiation, temperature rise on the non fire side to the maximum of 140° C above the ambient temperature on the exposed surface of the shutter. The fire doors are tested with NCBN technology ("Non Combustible by Nature"). a) Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 Kilogram/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete. ( Ground Floor )

15

-

-

... More
109.C Fire Door 55mm 2HR FRL (120/120) 3 Criteria - INTEGRITY / INSULATION/ STABILITY WOODEN DOOR - Fire Door Tested in accordance to IS: 3614 Part 2. Providing of 120 min Fire rated doors system duly tested for 3 criteria - Integrity, Insulation and Stability Criteria as per the IS: 3614 Part 2 and BS: 476 part 22 at National Test House, Govt of India laborator and/or with Central Building Research Institute, Govt of India undertaking with standard heating conditions as specified in IS:3614 Part II 1992 and BS: 476 part 20 & 22 1987 to achieve the required integrity, insulation and stability (i.e. to restrict the heat radiation, temperature rise on the non fire side to the maximum of 140° C above the ambient temperature on the exposed surface of the shutter. The fire doors are tested with NCBN technology ("Non Combustible by Nature"). a) Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 Kilogram/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete. ( First Floor )

15

-

-

... More
109.D Fire Door 55mm 2HR FRL (120/120) 3 Criteria - INTEGRITY / INSULATION/ STABILITY WOODEN DOOR - Fire Door Tested in accordance to IS: 3614 Part 2. Providing of 120 min Fire rated doors system duly tested for 3 criteria - Integrity, Insulation and Stability Criteria as per the IS: 3614 Part 2 and BS: 476 part 22 at National Test House, Govt of India laborator and/or with Central Building Research Institute, Govt of India undertaking with standard heating conditions as specified in IS:3614 Part II 1992 and BS: 476 part 20 & 22 1987 to achieve the required integrity, insulation and stability (i.e. to restrict the heat radiation, temperature rise on the non fire side to the maximum of 140° C above the ambient temperature on the exposed surface of the shutter. The fire doors are tested with NCBN technology ("Non Combustible by Nature"). a) Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 Kilogram/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete. ( Second Floor )

15

-

-

... More
109.E Fire Door 55mm 2HR FRL (120/120) 3 Criteria - INTEGRITY / INSULATION/ STABILITY WOODEN DOOR - Fire Door Tested in accordance to IS: 3614 Part 2. Providing of 120 min Fire rated doors system duly tested for 3 criteria - Integrity, Insulation and Stability Criteria as per the IS: 3614 Part 2 and BS: 476 part 22 at National Test House, Govt of India laborator and/or with Central Building Research Institute, Govt of India undertaking with standard heating conditions as specified in IS:3614 Part II 1992 and BS: 476 part 20 & 22 1987 to achieve the required integrity, insulation and stability (i.e. to restrict the heat radiation, temperature rise on the non fire side to the maximum of 140° C above the ambient temperature on the exposed surface of the shutter. The fire doors are tested with NCBN technology ("Non Combustible by Nature"). a) Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 Kilogram/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete. ( Third Floor )

15

-

-

... More
109.F Fire Door 55mm 2HR FRL (120/120) 3 Criteria - INTEGRITY / INSULATION/ STABILITY WOODEN DOOR - Fire Door Tested in accordance to IS: 3614 Part 2. Providing of 120 min Fire rated doors system duly tested for 3 criteria - Integrity, Insulation and Stability Criteria as per the IS: 3614 Part 2 and BS: 476 part 22 at National Test House, Govt of India laborator and/or with Central Building Research Institute, Govt of India undertaking with standard heating conditions as specified in IS:3614 Part II 1992 and BS: 476 part 20 & 22 1987 to achieve the required integrity, insulation and stability (i.e. to restrict the heat radiation, temperature rise on the non fire side to the maximum of 140° C above the ambient temperature on the exposed surface of the shutter. The fire doors are tested with NCBN technology ("Non Combustible by Nature"). a) Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 Kilogram/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete. ( Fourth Floor )

15

-

-

... More
109.G Fire Door 55mm 2HR FRL (120/120) 3 Criteria - INTEGRITY / INSULATION/ STABILITY WOODEN DOOR - Fire Door Tested in accordance to IS: 3614 Part 2. Providing of 120 min Fire rated doors system duly tested for 3 criteria - Integrity, Insulation and Stability Criteria as per the IS: 3614 Part 2 and BS: 476 part 22 at National Test House, Govt of India laborator and/or with Central Building Research Institute, Govt of India undertaking with standard heating conditions as specified in IS:3614 Part II 1992 and BS: 476 part 20 & 22 1987 to achieve the required integrity, insulation and stability (i.e. to restrict the heat radiation, temperature rise on the non fire side to the maximum of 140° C above the ambient temperature on the exposed surface of the shutter. The fire doors are tested with NCBN technology ("Non Combustible by Nature"). a) Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 Kilogram/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete. ( Fifth Floor )

15

-

-

... More
109.H Fire Door 55mm 2HR FRL (120/120) 3 Criteria - INTEGRITY / INSULATION/ STABILITY WOODEN DOOR - Fire Door Tested in accordance to IS: 3614 Part 2. Providing of 120 min Fire rated doors system duly tested for 3 criteria - Integrity, Insulation and Stability Criteria as per the IS: 3614 Part 2 and BS: 476 part 22 at National Test House, Govt of India laborator and/or with Central Building Research Institute, Govt of India undertaking with standard heating conditions as specified in IS:3614 Part II 1992 and BS: 476 part 20 & 22 1987 to achieve the required integrity, insulation and stability (i.e. to restrict the heat radiation, temperature rise on the non fire side to the maximum of 140° C above the ambient temperature on the exposed surface of the shutter. The fire doors are tested with NCBN technology ("Non Combustible by Nature"). a) Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 Kilogram/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete. ( Sixth Floor )

15

-

-

... More
110.B b)Shutter : Supplying & Fixing of 55mm thick asbestos free criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 Kilogram/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kilogram/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping. ( Ground Floor )

9

-

-

... More
110.C b)Shutter : Supplying & Fixing of 55mm thick asbestos free criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 Kilogram/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kilogram/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping. ( First Floor )

9

-

-

... More
110.D b)Shutter : Supplying & Fixing of 55mm thick asbestos free criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 Kilogram/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kilogram/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping. ( Second Floor )

9

-

-

... More
110.E b)Shutter : Supplying & Fixing of 55mm thick asbestos free criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 Kilogram/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kilogram/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping. ( Third Floor )

9

-

-

... More
110.F b)Shutter : Supplying & Fixing of 55mm thick asbestos free criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 Kilogram/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kilogram/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping. ( Fourth Floor )

9

-

-

... More
110.G b)Shutter : Supplying & Fixing of 55mm thick asbestos free criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 Kilogram/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kilogram/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping. ( Fifth Floor )

9

-

-

... More
110.H b)Shutter : Supplying & Fixing of 55mm thick asbestos free criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 Kilogram/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kilogram/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping. ( Sixth Floor )

9

-

-

... More
111.B c) Vision Panel: 2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints. ( Ground Floor )

0.81

-

-

... More
111.C c) Vision Panel: 2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints. ( First Floor )

0.81

-

-

... More
111.D c) Vision Panel: 2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints. ( Second Floor )

0.81

-

-

... More
111.E c) Vision Panel: 2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints. ( Third Floor )

0.81

-

-

... More
111.F c) Vision Panel: 2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints. ( Fourth Floor )

0.81

-

-

... More
111.G c) Vision Panel: 2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints. ( Fifth Floor )

0.81

-

-

... More
111.H c) Vision Panel: 2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints. ( Sixth Floor )

0.81

-

-

... More
112.D Sliding Window- 3 Track (2 Glass shutter + 1 flymesh) of approved make with DGU, providing and fixing of Sliding Window- 3 Track (2 Glass shutter + 1 flymesh ). For details refer to Specifications. As directed by Engineer in charge. ( Second Floor )

272.16

-

-

... More
112.E Sliding Window- 3 Track (2 Glass shutter + 1 flymesh) of approved make with DGU, providing and fixing of Sliding Window- 3 Track (2 Glass shutter + 1 flymesh ). For details refer to Specifications. As directed by Engineer in charge. ( Third Floor )

445.66

-

-

... More
112.F Sliding Window- 3 Track (2 Glass shutter + 1 flymesh) of approved make with DGU, providing and fixing of Sliding Window- 3 Track (2 Glass shutter + 1 flymesh ). For details refer to Specifications. As directed by Engineer in charge. ( Fourth Floor )

445.66

-

-

... More
112.G Sliding Window- 3 Track (2 Glass shutter + 1 flymesh) of approved make with DGU, providing and fixing of Sliding Window- 3 Track (2 Glass shutter + 1 flymesh ). For details refer to Specifications. As directed by Engineer in charge. ( Fifth Floor )

272.16

-

-

... More
112.H Sliding Window- 3 Track (2 Glass shutter + 1 flymesh) of approved make with DGU, providing and fixing of Sliding Window- 3 Track (2 Glass shutter + 1 flymesh ). For details refer to Specifications. As directed by Engineer in charge. ( Sixth Floor )

272.16

-

-

... More
113.B Providing and fixing in position powder coated aluminium louvered windows / ventilator of various sizes with powder coating as per detailed drawing and specifications including aluminium frames 80 x 38 mm x 1.22 mm box type, 5 mm thick sheet glass louvers, of approved quality etc. complete. ( Ground Floor )

10.8

-

-

... More
113.C Providing and fixing in position powder coated aluminium louvered windows / ventilator of various sizes with powder coating as per detailed drawing and specifications including aluminium frames 80 x 38 mm x 1.22 mm box type, 5 mm thick sheet glass louvers, of approved quality etc. complete. ( First Floor )

5.67

-

-

... More
113.D Providing and fixing in position powder coated aluminium louvered windows / ventilator of various sizes with powder coating as per detailed drawing and specifications including aluminium frames 80 x 38 mm x 1.22 mm box type, 5 mm thick sheet glass louvers, of approved quality etc. complete. ( Second Floor )

5.67

-

-

... More
113.E Providing and fixing in position powder coated aluminium louvered windows / ventilator of various sizes with powder coating as per detailed drawing and specifications including aluminium frames 80 x 38 mm x 1.22 mm box type, 5 mm thick sheet glass louvers, of approved quality etc. complete. ( Third Floor )

23.49

-

-

... More
113.F Providing and fixing in position powder coated aluminium louvered windows / ventilator of various sizes with powder coating as per detailed drawing and specifications including aluminium frames 80 x 38 mm x 1.22 mm box type, 5 mm thick sheet glass louvers, of approved quality etc. complete. ( Fourth Floor )

23.49

-

-

... More
113.G Providing and fixing in position powder coated aluminium louvered windows / ventilator of various sizes with powder coating as per detailed drawing and specifications including aluminium frames 80 x 38 mm x 1.22 mm box type, 5 mm thick sheet glass louvers, of approved quality etc. complete. ( Fifth Floor )

17.28

-

-

... More
113.H Providing and fixing in position powder coated aluminium louvered windows / ventilator of various sizes with powder coating as per detailed drawing and specifications including aluminium frames 80 x 38 mm x 1.22 mm box type, 5 mm thick sheet glass louvers, of approved quality etc. complete. ( Sixth Floor )

17.28

-

-

... More
114.B Providing and Fixing Sun Louvre panels roll formed, 0.6mm thick, pre-painted stove enameled aluminium strip of a corrosion resistant alloy, including necessary fitting etc. complete, as directed by Engineer in Charge. ( Ground Floor )

59.02

-

-

... More
114.C Providing and Fixing Sun Louvre panels roll formed, 0.6mm thick, pre-painted stove enameled aluminium strip of a corrosion resistant alloy, including necessary fitting etc. complete, as directed by Engineer in Charge. ( First Floor )

13.43

-

-

... More
114.D Providing and Fixing Sun Louvre panels roll formed, 0.6mm thick, pre-painted stove enameled aluminium strip of a corrosion resistant alloy, including necessary fitting etc. complete, as directed by Engineer in Charge. ( Second Floor )

10.73

-

-

... More
114.E Providing and Fixing Sun Louvre panels roll formed, 0.6mm thick, pre-painted stove enameled aluminium strip of a corrosion resistant alloy, including necessary fitting etc. complete, as directed by Engineer in Charge. ( Third Floor )

89.85

-

-

... More
114.F Providing and Fixing Sun Louvre panels roll formed, 0.6mm thick, pre-painted stove enameled aluminium strip of a corrosion resistant alloy, including necessary fitting etc. complete, as directed by Engineer in Charge. ( Fourth Floor )

89.85

-

-

... More
114.G Providing and Fixing Sun Louvre panels roll formed, 0.6mm thick, pre-painted stove enameled aluminium strip of a corrosion resistant alloy, including necessary fitting etc. complete, as directed by Engineer in Charge. ( Fifth Floor )

80.18

-

-

... More
114.H Providing and Fixing Sun Louvre panels roll formed, 0.6mm thick, pre-painted stove enameled aluminium strip of a corrosion resistant alloy, including necessary fitting etc. complete, as directed by Engineer in Charge. ( Sixth Floor )

80.18

-

-

... More
115.B Providing and fixing 900mm high S.S.304 Grade Stainless steel railing with 40mm diameter and 1.5mm thick at top, 40mm diameter and 1.5mm thick vertical supports spaced at 1.5m center to center and 8mm thick toughened glass including fabricating ,fixtures, errecting , necessary welding , grinding , finishing, buffing to stainless steel pipe etc. complete ( Ground Floor )

90.93

-

-

... More
115.C Providing and fixing 900mm high S.S.304 Grade Stainless steel railing with 40mm diameter and 1.5mm thick at top, 40mm diameter and 1.5mm thick vertical supports spaced at 1.5m center to center and 8mm thick toughened glass including fabricating ,fixtures, errecting , necessary welding , grinding , finishing, buffing to stainless steel pipe etc. complete ( First Floor )

92.28

-

-

... More
115.D Providing and fixing 900mm high S.S.304 Grade Stainless steel railing with 40mm diameter and 1.5mm thick at top, 40mm diameter and 1.5mm thick vertical supports spaced at 1.5m center to center and 8mm thick toughened glass including fabricating ,fixtures, errecting , necessary welding , grinding , finishing, buffing to stainless steel pipe etc. complete ( Second Floor )

101.8

-

-

... More
115.E Providing and fixing 900mm high S.S.304 Grade Stainless steel railing with 40mm diameter and 1.5mm thick at top, 40mm diameter and 1.5mm thick vertical supports spaced at 1.5m center to center and 8mm thick toughened glass including fabricating ,fixtures, errecting , necessary welding , grinding , finishing, buffing to stainless steel pipe etc. complete ( Third Floor )

52.2

-

-

... More
115.F Providing and fixing 900mm high S.S.304 Grade Stainless steel railing with 40mm diameter and 1.5mm thick at top, 40mm diameter and 1.5mm thick vertical supports spaced at 1.5m center to center and 8mm thick toughened glass including fabricating ,fixtures, errecting , necessary welding , grinding , finishing, buffing to stainless steel pipe etc. complete ( Fourth Floor )

46.2

-

-

... More
115.G Providing and fixing 900mm high S.S.304 Grade Stainless steel railing with 40mm diameter and 1.5mm thick at top, 40mm diameter and 1.5mm thick vertical supports spaced at 1.5m center to center and 8mm thick toughened glass including fabricating ,fixtures, errecting , necessary welding , grinding , finishing, buffing to stainless steel pipe etc. complete ( Fifth Floor )

36.6

-

-

... More
115.H Providing and fixing 900mm high S.S.304 Grade Stainless steel railing with 40mm diameter and 1.5mm thick at top, 40mm diameter and 1.5mm thick vertical supports spaced at 1.5m center to center and 8mm thick toughened glass including fabricating ,fixtures, errecting , necessary welding , grinding , finishing, buffing to stainless steel pipe etc. complete ( Sixth Floor )

36.6

-

-

... More
116.B Providing and fixing mechanical puzzle car parking suitable for standard passange cars of three stacks as per the sizes and specifications in given drawing including all the necessary mechanical equipment's, hardware's, software's, electrical assembly and panels entire system considering appropriate clearance space at top and bottom and sides. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on the site. Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge ( Ground Floor )

15

-

-

... More
117.B Design, Supply, supervision of Erection & Commissioning of Sewage Treatment Plant - 70 KLD – MBBR BASED- Supplying, erecting and commissioning Sewage Treatment Plant including following detail with respective Capacity and following electro mechanical specification only. Designing, providing, hydraulic testing, commissioning and giving satisfactorily trials of Sewer Treatment Plant consisting of Inlet Chamber, Screen chamber, BAR SCREEN, SEWAGE WATER TRANSFER PUMP , AIR BLOWER WITH MOTOR & ACOUSTIC HOOD, DIFFUSER MEMBRANE & AIR GRID, AIR GRID WITH AIR BLOWER PIPING, MEDIA FOR BIOREACTOR (MBBR), STEEL MESH FOR AT / PERFORATED PIPE, SLUDGE TRANSFER PUMP, CHLORINE DOSING SYSTEM, FILTER FEED PUMP, PRESSURE SAND FILTER, ACTIVATED CARBON FILTER, CENTRIFUGE WITH PUMPS & POLY DOSING SYSTEM, INTERCONNECTING PIPING & FITTINGS, INSTRUMENTS with required valves, gates, drains, pathways, Administration Block cum Laboratory, Laboratory Equipment’s, spares parts for 5 years of operation, etc. complete as turnkey job with only electrical and mechanical works inclusive of following items, units as per detailed specifications for electrical and mechanical components with excluding GST levied by GOI & GOM in all respect etc. complete. Treated sewage can be used for irrigation, horticulture & flushing purposes. (as per technical details attached separately) ( Ground Floor )

1

-

-

... More
118.B Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete. ( Ground Floor )

162.78

-

-

... More
118.C Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete. ( First Floor )

239.83

-

-

... More
118.D Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete. ( Second Floor )

239.83

-

-

... More
118.E Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete. ( Third Floor )

239.83

-

-

... More
118.F Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete. ( Fourth Floor )

239.83

-

-

... More
118.G Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete. ( Fifth Floor )

402.7

-

-

... More
118.H Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete. ( Sixth Floor )

100

-

-

... More
119.B PRIVIDING AND FIXING ACOUSTICAL FALSE CEILING WITH 0.9 NRC: Sierra Mineral Fibre Acoustical Suspended Ceiling System with 15mm thick Sierra OP Tegular 15/90 Edge Tiles with Suprafine 15mm face exposed grid. The tiles shall have smooth laminated visual with Humidity Resistance (RH) of 95%, NRC 0.90 (Average value of Absorption Co-efficient readings taken at 250 Hz, 500 Hz, 1000 Hz and 2000 Hz) as per ASTM C423 standard, CAC of 25db as per ASTM E1414, Light Reflectance ≥86% as per ASTM E-1477, Thermal Conductivity λ = 0.040 W/mK, Colour Global White, Fire Performance of class A2-s1, d0 according to EN 13501-1 with 15mm Tegular 15/90˚ edge and 8mm drop in module size of 600 x 600mm. The scrim on the face of the tile shall be cleanable and classified as ISO 14644-1 cleanroom class 5. It shall be suitable for Green Building application, with Recycled content of 43% and VOC Emissions (French) class of A+. The tile shall have Environmental Product Declaration as per ISO 14025 and EN 15804+A2. The tile shall have certifications from GRIHA and GreenPro thereby confirming that it is an environment friendly product. SUSPENSION: The tile shall be laid on Suprafine 38 with 15 mm wide T - section flanges colour global white (matching to tile color) having roll formed double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel and fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel of 90 gsm as per IS 277 (2003) and pre-painted steel with baked polyester paint with 0T bending capability. All border cross tee/main beam shall be levelled using perimeter fill.The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate.INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications above) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from the adjacent wall along with the first and the last main beam shall be at less than 600mm from the wall. Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm to form 1200 x 600 mm module. Cut cross tees longer than 600mm require independent support. 600 x 600mm module to be formed by fitting 600mm long flush fitting cross tees centrally between the 1200 mm cross tees. Perimeter trim to be wall angles of size 3000x19x19mm, secured to walls using screws at 450mm centre to centre maximum. Installation shall be carried out as per recommended procedure. SUSPENSION SYSTEM accessories supplied by consisting of M6 Anchor Fasteners with hanger hole, pre-straightened hanger wire of dia – 2.5 mm of 1.80 m length having a tensile strength of 344-413 MPa and a minimum loading strength of 110 kgs. (Optionally, adjustable hook clips made of 0.7mm thick Grade 1 C55 galvanized spring steel of dimension 100 x 20mm and 4 mm aquiline wire to be used for level adjustment during installation purpose in main runners). ( Ground Floor )

650.44

-

-

... More
119.C PRIVIDING AND FIXING ACOUSTICAL FALSE CEILING WITH 0.9 NRC: Sierra Mineral Fibre Acoustical Suspended Ceiling System with 15mm thick Sierra OP Tegular 15/90 Edge Tiles with Suprafine 15mm face exposed grid. The tiles shall have smooth laminated visual with Humidity Resistance (RH) of 95%, NRC 0.90 (Average value of Absorption Co-efficient readings taken at 250 Hz, 500 Hz, 1000 Hz and 2000 Hz) as per ASTM C423 standard, CAC of 25db as per ASTM E1414, Light Reflectance ≥86% as per ASTM E-1477, Thermal Conductivity λ = 0.040 W/mK, Colour Global White, Fire Performance of class A2-s1, d0 according to EN 13501-1 with 15mm Tegular 15/90˚ edge and 8mm drop in module size of 600 x 600mm. The scrim on the face of the tile shall be cleanable and classified as ISO 14644-1 cleanroom class 5. It shall be suitable for Green Building application, with Recycled content of 43% and VOC Emissions (French) class of A+. The tile shall have Environmental Product Declaration as per ISO 14025 and EN 15804+A2. The tile shall have certifications from GRIHA and GreenPro thereby confirming that it is an environment friendly product. SUSPENSION: The tile shall be laid on Suprafine 38 with 15 mm wide T - section flanges colour global white (matching to tile color) having roll formed double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel and fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel of 90 gsm as per IS 277 (2003) and pre-painted steel with baked polyester paint with 0T bending capability. All border cross tee/main beam shall be levelled using perimeter fill.The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate.INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications above) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from the adjacent wall along with the first and the last main beam shall be at less than 600mm from the wall. Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm to form 1200 x 600 mm module. Cut cross tees longer than 600mm require independent support. 600 x 600mm module to be formed by fitting 600mm long flush fitting cross tees centrally between the 1200 mm cross tees. Perimeter trim to be wall angles of size 3000x19x19mm, secured to walls using screws at 450mm centre to centre maximum. Installation shall be carried out as per recommended procedure. SUSPENSION SYSTEM accessories supplied by consisting of M6 Anchor Fasteners with hanger hole, pre-straightened hanger wire of dia – 2.5 mm of 1.80 m length having a tensile strength of 344-413 MPa and a minimum loading strength of 110 kgs. (Optionally, adjustable hook clips made of 0.7mm thick Grade 1 C55 galvanized spring steel of dimension 100 x 20mm and 4 mm aquiline wire to be used for level adjustment during installation purpose in main runners). ( First Floor )

188.6

-

-

... More
119.D PRIVIDING AND FIXING ACOUSTICAL FALSE CEILING WITH 0.9 NRC: Sierra Mineral Fibre Acoustical Suspended Ceiling System with 15mm thick Sierra OP Tegular 15/90 Edge Tiles with Suprafine 15mm face exposed grid. The tiles shall have smooth laminated visual with Humidity Resistance (RH) of 95%, NRC 0.90 (Average value of Absorption Co-efficient readings taken at 250 Hz, 500 Hz, 1000 Hz and 2000 Hz) as per ASTM C423 standard, CAC of 25db as per ASTM E1414, Light Reflectance ≥86% as per ASTM E-1477, Thermal Conductivity λ = 0.040 W/mK, Colour Global White, Fire Performance of class A2-s1, d0 according to EN 13501-1 with 15mm Tegular 15/90˚ edge and 8mm drop in module size of 600 x 600mm. The scrim on the face of the tile shall be cleanable and classified as ISO 14644-1 cleanroom class 5. It shall be suitable for Green Building application, with Recycled content of 43% and VOC Emissions (French) class of A+. The tile shall have Environmental Product Declaration as per ISO 14025 and EN 15804+A2. The tile shall have certifications from GRIHA and GreenPro thereby confirming that it is an environment friendly product. SUSPENSION: The tile shall be laid on Suprafine 38 with 15 mm wide T - section flanges colour global white (matching to tile color) having roll formed double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel and fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel of 90 gsm as per IS 277 (2003) and pre-painted steel with baked polyester paint with 0T bending capability. All border cross tee/main beam shall be levelled using perimeter fill.The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate.INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications above) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from the adjacent wall along with the first and the last main beam shall be at less than 600mm from the wall. Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm to form 1200 x 600 mm module. Cut cross tees longer than 600mm require independent support. 600 x 600mm module to be formed by fitting 600mm long flush fitting cross tees centrally between the 1200 mm cross tees. Perimeter trim to be wall angles of size 3000x19x19mm, secured to walls using screws at 450mm centre to centre maximum. Installation shall be carried out as per recommended procedure. SUSPENSION SYSTEM accessories supplied by consisting of M6 Anchor Fasteners with hanger hole, pre-straightened hanger wire of dia – 2.5 mm of 1.80 m length having a tensile strength of 344-413 MPa and a minimum loading strength of 110 kgs. (Optionally, adjustable hook clips made of 0.7mm thick Grade 1 C55 galvanized spring steel of dimension 100 x 20mm and 4 mm aquiline wire to be used for level adjustment during installation purpose in main runners). ( Second Floor )

1660.58

-

-

... More
119.E PRIVIDING AND FIXING ACOUSTICAL FALSE CEILING WITH 0.9 NRC: Sierra Mineral Fibre Acoustical Suspended Ceiling System with 15mm thick Sierra OP Tegular 15/90 Edge Tiles with Suprafine 15mm face exposed grid. The tiles shall have smooth laminated visual with Humidity Resistance (RH) of 95%, NRC 0.90 (Average value of Absorption Co-efficient readings taken at 250 Hz, 500 Hz, 1000 Hz and 2000 Hz) as per ASTM C423 standard, CAC of 25db as per ASTM E1414, Light Reflectance ≥86% as per ASTM E-1477, Thermal Conductivity λ = 0.040 W/mK, Colour Global White, Fire Performance of class A2-s1, d0 according to EN 13501-1 with 15mm Tegular 15/90˚ edge and 8mm drop in module size of 600 x 600mm. The scrim on the face of the tile shall be cleanable and classified as ISO 14644-1 cleanroom class 5. It shall be suitable for Green Building application, with Recycled content of 43% and VOC Emissions (French) class of A+. The tile shall have Environmental Product Declaration as per ISO 14025 and EN 15804+A2. The tile shall have certifications from GRIHA and GreenPro thereby confirming that it is an environment friendly product. SUSPENSION: The tile shall be laid on Suprafine 38 with 15 mm wide T - section flanges colour global white (matching to tile color) having roll formed double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel and fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel of 90 gsm as per IS 277 (2003) and pre-painted steel with baked polyester paint with 0T bending capability. All border cross tee/main beam shall be levelled using perimeter fill.The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate.INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications above) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from the adjacent wall along with the first and the last main beam shall be at less than 600mm from the wall. Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm to form 1200 x 600 mm module. Cut cross tees longer than 600mm require independent support. 600 x 600mm module to be formed by fitting 600mm long flush fitting cross tees centrally between the 1200 mm cross tees. Perimeter trim to be wall angles of size 3000x19x19mm, secured to walls using screws at 450mm centre to centre maximum. Installation shall be carried out as per recommended procedure. SUSPENSION SYSTEM accessories supplied by consisting of M6 Anchor Fasteners with hanger hole, pre-straightened hanger wire of dia – 2.5 mm of 1.80 m length having a tensile strength of 344-413 MPa and a minimum loading strength of 110 kgs. (Optionally, adjustable hook clips made of 0.7mm thick Grade 1 C55 galvanized spring steel of dimension 100 x 20mm and 4 mm aquiline wire to be used for level adjustment during installation purpose in main runners). ( Third Floor )

1660.58

-

-

... More
119.F PRIVIDING AND FIXING ACOUSTICAL FALSE CEILING WITH 0.9 NRC: Sierra Mineral Fibre Acoustical Suspended Ceiling System with 15mm thick Sierra OP Tegular 15/90 Edge Tiles with Suprafine 15mm face exposed grid. The tiles shall have smooth laminated visual with Humidity Resistance (RH) of 95%, NRC 0.90 (Average value of Absorption Co-efficient readings taken at 250 Hz, 500 Hz, 1000 Hz and 2000 Hz) as per ASTM C423 standard, CAC of 25db as per ASTM E1414, Light Reflectance ≥86% as per ASTM E-1477, Thermal Conductivity λ = 0.040 W/mK, Colour Global White, Fire Performance of class A2-s1, d0 according to EN 13501-1 with 15mm Tegular 15/90˚ edge and 8mm drop in module size of 600 x 600mm. The scrim on the face of the tile shall be cleanable and classified as ISO 14644-1 cleanroom class 5. It shall be suitable for Green Building application, with Recycled content of 43% and VOC Emissions (French) class of A+. The tile shall have Environmental Product Declaration as per ISO 14025 and EN 15804+A2. The tile shall have certifications from GRIHA and GreenPro thereby confirming that it is an environment friendly product. SUSPENSION: The tile shall be laid on Suprafine 38 with 15 mm wide T - section flanges colour global white (matching to tile color) having roll formed double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel and fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel of 90 gsm as per IS 277 (2003) and pre-painted steel with baked polyester paint with 0T bending capability. All border cross tee/main beam shall be levelled using perimeter fill.The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate.INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications above) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from the adjacent wall along with the first and the last main beam shall be at less than 600mm from the wall. Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm to form 1200 x 600 mm module. Cut cross tees longer than 600mm require independent support. 600 x 600mm module to be formed by fitting 600mm long flush fitting cross tees centrally between the 1200 mm cross tees. Perimeter trim to be wall angles of size 3000x19x19mm, secured to walls using screws at 450mm centre to centre maximum. Installation shall be carried out as per recommended procedure. SUSPENSION SYSTEM accessories supplied by consisting of M6 Anchor Fasteners with hanger hole, pre-straightened hanger wire of dia – 2.5 mm of 1.80 m length having a tensile strength of 344-413 MPa and a minimum loading strength of 110 kgs. (Optionally, adjustable hook clips made of 0.7mm thick Grade 1 C55 galvanized spring steel of dimension 100 x 20mm and 4 mm aquiline wire to be used for level adjustment during installation purpose in main runners). ( Fourth Floor )

1660.58

-

-

... More
119.G PRIVIDING AND FIXING ACOUSTICAL FALSE CEILING WITH 0.9 NRC: Sierra Mineral Fibre Acoustical Suspended Ceiling System with 15mm thick Sierra OP Tegular 15/90 Edge Tiles with Suprafine 15mm face exposed grid. The tiles shall have smooth laminated visual with Humidity Resistance (RH) of 95%, NRC 0.90 (Average value of Absorption Co-efficient readings taken at 250 Hz, 500 Hz, 1000 Hz and 2000 Hz) as per ASTM C423 standard, CAC of 25db as per ASTM E1414, Light Reflectance ≥86% as per ASTM E-1477, Thermal Conductivity λ = 0.040 W/mK, Colour Global White, Fire Performance of class A2-s1, d0 according to EN 13501-1 with 15mm Tegular 15/90˚ edge and 8mm drop in module size of 600 x 600mm. The scrim on the face of the tile shall be cleanable and classified as ISO 14644-1 cleanroom class 5. It shall be suitable for Green Building application, with Recycled content of 43% and VOC Emissions (French) class of A+. The tile shall have Environmental Product Declaration as per ISO 14025 and EN 15804+A2. The tile shall have certifications from GRIHA and GreenPro thereby confirming that it is an environment friendly product. SUSPENSION: The tile shall be laid on Suprafine 38 with 15 mm wide T - section flanges colour global white (matching to tile color) having roll formed double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel and fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel of 90 gsm as per IS 277 (2003) and pre-painted steel with baked polyester paint with 0T bending capability. All border cross tee/main beam shall be levelled using perimeter fill.The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate.INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications above) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from the adjacent wall along with the first and the last main beam shall be at less than 600mm from the wall. Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm to form 1200 x 600 mm module. Cut cross tees longer than 600mm require independent support. 600 x 600mm module to be formed by fitting 600mm long flush fitting cross tees centrally between the 1200 mm cross tees. Perimeter trim to be wall angles of size 3000x19x19mm, secured to walls using screws at 450mm centre to centre maximum. Installation shall be carried out as per recommended procedure. SUSPENSION SYSTEM accessories supplied by consisting of M6 Anchor Fasteners with hanger hole, pre-straightened hanger wire of dia – 2.5 mm of 1.80 m length having a tensile strength of 344-413 MPa and a minimum loading strength of 110 kgs. (Optionally, adjustable hook clips made of 0.7mm thick Grade 1 C55 galvanized spring steel of dimension 100 x 20mm and 4 mm aquiline wire to be used for level adjustment during installation purpose in main runners). ( Fifth Floor )

602.96

-

-

... More
119.H PRIVIDING AND FIXING ACOUSTICAL FALSE CEILING WITH 0.9 NRC: Sierra Mineral Fibre Acoustical Suspended Ceiling System with 15mm thick Sierra OP Tegular 15/90 Edge Tiles with Suprafine 15mm face exposed grid. The tiles shall have smooth laminated visual with Humidity Resistance (RH) of 95%, NRC 0.90 (Average value of Absorption Co-efficient readings taken at 250 Hz, 500 Hz, 1000 Hz and 2000 Hz) as per ASTM C423 standard, CAC of 25db as per ASTM E1414, Light Reflectance ≥86% as per ASTM E-1477, Thermal Conductivity λ = 0.040 W/mK, Colour Global White, Fire Performance of class A2-s1, d0 according to EN 13501-1 with 15mm Tegular 15/90˚ edge and 8mm drop in module size of 600 x 600mm. The scrim on the face of the tile shall be cleanable and classified as ISO 14644-1 cleanroom class 5. It shall be suitable for Green Building application, with Recycled content of 43% and VOC Emissions (French) class of A+. The tile shall have Environmental Product Declaration as per ISO 14025 and EN 15804+A2. The tile shall have certifications from GRIHA and GreenPro thereby confirming that it is an environment friendly product. SUSPENSION: The tile shall be laid on Suprafine 38 with 15 mm wide T - section flanges colour global white (matching to tile color) having roll formed double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel and fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel of 90 gsm as per IS 277 (2003) and pre-painted steel with baked polyester paint with 0T bending capability. All border cross tee/main beam shall be levelled using perimeter fill.The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate.INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications above) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from the adjacent wall along with the first and the last main beam shall be at less than 600mm from the wall. Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm to form 1200 x 600 mm module. Cut cross tees longer than 600mm require independent support. 600 x 600mm module to be formed by fitting 600mm long flush fitting cross tees centrally between the 1200 mm cross tees. Perimeter trim to be wall angles of size 3000x19x19mm, secured to walls using screws at 450mm centre to centre maximum. Installation shall be carried out as per recommended procedure. SUSPENSION SYSTEM accessories supplied by consisting of M6 Anchor Fasteners with hanger hole, pre-straightened hanger wire of dia – 2.5 mm of 1.80 m length having a tensile strength of 344-413 MPa and a minimum loading strength of 110 kgs. (Optionally, adjustable hook clips made of 0.7mm thick Grade 1 C55 galvanized spring steel of dimension 100 x 20mm and 4 mm aquiline wire to be used for level adjustment during installation purpose in main runners). ( Sixth Floor )

1116.43

-

-

... More
120.B Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish ( Ground Floor )

3.6

-

-

... More
120.C Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish ( First Floor )

3.6

-

-

... More
120.D Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish ( Second Floor )

13.2

-

-

... More
120.E Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish ( Third Floor )

18

-

-

... More
120.F Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish ( Fourth Floor )

18

-

-

... More
120.G Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish ( Fifth Floor )

18

-

-

... More
120.H Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish ( Sixth Floor )

16.8

-

-

... More
121.B METAL OPEN CELL CEILING : Providing & fixing horizontal level Open cell Aluminium lay-in ceiling tiles with border panels forming board edge of size 600x600x38mm (Nominal) having cell size of 100x100mm made of AA-3003-H14 (Tempered) grade Aluminium suitable for architectural finishes in 0.35mm thickness as per in IS:2676 (1981) in Global white color. The tile shall be electrostatically polyester powder coated using RoHS compliant powder having coating thickness ranging from 60- 80 microns. The powder coating shall pass Salt Spray Test for 750 hours as per ASTM B117, QUV –A Test for 1000 hours as per ASTM G-154 – (Cycle – 1) and Humidity test for 1000 hours as per DIN 50017. The powder coating shall have an adhesion of GT0 as per EN ISO 2409. The shade variation across batches shall be delta E1 using Excite/BYK Gardner instrument and gloss level of 25±5% at 60˚ as per ASTM D523. Tile shall have a Fire Performance class A as per GB 8624-2012. SUSPENSION: The tile shall be laid on 15 mm wide T - section flanges colour global white (matching to tile colour) having double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel clip fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel 90 gsm and pre-painted steel with baked polyester paint of 0T bending capability. , The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate. INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications below) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from ( Ground Floor )

192.5

-

-

... More
121.C METAL OPEN CELL CEILING : Providing & fixing horizontal level Open cell Aluminium lay-in ceiling tiles with border panels forming board edge of size 600x600x38mm (Nominal) having cell size of 100x100mm made of AA-3003-H14 (Tempered) grade Aluminium suitable for architectural finishes in 0.35mm thickness as per in IS:2676 (1981) in Global white color. The tile shall be electrostatically polyester powder coated using RoHS compliant powder having coating thickness ranging from 60- 80 microns. The powder coating shall pass Salt Spray Test for 750 hours as per ASTM B117, QUV –A Test for 1000 hours as per ASTM G-154 – (Cycle – 1) and Humidity test for 1000 hours as per DIN 50017. The powder coating shall have an adhesion of GT0 as per EN ISO 2409. The shade variation across batches shall be delta E1 using Excite/BYK Gardner instrument and gloss level of 25±5% at 60˚ as per ASTM D523. Tile shall have a Fire Performance class A as per GB 8624-2012. SUSPENSION: The tile shall be laid on 15 mm wide T - section flanges colour global white (matching to tile colour) having double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel clip fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel 90 gsm and pre-painted steel with baked polyester paint of 0T bending capability. , The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate. INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications below) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from ( First Floor )

136.35

-

-

... More
121.D METAL OPEN CELL CEILING : Providing & fixing horizontal level Open cell Aluminium lay-in ceiling tiles with border panels forming board edge of size 600x600x38mm (Nominal) having cell size of 100x100mm made of AA-3003-H14 (Tempered) grade Aluminium suitable for architectural finishes in 0.35mm thickness as per in IS:2676 (1981) in Global white color. The tile shall be electrostatically polyester powder coated using RoHS compliant powder having coating thickness ranging from 60- 80 microns. The powder coating shall pass Salt Spray Test for 750 hours as per ASTM B117, QUV –A Test for 1000 hours as per ASTM G-154 – (Cycle – 1) and Humidity test for 1000 hours as per DIN 50017. The powder coating shall have an adhesion of GT0 as per EN ISO 2409. The shade variation across batches shall be delta E1 using Excite/BYK Gardner instrument and gloss level of 25±5% at 60˚ as per ASTM D523. Tile shall have a Fire Performance class A as per GB 8624-2012. SUSPENSION: The tile shall be laid on 15 mm wide T - section flanges colour global white (matching to tile colour) having double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel clip fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel 90 gsm and pre-painted steel with baked polyester paint of 0T bending capability. , The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate. INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications below) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from ( Second Floor )

136.35

-

-

... More
121.E METAL OPEN CELL CEILING : Providing & fixing horizontal level Open cell Aluminium lay-in ceiling tiles with border panels forming board edge of size 600x600x38mm (Nominal) having cell size of 100x100mm made of AA-3003-H14 (Tempered) grade Aluminium suitable for architectural finishes in 0.35mm thickness as per in IS:2676 (1981) in Global white color. The tile shall be electrostatically polyester powder coated using RoHS compliant powder having coating thickness ranging from 60- 80 microns. The powder coating shall pass Salt Spray Test for 750 hours as per ASTM B117, QUV –A Test for 1000 hours as per ASTM G-154 – (Cycle – 1) and Humidity test for 1000 hours as per DIN 50017. The powder coating shall have an adhesion of GT0 as per EN ISO 2409. The shade variation across batches shall be delta E1 using Excite/BYK Gardner instrument and gloss level of 25±5% at 60˚ as per ASTM D523. Tile shall have a Fire Performance class A as per GB 8624-2012. SUSPENSION: The tile shall be laid on 15 mm wide T - section flanges colour global white (matching to tile colour) having double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel clip fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel 90 gsm and pre-painted steel with baked polyester paint of 0T bending capability. , The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate. INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications below) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from ( Third Floor )

136.35

-

-

... More
121.F METAL OPEN CELL CEILING : Providing & fixing horizontal level Open cell Aluminium lay-in ceiling tiles with border panels forming board edge of size 600x600x38mm (Nominal) having cell size of 100x100mm made of AA-3003-H14 (Tempered) grade Aluminium suitable for architectural finishes in 0.35mm thickness as per in IS:2676 (1981) in Global white color. The tile shall be electrostatically polyester powder coated using RoHS compliant powder having coating thickness ranging from 60- 80 microns. The powder coating shall pass Salt Spray Test for 750 hours as per ASTM B117, QUV –A Test for 1000 hours as per ASTM G-154 – (Cycle – 1) and Humidity test for 1000 hours as per DIN 50017. The powder coating shall have an adhesion of GT0 as per EN ISO 2409. The shade variation across batches shall be delta E1 using Excite/BYK Gardner instrument and gloss level of 25±5% at 60˚ as per ASTM D523. Tile shall have a Fire Performance class A as per GB 8624-2012. SUSPENSION: The tile shall be laid on 15 mm wide T - section flanges colour global white (matching to tile colour) having double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel clip fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel 90 gsm and pre-painted steel with baked polyester paint of 0T bending capability. , The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate. INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications below) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from ( Fourth Floor )

136.35

-

-

... More
121.G METAL OPEN CELL CEILING : Providing & fixing horizontal level Open cell Aluminium lay-in ceiling tiles with border panels forming board edge of size 600x600x38mm (Nominal) having cell size of 100x100mm made of AA-3003-H14 (Tempered) grade Aluminium suitable for architectural finishes in 0.35mm thickness as per in IS:2676 (1981) in Global white color. The tile shall be electrostatically polyester powder coated using RoHS compliant powder having coating thickness ranging from 60- 80 microns. The powder coating shall pass Salt Spray Test for 750 hours as per ASTM B117, QUV –A Test for 1000 hours as per ASTM G-154 – (Cycle – 1) and Humidity test for 1000 hours as per DIN 50017. The powder coating shall have an adhesion of GT0 as per EN ISO 2409. The shade variation across batches shall be delta E1 using Excite/BYK Gardner instrument and gloss level of 25±5% at 60˚ as per ASTM D523. Tile shall have a Fire Performance class A as per GB 8624-2012. SUSPENSION: The tile shall be laid on 15 mm wide T - section flanges colour global white (matching to tile colour) having double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel clip fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel 90 gsm and pre-painted steel with baked polyester paint of 0T bending capability. , The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate. INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications below) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from ( Fifth Floor )

253.89

-

-

... More
121.H METAL OPEN CELL CEILING : Providing & fixing horizontal level Open cell Aluminium lay-in ceiling tiles with border panels forming board edge of size 600x600x38mm (Nominal) having cell size of 100x100mm made of AA-3003-H14 (Tempered) grade Aluminium suitable for architectural finishes in 0.35mm thickness as per in IS:2676 (1981) in Global white color. The tile shall be electrostatically polyester powder coated using RoHS compliant powder having coating thickness ranging from 60- 80 microns. The powder coating shall pass Salt Spray Test for 750 hours as per ASTM B117, QUV –A Test for 1000 hours as per ASTM G-154 – (Cycle – 1) and Humidity test for 1000 hours as per DIN 50017. The powder coating shall have an adhesion of GT0 as per EN ISO 2409. The shade variation across batches shall be delta E1 using Excite/BYK Gardner instrument and gloss level of 25±5% at 60˚ as per ASTM D523. Tile shall have a Fire Performance class A as per GB 8624-2012. SUSPENSION: The tile shall be laid on 15 mm wide T - section flanges colour global white (matching to tile colour) having double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 12.5 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 15kg/m. The end details of the cross tee shall be made of pre hardened steel clip fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of hot dipped galvanized steel 90 gsm and pre-painted steel with baked polyester paint of 0T bending capability. , The Tile & Grid system used together shall carry a 10 year warranty against manufacturing defect and manufacturer shall provide a warranty certificate. The Tile & Grid shall have the manufacturers name embossed/printed on it. The supply shall be backed by a Manufacturing Test Certificate. INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications below) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from ( Sixth Floor )

136.35

-

-

... More
122.C Providing & Fixing Of Classic Axiom Perimeter Trim with 19mm face for perimeter solution of acoustical ceiling using appropriate Accessories Classic Vector Axiom (AX4VESTRI/ AX4VECURI xx) to offer perimeter solution with acoustical ceiling system. Classic Vector Axiom (AX2STR42I/ AX2CUR42Ixx) is made of extruded aluminum of O/L dimension of 19.3 x 100 x 3000mm. The inverted F- Shape section provides 2 flanges and 19mm face for resting of tiles. Classsic Axiom must be powder coated in Global White. Profile to have engineered design boss for fitment of Tee bar connector, Splice plate Corner connector & hanger clips. Classic Axiom ( AX4VECURI xx) can be curvered to a minumum radius of 600mm Axiom Splice Plate (AX4SPLICEI/AXSPLICEI): Formed to fit into special boss in the Axiom and locked in place with factory-installed screws. These Steel splice plates (AX4SPLICEI) are used to align and secure all joints between sections of Axiom trims. Corners are to be formed by mitering the end of axiom and splice plate (AXSPLICE) to be bent at right angle for connecting the end pieces. Axiom Tee-Bar Connection Clip (AXTBCI): Commercial quality G.I formed to fit into special boss of trim and locked in place by factory-installed screws and attached to (XL-24 / XL-15/Silhouette) suspension system members. T-Bar connection clips are used to attach the Axiom to the supporting Suspension system members. One clip is required at each location where the grid system intersects the Axiom trim. Hanging Grid clips (AXHGCI): Axioms to be hung independently to the structural soffit by engaging the Hanging Grid Clip into the boss of the Axiom trim channel and securing it to structural soffit Suspension . INSTALLATION: Hang the sections of Axiom Trim onto the grid system by engaging the top ear of the connection clip under the boss of the channel trim. Slide the lower leg downward to engage the lower boss on the trim and secure by tightening the locking screw. Complete the installation of all channel trims sections. Install and secure the splice plates, corner pieces, and alignment plate’s etc. Make adjustments as necessary to properly align the complete installation. ( First Floor )

1647.8

-

-

... More
122.D Providing & Fixing Of Classic Axiom Perimeter Trim with 19mm face for perimeter solution of acoustical ceiling using appropriate Accessories Classic Vector Axiom (AX4VESTRI/ AX4VECURI xx) to offer perimeter solution with acoustical ceiling system. Classic Vector Axiom (AX2STR42I/ AX2CUR42Ixx) is made of extruded aluminum of O/L dimension of 19.3 x 100 x 3000mm. The inverted F- Shape section provides 2 flanges and 19mm face for resting of tiles. Classsic Axiom must be powder coated in Global White. Profile to have engineered design boss for fitment of Tee bar connector, Splice plate Corner connector & hanger clips. Classic Axiom ( AX4VECURI xx) can be curvered to a minumum radius of 600mm Axiom Splice Plate (AX4SPLICEI/AXSPLICEI): Formed to fit into special boss in the Axiom and locked in place with factory-installed screws. These Steel splice plates (AX4SPLICEI) are used to align and secure all joints between sections of Axiom trims. Corners are to be formed by mitering the end of axiom and splice plate (AXSPLICE) to be bent at right angle for connecting the end pieces. Axiom Tee-Bar Connection Clip (AXTBCI): Commercial quality G.I formed to fit into special boss of trim and locked in place by factory-installed screws and attached to (XL-24 / XL-15/Silhouette) suspension system members. T-Bar connection clips are used to attach the Axiom to the supporting Suspension system members. One clip is required at each location where the grid system intersects the Axiom trim. Hanging Grid clips (AXHGCI): Axioms to be hung independently to the structural soffit by engaging the Hanging Grid Clip into the boss of the Axiom trim channel and securing it to structural soffit Suspension . INSTALLATION: Hang the sections of Axiom Trim onto the grid system by engaging the top ear of the connection clip under the boss of the channel trim. Slide the lower leg downward to engage the lower boss on the trim and secure by tightening the locking screw. Complete the installation of all channel trims sections. Install and secure the splice plates, corner pieces, and alignment plate’s etc. Make adjustments as necessary to properly align the complete installation. ( Second Floor )

1647.8

-

-

... More
122.E Providing & Fixing Of Classic Axiom Perimeter Trim with 19mm face for perimeter solution of acoustical ceiling using appropriate Accessories Classic Vector Axiom (AX4VESTRI/ AX4VECURI xx) to offer perimeter solution with acoustical ceiling system. Classic Vector Axiom (AX2STR42I/ AX2CUR42Ixx) is made of extruded aluminum of O/L dimension of 19.3 x 100 x 3000mm. The inverted F- Shape section provides 2 flanges and 19mm face for resting of tiles. Classsic Axiom must be powder coated in Global White. Profile to have engineered design boss for fitment of Tee bar connector, Splice plate Corner connector & hanger clips. Classic Axiom ( AX4VECURI xx) can be curvered to a minumum radius of 600mm Axiom Splice Plate (AX4SPLICEI/AXSPLICEI): Formed to fit into special boss in the Axiom and locked in place with factory-installed screws. These Steel splice plates (AX4SPLICEI) are used to align and secure all joints between sections of Axiom trims. Corners are to be formed by mitering the end of axiom and splice plate (AXSPLICE) to be bent at right angle for connecting the end pieces. Axiom Tee-Bar Connection Clip (AXTBCI): Commercial quality G.I formed to fit into special boss of trim and locked in place by factory-installed screws and attached to (XL-24 / XL-15/Silhouette) suspension system members. T-Bar connection clips are used to attach the Axiom to the supporting Suspension system members. One clip is required at each location where the grid system intersects the Axiom trim. Hanging Grid clips (AXHGCI): Axioms to be hung independently to the structural soffit by engaging the Hanging Grid Clip into the boss of the Axiom trim channel and securing it to structural soffit Suspension . INSTALLATION: Hang the sections of Axiom Trim onto the grid system by engaging the top ear of the connection clip under the boss of the channel trim. Slide the lower leg downward to engage the lower boss on the trim and secure by tightening the locking screw. Complete the installation of all channel trims sections. Install and secure the splice plates, corner pieces, and alignment plate’s etc. Make adjustments as necessary to properly align the complete installation. ( Third Floor )

1647.8

-

-

... More
122.F Providing & Fixing Of Classic Axiom Perimeter Trim with 19mm face for perimeter solution of acoustical ceiling using appropriate Accessories Classic Vector Axiom (AX4VESTRI/ AX4VECURI xx) to offer perimeter solution with acoustical ceiling system. Classic Vector Axiom (AX2STR42I/ AX2CUR42Ixx) is made of extruded aluminum of O/L dimension of 19.3 x 100 x 3000mm. The inverted F- Shape section provides 2 flanges and 19mm face for resting of tiles. Classsic Axiom must be powder coated in Global White. Profile to have engineered design boss for fitment of Tee bar connector, Splice plate Corner connector & hanger clips. Classic Axiom ( AX4VECURI xx) can be curvered to a minumum radius of 600mm Axiom Splice Plate (AX4SPLICEI/AXSPLICEI): Formed to fit into special boss in the Axiom and locked in place with factory-installed screws. These Steel splice plates (AX4SPLICEI) are used to align and secure all joints between sections of Axiom trims. Corners are to be formed by mitering the end of axiom and splice plate (AXSPLICE) to be bent at right angle for connecting the end pieces. Axiom Tee-Bar Connection Clip (AXTBCI): Commercial quality G.I formed to fit into special boss of trim and locked in place by factory-installed screws and attached to (XL-24 / XL-15/Silhouette) suspension system members. T-Bar connection clips are used to attach the Axiom to the supporting Suspension system members. One clip is required at each location where the grid system intersects the Axiom trim. Hanging Grid clips (AXHGCI): Axioms to be hung independently to the structural soffit by engaging the Hanging Grid Clip into the boss of the Axiom trim channel and securing it to structural soffit Suspension . INSTALLATION: Hang the sections of Axiom Trim onto the grid system by engaging the top ear of the connection clip under the boss of the channel trim. Slide the lower leg downward to engage the lower boss on the trim and secure by tightening the locking screw. Complete the installation of all channel trims sections. Install and secure the splice plates, corner pieces, and alignment plate’s etc. Make adjustments as necessary to properly align the complete installation. ( Fourth Floor )

1647.8

-

-

... More
122.G Providing & Fixing Of Classic Axiom Perimeter Trim with 19mm face for perimeter solution of acoustical ceiling using appropriate Accessories Classic Vector Axiom (AX4VESTRI/ AX4VECURI xx) to offer perimeter solution with acoustical ceiling system. Classic Vector Axiom (AX2STR42I/ AX2CUR42Ixx) is made of extruded aluminum of O/L dimension of 19.3 x 100 x 3000mm. The inverted F- Shape section provides 2 flanges and 19mm face for resting of tiles. Classsic Axiom must be powder coated in Global White. Profile to have engineered design boss for fitment of Tee bar connector, Splice plate Corner connector & hanger clips. Classic Axiom ( AX4VECURI xx) can be curvered to a minumum radius of 600mm Axiom Splice Plate (AX4SPLICEI/AXSPLICEI): Formed to fit into special boss in the Axiom and locked in place with factory-installed screws. These Steel splice plates (AX4SPLICEI) are used to align and secure all joints between sections of Axiom trims. Corners are to be formed by mitering the end of axiom and splice plate (AXSPLICE) to be bent at right angle for connecting the end pieces. Axiom Tee-Bar Connection Clip (AXTBCI): Commercial quality G.I formed to fit into special boss of trim and locked in place by factory-installed screws and attached to (XL-24 / XL-15/Silhouette) suspension system members. T-Bar connection clips are used to attach the Axiom to the supporting Suspension system members. One clip is required at each location where the grid system intersects the Axiom trim. Hanging Grid clips (AXHGCI): Axioms to be hung independently to the structural soffit by engaging the Hanging Grid Clip into the boss of the Axiom trim channel and securing it to structural soffit Suspension . INSTALLATION: Hang the sections of Axiom Trim onto the grid system by engaging the top ear of the connection clip under the boss of the channel trim. Slide the lower leg downward to engage the lower boss on the trim and secure by tightening the locking screw. Complete the installation of all channel trims sections. Install and secure the splice plates, corner pieces, and alignment plate’s etc. Make adjustments as necessary to properly align the complete installation. ( Fifth Floor )

1693.37

-

-

... More
122.H Providing & Fixing Of Classic Axiom Perimeter Trim with 19mm face for perimeter solution of acoustical ceiling using appropriate Accessories Classic Vector Axiom (AX4VESTRI/ AX4VECURI xx) to offer perimeter solution with acoustical ceiling system. Classic Vector Axiom (AX2STR42I/ AX2CUR42Ixx) is made of extruded aluminum of O/L dimension of 19.3 x 100 x 3000mm. The inverted F- Shape section provides 2 flanges and 19mm face for resting of tiles. Classsic Axiom must be powder coated in Global White. Profile to have engineered design boss for fitment of Tee bar connector, Splice plate Corner connector & hanger clips. Classic Axiom ( AX4VECURI xx) can be curvered to a minumum radius of 600mm Axiom Splice Plate (AX4SPLICEI/AXSPLICEI): Formed to fit into special boss in the Axiom and locked in place with factory-installed screws. These Steel splice plates (AX4SPLICEI) are used to align and secure all joints between sections of Axiom trims. Corners are to be formed by mitering the end of axiom and splice plate (AXSPLICE) to be bent at right angle for connecting the end pieces. Axiom Tee-Bar Connection Clip (AXTBCI): Commercial quality G.I formed to fit into special boss of trim and locked in place by factory-installed screws and attached to (XL-24 / XL-15/Silhouette) suspension system members. T-Bar connection clips are used to attach the Axiom to the supporting Suspension system members. One clip is required at each location where the grid system intersects the Axiom trim. Hanging Grid clips (AXHGCI): Axioms to be hung independently to the structural soffit by engaging the Hanging Grid Clip into the boss of the Axiom trim channel and securing it to structural soffit Suspension . INSTALLATION: Hang the sections of Axiom Trim onto the grid system by engaging the top ear of the connection clip under the boss of the channel trim. Slide the lower leg downward to engage the lower boss on the trim and secure by tightening the locking screw. Complete the installation of all channel trims sections. Install and secure the splice plates, corner pieces, and alignment plate’s etc. Make adjustments as necessary to properly align the complete installation. ( Sixth Floor )

1647.8

-

-

... More
123.B Providing and fixing frame with / without ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebating, iron holdfast of size 300mm x 40mm x 5mm with oil painting, etc. complete ( Ground Floor )

0.97

-

-

... More
123.C Providing and fixing frame with / without ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebating, iron holdfast of size 300mm x 40mm x 5mm with oil painting, etc. complete ( First Floor )

0.84

-

-

... More
123.D Providing and fixing frame with / without ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebating, iron holdfast of size 300mm x 40mm x 5mm with oil painting, etc. complete ( Second Floor )

1.03

-

-

... More
123.E Providing and fixing frame with / without ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebating, iron holdfast of size 300mm x 40mm x 5mm with oil painting, etc. complete ( Third Floor )

0.49

-

-

... More
123.F Providing and fixing frame with / without ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebating, iron holdfast of size 300mm x 40mm x 5mm with oil painting, etc. complete ( Fourth Floor )

1.09

-

-

... More
123.G Providing and fixing frame with / without ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebating, iron holdfast of size 300mm x 40mm x 5mm with oil painting, etc. complete ( Fifth Floor )

1.03

-

-

... More
123.H Providing and fixing frame with / without ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebating, iron holdfast of size 300mm x 40mm x 5mm with oil painting, etc. complete ( Sixth Floor )

1.03

-

-

... More
123.I Providing and fixing frame with / without ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebating, iron holdfast of size 300mm x 40mm x 5mm with oil painting, etc. complete ( Terrace Floor )

1.03

-

-

... More
124.B Providing and fixing white european type wall-hung, Size 360mm x 360mm x 575 mm with flush valve having flow rate up to 6.0 Litr/Minute of Jaquar/Cera/Hindware /Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings,cutting & making good walls, floors etc as directed by Engineer in charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Ground Floor )

16

-

-

... More
124.C Providing and fixing white european type wall-hung, Size 360mm x 360mm x 575 mm with flush valve having flow rate up to 6.0 Litr/Minute of Jaquar/Cera/Hindware /Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings,cutting & making good walls, floors etc as directed by Engineer in charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( First Floor )

32

-

-

... More
124.D Providing and fixing white european type wall-hung, Size 360mm x 360mm x 575 mm with flush valve having flow rate up to 6.0 Litr/Minute of Jaquar/Cera/Hindware /Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings,cutting & making good walls, floors etc as directed by Engineer in charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Second Floor )

32

-

-

... More
124.E Providing and fixing white european type wall-hung, Size 360mm x 360mm x 575 mm with flush valve having flow rate up to 6.0 Litr/Minute of Jaquar/Cera/Hindware /Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings,cutting & making good walls, floors etc as directed by Engineer in charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Third Floor )

32

-

-

... More
124.F Providing and fixing white european type wall-hung, Size 360mm x 360mm x 575 mm with flush valve having flow rate up to 6.0 Litr/Minute of Jaquar/Cera/Hindware /Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings,cutting & making good walls, floors etc as directed by Engineer in charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Fourth Floor )

32

-

-

... More
124.G Providing and fixing white european type wall-hung, Size 360mm x 360mm x 575 mm with flush valve having flow rate up to 6.0 Litr/Minute of Jaquar/Cera/Hindware /Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings,cutting & making good walls, floors etc as directed by Engineer in charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Fifth Floor )

28

-

-

... More
124.H Providing and fixing white european type wall-hung, Size 360mm x 360mm x 575 mm with flush valve having flow rate up to 6.0 Litr/Minute of Jaquar/Cera/Hindware /Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings,cutting & making good walls, floors etc as directed by Engineer in charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Sixth Floor )

28

-

-

... More
125.B Providing and fixing Orissa Pan of size 580x445x260 mm with approved make flush valve including trap, C.I. soil and vent pipe upto outside face of wall including 100mm dia. C.I. plug, bend and necessary pipe connection, etc complete. As directed by Engineer in charge. ( Ground Floor )

4

-

-

... More
126.B Providing and fixing white wash basin with half pedestal of size 515mmX615mmX460mm including pillar cock auto-closing system CP angular stop cock long thread of approved make continental including S.S. bottle trap of necessary pipe connection upto the outside face of the wall. ( Ground Floor )

5

-

-

... More
126.C Providing and fixing white wash basin with half pedestal of size 515mmX615mmX460mm including pillar cock auto-closing system CP angular stop cock long thread of approved make continental including S.S. bottle trap of necessary pipe connection upto the outside face of the wall. ( First Floor )

5

-

-

... More
126.D Providing and fixing white wash basin with half pedestal of size 515mmX615mmX460mm including pillar cock auto-closing system CP angular stop cock long thread of approved make continental including S.S. bottle trap of necessary pipe connection upto the outside face of the wall. ( Second Floor )

5

-

-

... More
126.E Providing and fixing white wash basin with half pedestal of size 515mmX615mmX460mm including pillar cock auto-closing system CP angular stop cock long thread of approved make continental including S.S. bottle trap of necessary pipe connection upto the outside face of the wall. ( Third Floor )

5

-

-

... More
126.F Providing and fixing white wash basin with half pedestal of size 515mmX615mmX460mm including pillar cock auto-closing system CP angular stop cock long thread of approved make continental including S.S. bottle trap of necessary pipe connection upto the outside face of the wall. ( Fourth Floor )

5

-

-

... More
126.G Providing and fixing white wash basin with half pedestal of size 515mmX615mmX460mm including pillar cock auto-closing system CP angular stop cock long thread of approved make continental including S.S. bottle trap of necessary pipe connection upto the outside face of the wall. ( Fifth Floor )

5

-

-

... More
126.H Providing and fixing white wash basin with half pedestal of size 515mmX615mmX460mm including pillar cock auto-closing system CP angular stop cock long thread of approved make continental including S.S. bottle trap of necessary pipe connection upto the outside face of the wall. ( Sixth Floor )

5

-

-

... More
127.B Providing and fixing Table top white wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge. ( Ground Floor )

20

-

-

... More
127.C Providing and fixing Table top white wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge. ( First Floor )

34

-

-

... More
127.D Providing and fixing Table top white wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge. ( Second Floor )

34

-

-

... More
127.E Providing and fixing Table top white wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge. ( Third Floor )

34

-

-

... More
127.F Providing and fixing Table top white wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge. ( Fourth Floor )

34

-

-

... More
127.G Providing and fixing Table top white wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge. ( Fifth Floor )

34

-

-

... More
127.H Providing and fixing Table top white wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge. ( Sixth Floor )

34

-

-

... More
128.B Providing and fixing white glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete. ( Ground Floor )

4

-

-

... More
128.C Providing and fixing white glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete. ( First Floor )

11

-

-

... More
128.D Providing and fixing white glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete. ( Second Floor )

11

-

-

... More
128.E Providing and fixing white glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete. ( Third Floor )

11

-

-

... More
128.F Providing and fixing white glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete. ( Fourth Floor )

11

-

-

... More
128.G Providing and fixing white glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete. ( Fifth Floor )

11

-

-

... More
128.H Providing and fixing white glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete. ( Sixth Floor )

11

-

-

... More
129.B Providing and fixing stainless steel sink of size 600 x 510 x 200 mm incluidng coupling, outlet pipe, elbow and other necessary fitting, finishing etc. complete. ( Ground Floor )

3

-

-

... More
130.B Grab bars-Providing SS grab bars set for accessible toilets comprising of 4 nos. Grab bars as specified below.(1 nos. wing grab bar + 1 nos. L shaped grab bar + 2 nos. straight grab bars = 1 typical set) 27a) Swing grab bar (1 NOS) Providing a S.S. 304 SWING HANDICAP GRAB BAR - 700 mm and of DIA: 32MM and thickness 1.5mm of the roved brand and make. 27b) L Shaped grab bar (1 NOS) Providing S.S. 304 L SHAPED DISABLED GRAB BAR of IZE-600MM (H) X 600MM (D) and 32MM DIA. and thickness mm of the approved brand and make. 27c) Straight grab bar (2 NOS) Providing S.STEEL 304 GRAB RAIL (600 MM),32MM DIA. and thickness 1.5mm of the approved brand and make. ( Ground Floor )

2

-

-

... More
130.C Grab bars-Providing SS grab bars set for accessible toilets comprising of 4 nos. Grab bars as specified below.(1 nos. wing grab bar + 1 nos. L shaped grab bar + 2 nos. straight grab bars = 1 typical set) 27a) Swing grab bar (1 NOS) Providing a S.S. 304 SWING HANDICAP GRAB BAR - 700 mm and of DIA: 32MM and thickness 1.5mm of the roved brand and make. 27b) L Shaped grab bar (1 NOS) Providing S.S. 304 L SHAPED DISABLED GRAB BAR of IZE-600MM (H) X 600MM (D) and 32MM DIA. and thickness mm of the approved brand and make. 27c) Straight grab bar (2 NOS) Providing S.STEEL 304 GRAB RAIL (600 MM),32MM DIA. and thickness 1.5mm of the approved brand and make. ( First Floor )

8

-

-

... More
130.D Grab bars-Providing SS grab bars set for accessible toilets comprising of 4 nos. Grab bars as specified below.(1 nos. wing grab bar + 1 nos. L shaped grab bar + 2 nos. straight grab bars = 1 typical set) 27a) Swing grab bar (1 NOS) Providing a S.S. 304 SWING HANDICAP GRAB BAR - 700 mm and of DIA: 32MM and thickness 1.5mm of the roved brand and make. 27b) L Shaped grab bar (1 NOS) Providing S.S. 304 L SHAPED DISABLED GRAB BAR of IZE-600MM (H) X 600MM (D) and 32MM DIA. and thickness mm of the approved brand and make. 27c) Straight grab bar (2 NOS) Providing S.STEEL 304 GRAB RAIL (600 MM),32MM DIA. and thickness 1.5mm of the approved brand and make. ( Second Floor )

8

-

-

... More
130.E Grab bars-Providing SS grab bars set for accessible toilets comprising of 4 nos. Grab bars as specified below.(1 nos. wing grab bar + 1 nos. L shaped grab bar + 2 nos. straight grab bars = 1 typical set) 27a) Swing grab bar (1 NOS) Providing a S.S. 304 SWING HANDICAP GRAB BAR - 700 mm and of DIA: 32MM and thickness 1.5mm of the roved brand and make. 27b) L Shaped grab bar (1 NOS) Providing S.S. 304 L SHAPED DISABLED GRAB BAR of IZE-600MM (H) X 600MM (D) and 32MM DIA. and thickness mm of the approved brand and make. 27c) Straight grab bar (2 NOS) Providing S.STEEL 304 GRAB RAIL (600 MM),32MM DIA. and thickness 1.5mm of the approved brand and make. ( Third Floor )

8

-

-

... More
130.F Grab bars-Providing SS grab bars set for accessible toilets comprising of 4 nos. Grab bars as specified below.(1 nos. wing grab bar + 1 nos. L shaped grab bar + 2 nos. straight grab bars = 1 typical set) 27a) Swing grab bar (1 NOS) Providing a S.S. 304 SWING HANDICAP GRAB BAR - 700 mm and of DIA: 32MM and thickness 1.5mm of the roved brand and make. 27b) L Shaped grab bar (1 NOS) Providing S.S. 304 L SHAPED DISABLED GRAB BAR of IZE-600MM (H) X 600MM (D) and 32MM DIA. and thickness mm of the approved brand and make. 27c) Straight grab bar (2 NOS) Providing S.STEEL 304 GRAB RAIL (600 MM),32MM DIA. and thickness 1.5mm of the approved brand and make. ( Fourth Floor )

8

-

-

... More
130.G Grab bars-Providing SS grab bars set for accessible toilets comprising of 4 nos. Grab bars as specified below.(1 nos. wing grab bar + 1 nos. L shaped grab bar + 2 nos. straight grab bars = 1 typical set) 27a) Swing grab bar (1 NOS) Providing a S.S. 304 SWING HANDICAP GRAB BAR - 700 mm and of DIA: 32MM and thickness 1.5mm of the roved brand and make. 27b) L Shaped grab bar (1 NOS) Providing S.S. 304 L SHAPED DISABLED GRAB BAR of IZE-600MM (H) X 600MM (D) and 32MM DIA. and thickness mm of the approved brand and make. 27c) Straight grab bar (2 NOS) Providing S.STEEL 304 GRAB RAIL (600 MM),32MM DIA. and thickness 1.5mm of the approved brand and make. ( Fifth Floor )

8

-

-

... More
130.H Grab bars-Providing SS grab bars set for accessible toilets comprising of 4 nos. Grab bars as specified below.(1 nos. wing grab bar + 1 nos. L shaped grab bar + 2 nos. straight grab bars = 1 typical set) 27a) Swing grab bar (1 NOS) Providing a S.S. 304 SWING HANDICAP GRAB BAR - 700 mm and of DIA: 32MM and thickness 1.5mm of the roved brand and make. 27b) L Shaped grab bar (1 NOS) Providing S.S. 304 L SHAPED DISABLED GRAB BAR of IZE-600MM (H) X 600MM (D) and 32MM DIA. and thickness mm of the approved brand and make. 27c) Straight grab bar (2 NOS) Providing S.STEEL 304 GRAB RAIL (600 MM),32MM DIA. and thickness 1.5mm of the approved brand and make. ( Sixth Floor )

8

-

-

... More
131.B Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. ( Ground Floor )

22

-

-

... More
131.C Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. ( First Floor )

34

-

-

... More
131.D Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. ( Second Floor )

34

-

-

... More
131.E Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. ( Third Floor )

34

-

-

... More
131.F Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. ( Fourth Floor )

34

-

-

... More
131.G Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. ( Fifth Floor )

34

-

-

... More
131.H Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. ( Sixth Floor )

34

-

-

... More
132.B Providing and fixing C.P. BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge. ( Ground Floor )

3

-

-

... More
133.B Providing and fixing sink cock with regular swinging spout (Wall / floor Mounted Model) with wall flange having flow rate up to 6.0 Litr/Minute of Jaquar/Cera/Hindware /Perryware or equivalent make incluidng other necessary fitting, etc. complete as directed by Engineer in charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Ground Floor )

3

-

-

... More
134.B Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge. ( Ground Floor )

16

-

-

... More
134.C Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge. ( First Floor )

32

-

-

... More
134.D Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge. ( Second Floor )

32

-

-

... More
134.E Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge. ( Third Floor )

32

-

-

... More
134.F Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge. ( Fourth Floor )

32

-

-

... More
134.G Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge. ( Fifth Floor )

28

-

-

... More
134.H Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge. ( Sixth Floor )

28

-

-

... More
135.B Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete. ( Ground Floor )

20

-

-

... More
135.C Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete. ( First Floor )

34

-

-

... More
135.D Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete. ( Second Floor )

34

-

-

... More
135.E Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete. ( Third Floor )

34

-

-

... More
135.F Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete. ( Fourth Floor )

34

-

-

... More
135.G Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete. ( Fifth Floor )

34

-

-

... More
135.H Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete. ( Sixth Floor )

34

-

-

... More
136.B Providing and fixing 15 mm diameter PVC Aqua kraft type of approved make super jet spray with flange 2 in 1 faucet 1.50 metre long including all accessories etc complete ( Ground Floor )

16

-

-

... More
136.C Providing and fixing 15 mm diameter PVC Aqua kraft type of approved make super jet spray with flange 2 in 1 faucet 1.50 metre long including all accessories etc complete ( First Floor )

32

-

-

... More
136.D Providing and fixing 15 mm diameter PVC Aqua kraft type of approved make super jet spray with flange 2 in 1 faucet 1.50 metre long including all accessories etc complete ( Second Floor )

32

-

-

... More
136.E Providing and fixing 15 mm diameter PVC Aqua kraft type of approved make super jet spray with flange 2 in 1 faucet 1.50 metre long including all accessories etc complete ( Third Floor )

32

-

-

... More
136.F Providing and fixing 15 mm diameter PVC Aqua kraft type of approved make super jet spray with flange 2 in 1 faucet 1.50 metre long including all accessories etc complete ( Fourth Floor )

32

-

-

... More
136.G Providing and fixing 15 mm diameter PVC Aqua kraft type of approved make super jet spray with flange 2 in 1 faucet 1.50 metre long including all accessories etc complete ( Fifth Floor )

28

-

-

... More
136.H Providing and fixing 15 mm diameter PVC Aqua kraft type of approved make super jet spray with flange 2 in 1 faucet 1.50 metre long including all accessories etc complete ( Sixth Floor )

28

-

-

... More
137.B Providing and fixing wall mixer with overhead shower,shower arm,hand shower with wall bracket having flow rate up to 12 liters/minutes of Jaquar/Cera/Hindware /Perryware or equivalent make including all necessary pipes,fittings etc.complete as directed by Engineer In Charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Ground Floor )

5

-

-

... More
137.C Providing and fixing wall mixer with overhead shower,shower arm,hand shower with wall bracket having flow rate up to 12 liters/minutes of Jaquar/Cera/Hindware /Perryware or equivalent make including all necessary pipes,fittings etc.complete as directed by Engineer In Charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( First Floor )

5

-

-

... More
137.D Providing and fixing wall mixer with overhead shower,shower arm,hand shower with wall bracket having flow rate up to 12 liters/minutes of Jaquar/Cera/Hindware /Perryware or equivalent make including all necessary pipes,fittings etc.complete as directed by Engineer In Charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Second Floor )

5

-

-

... More
137.E Providing and fixing wall mixer with overhead shower,shower arm,hand shower with wall bracket having flow rate up to 12 liters/minutes of Jaquar/Cera/Hindware /Perryware or equivalent make including all necessary pipes,fittings etc.complete as directed by Engineer In Charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Third Floor )

5

-

-

... More
137.F Providing and fixing wall mixer with overhead shower,shower arm,hand shower with wall bracket having flow rate up to 12 liters/minutes of Jaquar/Cera/Hindware /Perryware or equivalent make including all necessary pipes,fittings etc.complete as directed by Engineer In Charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Fourth Floor )

5

-

-

... More
137.G Providing and fixing wall mixer with overhead shower,shower arm,hand shower with wall bracket having flow rate up to 12 liters/minutes of Jaquar/Cera/Hindware /Perryware or equivalent make including all necessary pipes,fittings etc.complete as directed by Engineer In Charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Fifth Floor )

5

-

-

... More
137.H Providing and fixing wall mixer with overhead shower,shower arm,hand shower with wall bracket having flow rate up to 12 liters/minutes of Jaquar/Cera/Hindware /Perryware or equivalent make including all necessary pipes,fittings etc.complete as directed by Engineer In Charge.( Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) ( Sixth Floor )

5

-

-

... More
138.B Providing and fixing 75 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete ( Ground Floor )

83

-

-

... More
138.C Providing and fixing 75 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete ( First Floor )

288

-

-

... More
138.D Providing and fixing 75 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete ( Second Floor )

347

-

-

... More
138.E Providing and fixing 75 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete ( Third Floor )

347

-

-

... More
138.F Providing and fixing 75 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete ( Fourth Floor )

347

-

-

... More
138.G Providing and fixing 75 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete ( Fifth Floor )

347

-

-

... More
138.H Providing and fixing 75 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete ( Sixth Floor )

347

-

-

... More
139.B Providing and fixing 100 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. ( Ground Floor )

154

-

-

... More
139.C Providing and fixing 100 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. ( First Floor )

213

-

-

... More
139.D Providing and fixing 100 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. ( Second Floor )

213

-

-

... More
139.E Providing and fixing 100 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. ( Third Floor )

213

-

-

... More
139.F Providing and fixing 100 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. ( Fourth Floor )

213

-

-

... More
139.G Providing and fixing 100 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. ( Fifth Floor )

213

-

-

... More
139.H Providing and fixing 100 mm dia stabiliser pipe/ P.V.C. soil vent/waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. ( Sixth Floor )

318

-

-

... More
140.B Supplying installation testing and commissoning of Hubless centrifugally cast iron pipes as per ISI 15905 equivalent to NECO inclusive of all necessary special fitting like bends, tees, and caps, 'Y' bends for cleaning offsets, junctions, cowls, etc. lad under floor/fixed on walls and in pipe shafts etc. complete. The quoted rate should include lead and lifting charges to all levels, necessary scaffolding and supports like hanger supports grip bolts and CV sheet 304 grade clamps etc. with prior approval of concerned Superitending Engineer. e) 150 mm dia ( Ground Floor )

125

-

-

... More
141.B Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and One Number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete. ( Ground Floor )

42

-

-

... More
141.C Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and One Number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete. ( First Floor )

50

-

-

... More
141.D Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and One Number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete. ( Second Floor )

50

-

-

... More
141.E Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and One Number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete. ( Third Floor )

50

-

-

... More
141.F Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and One Number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete. ( Fourth Floor )

50

-

-

... More
141.G Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and One Number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete. ( Fifth Floor )

50

-

-

... More
141.H Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and One Number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete. ( Sixth Floor )

72

-

-

... More
142.B Providing and fixing 15 cm rigid PVC Nahani trap including PVC grating ,bend,connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use) ( Ground Floor )

30

-

-

... More
142.C Providing and fixing 15 cm rigid PVC Nahani trap including PVC grating ,bend,connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use) ( First Floor )

60

-

-

... More
142.D Providing and fixing 15 cm rigid PVC Nahani trap including PVC grating ,bend,connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use) ( Second Floor )

60

-

-

... More
142.E Providing and fixing 15 cm rigid PVC Nahani trap including PVC grating ,bend,connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use) ( Third Floor )

60

-

-

... More
142.F Providing and fixing 15 cm rigid PVC Nahani trap including PVC grating ,bend,connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use) ( Fourth Floor )

59

-

-

... More
142.G Providing and fixing 15 cm rigid PVC Nahani trap including PVC grating ,bend,connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use) ( Fifth Floor )

53

-

-

... More
142.H Providing and fixing 15 cm rigid PVC Nahani trap including PVC grating ,bend,connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use) ( Sixth Floor )

53

-

-

... More
143.B Providing and fixing on walls/ceiling/floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Ground Floor )

101

-

-

... More
143.C Providing and fixing on walls/ceiling/floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( First Floor )

280

-

-

... More
143.D Providing and fixing on walls/ceiling/floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Second Floor )

293

-

-

... More
143.E Providing and fixing on walls/ceiling/floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Third Floor )

293

-

-

... More
143.F Providing and fixing on walls/ceiling/floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Fourth Floor )

281

-

-

... More
143.G Providing and fixing on walls/ceiling/floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Fifth Floor )

236

-

-

... More
143.H Providing and fixing on walls/ceiling/floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Sixth Floor )

52

-

-

... More
144.B Providing and fixing on walls/ ceiling/ floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Ground Floor )

22

-

-

... More
144.C Providing and fixing on walls/ ceiling/ floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( First Floor )

36

-

-

... More
144.D Providing and fixing on walls/ ceiling/ floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Second Floor )

24

-

-

... More
144.E Providing and fixing on walls/ ceiling/ floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Third Floor )

17

-

-

... More
144.F Providing and fixing on walls/ ceiling/ floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Fourth Floor )

24

-

-

... More
144.G Providing and fixing on walls/ ceiling/ floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Fifth Floor )

3

-

-

... More
144.H Providing and fixing on walls/ ceiling/ floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Sixth Floor )

15

-

-

... More
145.B Providing and fixing on walls/ ceiling/ floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Ground Floor )

26

-

-

... More
145.C Providing and fixing on walls/ ceiling/ floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( First Floor )

167

-

-

... More
145.D Providing and fixing on walls/ ceiling/ floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Second Floor )

131

-

-

... More
145.E Providing and fixing on walls/ ceiling/ floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Third Floor )

194

-

-

... More
145.F Providing and fixing on walls/ ceiling/ floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Fourth Floor )

123

-

-

... More
145.G Providing and fixing on walls/ ceiling/ floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Fifth Floor )

88

-

-

... More
145.H Providing and fixing on walls/ ceiling/ floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Sixth Floor )

87

-

-

... More
146.B Providing and fixing on walls /ceiling/ floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Ground Floor )

24

-

-

... More
146.C Providing and fixing on walls /ceiling/ floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( First Floor )

57

-

-

... More
146.D Providing and fixing on walls /ceiling/ floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Second Floor )

137

-

-

... More
146.E Providing and fixing on walls /ceiling/ floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Third Floor )

162

-

-

... More
146.F Providing and fixing on walls /ceiling/ floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Fourth Floor )

212

-

-

... More
146.G Providing and fixing on walls /ceiling/ floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Fifth Floor )

165

-

-

... More
146.H Providing and fixing on walls /ceiling/ floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. ( Sixth Floor )

65

-

-

... More
147.B Providing and fixing on walls/ ceiling/ floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. ( Ground Floor )

406

-

-

... More
147.C Providing and fixing on walls/ ceiling/ floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. ( First Floor )

47

-

-

... More
147.D Providing and fixing on walls/ ceiling/ floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. ( Second Floor )

41

-

-

... More
147.E Providing and fixing on walls/ ceiling/ floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. ( Third Floor )

47

-

-

... More
147.F Providing and fixing on walls/ ceiling/ floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. ( Fourth Floor )

47

-

-

... More
147.G Providing and fixing on walls/ ceiling/ floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. ( Fifth Floor )

34

-

-

... More
147.H Providing and fixing on walls/ ceiling/ floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. ( Sixth Floor )

80

-

-

... More
Providing and making ISI Mark ferrule connection of 50 mm dia. to water main including ferrule coupling cast iron bell mouth cover, built in non return valve and fixing including excavation and reinstatement complete.

2

-

-

... More
Providing and laying in trenches 50 mm dia. heavy grade having embossed as ISI Mark galvanised iron pipes of 6.33 Kilogram/metre necessary fitting remaking good the demolished portion with filling trenches and with primer of anti-corrosive oil paint , 2 coats complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.

304

-

-

... More
150.B Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Ground Floor )

2

-

-

... More
150.C Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( First Floor )

8

-

-

... More
150.D Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Second Floor )

9

-

-

... More
150.E Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Third Floor )

8

-

-

... More
150.F Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Fourth Floor )

6

-

-

... More
150.G Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Fifth Floor )

2

-

-

... More
150.H Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Sixth Floor )

6

-

-

... More
151.B Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Ground Floor )

3

-

-

... More
151.C Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( First Floor )

5

-

-

... More
151.D Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Second Floor )

5

-

-

... More
151.E Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Third Floor )

5

-

-

... More
151.F Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Fourth Floor )

5

-

-

... More
151.G Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Fifth Floor )

3

-

-

... More
151.H Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Sixth Floor )

2

-

-

... More
152.C Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( First Floor )

6

-

-

... More
152.D Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Second Floor )

8

-

-

... More
152.E Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Third Floor )

6

-

-

... More
152.F Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Fourth Floor )

5

-

-

... More
152.G Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Fifth Floor )

2

-

-

... More
152.H Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Sixth Floor )

3

-

-

... More
153.B Providing and fixing screw down for 40 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Ground Floor )

2

-

-

... More
153.C Providing and fixing screw down for 40 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( First Floor )

2

-

-

... More
153.D Providing and fixing screw down for 40 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Second Floor )

2

-

-

... More
153.E Providing and fixing screw down for 40 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Third Floor )

2

-

-

... More
153.F Providing and fixing screw down for 40 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Fourth Floor )

2

-

-

... More
153.H Providing and fixing screw down for 40 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Sixth Floor )

14

-

-

... More
154.C Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete. ( First Floor )

2

-

-

... More
154.D Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete. ( Second Floor )

2

-

-

... More
154.E Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete. ( Third Floor )

2

-

-

... More
154.F Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete. ( Fourth Floor )

2

-

-

... More
154.G Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete. ( Fifth Floor )

3

-

-

... More
154.H Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete. ( Sixth Floor )

4

-

-

... More
155.B Providing and fixing screw down for 65 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Ground Floor )

3

-

-

... More
155.C Providing and fixing screw down for 65 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( First Floor )

4

-

-

... More
155.D Providing and fixing screw down for 65 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Second Floor )

4

-

-

... More
155.E Providing and fixing screw down for 65 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Third Floor )

4

-

-

... More
155.F Providing and fixing screw down for 65 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Fourth Floor )

4

-

-

... More
155.H Providing and fixing screw down for 65 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Sixth Floor )

9

-

-

... More
156.H Providing and fixing screw down for 80 mm. dia. wheeled stop tap of brass including necessary sockets/union nut complete. ( Sixth Floor )

4

-

-

... More
Providing and fixing reinforced cement concrete cover of size 90 cm x 45 cm with frame over inspection chamber etc. complete. Medium duty (140 Kilogram)

20

-

-

... More
158.B Providing and fixing 50mm diameter water meter with non-return valve including strainer,sockets/ union nut and including water meter box making locking arrangement and lock. [without chamber] ( Ground Floor )

3

-

-

... More
159.B Providing and fixing 45 cm wide mild steel ladder of 40mm x 6 mm mild steel flat stringers and steps of 18 mm dia. mild steel bar for water tank including fixing it in (1:2:4) M-15 cement concrete block 60cm x 30cm x 30cm and painting the ladder complete. (Anti Corossive Paint) ( Ground Floor )

6

-

-

... More
159.H Providing and fixing 45 cm wide mild steel ladder of 40mm x 6 mm mild steel flat stringers and steps of 18 mm dia. mild steel bar for water tank including fixing it in (1:2:4) M-15 cement concrete block 60cm x 30cm x 30cm and painting the ladder complete. (Anti Corossive Paint) ( Sixth Floor )

32

-

-

... More
160.B Providing and fixing 40 mm. dia Ball cock medium type with PVC float including sockets and necessary fittings and tested as per municipal requirements etc. complete. ( Ground Floor )

3

-

-

... More
Providing and constructing Brick Masonry inspection trap Chamber 90cm x 45cm including 1:4:8 C.C foundation, 1:2:4 C.C.channels/half round glazed stoneware pipe channel, salt glazed stone-ware intercepting trap with rodding pipe set in 1:4:8 cement concrete block, brick masonry plastering inside and Outside, fixed in cement concrete with R.C.C. Cover medium duty 140 Kilogram. etc complete

2

-

-

... More
Providing and laying 100 mm dia salt glazed stoneware pipe including fittings such as bends, tees, single junction, double junctions laying, jointing (including excavation and refilling the trenches) complete.

104

-

-

... More
Providing and laying concrete pipes of I.S.NP. class of 225mm diameter in proper line, level and slope including necessary collars, excavation, laying, fixing with collars in cement mortar 1:1 and refilling the trench complete.

2262

-

-

... More
Providing and laying concrete pipes of I.S.NP. class of 300mm diameter in proper line, level and slope including necessary collars, excavation, laying, fixing with collars in cement mortar 1:1 and refilling the trench complete.

77

-

-

... More
Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 450mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete.

311

-

-

... More
Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete.

42

-

-

... More
Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 900mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete.

15

-

-

... More
Providing and constructing Brick Masonry Inspection Chamber 90cm x 45cm x 90cm including 1:4:8 cement concrete foundation 1:2:4 cement concrete channels half round G.S.W.pipes, Brick Masonry, plastering from inside and with frame fixed in cement concrete with R.C.C. Cover medium duty 140Kilogramwith frame etc complete.

11

-

-

... More
169.B Providing and fixing Ductile iron Man Hole Covers/ Strom Water Grating and Grating with frame of Various sizes, weight and types and load bearing capacity as per EN-124, equivalent NECO with prior approval of concerned Superitending Engineer. ( Ground Floor )

4074

-

-

... More
170.B RWH - Recharge Pit Providing and constructing recharge pit of 2.0m deep and 1.0m dia of pre-cast RCC rings with 6.5" dia x 25m deep borewell at the floor of recharge pit including installation of combination of solid/perforated PVC casing pipe wrapped around with netlon mesh including 300mm thick sidefilling around outside of RCC rings (annular space) with 40mm size boulders including filling of recharge pit up to 0.5m depth with 25-75mm clean washed gravels from bottom up followed by 0.5m depth of 10- 25mm of clean washed stones followed by 0.5m of washed river fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) including netlon mesh between each gravel/fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) media layer including covering with RCC slab, manhole frame & cover, PVC rungs, PVC end- caps, fittings etc. including arrangement for inlet & outlet pipe excavation & backfilling as shown in the drawing.The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, taxes, including all leads, lifts at all levels. All material should be of approved make. All works complete as per the drawing, technical specification and direction of the Engineer in charge. ( Ground Floor )

3

-

-

... More
171.B Providing and constructing on sewer, B.B. masonry circular manhole with concentric cone 1.2 M dia. at bottom and 0.5 M dia. at top and upto a depth of 2.00 M with 23 cm brick work in CM 1:4 proportion excluding excavation including foundation concrete 250 mm thick and haunches and channels in C.C. 1:2:4 proportion, finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.5 kg., 1:2:4 coping and providing and fixing approved make and quality FRP (Fibre-reinforced plastic). frame and cover of 56 cm dia.etc. complete as directed by Engineerin-charge. ( Ground Floor )

20

-

-

... More
172.B Providing and constructing on sewer, B.B. masonry circular manhole concentric cone 1.5 M dia. at bottom and 0.5 M dia. at top and upto a depth of 5.00 M with 23 cm brick work, upto depth of 2 M from top and 35 cm thick brick work for balance depth in CM 1:4 proportion with 20 mm thick smooth plaster on both sides in CM 1:2 proportion excluding excavation including foundation concrete 250 mm thick and haunches and channels in C.C. 1:2:4 proportion, finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.5 kg., 1:2:4 coping and providing and fixing approved make and quality FRP (Fibre-reinforced plastic) frame and cover of 56 cm dia. etc. complete as directed by Engineerin-charge. ( Ground Floor )

32

-

-

... More
173.B Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast FRP. frame and cover, etc. complete as directed by Engineer-in-charge. C] As above of 90 x 60 cm internal size and depth upto 1.2 M with FRP. frame and cover. ( Ground Floor )

80

-

-

... More
174.B Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast FRP. frame and cover, etc. complete as directed by Engineer-in-charge. D] As above of 90 x 90 cm internal size and depth upto 1.2 M with FRP. frame and cover. ( Ground Floor )

107

-

-

... More
175.B Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( Ground Floor )

12

-

-

... More
175.C Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( First Floor )

33

-

-

... More
175.D Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( Second Floor )

34

-

-

... More
175.E Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( Third Floor )

53

-

-

... More
175.F Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( Fourth Floor )

65

-

-

... More
175.G Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( Fifth Floor )

57

-

-

... More
175.H Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( Sixth Floor )

388

-

-

... More
176.D Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 80mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( Second Floor )

12

-

-

... More
176.E Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 80mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( Third Floor )

12

-

-

... More
176.F Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 80mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( Fourth Floor )

12

-

-

... More
176.G Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 80mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( Fifth Floor )

20

-

-

... More
176.H Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 80mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer. ( Sixth Floor )

701

-

-

... More
177.B Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass perforated Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Ground Floor )

22

-

-

... More
177.C Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass perforated Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( First Floor )

44

-

-

... More
177.D Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass perforated Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Second Floor )

44

-

-

... More
177.E Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass perforated Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Third Floor )

44

-

-

... More
177.F Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass perforated Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Fourth Floor )

44

-

-

... More
177.G Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass perforated Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Fifth Floor )

44

-

-

... More
177.H Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass perforated Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Sixth Floor )

44

-

-

... More
178.B Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Ground Floor )

9

-

-

... More
178.C Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( First Floor )

17

-

-

... More
178.D Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Second Floor )

17

-

-

... More
178.E Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Third Floor )

17

-

-

... More
178.F Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Fourth Floor )

16

-

-

... More
178.G Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Fifth Floor )

10

-

-

... More
178.H Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in floor with cement motor to match with floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge. ( Sixth Floor )

10

-

-

... More
179.B Providing & Arrangemnt of High Back, Synchronized Mechanism with Multiple Locking, Adjustable Armrest, Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Leatherite Upholstery ( Ground Floor )

2

-

-

... More
179.C Providing & Arrangemnt of High Back, Synchronized Mechanism with Multiple Locking, Adjustable Armrest, Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Leatherite Upholstery ( First Floor )

2

-

-

... More
179.D Providing & Arrangemnt of High Back, Synchronized Mechanism with Multiple Locking, Adjustable Armrest, Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Leatherite Upholstery ( Second Floor )

6

-

-

... More
179.E Providing & Arrangemnt of High Back, Synchronized Mechanism with Multiple Locking, Adjustable Armrest, Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Leatherite Upholstery ( Third Floor )

6

-

-

... More
179.F Providing & Arrangemnt of High Back, Synchronized Mechanism with Multiple Locking, Adjustable Armrest, Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Leatherite Upholstery ( Fourth Floor )

6

-

-

... More
179.G Providing & Arrangemnt of High Back, Synchronized Mechanism with Multiple Locking, Adjustable Armrest, Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Leatherite Upholstery ( Fifth Floor )

6

-

-

... More
179.H Providing & Arrangemnt of High Back, Synchronized Mechanism with Multiple Locking, Adjustable Armrest, Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Leatherite Upholstery ( Sixth Floor )

2

-

-

... More
180.B Providing & Arrangemnt of High Back Chair - TILT MECHANISM WITH MULTILOCKING, HIGH DENSITY CUSHION ON SEAT COMPOSITE LEATHER WITH METALLIC SILVER FINISH BASE AND ARMS WITH P.U.CASTORS GASLIFT FOR HEIGHT ADJUSTMENT. ( Ground Floor )

2

-

-

... More
180.C Providing & Arrangemnt of High Back Chair - TILT MECHANISM WITH MULTILOCKING, HIGH DENSITY CUSHION ON SEAT COMPOSITE LEATHER WITH METALLIC SILVER FINISH BASE AND ARMS WITH P.U.CASTORS GASLIFT FOR HEIGHT ADJUSTMENT. ( First Floor )

2

-

-

... More
180.D Providing & Arrangemnt of High Back Chair - TILT MECHANISM WITH MULTILOCKING, HIGH DENSITY CUSHION ON SEAT COMPOSITE LEATHER WITH METALLIC SILVER FINISH BASE AND ARMS WITH P.U.CASTORS GASLIFT FOR HEIGHT ADJUSTMENT. ( Second Floor )

2

-

-

... More
180.E Providing & Arrangemnt of High Back Chair - TILT MECHANISM WITH MULTILOCKING, HIGH DENSITY CUSHION ON SEAT COMPOSITE LEATHER WITH METALLIC SILVER FINISH BASE AND ARMS WITH P.U.CASTORS GASLIFT FOR HEIGHT ADJUSTMENT. ( Third Floor )

40

-

-

... More
180.F Providing & Arrangemnt of High Back Chair - TILT MECHANISM WITH MULTILOCKING, HIGH DENSITY CUSHION ON SEAT COMPOSITE LEATHER WITH METALLIC SILVER FINISH BASE AND ARMS WITH P.U.CASTORS GASLIFT FOR HEIGHT ADJUSTMENT. ( Fourth Floor )

40

-

-

... More
180.G Providing & Arrangemnt of High Back Chair - TILT MECHANISM WITH MULTILOCKING, HIGH DENSITY CUSHION ON SEAT COMPOSITE LEATHER WITH METALLIC SILVER FINISH BASE AND ARMS WITH P.U.CASTORS GASLIFT FOR HEIGHT ADJUSTMENT. ( Fifth Floor )

44

-

-

... More
180.H Providing & Arrangemnt of High Back Chair - TILT MECHANISM WITH MULTILOCKING, HIGH DENSITY CUSHION ON SEAT COMPOSITE LEATHER WITH METALLIC SILVER FINISH BASE AND ARMS WITH P.U.CASTORS GASLIFT FOR HEIGHT ADJUSTMENT. ( Sixth Floor )

41

-

-

... More
181.B Providing & Arrangemnt of MId Back, Normal Syncro Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong/Nylon Base with Leather Upholstery ( Ground Floor )

5

-

-

... More
181.C Providing & Arrangemnt of MId Back, Normal Syncro Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong/Nylon Base with Leather Upholstery ( First Floor )

5

-

-

... More
181.D Providing & Arrangemnt of MId Back, Normal Syncro Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong/Nylon Base with Leather Upholstery ( Second Floor )

186

-

-

... More
181.E Providing & Arrangemnt of MId Back, Normal Syncro Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong/Nylon Base with Leather Upholstery ( Third Floor )

251

-

-

... More
181.F Providing & Arrangemnt of MId Back, Normal Syncro Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong/Nylon Base with Leather Upholstery ( Fourth Floor )

251

-

-

... More
181.G Providing & Arrangemnt of MId Back, Normal Syncro Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong/Nylon Base with Leather Upholstery ( Fifth Floor )

318

-

-

... More
181.H Providing & Arrangemnt of MId Back, Normal Syncro Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong/Nylon Base with Leather Upholstery ( Sixth Floor )

265

-

-

... More
182.B Providing & Arrangemnt of Mid Back, ECO CTS Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Fabric Upholstery ( Ground Floor )

5

-

-

... More
182.C Providing & Arrangemnt of Mid Back, ECO CTS Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Fabric Upholstery ( First Floor )

5

-

-

... More
182.D Providing & Arrangemnt of Mid Back, ECO CTS Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Fabric Upholstery ( Second Floor )

4

-

-

... More
182.E Providing & Arrangemnt of Mid Back, ECO CTS Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Fabric Upholstery ( Third Floor )

74

-

-

... More
182.F Providing & Arrangemnt of Mid Back, ECO CTS Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Fabric Upholstery ( Fourth Floor )

74

-

-

... More
182.G Providing & Arrangemnt of Mid Back, ECO CTS Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Fabric Upholstery ( Fifth Floor )

82

-

-

... More
182.H Providing & Arrangemnt of Mid Back, ECO CTS Mechanism , Fixed Armrest , Gaslift for Seat height adjustment, Standard 5-prong P/Nylon Base with Fabric Upholstery ( Sixth Floor )

76

-

-

... More
183.B Public Seating Chair. - 3 Seater Providing and Fixing 3 seater Public seating chair made of complete metal with Legs in Crome finish and seates in silver powder coating finish. ( Ground Floor )

10

-

-

... More
183.C Public Seating Chair. - 3 Seater Providing and Fixing 3 seater Public seating chair made of complete metal with Legs in Crome finish and seates in silver powder coating finish. ( First Floor )

5

-

-

... More
183.D Public Seating Chair. - 3 Seater Providing and Fixing 3 seater Public seating chair made of complete metal with Legs in Crome finish and seates in silver powder coating finish. ( Second Floor )

11

-

-

... More
183.E Public Seating Chair. - 3 Seater Providing and Fixing 3 seater Public seating chair made of complete metal with Legs in Crome finish and seates in silver powder coating finish. ( Third Floor )

11

-

-

... More
183.F Public Seating Chair. - 3 Seater Providing and Fixing 3 seater Public seating chair made of complete metal with Legs in Crome finish and seates in silver powder coating finish. ( Fourth Floor )

11

-

-

... More
183.G Public Seating Chair. - 3 Seater Providing and Fixing 3 seater Public seating chair made of complete metal with Legs in Crome finish and seates in silver powder coating finish. ( Fifth Floor )

11

-

-

... More
183.H Public Seating Chair. - 3 Seater Providing and Fixing 3 seater Public seating chair made of complete metal with Legs in Crome finish and seates in silver powder coating finish. ( Sixth Floor )

11

-

-

... More
184.B Alluminium foldable ladder for store Providing & Fixing Foldable Alluminum Ladder 1500 mm. Ht. ( Ground Floor )

2

-

-

... More
184.C Alluminium foldable ladder for store Providing & Fixing Foldable Alluminum Ladder 1500 mm. Ht. ( First Floor )

2

-

-

... More
184.D Alluminium foldable ladder for store Providing & Fixing Foldable Alluminum Ladder 1500 mm. Ht. ( Second Floor )

2

-

-

... More
184.E Alluminium foldable ladder for store Providing & Fixing Foldable Alluminum Ladder 1500 mm. Ht. ( Third Floor )

2

-

-

... More
184.F Alluminium foldable ladder for store Providing & Fixing Foldable Alluminum Ladder 1500 mm. Ht. ( Fourth Floor )

2

-

-

... More
184.G Alluminium foldable ladder for store Providing & Fixing Foldable Alluminum Ladder 1500 mm. Ht. ( Fifth Floor )

2

-

-

... More
184.H Alluminium foldable ladder for store Providing & Fixing Foldable Alluminum Ladder 1500 mm. Ht. ( Sixth Floor )

2

-

-

... More
185.C Providing & fixing in position, heavy duty fully upholstered Auditorium chairs 520 mm c to c tip-up type. Height of back should be less than 1030 mm with plastic protective cover on back and bottom having teak wood handles. Back to back distance is 1000mm. The auditorium chairs should be of following specifications 1. Powder Coated Heavy duty MS Stand. 2. Individually moulded , ergonomically designed seat and back cushions. 3.Moulded Polyurethane Foam cushion. PU foam density 48 – 52 Kilograms/cu.mtr 4. Moulded Polyurethane Foam manufactured in certified ISO 9001 facility to ensure consistency in density for longevity .5.Upholstered in Foam laminated stretch sandwich Fabric for clean finish and soft comfortable feel as per the colour & pattern selected by the client. 6.Seat and Back should have moulded synthetic protective cover. 7. Wooden or PU armrest 65mm x 20mm - 330mm long . 8.Mounted using Anchor fasteners. ( First Floor )

225

-

-

... More
185.H Providing & fixing in position, heavy duty fully upholstered Auditorium chairs 520 mm c to c tip-up type. Height of back should be less than 1030 mm with plastic protective cover on back and bottom having teak wood handles. Back to back distance is 1000mm. The auditorium chairs should be of following specifications 1. Powder Coated Heavy duty MS Stand. 2. Individually moulded , ergonomically designed seat and back cushions. 3.Moulded Polyurethane Foam cushion. PU foam density 48 – 52 Kilograms/cu.mtr 4. Moulded Polyurethane Foam manufactured in certified ISO 9001 facility to ensure consistency in density for longevity .5.Upholstered in Foam laminated stretch sandwich Fabric for clean finish and soft comfortable feel as per the colour & pattern selected by the client. 6.Seat and Back should have moulded synthetic protective cover. 7. Wooden or PU armrest 65mm x 20mm - 330mm long . 8.Mounted using Anchor fasteners. ( Sixth Floor )

46

-

-

... More
186.B Sofa Set 3+1+1 Providing & fixing Sofa Set 3+1+1 Brown and Cream leather DIMENSION Length: 182.5 (cms) Breadth (cms): 100 (cms)Height (cms): 100 (cms) Weight (Kilograms): 66 (Kilogram) Seating Capacity: Five Seat ( Ground Floor )

3

-

-

... More
186.C Sofa Set 3+1+1 Providing & fixing Sofa Set 3+1+1 Brown and Cream leather DIMENSION Length: 182.5 (cms) Breadth (cms): 100 (cms)Height (cms): 100 (cms) Weight (Kilograms): 66 (Kilogram) Seating Capacity: Five Seat ( First Floor )

2

-

-

... More
186.D Sofa Set 3+1+1 Providing & fixing Sofa Set 3+1+1 Brown and Cream leather DIMENSION Length: 182.5 (cms) Breadth (cms): 100 (cms)Height (cms): 100 (cms) Weight (Kilograms): 66 (Kilogram) Seating Capacity: Five Seat ( Second Floor )

5

-

-

... More
186.E Sofa Set 3+1+1 Providing & fixing Sofa Set 3+1+1 Brown and Cream leather DIMENSION Length: 182.5 (cms) Breadth (cms): 100 (cms)Height (cms): 100 (cms) Weight (Kilograms): 66 (Kilogram) Seating Capacity: Five Seat ( Third Floor )

7

-

-

... More
186.F Sofa Set 3+1+1 Providing & fixing Sofa Set 3+1+1 Brown and Cream leather DIMENSION Length: 182.5 (cms) Breadth (cms): 100 (cms)Height (cms): 100 (cms) Weight (Kilograms): 66 (Kilogram) Seating Capacity: Five Seat ( Fourth Floor )

7

-

-

... More
186.G Sofa Set 3+1+1 Providing & fixing Sofa Set 3+1+1 Brown and Cream leather DIMENSION Length: 182.5 (cms) Breadth (cms): 100 (cms)Height (cms): 100 (cms) Weight (Kilograms): 66 (Kilogram) Seating Capacity: Five Seat ( Fifth Floor )

7

-

-

... More
186.H Sofa Set 3+1+1 Providing & fixing Sofa Set 3+1+1 Brown and Cream leather DIMENSION Length: 182.5 (cms) Breadth (cms): 100 (cms)Height (cms): 100 (cms) Weight (Kilograms): 66 (Kilogram) Seating Capacity: Five Seat ( Sixth Floor )

7

-

-

... More
187.H Sofa 3 seater: Providing and installing sofa 3 seater 1.8x0.8m fabric up to 1000 rs/mtrs. fabric and design must be approved and verified by project Architect. Table must be including all required fittings and fixing etc. complete, as per direction of the Engineer-In-Charge. ( Sixth Floor )

8

-

-

... More
188.H Single seater chair teak wood : Providing and installing Single seater chair teak wood with antique champagne gold finish and as per approved fabric for sofa chair overall size of sofa chair is 0.75x0.75M. Sofa chair sample must be approved and verified by project Architect. Sofa chair must be including all required fitting and fixing etc. complete, as per direction of the Engineer-in-Charge ( Sixth Floor )

5

-

-

... More
189.H Wooden antique Center table : Providing and installing Wooden antique Center table of 1.016m x 0.6m with antique champagne gold finish and top of the table must be ceramic. table sample must be approved and verified by project Architect. Table must be including all required fitting and fixing etc. complete, as per direction of the Engineer-in-Charge ( Sixth Floor )

5

-

-

... More
190.B Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD Providing and fixing Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD - BASE FRAME : Base Frame shall be fabricated in channel Type from minimum 2.5 mm thick MS Sheet Size of Channel 25mm x 100mm x 45mm. GUIDE RAILS : The guide rails shall be made out of 28mm Bright bar placed on 1.2 mm thick M.S. Plate which will be above the floor and are as per the international standard of safety. SUPER STRUCTURE : Super structure of the Mobile storage system will consist of knock down type panels. All the components such as shelves, front panel, end panel, vertical rear panel, central partition etc. Will act as an integral member of the Unit. SHELVES : Shelves made of 22SWG thick Prime Quality C.R.C.A. having 10 folds each will be provided each designed to carry a U.D.L. of 70 Kilograms. VERTICAL PANEL : Vertical panel consists of the front, Centre & rear panel shall be made out of 20SWG thick C.R.C.A. Prime quality Mild Steel & designed to take the load of shelves. DRIVE COVER PANEL : Made out of 22SWG thick C. R.C. A. prime quality Steel to cover the entire drive mechanism. CENTRE PARTITION : The Centre partition will comprise of a full C.R.C.A. prime quality Mild Steel 22SWG Sheet. LOCKING : System will be provided with individual rack locking as well as centralised locking arrangement on the last unit when all units are brought together, central lock when operated gets locked with the floor & does not allow access to the units. DRIVE MECHANISM : Driving Mechanism will be provided externally supported on special grade anti-friction bearing to have smooth & effortless movement. Entire mechanism or gear & sprockets shall be incorporated within the front panel provided in the front of the unit within an area of 1000mm x 200mm x 60mm. DRIVING WHEEL : Fully Powder Coated three pronged drive wheel for better torque & free movement of the rack over the guide rail. INDEXING ARRANGEMENT : Acrylic card holders provided on the front panel for easy identification & retrieval. FINAL FINISH : Powder Coating (8 tanks process with 70 microns). ( Ground Floor )

16

-

-

... More
190.C Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD Providing and fixing Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD - BASE FRAME : Base Frame shall be fabricated in channel Type from minimum 2.5 mm thick MS Sheet Size of Channel 25mm x 100mm x 45mm. GUIDE RAILS : The guide rails shall be made out of 28mm Bright bar placed on 1.2 mm thick M.S. Plate which will be above the floor and are as per the international standard of safety. SUPER STRUCTURE : Super structure of the Mobile storage system will consist of knock down type panels. All the components such as shelves, front panel, end panel, vertical rear panel, central partition etc. Will act as an integral member of the Unit. SHELVES : Shelves made of 22SWG thick Prime Quality C.R.C.A. having 10 folds each will be provided each designed to carry a U.D.L. of 70 Kilograms. VERTICAL PANEL : Vertical panel consists of the front, Centre & rear panel shall be made out of 20SWG thick C.R.C.A. Prime quality Mild Steel & designed to take the load of shelves. DRIVE COVER PANEL : Made out of 22SWG thick C. R.C. A. prime quality Steel to cover the entire drive mechanism. CENTRE PARTITION : The Centre partition will comprise of a full C.R.C.A. prime quality Mild Steel 22SWG Sheet. LOCKING : System will be provided with individual rack locking as well as centralised locking arrangement on the last unit when all units are brought together, central lock when operated gets locked with the floor & does not allow access to the units. DRIVE MECHANISM : Driving Mechanism will be provided externally supported on special grade anti-friction bearing to have smooth & effortless movement. Entire mechanism or gear & sprockets shall be incorporated within the front panel provided in the front of the unit within an area of 1000mm x 200mm x 60mm. DRIVING WHEEL : Fully Powder Coated three pronged drive wheel for better torque & free movement of the rack over the guide rail. INDEXING ARRANGEMENT : Acrylic card holders provided on the front panel for easy identification & retrieval. FINAL FINISH : Powder Coating (8 tanks process with 70 microns). ( First Floor )

16

-

-

... More
190.D Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD Providing and fixing Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD - BASE FRAME : Base Frame shall be fabricated in channel Type from minimum 2.5 mm thick MS Sheet Size of Channel 25mm x 100mm x 45mm. GUIDE RAILS : The guide rails shall be made out of 28mm Bright bar placed on 1.2 mm thick M.S. Plate which will be above the floor and are as per the international standard of safety. SUPER STRUCTURE : Super structure of the Mobile storage system will consist of knock down type panels. All the components such as shelves, front panel, end panel, vertical rear panel, central partition etc. Will act as an integral member of the Unit. SHELVES : Shelves made of 22SWG thick Prime Quality C.R.C.A. having 10 folds each will be provided each designed to carry a U.D.L. of 70 Kilograms. VERTICAL PANEL : Vertical panel consists of the front, Centre & rear panel shall be made out of 20SWG thick C.R.C.A. Prime quality Mild Steel & designed to take the load of shelves. DRIVE COVER PANEL : Made out of 22SWG thick C. R.C. A. prime quality Steel to cover the entire drive mechanism. CENTRE PARTITION : The Centre partition will comprise of a full C.R.C.A. prime quality Mild Steel 22SWG Sheet. LOCKING : System will be provided with individual rack locking as well as centralised locking arrangement on the last unit when all units are brought together, central lock when operated gets locked with the floor & does not allow access to the units. DRIVE MECHANISM : Driving Mechanism will be provided externally supported on special grade anti-friction bearing to have smooth & effortless movement. Entire mechanism or gear & sprockets shall be incorporated within the front panel provided in the front of the unit within an area of 1000mm x 200mm x 60mm. DRIVING WHEEL : Fully Powder Coated three pronged drive wheel for better torque & free movement of the rack over the guide rail. INDEXING ARRANGEMENT : Acrylic card holders provided on the front panel for easy identification & retrieval. FINAL FINISH : Powder Coating (8 tanks process with 70 microns). ( Second Floor )

115

-

-

... More
190.E Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD Providing and fixing Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD - BASE FRAME : Base Frame shall be fabricated in channel Type from minimum 2.5 mm thick MS Sheet Size of Channel 25mm x 100mm x 45mm. GUIDE RAILS : The guide rails shall be made out of 28mm Bright bar placed on 1.2 mm thick M.S. Plate which will be above the floor and are as per the international standard of safety. SUPER STRUCTURE : Super structure of the Mobile storage system will consist of knock down type panels. All the components such as shelves, front panel, end panel, vertical rear panel, central partition etc. Will act as an integral member of the Unit. SHELVES : Shelves made of 22SWG thick Prime Quality C.R.C.A. having 10 folds each will be provided each designed to carry a U.D.L. of 70 Kilograms. VERTICAL PANEL : Vertical panel consists of the front, Centre & rear panel shall be made out of 20SWG thick C.R.C.A. Prime quality Mild Steel & designed to take the load of shelves. DRIVE COVER PANEL : Made out of 22SWG thick C. R.C. A. prime quality Steel to cover the entire drive mechanism. CENTRE PARTITION : The Centre partition will comprise of a full C.R.C.A. prime quality Mild Steel 22SWG Sheet. LOCKING : System will be provided with individual rack locking as well as centralised locking arrangement on the last unit when all units are brought together, central lock when operated gets locked with the floor & does not allow access to the units. DRIVE MECHANISM : Driving Mechanism will be provided externally supported on special grade anti-friction bearing to have smooth & effortless movement. Entire mechanism or gear & sprockets shall be incorporated within the front panel provided in the front of the unit within an area of 1000mm x 200mm x 60mm. DRIVING WHEEL : Fully Powder Coated three pronged drive wheel for better torque & free movement of the rack over the guide rail. INDEXING ARRANGEMENT : Acrylic card holders provided on the front panel for easy identification & retrieval. FINAL FINISH : Powder Coating (8 tanks process with 70 microns). ( Third Floor )

45

-

-

... More
190.F Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD Providing and fixing Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD - BASE FRAME : Base Frame shall be fabricated in channel Type from minimum 2.5 mm thick MS Sheet Size of Channel 25mm x 100mm x 45mm. GUIDE RAILS : The guide rails shall be made out of 28mm Bright bar placed on 1.2 mm thick M.S. Plate which will be above the floor and are as per the international standard of safety. SUPER STRUCTURE : Super structure of the Mobile storage system will consist of knock down type panels. All the components such as shelves, front panel, end panel, vertical rear panel, central partition etc. Will act as an integral member of the Unit. SHELVES : Shelves made of 22SWG thick Prime Quality C.R.C.A. having 10 folds each will be provided each designed to carry a U.D.L. of 70 Kilograms. VERTICAL PANEL : Vertical panel consists of the front, Centre & rear panel shall be made out of 20SWG thick C.R.C.A. Prime quality Mild Steel & designed to take the load of shelves. DRIVE COVER PANEL : Made out of 22SWG thick C. R.C. A. prime quality Steel to cover the entire drive mechanism. CENTRE PARTITION : The Centre partition will comprise of a full C.R.C.A. prime quality Mild Steel 22SWG Sheet. LOCKING : System will be provided with individual rack locking as well as centralised locking arrangement on the last unit when all units are brought together, central lock when operated gets locked with the floor & does not allow access to the units. DRIVE MECHANISM : Driving Mechanism will be provided externally supported on special grade anti-friction bearing to have smooth & effortless movement. Entire mechanism or gear & sprockets shall be incorporated within the front panel provided in the front of the unit within an area of 1000mm x 200mm x 60mm. DRIVING WHEEL : Fully Powder Coated three pronged drive wheel for better torque & free movement of the rack over the guide rail. INDEXING ARRANGEMENT : Acrylic card holders provided on the front panel for easy identification & retrieval. FINAL FINISH : Powder Coating (8 tanks process with 70 microns). ( Fourth Floor )

45

-

-

... More
190.G Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD Providing and fixing Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD - BASE FRAME : Base Frame shall be fabricated in channel Type from minimum 2.5 mm thick MS Sheet Size of Channel 25mm x 100mm x 45mm. GUIDE RAILS : The guide rails shall be made out of 28mm Bright bar placed on 1.2 mm thick M.S. Plate which will be above the floor and are as per the international standard of safety. SUPER STRUCTURE : Super structure of the Mobile storage system will consist of knock down type panels. All the components such as shelves, front panel, end panel, vertical rear panel, central partition etc. Will act as an integral member of the Unit. SHELVES : Shelves made of 22SWG thick Prime Quality C.R.C.A. having 10 folds each will be provided each designed to carry a U.D.L. of 70 Kilograms. VERTICAL PANEL : Vertical panel consists of the front, Centre & rear panel shall be made out of 20SWG thick C.R.C.A. Prime quality Mild Steel & designed to take the load of shelves. DRIVE COVER PANEL : Made out of 22SWG thick C. R.C. A. prime quality Steel to cover the entire drive mechanism. CENTRE PARTITION : The Centre partition will comprise of a full C.R.C.A. prime quality Mild Steel 22SWG Sheet. LOCKING : System will be provided with individual rack locking as well as centralised locking arrangement on the last unit when all units are brought together, central lock when operated gets locked with the floor & does not allow access to the units. DRIVE MECHANISM : Driving Mechanism will be provided externally supported on special grade anti-friction bearing to have smooth & effortless movement. Entire mechanism or gear & sprockets shall be incorporated within the front panel provided in the front of the unit within an area of 1000mm x 200mm x 60mm. DRIVING WHEEL : Fully Powder Coated three pronged drive wheel for better torque & free movement of the rack over the guide rail. INDEXING ARRANGEMENT : Acrylic card holders provided on the front panel for easy identification & retrieval. FINAL FINISH : Powder Coating (8 tanks process with 70 microns). ( Fifth Floor )

45

-

-

... More
190.H Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD Providing and fixing Single Faced Mobile Unit for Compactor 2150mmH x 2745mmW x 457mmD - BASE FRAME : Base Frame shall be fabricated in channel Type from minimum 2.5 mm thick MS Sheet Size of Channel 25mm x 100mm x 45mm. GUIDE RAILS : The guide rails shall be made out of 28mm Bright bar placed on 1.2 mm thick M.S. Plate which will be above the floor and are as per the international standard of safety. SUPER STRUCTURE : Super structure of the Mobile storage system will consist of knock down type panels. All the components such as shelves, front panel, end panel, vertical rear panel, central partition etc. Will act as an integral member of the Unit. SHELVES : Shelves made of 22SWG thick Prime Quality C.R.C.A. having 10 folds each will be provided each designed to carry a U.D.L. of 70 Kilograms. VERTICAL PANEL : Vertical panel consists of the front, Centre & rear panel shall be made out of 20SWG thick C.R.C.A. Prime quality Mild Steel & designed to take the load of shelves. DRIVE COVER PANEL : Made out of 22SWG thick C. R.C. A. prime quality Steel to cover the entire drive mechanism. CENTRE PARTITION : The Centre partition will comprise of a full C.R.C.A. prime quality Mild Steel 22SWG Sheet. LOCKING : System will be provided with individual rack locking as well as centralised locking arrangement on the last unit when all units are brought together, central lock when operated gets locked with the floor & does not allow access to the units. DRIVE MECHANISM : Driving Mechanism will be provided externally supported on special grade anti-friction bearing to have smooth & effortless movement. Entire mechanism or gear & sprockets shall be incorporated within the front panel provided in the front of the unit within an area of 1000mm x 200mm x 60mm. DRIVING WHEEL : Fully Powder Coated three pronged drive wheel for better torque & free movement of the rack over the guide rail. INDEXING ARRANGEMENT : Acrylic card holders provided on the front panel for easy identification & retrieval. FINAL FINISH : Powder Coating (8 tanks process with 70 microns). ( Sixth Floor )

45

-

-

... More
191.B Providing and Fixing Rollar Blinds AMI Make or approved make & shade of 38mm round Aluminium channel with Blackout fabric & telting with chain (Ball) system with all necessary fixtures and fitting etc. complete. (Sample to be final by Engineer In-charge prior execution of work) ( Ground Floor )

10

-

-

... More
191.C Providing and Fixing Rollar Blinds AMI Make or approved make & shade of 38mm round Aluminium channel with Blackout fabric & telting with chain (Ball) system with all necessary fixtures and fitting etc. complete. (Sample to be final by Engineer In-charge prior execution of work) ( First Floor )

10

-

-

... More
191.D Providing and Fixing Rollar Blinds AMI Make or approved make & shade of 38mm round Aluminium channel with Blackout fabric & telting with chain (Ball) system with all necessary fixtures and fitting etc. complete. (Sample to be final by Engineer In-charge prior execution of work) ( Second Floor )

521.02

-

-

... More
191.E Providing and Fixing Rollar Blinds AMI Make or approved make & shade of 38mm round Aluminium channel with Blackout fabric & telting with chain (Ball) system with all necessary fixtures and fitting etc. complete. (Sample to be final by Engineer In-charge prior execution of work) ( Third Floor )

426.16

-

-

... More
191.F Providing and Fixing Rollar Blinds AMI Make or approved make & shade of 38mm round Aluminium channel with Blackout fabric & telting with chain (Ball) system with all necessary fixtures and fitting etc. complete. (Sample to be final by Engineer In-charge prior execution of work) ( Fourth Floor )

246.25

-

-

... More
191.G Providing and Fixing Rollar Blinds AMI Make or approved make & shade of 38mm round Aluminium channel with Blackout fabric & telting with chain (Ball) system with all necessary fixtures and fitting etc. complete. (Sample to be final by Engineer In-charge prior execution of work) ( Fifth Floor )

195.23

-

-

... More
191.H Providing and Fixing Rollar Blinds AMI Make or approved make & shade of 38mm round Aluminium channel with Blackout fabric & telting with chain (Ball) system with all necessary fixtures and fitting etc. complete. (Sample to be final by Engineer In-charge prior execution of work) ( Sixth Floor )

190.45

-

-

... More
192.D Veneer Wall Panelling: P1,P2,P3 Providing and fixing wall panel 19 mm thick plywoodas shown in drawing made up of BWR grade 19mm thick, plywood panel fixed on 19mm ply grid, finished with 4 mm veneer and provide 4 mm thk groove on panel as shown in the drawing and design supplied by the Architect with antitermite treatment to all plywoods and melamine polishing 2 coat to all veneer and wooden surface etc. complete. All samples muct be approved by the Project Architect and work must be done as directed by Engineer-in-Charge. ( Second Floor )

45

-

-

... More
192.E Veneer Wall Panelling: P1,P2,P3 Providing and fixing wall panel 19 mm thick plywoodas shown in drawing made up of BWR grade 19mm thick, plywood panel fixed on 19mm ply grid, finished with 4 mm veneer and provide 4 mm thk groove on panel as shown in the drawing and design supplied by the Architect with antitermite treatment to all plywoods and melamine polishing 2 coat to all veneer and wooden surface etc. complete. All samples muct be approved by the Project Architect and work must be done as directed by Engineer-in-Charge. ( Third Floor )

45

-

-

... More
192.F Veneer Wall Panelling: P1,P2,P3 Providing and fixing wall panel 19 mm thick plywoodas shown in drawing made up of BWR grade 19mm thick, plywood panel fixed on 19mm ply grid, finished with 4 mm veneer and provide 4 mm thk groove on panel as shown in the drawing and design supplied by the Architect with antitermite treatment to all plywoods and melamine polishing 2 coat to all veneer and wooden surface etc. complete. All samples muct be approved by the Project Architect and work must be done as directed by Engineer-in-Charge. ( Fourth Floor )

45

-

-

... More
192.G Veneer Wall Panelling: P1,P2,P3 Providing and fixing wall panel 19 mm thick plywoodas shown in drawing made up of BWR grade 19mm thick, plywood panel fixed on 19mm ply grid, finished with 4 mm veneer and provide 4 mm thk groove on panel as shown in the drawing and design supplied by the Architect with antitermite treatment to all plywoods and melamine polishing 2 coat to all veneer and wooden surface etc. complete. All samples muct be approved by the Project Architect and work must be done as directed by Engineer-in-Charge. ( Fifth Floor )

90

-

-

... More
192.H Veneer Wall Panelling: P1,P2,P3 Providing and fixing wall panel 19 mm thick plywoodas shown in drawing made up of BWR grade 19mm thick, plywood panel fixed on 19mm ply grid, finished with 4 mm veneer and provide 4 mm thk groove on panel as shown in the drawing and design supplied by the Architect with antitermite treatment to all plywoods and melamine polishing 2 coat to all veneer and wooden surface etc. complete. All samples muct be approved by the Project Architect and work must be done as directed by Engineer-in-Charge. ( Sixth Floor )

45

-

-

... More
193.G PLY CEILING WITH VENEER: Providing & fixing in position false ceiling made up of 19mm Plywood Conforming to ISI-303 finished with 3/4mm thick veneer of approved make, shade on one side, with 4mm grooves in veneer, including with support framework, pasting, screwings, cutting, jointing, finishing, fixing to the walls etc. as shown in the drawing and design provided by the Architect, and antitermite treatment to wood, plywoods etc. complete as directed by Engineer-In-Charge. ( Fifth Floor )

50

-

-

... More
193.H PLY CEILING WITH VENEER: Providing & fixing in position false ceiling made up of 19mm Plywood Conforming to ISI-303 finished with 3/4mm thick veneer of approved make, shade on one side, with 4mm grooves in veneer, including with support framework, pasting, screwings, cutting, jointing, finishing, fixing to the walls etc. as shown in the drawing and design provided by the Architect, and antitermite treatment to wood, plywoods etc. complete as directed by Engineer-In-Charge. ( Sixth Floor )

50

-

-

... More
194.B WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1500mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm ( Ground Floor )

25

-

-

... More
194.C WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1500mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm ( First Floor )

5

-

-

... More
194.D WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1500mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm ( Second Floor )

1

-

-

... More
194.E WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1500mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm ( Third Floor )

165

-

-

... More
194.F WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1500mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm ( Fourth Floor )

170

-

-

... More
194.G WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1500mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm ( Fifth Floor )

165

-

-

... More
194.H WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1500mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm ( Sixth Floor )

162

-

-

... More
195.B WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1800mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Ground Floor )

5

-

-

... More
195.C WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1800mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( First Floor )

5

-

-

... More
195.D WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1800mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
195.E WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1800mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

42

-

-

... More
195.F WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1800mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

43

-

-

... More
195.G WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1800mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

54

-

-

... More
195.H WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Table with pedestal = 1800mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza = 900mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

52

-

-

... More
196.B WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (750mm +750mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Ground Floor )

5

-

-

... More
196.C WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (750mm +750mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( First Floor )

5

-

-

... More
196.D WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (750mm +750mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
196.E WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (750mm +750mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

58

-

-

... More
196.F WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (750mm +750mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

58

-

-

... More
196.G WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (750mm +750mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

67

-

-

... More
196.H WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (750mm +750mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

96

-

-

... More
197.B WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1800mm X 300mm (900mm + 900mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Ground Floor )

5

-

-

... More
197.C WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1800mm X 300mm (900mm + 900mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( First Floor )

5

-

-

... More
197.D WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1800mm X 300mm (900mm + 900mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
197.E WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1800mm X 300mm (900mm + 900mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

46

-

-

... More
197.F WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1800mm X 300mm (900mm + 900mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

46

-

-

... More
197.G WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1800mm X 300mm (900mm + 900mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

52

-

-

... More
197.H WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1800mm X 300mm (900mm + 900mm) Front Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

30

-

-

... More
198.D WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (1500mm) Side Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
198.E WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (1500mm) Side Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

84

-

-

... More
198.F WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (1500mm) Side Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

84

-

-

... More
198.G WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (1500mm) Side Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

104

-

-

... More
198.H WORKSPACE CUBICALS: Supply and installation of Modular Workspace Cubicles as per approved design & specs by the Architect . Table: Prelam understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty (individual/ common/ NA, as the case may be.) Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Credenza: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Fabric Screen: Aluminum framed, Tackable fabric screen with approved fabric by the Architect. Tackable Fabric Screen-1500mm X 300mm (1500mm) Side Screen including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

114

-

-

... More
199.D INSPECTOR CHAMBER (TYPE-: L-WORKSTATION): Supply and installation of Inspector Cabin Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1500mm x 1500mm X 600mm X 750mm Pedestal-Pedestal 400mm x 450mm X 660mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
199.E INSPECTOR CHAMBER (TYPE-: L-WORKSTATION): Supply and installation of Inspector Cabin Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1500mm x 1500mm X 600mm X 750mm Pedestal-Pedestal 400mm x 450mm X 660mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

14

-

-

... More
199.F INSPECTOR CHAMBER (TYPE-: L-WORKSTATION): Supply and installation of Inspector Cabin Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1500mm x 1500mm X 600mm X 750mm Pedestal-Pedestal 400mm x 450mm X 660mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

14

-

-

... More
199.G INSPECTOR CHAMBER (TYPE-: L-WORKSTATION): Supply and installation of Inspector Cabin Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1500mm x 1500mm X 600mm X 750mm Pedestal-Pedestal 400mm x 450mm X 660mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

14

-

-

... More
199.H INSPECTOR CHAMBER (TYPE-: L-WORKSTATION): Supply and installation of Inspector Cabin Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1500mm x 1500mm X 600mm X 750mm Pedestal-Pedestal 400mm x 450mm X 660mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

3

-

-

... More
200.D INSPECTOR CHAMBER (TYPE: TABLE & SIDE CREDENZA): Supply and installation of Inspector Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1800mm X 750mm X 750mm, Pedestal 400mm x 450mm Side Credenza-950mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
200.E INSPECTOR CHAMBER (TYPE: TABLE & SIDE CREDENZA): Supply and installation of Inspector Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1800mm X 750mm X 750mm, Pedestal 400mm x 450mm Side Credenza-950mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

15

-

-

... More
200.F INSPECTOR CHAMBER (TYPE: TABLE & SIDE CREDENZA): Supply and installation of Inspector Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1800mm X 750mm X 750mm, Pedestal 400mm x 450mm Side Credenza-950mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

15

-

-

... More
200.G INSPECTOR CHAMBER (TYPE: TABLE & SIDE CREDENZA): Supply and installation of Inspector Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1800mm X 750mm X 750mm, Pedestal 400mm x 450mm Side Credenza-950mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

15

-

-

... More
200.H INSPECTOR CHAMBER (TYPE: TABLE & SIDE CREDENZA): Supply and installation of Inspector Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1800mm X 750mm X 750mm, Pedestal 400mm x 450mm Side Credenza-950mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

3

-

-

... More
201.D ACCOUNT OFFICE: Supply and installation of Accounts Office Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1800mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza-950mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
201.E ACCOUNT OFFICE: Supply and installation of Accounts Office Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1800mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza-950mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

3

-

-

... More
201.F ACCOUNT OFFICE: Supply and installation of Accounts Office Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1800mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza-950mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

3

-

-

... More
201.G ACCOUNT OFFICE: Supply and installation of Accounts Office Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1800mm X 600mm X 750mm, Pedestal 400mm x 450mm Side Credenza-950mm X 450mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

3

-

-

... More
202.D LINEAR WORKSTATIONS: Supply and installation of Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1350mm X 600mm X 750mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
202.E LINEAR WORKSTATIONS: Supply and installation of Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1350mm X 600mm X 750mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

25

-

-

... More
202.F LINEAR WORKSTATIONS: Supply and installation of Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1350mm X 600mm X 750mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

25

-

-

... More
202.G LINEAR WORKSTATIONS: Supply and installation of Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1350mm X 600mm X 750mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

37

-

-

... More
202.H LINEAR WORKSTATIONS: Supply and installation of Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1350mm X 600mm X 750mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

24

-

-

... More
203.D LINEAR WORKSTATIONS: Supply and installation of Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1500mm X 600mm X 750mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
203.E LINEAR WORKSTATIONS: Supply and installation of Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1500mm X 600mm X 750mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

1

-

-

... More
203.F LINEAR WORKSTATIONS: Supply and installation of Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1500mm X 600mm X 750mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

1

-

-

... More
203.G LINEAR WORKSTATIONS: Supply and installation of Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1500mm X 600mm X 750mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

1

-

-

... More
204.B RECEPTION STATION: Supply and installation of Linear Modular Reception Station as per approved design & specs by the Architect . Table: Ply understructure, Laminate finished 25mm commercial ply top PVC edge banded, Ply modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm ply, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in ply, PVC edge banded. Front surface shall be with back painted glass. 2750mm X 600-1050mm X 750-1050mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Ground Floor )

2

-

-

... More
204.C RECEPTION STATION: Supply and installation of Linear Modular Reception Station as per approved design & specs by the Architect . Table: Ply understructure, Laminate finished 25mm commercial ply top PVC edge banded, Ply modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm ply, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in ply, PVC edge banded. Front surface shall be with back painted glass. 2750mm X 600-1050mm X 750-1050mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( First Floor )

1

-

-

... More
204.D RECEPTION STATION: Supply and installation of Linear Modular Reception Station as per approved design & specs by the Architect . Table: Ply understructure, Laminate finished 25mm commercial ply top PVC edge banded, Ply modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm ply, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in ply, PVC edge banded. Front surface shall be with back painted glass. 2750mm X 600-1050mm X 750-1050mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
204.E RECEPTION STATION: Supply and installation of Linear Modular Reception Station as per approved design & specs by the Architect . Table: Ply understructure, Laminate finished 25mm commercial ply top PVC edge banded, Ply modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm ply, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in ply, PVC edge banded. Front surface shall be with back painted glass. 2750mm X 600-1050mm X 750-1050mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

2

-

-

... More
204.F RECEPTION STATION: Supply and installation of Linear Modular Reception Station as per approved design & specs by the Architect . Table: Ply understructure, Laminate finished 25mm commercial ply top PVC edge banded, Ply modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm ply, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in ply, PVC edge banded. Front surface shall be with back painted glass. 2750mm X 600-1050mm X 750-1050mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

2

-

-

... More
204.G RECEPTION STATION: Supply and installation of Linear Modular Reception Station as per approved design & specs by the Architect . Table: Ply understructure, Laminate finished 25mm commercial ply top PVC edge banded, Ply modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm ply, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in ply, PVC edge banded. Front surface shall be with back painted glass. 2750mm X 600-1050mm X 750-1050mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

2

-

-

... More
204.H RECEPTION STATION: Supply and installation of Linear Modular Reception Station as per approved design & specs by the Architect . Table: Ply understructure, Laminate finished 25mm commercial ply top PVC edge banded, Ply modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm ply, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in ply, PVC edge banded. Front surface shall be with back painted glass. 2750mm X 600-1050mm X 750-1050mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

2

-

-

... More
205.B Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-900mm X 400mm X 900mm. including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Ground Floor )

2

-

-

... More
205.C Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-900mm X 400mm X 900mm. including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( First Floor )

1

-

-

... More
205.D Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-900mm X 400mm X 900mm. including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
205.E Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-900mm X 400mm X 900mm. including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

4

-

-

... More
205.F Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-900mm X 400mm X 900mm. including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

4

-

-

... More
205.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-900mm X 400mm X 900mm. including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

4

-

-

... More
206.B Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-1050mm X 400mm X 900mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Ground Floor )

2

-

-

... More
206.C Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-1050mm X 400mm X 900mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( First Floor )

1

-

-

... More
206.D Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-1050mm X 400mm X 900mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
206.E Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-1050mm X 400mm X 900mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

48

-

-

... More
206.F Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-1050mm X 400mm X 900mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

48

-

-

... More
206.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage-1050mm X 400mm X 900mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

48

-

-

... More
207.B Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-900mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Ground Floor )

2

-

-

... More
207.C Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-900mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( First Floor )

1

-

-

... More
207.D Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-900mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
207.E Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-900mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

20

-

-

... More
207.F Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-900mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

20

-

-

... More
207.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-900mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

28

-

-

... More
207.H Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-900mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

4

-

-

... More
208.B Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) -Low Height Storage with Planter-1200mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Ground Floor )

2

-

-

... More
208.C Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) -Low Height Storage with Planter-1200mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( First Floor )

1

-

-

... More
208.D Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) -Low Height Storage with Planter-1200mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
208.E Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) -Low Height Storage with Planter-1200mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

54

-

-

... More
208.F Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) -Low Height Storage with Planter-1200mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

54

-

-

... More
208.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) -Low Height Storage with Planter-1200mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

54

-

-

... More
208.H Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) -Low Height Storage with Planter-1200mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

22

-

-

... More
209.B Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-1500mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Ground Floor )

2

-

-

... More
209.C Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-1500mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( First Floor )

1

-

-

... More
209.D Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-1500mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
209.E Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-1500mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

42

-

-

... More
209.F Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-1500mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

42

-

-

... More
209.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-1500mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

52

-

-

... More
209.H Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Low Height Storage with Planter-1500mm X 400mm X 1200mm (1050+150) including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

10

-

-

... More
210.B Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2200mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Ground Floor )

2

-

-

... More
210.C Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2200mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( First Floor )

1

-

-

... More
210.D Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2200mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
210.E Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2200mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

6

-

-

... More
210.F Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2200mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

6

-

-

... More
210.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2200mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

7

-

-

... More
210.H Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2200mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

3

-

-

... More
211.B Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2400mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Ground Floor )

2

-

-

... More
211.C Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2400mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( First Floor )

1

-

-

... More
211.D Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2400mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
211.E Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2400mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

4

-

-

... More
211.F Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2400mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

4

-

-

... More
211.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2400mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

4

-

-

... More
212.D Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2750mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

1

-

-

... More
212.E Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2750mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

10

-

-

... More
212.F Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2750mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

10

-

-

... More
212.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2750mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

10

-

-

... More
212.H Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-2750mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

2

-

-

... More
213.E Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . Full Height Storages-2100mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

2

-

-

... More
213.F Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . Full Height Storages-2100mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

2

-

-

... More
213.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . Full Height Storages-2100mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

2

-

-

... More
213.H Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . Full Height Storages-2100mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

2

-

-

... More
214.E Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-3000mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

5

-

-

... More
214.F Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-3000mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

5

-

-

... More
214.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-3000mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

5

-

-

... More
214.H Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-3000mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

5

-

-

... More
215.E Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-3500mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

2

-

-

... More
215.F Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-3500mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

2

-

-

... More
215.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-3500mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

2

-

-

... More
215.H Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-3500mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

2

-

-

... More
216.E READER POLICE -CUBICAL : Supply and installation of Modular Reader Police Cubical as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1650mm x 1500mm X 600mm X 750mm Pedestal-400mm x 450mm X 660mm Back Credenza-1650mm X 400mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

6

-

-

... More
216.F READER POLICE -CUBICAL : Supply and installation of Modular Reader Police Cubical as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1650mm x 1500mm X 600mm X 750mm Pedestal-400mm x 450mm X 660mm Back Credenza-1650mm X 400mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

6

-

-

... More
216.G READER POLICE -CUBICAL : Supply and installation of Modular Reader Police Cubical as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1650mm x 1500mm X 600mm X 750mm Pedestal-400mm x 450mm X 660mm Back Credenza-1650mm X 400mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

10

-

-

... More
216.H READER POLICE -CUBICAL : Supply and installation of Modular Reader Police Cubical as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table with pedestal-1650mm x 1500mm X 600mm X 750mm Pedestal-400mm x 450mm X 660mm Back Credenza-1650mm X 400mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

6

-

-

... More
217.E CHAMBER : Supply and installation of ACP Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table -2400mm X 750mm X 750mm Pedestal-450mm x 550mm X 660mm Side Credenza-1600mm X 400mm X 660mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

6

-

-

... More
217.F CHAMBER : Supply and installation of ACP Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table -2400mm X 750mm X 750mm Pedestal-450mm x 550mm X 660mm Side Credenza-1600mm X 400mm X 660mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

6

-

-

... More
217.G CHAMBER : Supply and installation of ACP Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table -2400mm X 750mm X 750mm Pedestal-450mm x 550mm X 660mm Side Credenza-1600mm X 400mm X 660mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

9

-

-

... More
217.H CHAMBER : Supply and installation of ACP Cabin Modular table as per approved design & specs by the Architect . Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Fixed pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Side Table: in 18mm prelam carcase & shutters with laminate finished 25mm plytop PVC edge banded and all require hardwares like hinges/ fingure grooved handle, skirting, etc. as per approved shop drawing by the architect, complete. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Table -2400mm X 750mm X 750mm Pedestal-450mm x 550mm X 660mm Side Credenza-1600mm X 400mm X 660mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

7

-

-

... More
218.E ADDL. CP STAFF LINEAR WORKSTATIONS : Supply and installation of ADDL. CP. Staff Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1100mm X 600mm X 750mm, Pedestal 300mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

6

-

-

... More
218.F ADDL. CP STAFF LINEAR WORKSTATIONS : Supply and installation of ADDL. CP. Staff Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1100mm X 600mm X 750mm, Pedestal 300mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

6

-

-

... More
218.G ADDL. CP STAFF LINEAR WORKSTATIONS : Supply and installation of ADDL. CP. Staff Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1100mm X 600mm X 750mm, Pedestal 300mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

12

-

-

... More
218.H ADDL. CP STAFF LINEAR WORKSTATIONS : Supply and installation of ADDL. CP. Staff Linear Modular Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded Linear Workstation-1100mm X 600mm X 750mm, Pedestal 300mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

6

-

-

... More
219.E ADDL. CP CABIN-Supply and installation of Reader Police Modular Cubical as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded -Table with pedestal-1500mm x 1500mm X 600mm X 750mm -Pedestal-400mm x 450mm X 660mm -Back Credenza-1500mm X 400mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

2

-

-

... More
219.F ADDL. CP CABIN-Supply and installation of Reader Police Modular Cubical as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded -Table with pedestal-1500mm x 1500mm X 600mm X 750mm -Pedestal-400mm x 450mm X 660mm -Back Credenza-1500mm X 400mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

2

-

-

... More
219.G ADDL. CP CABIN-Supply and installation of Reader Police Modular Cubical as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded -Table with pedestal-1500mm x 1500mm X 600mm X 750mm -Pedestal-400mm x 450mm X 660mm -Back Credenza-1500mm X 400mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

4

-

-

... More
219.H ADDL. CP CABIN-Supply and installation of Reader Police Modular Cubical as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded -Table with pedestal-1500mm x 1500mm X 600mm X 750mm -Pedestal-400mm x 450mm X 660mm -Back Credenza-1500mm X 400mm X 750mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

2

-

-

... More
220.E MEETING ROOM- 4PAX-Supply and installation of Meeting room Modular table with metal powder coated understructure as per Architect design Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Electrical raceway and vertical cable duct.: in prelam, PVC edge banded-Table -1980mm X 1200mm X 750mm -Access Flap-300mm long - 1No including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Third Floor )

1

-

-

... More
220.F MEETING ROOM- 4PAX-Supply and installation of Meeting room Modular table with metal powder coated understructure as per Architect design Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Electrical raceway and vertical cable duct.: in prelam, PVC edge banded-Table -1980mm X 1200mm X 750mm -Access Flap-300mm long - 1No including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fourth Floor )

1

-

-

... More
220.H MEETING ROOM- 4PAX-Supply and installation of Meeting room Modular table with metal powder coated understructure as per Architect design Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Electrical raceway and vertical cable duct.: in prelam, PVC edge banded-Table -1980mm X 1200mm X 750mm -Access Flap-300mm long - 1No including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

1

-

-

... More
221.E CONFERANCE ROOM- 11PAX-Supply and installation of Meeting room Modular table with metal powder coated understructure as per Architect design Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Electrical raceway and vertical cable duct.: in prelam, PVC edge banded-Table -5000mm X 1500mm X 750mm -Access Flap-450mm long - 2No ( Third Floor )

1

-

-

... More
221.F CONFERANCE ROOM- 11PAX-Supply and installation of Meeting room Modular table with metal powder coated understructure as per Architect design Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Electrical raceway and vertical cable duct.: in prelam, PVC edge banded-Table -5000mm X 1500mm X 750mm -Access Flap-450mm long - 2No ( Fourth Floor )

1

-

-

... More
221.H CONFERANCE ROOM- 11PAX-Supply and installation of Meeting room Modular table with metal powder coated understructure as per Architect design Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Electrical raceway and vertical cable duct.: in prelam, PVC edge banded-Table -5000mm X 1500mm X 750mm -Access Flap-450mm long - 2No ( Sixth Floor )

1

-

-

... More
222.H CONFERANCE ROOM- C SHAPE 35 PAX-Supply and installation of Meeting room Modular table with metal powder coated understructure as per Architect design Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Electrical raceway and vertical cable duct.: in prelam, PVC edge banded-Table -(6500mm + 2850mm + 6500mm) X 750mm X 750mm -Access Flap-450mm long - 6No including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

1

-

-

... More
223.H CONFERANCE ROOM- C SHAPE 52 PAX-Supply and installation of Meeting room Modular table with metal powder coated understructure as per Architect design Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Electrical raceway and vertical cable duct.: in prelam, PVC edge banded- Table -(9000mm + 3350mm + 9000mm) X 750mm X 750mm -Access Flap-450mm long - 12No including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

1

-

-

... More
224.D TRAINING TABLE WITH BENCH- 2 SEATER-Supply and Installtion of Training Modular Table with Bench for seating as per design & details by Architect. Laminate finished 18mm commercial ply top, PVC edge banded, prelam modesty Metal understructure- Table top-1200mm X 600mm x 750mm -Bench top-1200mm X 450-500mm x 450mm -Total Size with Bench in Plan-1200mm X 1250mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Second Floor )

50

-

-

... More
225.G Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-4000mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Fifth Floor )

2

-

-

... More
225.H Supply and Installtion of Modular STORAGE: Made in Ply with laminate finish as per approved design & specs by the Architect . Top & Body - Made of 18mm thick ply. Back - made of 12 mm thick ply. Openable shutters with Aluminium Finish C- handles + lock and keys. Inside of storage finished with 1 mm thick inner laminate as per selection. External visible surfaces of storage (front, sides and top) finished with 1.5 mm thick inner laminate as per selection. Laminated adjustable shelves made out of 12 mm ply. All edges to be finished with PVC edge banding 1.5 mm thick of approved make. Hardware - Hinges, lock of approved make (Hettich, haffle, ozone and eq.) Made in Ply with laminate finish as per approved design & specs by the Architect . -Full Height Storages-4000mm X 400mm X 2400mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

1

-

-

... More
226.H MEETING ROOM- 6 PAX- Supply and Installation of Meeting room table with metal powder coated understructure as per Architect design Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Electrical raceway and vertical cable duct.: in prelam, PVC edge banded-Table -2400mm X 1200mm X 750mm -Access Flap-450mm long - 1No - including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

1

-

-

... More
227.H WAR ROOM- 13 PAX-Supply and Installation of Meeting room table with metal powder coated understructure as per Architect design Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Electrical raceway and vertical cable duct.: in prelam, PVC edge banded-Table -4400mm X 1250mm X 750mm -Access Flap-450mm long - 3No - including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

1

-

-

... More
228.H CALL CENTRE WORKSTATION (TYPE-: L-WORKSTATION)-Supply and installation of Inspector Cabin Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded -Table with pedestal-1400mm x 1250mm X 600mm X 750mm -Pedestal-Pedestal 400mm x 450mm X 660mm - including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

36

-

-

... More
229.H CCTV COMMAND & CONTROL LINEAR WORKSTATIONS-Supply and installation of Linear Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded -Linear Workstation-1700mm X 750mm X 750mm, Pedestal 400mm x 450mm including all lead, lifts, scaffolding, fixing etc. complete as directed by Engineer-In-Charge ( Sixth Floor )

16

-

-

... More
230.H SMART CITY MONITOR ROOM LINEAR WORKSTATIONS-Supply and installation of Linear Workstation as per approved design & specs by the Architect . Desk based System Table: Metal understructure, Laminate finished 25mm commercial ply top PVC edge banded, Prelam modesty Pedestal: 2D + 1FD, Loose pedestal in 18mm prelam, PVC edge banded, fingure grooved handle, common lock. Electrical raceway and vertical cable duct.: in prelam, PVC edge banded -Linear Workstation-1600mm X 750mm X 750mm, Pedestal 400mm x 450mm ( Sixth Floor )

12

-

-

... More
231.D Single Bed: providing and fixing Single Bed of size 1.05 x 2.2 m having height of 450 mm as shown in drawing. Bed to be made up of 19 mm thick plywood for framework of bed and head board confirming to ISI-303.The top and headboard shall be finished with 19 mm thick ply and 1milimetre thick laminate as shown in the design and drawing provided and supplied by the project architect including labour fixtures and fastenings, nails, fevicol, material testing charges etc. and work must be done as directed by Engineer-In-Charge ( Second Floor )

28

-

-

... More
232.C Dinning Chairs: Providing and placing injection molded Polypropylene without handle chair of size 450 millimetre x 560millimetre and height 815 millimetre made up of primarily of 7/16" diameter steel rod with fire retardant power coating, Injection molded Polypropylene seat and back etc. complete as per drawing and image. All samples muct be approved by the Project Architect and work must be done as directed by Engineer-In-Charge. ( First Floor )

200

-

-

... More
232.D Dinning Chairs: Providing and placing injection molded Polypropylene without handle chair of size 450 millimetre x 560millimetre and height 815 millimetre made up of primarily of 7/16" diameter steel rod with fire retardant power coating, Injection molded Polypropylene seat and back etc. complete as per drawing and image. All samples muct be approved by the Project Architect and work must be done as directed by Engineer-In-Charge. ( Second Floor )

10

-

-

... More
232.E Dinning Chairs: Providing and placing injection molded Polypropylene without handle chair of size 450 millimetre x 560millimetre and height 815 millimetre made up of primarily of 7/16" diameter steel rod with fire retardant power coating, Injection molded Polypropylene seat and back etc. complete as per drawing and image. All samples muct be approved by the Project Architect and work must be done as directed by Engineer-In-Charge. ( Third Floor )

10

-

-

... More
232.F Dinning Chairs: Providing and placing injection molded Polypropylene without handle chair of size 450 millimetre x 560millimetre and height 815 millimetre made up of primarily of 7/16" diameter steel rod with fire retardant power coating, Injection molded Polypropylene seat and back etc. complete as per drawing and image. All samples muct be approved by the Project Architect and work must be done as directed by Engineer-In-Charge. ( Fourth Floor )

10

-

-

... More
232.G Dinning Chairs: Providing and placing injection molded Polypropylene without handle chair of size 450 millimetre x 560millimetre and height 815 millimetre made up of primarily of 7/16" diameter steel rod with fire retardant power coating, Injection molded Polypropylene seat and back etc. complete as per drawing and image. All samples muct be approved by the Project Architect and work must be done as directed by Engineer-In-Charge. ( Fifth Floor )

10

-

-

... More
232.H Dinning Chairs: Providing and placing injection molded Polypropylene without handle chair of size 450 millimetre x 560millimetre and height 815 millimetre made up of primarily of 7/16" diameter steel rod with fire retardant power coating, Injection molded Polypropylene seat and back etc. complete as per drawing and image. All samples muct be approved by the Project Architect and work must be done as directed by Engineer-In-Charge. ( Sixth Floor )

10

-

-

... More
233.C CENTER TABLE VEENER : Providing & Fixing CENTER TABLE VEENER having size 0.90x.60x.45 meter made up of 18 mm thick COMMERTIAL PLYWOOD (ISI-303) made up of as approved design & Drawing and finish with 4.00 mm thick VEENER (Flitchess metallic burl vereer series)(ISI-1326) primum quality in approved design & grove, plywood finish with BTC lipping internaly finished with Internaly finished with 0.8 mm Laminate confirming (151 2046), outer edges melamine polish antitermite treatment and as directer by engineer in charge etc completed ( First Floor )

2

-

-

... More
233.D CENTER TABLE VEENER : Providing & Fixing CENTER TABLE VEENER having size 0.90x.60x.45 meter made up of 18 mm thick COMMERTIAL PLYWOOD (ISI-303) made up of as approved design & Drawing and finish with 4.00 mm thick VEENER (Flitchess metallic burl vereer series)(ISI-1326) primum quality in approved design & grove, plywood finish with BTC lipping internaly finished with Internaly finished with 0.8 mm Laminate confirming (151 2046), outer edges melamine polish antitermite treatment and as directer by engineer in charge etc completed ( Second Floor )

2

-

-

... More
233.E CENTER TABLE VEENER : Providing & Fixing CENTER TABLE VEENER having size 0.90x.60x.45 meter made up of 18 mm thick COMMERTIAL PLYWOOD (ISI-303) made up of as approved design & Drawing and finish with 4.00 mm thick VEENER (Flitchess metallic burl vereer series)(ISI-1326) primum quality in approved design & grove, plywood finish with BTC lipping internaly finished with Internaly finished with 0.8 mm Laminate confirming (151 2046), outer edges melamine polish antitermite treatment and as directer by engineer in charge etc completed ( Third Floor )

2

-

-

... More
233.F CENTER TABLE VEENER : Providing & Fixing CENTER TABLE VEENER having size 0.90x.60x.45 meter made up of 18 mm thick COMMERTIAL PLYWOOD (ISI-303) made up of as approved design & Drawing and finish with 4.00 mm thick VEENER (Flitchess metallic burl vereer series)(ISI-1326) primum quality in approved design & grove, plywood finish with BTC lipping internaly finished with Internaly finished with 0.8 mm Laminate confirming (151 2046), outer edges melamine polish antitermite treatment and as directer by engineer in charge etc completed ( Fourth Floor )

2

-

-

... More
233.G CENTER TABLE VEENER : Providing & Fixing CENTER TABLE VEENER having size 0.90x.60x.45 meter made up of 18 mm thick COMMERTIAL PLYWOOD (ISI-303) made up of as approved design & Drawing and finish with 4.00 mm thick VEENER (Flitchess metallic burl vereer series)(ISI-1326) primum quality in approved design & grove, plywood finish with BTC lipping internaly finished with Internaly finished with 0.8 mm Laminate confirming (151 2046), outer edges melamine polish antitermite treatment and as directer by engineer in charge etc completed ( Fifth Floor )

4

-

-

... More
233.H CENTER TABLE VEENER : Providing & Fixing CENTER TABLE VEENER having size 0.90x.60x.45 meter made up of 18 mm thick COMMERTIAL PLYWOOD (ISI-303) made up of as approved design & Drawing and finish with 4.00 mm thick VEENER (Flitchess metallic burl vereer series)(ISI-1326) primum quality in approved design & grove, plywood finish with BTC lipping internaly finished with Internaly finished with 0.8 mm Laminate confirming (151 2046), outer edges melamine polish antitermite treatment and as directer by engineer in charge etc completed ( Sixth Floor )

4

-

-

... More
234.C Rubber Matting: Providing & fixing of Rubber Matting 8mm thick of roll or approved design fixing with adhesive solution, including transportation, loading, und unloading, all necessary arrangement, tools, plants, machinery other fixtures & fasteners etc complete as per details & directed by Engineer-in-Charge, including all taxes, transportation, loading and unloading etc complete as directed by Engineer- in-Charge ( First Floor )

198

-

-

... More
235 Rubber Matting: Providing & fixing of Rubber Matting 8mm thick of roll or approved design fixing with adhesive solution, including transportation, loading, und unloading, all necessary arrangement, tools, plants, machinery other fixtures & fasteners etc complete as per details & directed by Engineer-in-Charge, including all taxes, transportation, loading and unloading etc complete as directed by Engineer- in-Charge Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)

35.67

-

-

... More
236.B Sample Estimate for Preparation of Lawn in 100 Sq.mtr area (Depth 30.00 cm) ( Ground Floor )

3318.4

-

-

... More
237.B Sample Estimate for Preparation of Shrubbery in 100 Sq.mtr area (Depth 30.00 cm) ( Ground Floor )

829.6

-

-

... More
238.B Sample Estimate for Plantation of Trees (Ht.1-2 mtrs) ( Ground Floor )

350

-

-

... More
239.B Providing and Laying factory made coloured chamfered edge Cement concrete grass paver blocks of required strength,thickness & size/shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of fine fine aggregate (natural sand/crushed sand VSI grade finely washed etc.), compacting and proper embedding/laying of inter locking paver blocks into the fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) and cutting of paver blocks as per required size and pattern, finishing and sweeping extra fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) and complete as per manufacturer spsecifications & direction of Engineer-in-Charge. 60mm thick CC paver block of M-35 grade concrete with approved colour and design & pattern. ( Ground Floor )

302.5

-

-

... More
Providing and fixing factory made Hydraulically pressed Mechanically vibrated and compacted precast inter locking cement concrete paving blocks 80MM thick in M-40 grade of approved size and shape for City streets, small /medium market roads,low volume roads, utility cuts on arterial roads etc. as specified and as per IS 15658:2006 including cost of all materials, manufacturing, curing, transportation of blocks to work site including loading, unloading and stacking as directed, laying paving blocks in position over prepared bed of natural sand / crushed sand of 50 mm thickness including necessary excavation in all stratas, spreading blindge of fine sand over the prepared bed, compacting blocks by plate vibrator etc. complete.

302.5

-

-

... More
Stamp Concrete of 100mm Thickness - Providing and Laying in-situ M30 Grade unreinforced plain cement stamp concrete of 100mm thickness pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate (natural sand / VSI grade finely washed crushed sand) Confirming to IS 383, as per mixed in a batching and mixing plant / non tilting mixer and weigh batcher as per approved mix design, admixtures, transporting to site in nagpur city with lead upto 20KM (on Inner Ring Road from Avasti nagar to wadi), spreading, laying with approved make pover, compacted and finished in a continous operation, finishing to lines and grades Also Providing, Placing and applying stamp powder which is light fast UV resistant pigment with appropriate chemical compounds of desired colour on base concrete after excess bleed water has evaporated using dry shake method @5kg per sqm. Including texturing, and covering with plastic sheet (min 200 micron thickness) and also applying two coats of UV-stable,30 % solids clear sealer @ 150 to 250 gms per sqm using surface roller and protecting from falling dust,dirt and curring by curring compound / by providing cement vata in cement Mortor 1 :8 @ 0.6m x 0.6m center to center, admeasuring 80mm at bottom and 40mm at top with depth of 75mm and maintaining the same throughout curing period by any other method approved by Engineer-incharge or Landscape architect etc. complete. (prior approval of superinteding Engineer will be necessary )

593

-

-

... More
242.B Providing, supplying and fixing Ashlar fine Basalt Stone Kerbing of size 0.30m (L), 0.50m (H) & 0.15m thick in Cement mortar 1:1 proportion, fixing on bed 50mm thick, The stones shall be fine - tooled, with chisel drafts and chamfered as shown in the given drawing including all necessary labour and machinery, finishing, cleaning, lead, lift etc. complete. As per Drawings, specification: As Directed by Engineer In Charge ( Ground Floor )

1400

-

-

... More
243.B Providing fly ash brick masonry with conventional/ I.S. type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete ( Ground Floor )

46.58

-

-

... More
244.B Providing & fixing Ashlar fine dressed in basalt stone for flooring having size of stone 0.45m x 0.30m and minimum thickness of 0.18m, as per design, size & detailed drawing, from approved source & quality, including transportation & conveyance to specific location, laying at a slope of 1: 40 in line, level over layer of C.M. 1: 1 and minimum 50mm thick, with joints not exceeding 3mm thick, watering, curing, to be approved by the Architect and Engineer in charge etc. complete. ( Ground Floor )

508.4

-

-

... More
Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed.

2724

-

-

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - I Material

726.4

-

-

... More
Wet Mix Macadam -- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Laying By Grader/Paver.

726.4

-

-

... More
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-in- charge , compacting with vibratory roller, finishing, curing and including preparation of sub-grade surface if required etc. complete. with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete.

544.8

-

-

... More
Providing and laying in-situ M35 Grade unreinforced plain cement concrete pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS 383, using fine and coarse aggregates combined gradation as per Table 600-3 of MORTH Specification 2013, mixed in a batching and mixing plant/ non tilting mixer and Weigh batcher as per approved mix design, admixtures, transporting to site, spreading, laying with approved make paver,compacted and finished in a continuous operation, finishing to lines and grades as directed by Engineer-in-charge and curing by curing compound /by providing cement vata in cement Mortar 1:8 @0.6m X 0.6m centre to centre, admeasuring 80 mm at bottom and 40 mm at top with depth of 75mm and maintaining the same throughout curing period by any other method approved by Engineer-in-charge. with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete.

726.4

-

-

... More
Providing and fixing in position TMT FE 500, 25mm dia dowel bars precoated with anticorrosive epoxy paint of required Dia. 60 cms. Long and at 30.00 cm. C/C and wherever directed including handling, straightening, necessary cutting supported by TMT FE 500, chairs with proper alignment by using properly designed assembly of Bulkheads lubricating half length with bituminous paint as directed etc. complete.

1300

-

-

... More
Providing and laying 125 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete.

3632

-

-

... More
Providing and Laying hot applied thermoplastic road marking strip on Bituminous Surface of specified shade/ colour of 2.5 mm thick including 1.5 Refractive index reflectorizing glass beads @ 250gm/sqm .Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35:2015. Initial Dry reflectivity RL shall be 250 mcd/sqm/lux measured in the initial 7 days and sustained reflectivity RL of 100 mcd/sqm/ lux and Qd of 100 mcd/sqm/ lux measured at the end of 2 years by means of a Standard Reflectometer of Zehntner, Easylux, Delta make capable of measuring RL & QD both according to IRC 35:2015 clause 15.5. The finished surface to be level, uniform, and free from streaks and holes complete as per direction of Engineer-in-charge and in accordance with applicable specifications.(Refer MORTH Clause 803 for technical Specification and Performance for IRC 35:2015).

513.2

-

-

... More
Providing and fixing road junction/ information sign boards of size 1.80 x 1.20 Meter Prepared 16 guage Alluminium sheet on frame of with angle iron frame of size40x40x5mm with cross bracing of size 35x35x5 mm including Type IV High Intensity Micro-Prismatic Grade Sheeting (HIP) having pressure sensitive / heat activated adhesive, IRC Specified colour retro reflective cutout border & messages having pressure sensitive adhesive having border & messages in IRC Specified colour back ground including two angle iron post of size 65 x 65 x 6 mm of 3.65 m. long inflated at bottom drilled on top and painted in whiteand black bands of 30 cm. with 4 Nos. high strength G.I. bolts and nuts of size 10 mm dia. and 20 mm long sheet and angle iron post in one piece without joints including all taxes, conveying, fixing in ground with cement concrete 1:4:8 block of 60 cm x 60 cm x 75 cm size as directed by Engineer-in- charge etc. complete. Alluminium sheet Type IV High Intensity Micro-Prismatic Grade Sheeting.

10

-

-

... More
Providing and fixing informatory sign boards in square or rectangular shape of size 1.80m x1.20m made out of 3mm Aluminum composite panel bonded with IRC Specified colour of retro reflective sheeting of Type IV High Intensity Micro-Prismatic Grade Sheeting (HIP) having pressure sensitive / heat activated adhesive, IRC Specified colour retro reflective cutout border & messages having pressure sensitive adhesive having border & messages in IRC Specified colour background including M. S. angle iron frame of size 35 mm X 35 mm X 5 mm & two M.S. angle iron post of size 65 mm X 65 mm X 6 mm, 3.65 m long, duly painted with flat oil paint having alternate black and white bands of 25 cm width including G.I. fixtures etc; fixing the boards in M-20 concrete block of size 60cm X 60cm X 75cm including transportation etc; complete. Aluminum composite panel with Type IV High Intensity Micro-Prismatic Grade Sheeting.

10

-

-

... More
255.B Removing G.I. or A.C. sheet roofing including purlins, principal rafters etc. including sorting serviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete. ( Ground Floor )

4875.95

-

-

... More
256.B Removing and lowering the roof truss carefully without damaging the members and stacking as and where directed in the compound including scaffolding etc. complete. ( Ground Floor )

90

-

-

... More
257.B Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. ( Ground Floor )

1274.43

-

-

... More
258.B Dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etc. ( Ground Floor )

530.29

-

-

... More
259.B Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete. ( Ground Floor )

125

-

-

... More
260.B Removing wooden or A.C. partition including frame work and stack-ing the materials as with all leads, lifts etc. complete. ( Ground Floor )

2883.67

-

-

... More
261.B Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. ( Ground Floor )

2423.48

-

-

... More
262.B Removing urinal pans or wash hand basins with frame including disconnecting the sanitary and water supply connections, removing the same carefully and stacking the serviceable materials as and where directed including throwing the unserviceable materials outside etc complete ( Ground Floor )

48

-

-

... More
263.B Removing W.C. pans including disconnecting the sanitary and water supply connections, removing and breaking flooring and bed con-crete around pan removing the same carefully and stacking the serviceable materials as adn where directed including throwing the unserviceable materiasls out side etc. carefully and throwing out the refusal outside etc. complete. ( Ground Floor )

64

-

-

... More
264.B Removing cast iron or wrought iron or A.C. pipe and stacking them as directed with all leads, lifts etc. complete. ( Ground Floor )

5000

-

-

... More
265.B Conveyance of material/debris at a distance of 10 Km as directed by the Engineer-In-Charge. ( Ground Floor )

7962

-

-

... More
ELECTRICALWORK - SUB WORK-1 :-Providing Internal Electrification Work For Construction of Commissioner of Police Office (G + 7 FL) At Pune. Supplying, erecting & commissioning 2 pole RCCB 16/25A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB

3

-

-

... More
Supplying, erecting & commissioning 2 pole RCCB 40A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB

3

-

-

... More
Supplying, erecting & commissioning 4 pole RCCB 16/25A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB

43

-

-

... More
Supplying, erecting & commissioning 4 pole RCCB 40A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB

53

-

-

... More
Supplying, erecting & marking TPMCB 6A to 32A, with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB

228

-

-

... More
Supplying, erecting & marking TPMCB 40A to 63A, with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB

18

-

-

... More
Supplying, erecting & marking FPMCB 6A to 32A, with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB

2

-

-

... More
Supplying, erecting & marking FPMCB 40A to 63A, with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB

16

-

-

... More
Supplying, erecting & marking SPMCB 6A to 32A, C-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB

1060

-

-

... More
Supplying, erecting & marking SPMCB 6A to 32A, B-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB

1070

-

-

... More
Providing & erecting 4 Pole MCCB, 415 V, 100A, rated short-circuit breaking capacity 25 kA (Ics=100% of Icu), adjustable thermal (overload) setting and fixed magnetic setting with provided leads, provision for installation of shunt/UV/trip alarm contact. MCCB with phase barriers on both sides, insulation withstand capacity 800V & LSIG protection, no line-load bias in provided enclosure/panel as per specification no. SW-SWR/MCCB

17

-

-

... More
Providing & erecting 4 Pole MCCB, 415V, 200A, rated short-circuit breaking capacity 25 kA (Ics=100% of Icu), adjustable thermal (overload) setting and adjustable magnetic setting with provided leads, provision for installation of shunt/UV/trip alarm contact and MCCB should have phase barriers both sides, with insulation withstand capacity 800V & LSIG protection, no line-load bias in provided enclosure/panel as per specification no. SW-SWR/MCCB

1

-

-

... More
Supplying and erecting single pole and neutral distribution board (SPNDB), with 2 ways for incoming and 10 ways (10 poles) for outgoing SP MCBs, with door, 1.2mm thickness surface / flush mounted, IP 43 Protection on iron / GI frame as per specification no. SW-SWR/MCBDB

6

-

-

... More
Supplying & erecting triple pole and neutral distribution board (TPNDB), SPMCB of 4 ways/phase (12 poles), with door, 1.2mm thickness, surface/flush mounted, IP 43 protection on iron/GI frame (horizontal busbar type) as per specification no. SW-SWR/MCBDB

132

-

-

... More
Supplying & erecting triple pole and neutral distribution board (TPNDB), SPMCB of 8 ways / phase (24 poles), with door, 1.2mm thickness surface/ flush mounted, IP 43 Protection on iron/GI frame (horizontal busbar type) as per specification no. SW-SWR/MCBDB

20

-

-

... More
Supplying & erecting triple pole and neutral distribution board (TPNDB), SP/TP MCBs total 4 ways /12 Poles, with door, 1.2mm thickness surface/flush mounted, IP 43 Protection on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB

12

-

-

... More
Supplying & erecting triple pole and neutral distribution board (TPNDB), SP/TP MCBs total 8 ways /24 poles, with door, 1.2mm thickness surface/flush mounted, IP 43 Protection on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB

3

-

-

... More
Supplying & erecting triple pole and neutral distribution board (TPNDB), SP/TP MCBs total 12 ways /36 poles, with door, 1.2mm thickness surface/flush mounted, IP 43 Protection on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB

6

-

-

... More
Supplying & erecting triple pole and neutral distribution board (TPNDB), 3 pole/ 4 pole MCCB as incomer & outgoing SP MCB (12 poles) or TP MCB of 4 ways (12 poles), with door, 1.2mm thickness, surface/flush mounted, on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB1

7

-

-

... More
Supplying & erecting triple pole and neutral distribution board (TPNDB), 3 pole/4 pole MCCB as incomer & outgoing SP MCB (24 poles) or TP MCB of 8 ways (24 poles), with door, 1.2mm thickness, surface/flush mounted, on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB1

5

-

-

... More
Supplying & erecting triple pole and neutral distribution board (TPNDB), 3 pole/4 pole MCCB as incomer & outgoing SP MCB (36 poles) or TP MCB of 12 ways (36 poles), with door, 1.2mm thickness, surface/flush mounted, on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB1

3

-

-

... More
Supplying, installing, testing and commissioning FR, XLPE armoured cable 4 core 1.5 sq.mm. copper conductor complete erected on wall/ ceiling complete as per specification no. CB-LT/CU

60

-

-

... More
Supplying, installing, testing and commissioning FR, XLPE armoured cable 8 core 1.5 sq.mm. copper conductor complete erected on wall/ ceiling complete as per specification no. CB-LT/CU

60

-

-

... More
Supplying, installing, testing and commissioning FR, XLPE armoured cable 12 core 1.5 sq.mm. copper conductor complete erected on wall/ ceiling complete as per specification no. CB-LT/CU

60

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 4 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU

1920

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 6 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU

1529

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 25 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

3598

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 35 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

392

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 50 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

270

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 70 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

186

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 95 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

18

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 120 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

942

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 150 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

324

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 185 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

18

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½core 240 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

1738

-

-

... More
Supplying, erecting ,Testing & commissioning Ceiling or wall Mounting type 400A Capacity at 40C ambient temperature Air Insulated type Bus Trunking Aluminium Conductor having purity not less than 99.6% with Tin plated at joints suitable for (3L+N) 415V, 50 Hz A.C Supply with 100% Neutral+ enclosures as integral earth (PE) BBT Shall type tested as per IEC 61439-6 with IP 54 Protection, 25KA short circuit rating for 1sec, Insulation Class F (155 C), casing made of Galvanized / powder coated steel sheet enclosure having Mechanical strength certification up to IK10, with required shade of paint & having cross sectional area not more than 0.0270 Sq m, complete assembly must comply to seismic zone 4, with necessary accessories Like suspension bracket, wall bracket holder/ fixing accessories with , outlet cover , plug in hole as per site requirement with Horizontal / Vertical G.I. Support at required interval, with External Single Run 25x10mm Aluminium earthing strip or Internal Integral Earth complete confirming to IEC 61439-6 as per specification

45

-

-

... More
Supplying, installation, testing and commissioning of Flange end as per design requirement & site condition suitable for Aluminium 400A, 3 phase 4 wire 415V, 50 Hz A.C ,25kA short circuit rating for 1 sec for Air Insulated type BBT. With necessary accessories complete confirming to IEC 61439-6 as per specification

1

-

-

... More
Supplying, installing, testing & commissioning of Tap off box with interlock arrangement on existing Air Insulated / Sandwich type bus trunking/ rising mains for 32A to 125A 3 phase 4 wire 415V, 50Hz AC Supply made with High Grade Plastic enclosure with provision of MCB/ MCCB without (MCB/MCCB) complete as required confirming to IEC 61439-6 as per specification

8

-

-

... More
Supplying, installing, testing & commissioning of Tap off box with interlock arrangement on existing Air Insulated / Sandwich type bus trunking/ rising mains for 125A to 200A 3 phase 4 wire 415V, 50Hz AC Supply made with 1.5 mm thick sheet metal enclosure (IP54/55) duly powder coated with provision of MCCB( without MCCB) complete as required confirming to IEC 61439-6 as per specification

8

-

-

... More
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 150 mm width & 75 mm height complete with necessary coupler plates & hardware.

20

-

-

... More
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 200 mm width & 75 mm height complete with necessary coupler plates & hardware.

770

-

-

... More
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 300 mm width & 75 mm height complete with necessary coupler plates & hardware.

20

-

-

... More
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 400 mm width & 75 mm height complete with necessary coupler plates & hardware.

690

-

-

... More
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 500 mm width & 75 mm height complete with necessary coupler plates & hardware.

421

-

-

... More
Supplying & erecting conventional spike type air termination suitable to carry lightning stroke made up of heavy gauge 40 mm dia copper pipe of standard length with 5 Nos. copper spikes fixed on copper ball as air terminals duly threaded in copper pipe erected on provided foundation complete.

15

-

-

... More
Providng earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm complete with all materials, testing & recording the results as per specification no. EA-EP

41

-

-

... More
Supplying, installation and testing of maintenance free earthing comprising of Electrode of 17.2 mm diameter Low Carbon Steel with 250 micron molecular copper bonded earthing rod of Length 3m along with 25 kg Carbon based environment friendly back fill ground enhancing compound required to fill up the excavated earth with required quantity complete, and recording the results Specification no. EA-MOBI

8

-

-

... More
Supplying and erecting GI strip of high purity required size used for earthing on wall and/or any other purpose with necessary GI clamps fixed on wall painted with bituminous paint with joints required. As per specification no EA-EP.

3570

-

-

... More
Supplying and erecting GI wire of high purity of required sizes used for earthing or any other purposes on wall with necessary G. I. Clamps fixed on wall/cable/ conduit with screws complete.

215

-

-

... More
Supplying and erecting HMS PVC conduit FRLS grade 25 mm dia. with necessary accessories in wall/floor with chiselling appropriately as per specification No: WG-MA/CC.

24386

-

-

... More
Supplying and laying HMS PVC conduit FRLS grade 25 mm dia with necessary accessories in RCC work/false ceiling/false flooring as per specification No. WG-MA/CC.

10451

-

-

... More
Supplying and erecting HMS PVC conduit FRLS grade 32 mm dia. with necessary accessories in wall/floor with chiselling appropriately as per specification No: WG-MA/CC.

3844

-

-

... More
Supplying and laying HMS PVC conduit FRLS grade 32mm dia. with necessary accessories in RCC work/false ceiling/false flooring as per specification No. WG-MA/CC.

1648

-

-

... More
Supplying and erecting mains with 4x6 sq.mm frlsh copper pvc insulated wire laid in provided conduit/trunking/inside pole/bus bars or any other places. as per specification no: wg-ma/bw

3007

-

-

... More
Supplying and erecting mains with 1x6 sq.mm frlsh copper pvc insulated wire laid in provided conduit/trunking/inside pole/bus bars or any other places. as per specification no: wg-ma/bw

3009.07

-

-

... More
Supplying and erecting mains with 4x4 sq.mm frlsh copper pvc insulated wire laid in provided conduit/trunking/inside pole/bus bars or any other places. as per specification no: wg-ma/bw

2484

-

-

... More
Supplying and erecting mains with 1x4 sq.mm frlsh copper pvc insulated wire laid in provided conduit/trunking/inside pole/bus bars or any other places. as per specification no: wg-ma/bw

2484

-

-

... More
Supplying and erecting mains with 2x2.5 sq.mm frlsh copper pvc insulated wire laid in provided conduit/trunking/inside pole/bus bars or any other places. as per specification no: wg-ma/bw

38600

-

-

... More
Supplying and erecting mains with 1x2.5 sq.mm frlsh copper pvc insulated wire laid in provided conduit/trunking/inside pole/bus bars or any other places. as per specification no: wg-ma/bw

38600

-

-

... More
Supplying and erecting mains with 2x1.5 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places as per specification No: WG-MA/BW

31069

-

-

... More
Supplying and erecting mains with 1x1.5 sq.mm frlsh copper pvc insulated wire laid in provided conduit/trunking/inside pole/bus bars or any other places as per specification no: wg-ma/bw

31069

-

-

... More
Point wiring for light/bell concealed type in min 20 mm FRLS grade HMS PVC conduit with 1.5 sq.mm. (2+1E) FRLSH grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/CW

445

-

-

... More
Point wiring for light/bell hybrid type (Surface type under false ceiling and concealed type for drops & switch boards on walls) in min 20 mm PVC conduit / casing n capping with 1.5 sq.mm. (2+1E) FRLSH grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/HW

1037

-

-

... More
Point wiring for ceiling fan concealed type in min 20 mm FRLS grade HMS PVC conduit with 1.5 sq.mm. (2+1E) FRLSH grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/CW

1115

-

-

... More
Point wiring for ceiling fan (Surface type under false ceiling and concealed type for drops & switch boards on walls) in min 20 mm PVC conduit / casing n capping with 1.5 sq.mm. (2+1E) FRLSH grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/HW

56

-

-

... More
Secondary point wiring for additional light/ bell point, concealed type in min 20 mm FRLS grade PVC conduit with 1.5 sq.mm. (2+1E) FRLSH grade copper wires with required accessories as per specification No: WG-PW/CW

2285

-

-

... More
Wiring for plug on board with Switch socket surface/concealed type, copper wiring and earthing and with modular accessories as per specification No: WG-PW/CW

1051

-

-

... More
Supplying and erecting modular type switch 6A / 10A duly erected on provided plate and box with wiring connections complete.

3602

-

-

... More
Supplying and erecting modular type switch 16A duly erected on provided plate and box with wiring connections complete.

1549

-

-

... More
Supplying and erecting modular type 3 pin 6A multi socket with safety shutter, duly erected on provided plate and box with wiring connections complete.

3602

-

-

... More
Supplying and erecting modular type 3 pin 6 / 16A multi socket with safety shutter, duly erected on provided plate and box with wiring connections complete.

1549

-

-

... More
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 2 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.

55

-

-

... More
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 3 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.

1472

-

-

... More
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 4 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.

55

-

-

... More
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 6 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.

1644

-

-

... More
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 8 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.

55

-

-

... More
Supplying and erecting modular type blanking plate one module, duly erected on provided plate & box.

212

-

-

... More
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 12 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.

98

-

-

... More
Supplying and erecting LED square / circular Max. 7W down lighter/ Panel Light having pressure die-cast aluminium housing, polystyrene diffuser having system lumens output of Min. 770 Lumens, min. efficacy of 110 lumen/W, CRI80, CCT upto 6500K, Beam Angle of 120 deg., max. ripple of 5%, THD10%, p.f. 0.95, operating range of 120-270V, surge protection of 2.5 kV, Life class of 50,000 Hrs. at L70B50, including driver, having mounting arrangement with board for surface type or spring loaded mounting clips complete with 3 years warranty.

313

-

-

... More
Supplying and erecting LED square / circular Max. 14 W down lighter/Panel Light having pressure die-cast aluminium housing, polystyrene diffuser having system lumens output of Min. 1500 Lumens, min. efficacy of 110 lumen/W, CRI80, CCT upto 6500K, Beam Angle of 120 deg., max. ripple of 5%, THD10%, p.f. 0.95, operating range of 120-270V, surge protection of 2.5 kV, Life class of 50,000 Hrs. at L70B50, including driver, having mounting arrangement with board for surface type or spring loaded mounting clips complete with 3 years warranty.

359

-

-

... More
Supplying and erecting LED square / circular Max. 18 W down lighter/ Panel Light having pressure die-cast aluminium housing, polystyrene diffuser having system lumens output of Min. 2000 Lumens, min. efficacy of 110 lumen/W, CRI80, CCT upto 6500K, Beam Angle of 120 deg., max. ripple of 5%, THD10%, p.f. 0.95, operating range of 120-270V, surge protection of 2.5 kV, Life class of 50,000 Hrs. at L70B50, including driver, having mounting arrangement with board for surface type or spring loaded mounting clips complete with 3 years warranty.

1533

-

-

... More
Supplying and erecting LED Panel Light(600mm X 600mm) Max. 35 W having CRCA powder coated housing, polystyrene diffuser having system lumens output of Min 4200 Lumens, min. efficacy of 120 lumen/W, CRI80, CCT upto 6500K, Beam Angle of 120 deg., max. ripple of 5%, THD10%, p.f. 0.95, operating range of 120-270V, surge protection of 2.5 kV, Life class of 50,000 Hrs. at L70B50 including driver, having mounting arrangement with board for surface type or spring loaded mounting clips complete with 3 years warranty.

1126

-

-

... More
Supplying and erecting LED Strip light 5m Length Max. 45 W IP20 class having minimum lumens output of 800 Lumens/m, min. efficacy of 90 lumen/W, CRI80, CCT upto 5000K, Beam Angle of 110 deg., THD10%, p.f. 0.95, operating range of 230-270V, Life class of 30,000 Hrs. at L70B50, including driver with 1 year warranty.

73

-

-

... More
Supplying and erecting LED Strip light 5m Length Max. 95 W IP20 class having minimum lumens output of 1600 Lumens/m, min. efficacy of 90 lumen/W, CRI80, CCT upto 5000K, Beam Angle of 110 deg., THD10%, p.f. 0.95, operating range of 230-270V, Life class of 30,000 Hrs. at L70B50 including driver with 1 year warranty.

73

-

-

... More
Supplying and erecting anodized aluminium corridor / passage light LED fitting (4 feet) Max. 22W with high transitivity diffuser with system lumens output of Min.2200 lumens , min. efficacy of 100 lumen/W, CRI80, CCT upto 6000K, Beam Angle of 110 deg., Ripple5%, THD10%, p.f. 0.95, operating range of 200-270V, surge protection of 2 kV, Life class of 50,000 Hrs. at L70B50, including driver, with end caps on provided PVC Block / wooden board with 3 years warranty.

343

-

-

... More
Supplying & erecting inverter LED batten 20W tube light fitting with polycarbonate housing, heat sink, integrated HF electronic driver, Min. 2600 mAh Lithium ion Battery with charging time of 8-10 Hours and backup time of Min. 3 hrs. with minimum 25% of initial Watts having luminous efficacy of 100 lumen/watt, CRI80, CCT of 6500K and THD=20% having useful life of minimum 25000 hrs. with overheating protection with 2 years warranty.

221

-

-

... More
Supplying and erecting Energy Saving BLDC Ceiling fan 230 V A.C. 50 cycles 1200 mm, max. energy consumption of 28W having service ratio (CMM/W) of Min. 8 , PF0.9, THD10% without IR remote control & compatible speed regulator, Temperature Rise of Max. 40 deg. C, having external mounted control PCB completely erected in position as per specification no. FG-FN/CF

1115

-

-

... More
Supplying and erecting electronic type step regulator for ceiling fan 600/ 900/ 1200/ 1400 mm. sweep, complete erected on provided switch board.

1115

-

-

... More
Supplying and erecting exhaust fan heavy duty 230 V, A.C. 50 cycles 375/380 mm. 900 RPM complete erected in position as per specification no. FG-FN/EXF

94

-

-

... More
Supplying, erecting, testing and commissioning of 10 KVA capacity online pure sine wave, with backup time of 1 hrs. pwm & igbt based ups with 0.9 to unity output pf, 3 phase input and 3 phase output complete with all protections as per specification no. ap-ups ( For Emergency lighting and other load)

13

-

-

... More
Supplying, erecting, testing and commissioning of 20 KVA capacity online pure sine wave, with backup time of 1 hrs. pwm & igbt based ups with 0.9 to unity output pf, 3 phase input and 3 phase output complete with all protections as per specification no. ap-ups ( For Emergency lighting and other load)

6

-

-

... More
Supplying and erecting 12V/42Ah SMF battery with battery terminal wire, duly charged with 24 months warranty complete

416

-

-

... More
Supplying and erecting 12 V/65Ah SMF battery with battery terminal wire, duly charged complete with 24 months warranty complete

228

-

-

... More
Supplying and erecting 150 kVAr, 3 phase, 50 Hz., Power contactors Derated for microprocessor APFC controller with MPP / APP type capacitor with 525 V and having minimum overcurrent capacity of 1.8 In, peak inrush current capacity 300 In and minimum life 150000 hours with , consisting of suitable steps of MPP/APP type capacitor units with detuned aluminium filter 7% reactors with circuit breaker as main incomer and MCCB for each branch protection, as per specification no CP-ED/APFC

2

-

-

... More
Supplying and erecting 250 kVAr, 3 phase, 50 Hz., Power contactors Derated for microprocessor APFC controller with MPP / APP type capacitor with 525 V and having minimum overcurrent capacity of 1.8 In, peak inrush current capacity 300 In and minimum life 150000 hours with , consisting of suitable steps of MPP / APP type capacitor units with detuned aluminium filter 7% reactors with circuit breaker as main incomer and MCCB for each branch protection, as per specification no CP-ED/APFC

1

-

-

... More
Supplying, installing, testing and commissioning air circuit breaker electrical drawout type, 650V, 1600A rated at 50º C without deration, 12kV Impulse, 4 pole (100% Neutral Protection) 50 kA, (Ics=Icu=Icw for 1s),with standard accessories with ready to close, individual fault trip, alarm and trip indication, mechanical and electrical anti pumping, soft/hard rating plug (including hard rating plug CT) with Micro-processer based LCD display release with LSIG and temperature rise protection & with 4 C/O contacts for On-Off-Trip indication, min. 5 event and trip history on breaker display on provided iron frame as per specification no. SW-SWR/ACB ( for main changeover panel)

2

-

-

... More
Supply and erecting, testing & commissioning of MAIN LT PANEL for Commissioner of Police office building. All MCCB feeder shall be with ON, OFF & Trip Indication. All MCCB feeder shall be with ON, OFF & Trip Indication. All MCCB feeder shall be with ON, OFF & Trip Indication. The panel shall be powder coated of approved colour both inside & outside. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc. completed. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc. completed. Panel Shall be Indoor type With IP 43 Protection & Form-3b Separation. Panel Shall Be As Per IEC 61439.

1

-

-

... More
Supply and erecting, testing & commissioning of MAIN BUILDING LT PANEL for Commissioner of Police office building. All MCCB feeder shall be with ON, OFF & Trip Indication. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet. The panel shall be powder coated of approved colour both inside & outside. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc. completed. Panel Shall be Indoor type With IP 43 Protection & Form-3b Separation. Panel Shall Be As Per IEC 61439. As per CSR specification (SW-MCB, SW-MCCB, SW-ACB, CP-BB,CP,WG MA/BW,WG-MA CON )

1

-

-

... More
Supply and erecting, testing & commissioning of MAIN EMERGENCY LOAD PANEL for Commissioner of Police office building. All MCCB feeder shall be with ON, OFF & Trip Indication. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet. The panel shall be powder coated of approved colour both inside & outside. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc. completed. Panel Shall be Indoor type With IP 43 Protection & Form-3b Separation. Panel Shall Be as Per IEC 61439. As per CSR specification (SW-MCB, SW-MCCB, SW-ACB, CP-BB, CP, WG MA/BW, WG-MA CON)

1

-

-

... More
Supply and erecting, testing & commissioning of ANCILLARY BUILDING MAIN PANEL for Commissioner of Police office building. All MCCB feeder shall be with ON, OFF & Trip Indication. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet. he panel shall be powder coated of approved colour both inside & outside. The panel shall be powder coated of approved colour both inside & outside. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc. completed. Panel Shall be Indoor type With IP 43 Protection & Form-3b Separation. Panel Shall Be as Per IEC 61439. As per CSR specification (SW-MCB, SW-MCCB, SW-ACB, CP-BB, CP, WG MA/BW, WG-MA CON)

1

-

-

... More
Supply and erecting, testing & commissioning of MAIN BUILDING UTILITY SERVICES PANEL for Commissioner of Police office building. All MCCB feeder shall be with ON, OFF & Trip Indication. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet. The panel shall be powder coated of approved colour both inside & outside. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc. completed. Panel Shall be Indoor type With IP 43 Protection & Form-3b Separation. Panel Shall Be as Per IEC 61439. As per CSR specification (SW-MCB, SW-MCCB, SW-ACB, CP-BB, CP, WG MA/BW, WG-MA CON)

1

-

-

... More
Supply and erecting, testing & commissioning of AUDITORIUM MAIN PANEL for Commissioner of Police office building. All MCCB feeder shall be with ON, OFF & Trip Indication. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet. The panel shall be powder coated of approved colour both inside & outside. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc. completed. Panel Shall be Indoor type With IP 43 Protection & Form-3b Separation. Panel Shall Be as Per IEC 61439. As per CSR specification (SW-MCB, SW-MCCB, SW-ACB, CP-BB, CP, WG MA/BW, WG-MA CON)

1

-

-

... More
Supply and erecting, testing & commissioning of MAIN BUILDING HVAC PANEL for Commissioner of Police office building. All MCCB feeder shall be with ON, OFF & Trip Indication. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet. The panel shall be powder coated of approved colour both inside & outside. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc. completed. Panel Shall be Indoor type With IP 43 Protection & Form-3b Separation. Panel Shall Be as Per IEC 61439. As per CSR specification (SW-MCB, SW-MCCB, SW-ACB, CP-BB, CP, WG MA/BW, WG-MA CON)

1

-

-

... More
Supply and erecting, testing & commissioning of ANCILLARY HVAC PANEL for Commissioner of Police office building. All MCCB feeder shall be with ON, OFF & Trip Indication. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet. The panel shall be powder coated of approved colour both inside & outside. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc. completed. Panel Shall be Indoor type With IP 43 Protection & Form-3b Separation. Panel Shall Be as Per IEC 61439. As per CSR specification (SW-MCB, SW-MCCB, SW-ACB, CP-BB, CP, WG MA/BW, WG-MA CON)

1

-

-

... More
Supply and erecting, testing & commissioning of AUDITORIUM HVAC PANEL for Commissioner of Police office building. All MCCB feeder shall be with ON, OFF & Trip Indication. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet. The panel shall be powder coated of approved colour both inside & outside. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc. completed. Panel Shall be Indoor type With IP 43 Protection & Form-3b Separation. Panel Shall Be as Per IEC 61439. As per CSR specification (SW-MCB, SW-MCCB, SW-ACB, CP-BB, CP, WG MA/BW, WG-MA CON)

1

-

-

... More
Supply and erecting, testing & commissioning of MAIN BUILDING UPS PANEL for Commissioner of Police office building. All MCCB feeder shall be with ON, OFF & Trip Indication. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet. The panel shall be powder coated of approved colour both inside & outside. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc. completed. Panel Shall be Indoor type With IP 43 Protection & Form-3b Separation. Panel Shall Be as Per IEC 61439. As per CSR specification (SW-MCB, SW-MCCB, SW-ACB, CP-BB, CP, WG MA/BW, WG-MA CON)

1

-

-

... More
SUB WORK-2 :- Providing LAN ,Telephone & CCTV System For Construction of Commissioner of Police Office (G + 7 FL) At Pune. Supplying and erecting modular type computer Jack RJ45 with safety shutter, duly erected on provided plate and box with wiring connections complete.

1349

-

-

... More
Supplying, installing and testing UTP connector (RJ-45) as per specification No. WG-NAS/UTPC.

497

-

-

... More
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 2 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.

1159

-

-

... More
Supplying and fixing single band POE 2x2 Mesh Router, 802.11 n/ac 2.4 GHz, standalone/software based access point complete.

25

-

-

... More
Supplying and installing cat-6 cable suitable for networking as per specification no. WG-COC/NC

62415.06

-

-

... More
Supplying and fixing 1 m UTP patch cord of Cat 6 type in position as per specification No. WG-COC/PC

2638

-

-

... More
Supplying and erecting 3m HDMI cord low voltage grade minimum 4k compliant to be laid in provided conduits with male/female 19 pin HDMI connectors complete.

16

-

-

... More
Supplying and erecting 5m HDMI cord low voltage grade minimum 4k compliant to be laid in provided conduits with male/female 19 pin HDMI connectors complete.

45

-

-

... More
Supplying and erecting 10m HDMI cord low voltage grade minimum 4k compliant to be laid in provided conduits with male/female 19 pin HDMI connectors complete.

16

-

-

... More
Supplying and erecting 15m HDMI cord low voltage grade minimum 4k compliant to be laid in provided conduits with male/female 19 pin HDMI connectors complete.

17

-

-

... More
Supplying and erecting 20m HDMI cord low voltage grade minimum 4k compliant to be laid in provided conduits with male/female 19 pin HDMI connectors complete.

17

-

-

... More
Supplying and erecting modular pop up Box 8 module erected with provided AV/ HDMI , RJ 45,6 A electrical sockets and switch on provided table.

19

-

-

... More
Supplying and fixing 24 port patch panel with tool-less keystone jacks in provided U Rack complete as per specification no. WG-NAS/PP

89

-

-

... More
Supplying and fixing 6U wall mount rack (Dimension-DxWxH – 500x600x367 mm) as per specification No. WG-NAS/RAK

31

-

-

... More
Supplying and fixing 9U wall mount rack (Dimension-DxWxH – 500x600x500 mm) as per specification No. WG-NAS/RAK

7

-

-

... More
Supplying and fixing 17U floor mount rack (Dimension-DxWxH – 800x600x954 mm) as per specification No. WG-NAS/RAK

3

-

-

... More
Supplying and fixing 22 U floor mount rack (Dimension-DxWxH – 800x600x1176 mm) as per specification No. WG-NAS/RAK

7

-

-

... More
Supplying and fixing 42 U floor mount server rack (Dimension-DxWxH – 800x1000x2070 mm) as per specification No. WG-NAS/RAK

1

-

-

... More
Supplying, fixing, and configuring 24 ports + (4 SFP+) ports Managed Layer 2 switch of and web View/CLI, 6KV surge protection on ethernet port and console port for management as per specification complete.

59

-

-

... More
Supplying, fixing, and configuring 24 ports, POE switch in provided rack as per specification No. WG-NWC/ENS

30

-

-

... More
Supplying and erecting LSZH armoured multimode optical fibre cable with 12 fibres, core dia 50/125 µm (OM3), suitable up to 10 GBPS ethernet distance at 850 nm of wavelength, on wall/ceiling or laid in provided pipe/trench as per specification No. WG-COC/OFC

486

-

-

... More
Supplying and erecting HMS PVC conduit FRLS grade 25 mm dia. with necessary accessories in wall/floor with chiselling appropriately as per specification No: WG-MA/CC.

12563

-

-

... More
Supplying and laying HMS PVC conduit FRLS grade 25 mm dia with necessary accessories in RCC work/false ceiling/false flooring as per specification No. WG-MA/CC.

25142

-

-

... More
Supplying and erecting modular type telephone socket one gang with safety shutter, duly erected on provided plate and box with wiring connections complete.

712

-

-

... More
Supplying, installing, testing & commissioning push button telephone instrument desk top/wall mount with caller ID & Speaker unit as per specification complete.

712

-

-

... More
Supplying, installing, testing & commissioning IP telephone instrument as per specification complete.

8

-

-

... More
Supplying, erecting & commissioning MDF Box 50x50 pairs made from min. 1.5mm thick MS sheet as per specification no. WG-TW

9

-

-

... More
Supplying, erecting & commissioning MDF Box 100x100 pairs made from min. 1.5mm thick MS sheet as per specification no. WG-TW

8

-

-

... More
Supplying, erecting & commissioning 30 pairs FR junction box with moulded plastic enclosure as per specification no. WG-TW

4

-

-

... More
Supplying, erecting & commissioning 40 pairs FR junction box with moulded plastic enclosure as per specification no. WG-TW

2

-

-

... More
Supplying, erecting & commissioning 50 pairs FR junction box with moulded plastic enclosure as per specification no. WG-TW

3

-

-

... More
Supplying, erecting & commissioning 100 pairs M.S. junction box made from min. 1.5mm thick MS sheet as per specification no. WG-TW

8

-

-

... More
Supplying & erecting 50 pair, 0.5 mm dia. jelly filled armoured telephone copper cable with poly-al laminate moisture barrier, polythene sheathed, G.S.Tape armoured polythene jacketed having laid in provided trench as per specification No. WG-TW

675

-

-

... More
Supplying & erecting 100 pair, 0.5 mm dia. jelly filled armoured telephone copper cable with poly-al laminate moisture barrier, polythene sheathed, G.S.Tape armoured polythene jacketed having laid in provided trench as per specification No. WG-TW

600

-

-

... More
Supplying & erecting 2 pair telephone copper cable 0.5 mm dia. with high density polyethylene insulation, polyester taped, Nylon Rip Cord & grey colour sheathed with FR PVC, conforming to ITD specification S/WS 113C laid in provided PVC casing capping/conduit as per specification No. WG-TW

38569

-

-

... More
SUPPLYING AND INSTALLING, TESTING & COMMISSIONING OF DIGITAL (HYBRID) TYPE EPABX OF 6 X 32 EXTENSIONS SUITABLE UPTO 96 EXTENSIONS COMPLETE.

8

-

-

... More
Supplying & erecting approved make High definition 4/5 Megapixel IP IR Varifocal Dome Camera with following features Image Sensor : minimum 1/2.8" Progressive Scan CMOS, Video Resolution: minimum 2592 x 1520 Video Compression : H.264, H.265 or higher, at least Three individually configurable stream, Frame Rate : minimum 25 fps at all resolutions WDR : minimum 120 dB Wide Dynamic Range, ONVIF profile conformant. minimum IR distance : 50m, Lens Type: 2.8 - 13mm Lens, auto/motorized varifocal focal, Field of View : horizontal FOV 103° to 32°, vertical FOV 73° to 24°, diagonal FOV 142° to 40° Lux sensitivity - minimum 0.2 Lux at color, minimum 0.05 Lux at Black & White, 0.0 Lux (IR) Night Vision Distance Min IR- 30m, Camera minimum Adjustment Angles - Pan : 350°, Tilt : 72°, Rotate : 350°. Power Supply : Support 12VDC & PoE, IP67/IP66, IK10, built in micro SD/SDHC/SDXC card slot of min 128 GB, built in microphone. minimum Input/Output - Audio in × 1, Audio Out × 1, Alarm in× 1, Alarm Out × 1. Image Settings : Rotate mode, saturation, brightness, contrast, sharpness, gain, white balance. Image Enhancements : Day/Night-Auto (ICR)/Color/Black & White, 3D Digital Noise Reduction, Automatic White Balance, Automatic Gain Control, Backlight Compensation, Highlight Compensation. Events : Privacy Masking, Motion detection, Scene change detection, Face capture, Video tampering, audio exception detection, Region entrance detection, Region exiting detection. Operating temperature (-30 to 60° C) . Security - User account and password protection, HTTPS, IP filter, IEEE 802.1X, digest authentication, user access log, TLS1.2, AES-256, SSH/Telnet closed, FTP disabled. Protocol - DHCP, UDP, HTTP, HTTPS, NTP, DNS, RTP, RTSP, SMTP, SSL/TLS, TCP/IP, Secure Real-Time Transport Protocol (SRTP),Bonjour, SNMP and Secure shell (SSH) supported protocol. RoHS, WEEE, ISO-14001 and REACH compliant, UL/EN OR equivalent BIS/TECH/STQC or any indian standards as applicable, CE, FCC certified. duly erected in position on wall/ceiling/false ceiling/provided pole (mounting height not more than 5 meter) etc with all accessories etc complete as per specification no. CCTV-CAM

228

-

-

... More
Supplying & erecting of High definition 4/5 Megapixel IP IR PTZ Camera with following features Image Sensor : minimum 1/2.8" Progressive Scan CMOS Video Resolution: minimum 2880 x 1620 Video Compression : H.264, H.265 or higher, at least Three individually configurable stream, Frame Rate : minimum 30 fps at all resolutions, WDR : minimum 120 dB Wide Dynamic Range, ONVIF profile conformant. Auto Tracking, Pre-set Tour Settings, Pan : 360° endless, Tilt : From -15° to 90° (auto-flip 180°), minimum Pan Speed - from 0.1°/s to 160°/s, minimum Preset Speed: 240°/s, minimum Tilt Speed - from 0.1°/s to 120°/s, minimum Preset Speed : 200°/s, Min Presets- 250, Min IR distance :150m, Lens Type : minimum 4.3 - 12.5mm Lens min 16 x digital zoom, min 30 x optical Zoom. Focus Mode : Auto/Zooming/One Push Manual, Lux sensitivity- minimum 0.2 Lux at color, minimum 0.05 Lux at Black & White, 0.0 Lux (IR) Night Vision Distance Min IR- 150m, Power Supply : support 12/24 VDC, 24 VAC & PoE, IP67/IP66, IK10, built in micro SD/SDHC/SDXC card slot minimum 256 GB, built in microphone. minimum Input/Output : Audio in × 1, Audio Out × 1, Alarm in× 1, Alarm Out × 1. Image Settings : Rotate mode, saturation, brightness, contrast, sharpness, gain, white balance. Image Enhancements : Day/Night-Auto (ICR)/Color/Black & White, 3D Digital Noise Reduction, Automatic White Balance, Automatic Gain Control, Backlight Compensation, Highlight Compensation.

20

-

-

... More
Supplying, installing, testing & commissioning of 64/80 Ch Network Video Recorder (NVR), suitable connect Min. 64 IP Cameras, up to 5 Megapixel Resolution, with HDMI 1/VGA 1 and HDMI 2/VGA 2 outputs provided, Atleast one HDMI output of 4K resolution, atleast one VGA output with output up to 1920 × 1080, Support H.265 or higher, H.264, MJPEG, Supports Redundant Dual Power, Incoming Bandwidth 320 Mbps with minimum 8 SATA Hard Disks, ANR Technology, 8 SATA interfaces for 8 HDDs and capacity of each HDD up to 8TB, minimum 02 USB port, Alarm I/O 16/4, RJ-45 10/100/ 1000 Mbps self-adaptive Ethernet interface, support multi brand network Cameras, ONVIF conformance, Multiple network monitoring: Web viewer . support protocol TCP/IP, DHCP, DNS, DDNS, NTP, SADP, SMTP, NFS, iSCSI, UPnP™, HTTPS. RoHS, UL, CE, FCC certified. duly erected in provided U Rack with wiring connections, tagging and programming etc. complete as per specificationss no. CCTV-NVR

4

-

-

... More
Supplying & erecting 8 TB internal Surveillance HDD suitable for SATA Port of NVR, interface transfer rate 6 GB/S, maximum sustained transfer rate 210 MB/Sec to 213 MB/S. Drive bay supported 08+, Cameras supported up to 64, Cache (MB) 256, Load/Unload Cycle -3000000, Work Load Rating per Year 180TB, MTBF 1000000 Hrs. HTTPS. RoHS, UL, CE certified, duly erected in position in provided NVR as per specification no. CCTV-HDD

21

-

-

... More
SUPPLY,INSTALLATION,TESTING & COMMISSIONING OF ALLIR ONE COMPUTER FOR FACTOR - ALL-IN-ONE PROCESSOR TYPE CORE I5 FAMILY PROCESSOR SPEC 2.3 GHZ RAM 8 GB MEMORY TECHNOLOGY DDR4 COMPUTER MEMORY TYPE GDDR4 HARD DRIVE SIZE 1 TB HARD DISK DESCRIPTION HDD HARD DRIVE INTERFACE SERIAL ATA SSD 256 GE ADDITIONAL GRAPHICS COPROCESSOR INTEL UHD GRAPHICS 630 GRAPHICS CHIPSEL STANDING SCREEN DISPLAY SIZE 21.5 INCHES CONNECTIVITY TYPE BLUETOOTH WIRELESS TYPE BLUETOOTH 801.11AC. HARDWARE PLATFORM WINDOWS OPERATING SYSTEM WINDOWS 10 PROFESSIONAL WARRANTY - 3 YEARS

3

-

-

... More
Supplying & erecting 55" professional LED display with 1920 *1080 ( Full HD) Display, suitable for 32/64 channel NVR and following features Brightness: minimum 500 Cd/m2 Contrast Ratio: minimum 1000:1 Viewing angle: 178/178 deg. Response time: maximum 8 ms Inputs: HDMI, VGA, BNC,USB, Audio In, Built-in speakers maximum 10 W, Suitable to operate on 100-240 V 50 Hz AC supply and 24/7 Duty Cycle duly erected on wall or table top with standard accessories like wall mount stand and wiring connections etc. complete as per specifications no. CCTV-MON

4

-

-

... More
Supplying & erecting 32" professional LED Monitor with 1920*1080 (Full HD) Display, suitable for 16 channel NVR and following features Brightness: minimum 250 Cd/m2 Contrast Ratio: minimum 1000:1 Viewing angle: 178/178 deg. Response time: maximum 8 ms Inputs: HDMI, VGA, BNC, USB, Audio In, Built-in speakers maximum 2 W, Suitable to operate on 100-240 V 50 Hz AC supply and 24/7 Duty Cycle duly erected on wall or table top with standard accessories like wall mount stand and wiring connections etc. complete as per specifications no. CCTV-MON

4

-

-

... More
Supplying and laying (including excavation of suitable width & depth up to 90 cm) 50 mm outside dia. double wall corrugated pipes (DWC) of HDPE for enclosing cable below ground/road surface, to required depth complete.

1632

-

-

... More
Supplying and installing armoured single mode optical fibre cable with 6 fiber, core dia 50/125μm (OS1/OS2) 10/40 GBPS speed in provided underground HDPE pipe complete.

1920

-

-

... More
Supplying and erecting M.S. pipe pole ‘B’ class 80 mm dia 6 m long with pole cap, base plate in provided foundation as per specification no. OH-PL/GIP

20

-

-

... More
Making cement concrete foundation including excavation ( 45 x 45 x 120 ) cm deep in 1:3:6 cement concrete, 20 to 25 mm stone metal, (45 x 45 x 45) cm / 45 cm dia. x 45 cm height plinth duly plastered, with necessary curing and finishing complete. (for 6 m pole)

20

-

-

... More
SUB WORK-3 :- Providing Fire Fighting System, Fire Alarm System & PA System For Construction of Commissioner of Police Office (G + 7 FL) At Pune. Supplying, installing, testing and commissioning of micro processor based intelligent addressable main fire alarm panel, central processing unit with the 2 loop capacity and capable of supporting upto 250 devices and detectors per loop, with on-board LCD display with min 16 lines of text, operating at 230 V 50 HZ - AC with inbuilt Battery Backup of a minimum 24 hours in normal condition and 30 min in alarm condition, suitable provision for network connectivity, interfacing with third party equipment via a MODBUS/ OPC/ L-ON interface etc. conforming to IS 15908:2021, IS 2189: 2008, EN 54 & VDS / FM/ UL 864 (10th edition) with 3 years replacement warranty FF-AFAS/CP.

1

-

-

... More
Supplying, installing, testing and commissioning of micro processor based intelligent addressable main fire alarm panel, central processing unit with the 8 loop capacity and capable of supporting upto 250 devices and detectors per loop, with on-board LCD display with min 16 lines of text, operating at 230 V 50 HZ - AC with inbuilt Battery Backup of a minimum 24 hours in normal condition and 30 min in alarm condition, suitable provision for network connectivity, interfacing with third party equipment via a MODBUS/ OPC/ L-ON interface etc. conforming to IS 15908:2021, IS 2189: 2008, EN 54 & VDS / FM/ UL 864 (10th edition) with 3 years replacement warranty FF-AFAS/CP

2

-

-

... More
Supplying, installing, testing and commissioning of repeater panel with suitable battery backup of a minimum of 24 hours in normal condition and 30 min in alarm condition, 80 backlit alphanumeric LCD display with inbuilt buzzer to indicate fault/fire alarm, manual control keys for silence/mute and to reset the FACP from the repeater station. Panel size shall not more than 175 x 275 x 65 mm conforming to EN 54 or UL approved with 3 years equipment replacement warranty FF-AFAS/RP

2

-

-

... More
Supplying, installing, testing and commissioning of addressable optical smoke detector, single/twin LED’s with 360 degree view, suitable for low voltage 15 to 32 V DC two wires supply, in-built locking mechanism to check the removal and pilferage of the detector, in built isolation mode, start up current 300µA and alarm condition current shall be maximum 6.5 mA, operating temperature 0°C to 50°C, humidity 0-95% RH, IP 41, conforming to IS 2189: 2008, 11360_1985_Reff2020 EN 54 or UL Approved with 3 years equipment replacement warranty FF-AFAS/SD .

1508

-

-

... More
Supplying, installing, testing and commissioning of intelligent addressable thermal/heat detector with rate of rise cum fixed temperature thermistor complete with base as required, suitable for temperature variations from -20°C to 38°C for fixed-heat and rate-of-rise type detectors and 0°C to 66°C for high heat type detectors, in built isolation mode, suitable for offices/ceiling cable trenches/less ventilation area's etc. with 3 years equipment replacement warranty IS : 2175 - 1988 reaffirmed 2000, IS 15908:2021 standards FF-AFAS/SD.

224

-

-

... More
Supplying, installing, testing and commissioning of addressable manual call points ( break glass type/pull station type), made of addressable break glass plastic square in shape surface/flush mounted with "Break Glass" massage embedded on the glass, complete erected with mounting base and required accessories conforming to EN 54 or UL listed with 3 years equipment replacement warranty FF-AFAS/MCP.

26

-

-

... More
Supplying, installing, testing and commissioning of addressable fire control/relay module complete as required, with 3 years equipment replacement warranty conforming to IS 5051Part 2 (Sec 1 to 3) : 1982 reed relays, EN 54 or UL Listed FF-AFAS/CRM

33

-

-

... More
Supplying, installing, testing and commissioning of addressable fire monitor module complete as required. EN 54 or UL Listed with 3 years equipment replacement warranty conforming to IS 5051Part 2 (Sec 1 to 3) : 1982 Reed relays FF-AFAS/MM

48

-

-

... More
Supplying, installing, testing and commissioning of addressable horn cum strobe sound/ hooter, output frequency 500 to 1000 Hz with dB as per Chart given in IS 15908:2021, with flashing at 1 Hz over the strobe’s entire operating voltage range EN 54, conforming to IS 2189: 2008, IS 15908:2021 standards with 3 years equipment replacement warranty FF-AFAS/SSH.

26

-

-

... More
Supplying, installing, testing and commissioning FRLS, XLPE armoured cable 2 core 1.5 sq.mm. copper conductor complete erected on wall/ ceiling complete as per specification no. CB-LT/CU

7634

-

-

... More
Supplying, installing, testing & Commissionming of Dual Channel Power Amplifier of 2000W (1000W+1000W) RMS Power at 2Ω Dual channel direct coupled power amplifier with Selectable HPF (120Hz / 80Hz / OFF), frequency response & power bandwidth 20-20000Hz, input sensivity - 0dBu (775mV) & 4dBu (1.23V) (Selectable), S/N ratio 95dB, damping factor 400:1, input connection- 2×XLR, Stereo Phone Jack 6.3mm, output connection- Speakon 4-Way and Heavy duty, Two selectable input sensitivities, indicators like Power ON, Signal, Clip, Temperature with Class H operation for optimum efficiency, with shortcircuit overload protection & Cooling arrangement with temperature Sensor complete as per specification no. PA-DCPA

3

-

-

... More
Supplying, erecting, testing and commissioning rust free microphone table stand of chrome plating/powder coating or S.S. material, up to 500 mm height and suitable base for sturdy mechanism ensuring trouble free movement complete.

4

-

-

... More
Supplying, erecting, testing and commissioning 15 to 30 Watts sound column or ceiling mounted complete as per specification no. FF-PA/SOC

46

-

-

... More
Supplying, erecting, testing and commissioning 6 Watts speaker ceiling mounted complete as per specification no. FF-PA/SOC

277

-

-

... More
Supplying, erecting, testing and commissioning of 2 core shielded cable complete as per specification no. FF-PA/MCC

5427

-

-

... More
Supplying, installation, testing and commissioning of main fire pump(MFP / EP) suitable for water discharge of 2280 to 2850 LPM at 120 to 90 m head driven by electric motor 415 volts, 3 phase 50 Hz, AC supply of 75kW or of suitable kW capacity for manual/automatic operation and consisting of following : (a) Horizontal type, single stage, centrifugal/split casing pump of cast iron body & bronze impeller with stainless steel shaft(SS410 grade), mechanical seal conforming to IS 1520. (b) Squirrel cage induction motor, TEFC, synchronous speed 3000 RPM, suitable for operation with IP 55 protection for enclosure, horizontal foot mounted type with Class-'F' insulation, conforming to IS-325. (c) M.S. fabricated common base plate, coupling, coupling guard, foundation bolts etc. as required. (d) Erected on provided suitable size cement concrete foundation duly plastered with anti vibration pads with perfect aligning, proper levelling complete pump set with accessories duly painted with two coats of synthetic enamel paint of fire red colour over a coat of primer (ISC code 536 as per IS 2932 of 2003) complete, as per specification no. FF-MFP/SSC/EP

2

-

-

... More
Supplying, installation, testing and commissioning of jockey fire pump (JP) suitable for water discharge of 180 to 240 LPM at 110 to 90 m head driven by electric motor 415 volts, 3 phase 50 Hz, AC supply of 11 kW or of suitable kW capacity for manual/automatic operation and consisting of following : (a) Horizontal/vertical type, multi stage, centrifugal casing pump of cast iron body & bronze impeller with stainless steel shaft (SS410 grade), mechanical seal conforming to IS 1520. (b) Squirrel cage induction motor, TEFC, synchronous speed 3000 RPM, suitable for operation with IP 55 protection for enclosure, horizontal foot mounted type with Class-'F' insulation, conforming to IS-325. (c) M.S. fabricated common base plate, coupling, coupling guard, foundation bolts etc. as required. (d) Erected on provided suitable size cement concrete foundation duly plastered with anti vibration pads with perfect aligning, proper levelling complete pump set with accessories duly painted with two coats of synthetic enamel paint of fire red colour over a coat of primer (ISC code 536 as per IS 2932 of 2003) complete, as per specification no. FF-MFP/JP

2

-

-

... More
Supplying, installation, testing and commissioning of main fire pump (MFP/DP) suitable for water discharge of 2280 to 2850 LPM at 120 to 90 m head driven by 110 HP or suitable HP capacity diesel engine at required working speed suitable for automatic operation and consisting of following : (a) Horizontal type, single stage, centrifugal casing pump of cast iron body & bronze impeller with stainless steel shaft(SS410 grade), mechanical seal conforming to IS 1520. (b) Water cooled with radiator, diesel engine conforming to relevant IS standard complete with auto starting mechanism, 12/24 volts DC electric starting equipment with battery of required AH capacity with necessary charger suitable to work on 230v, 50Hz AC supply, diesel tank of minimum 150ltr capacity with first filling of diesel up to 100% level with necessary piping with valves up to engine , exhaust pipe extended up to 10 m outside pump house duly insulated with 50 mm thick glass wool with 1.0 mm thick aluminium sheet cladding, residential silencer, instruments and protection as per standard specification, stop solenoid for auto stop in the event of fault with audio indications etc. as required. (c) M.S. fabricated common base plate, coupling, coupling guard, foundation bolts etc. as required. (d) Erected on provided suitable size cement concrete foundation duly plastered with anti vibration pads with perfect aligning, proper levelling complete pump set with engine assembly and accessories duly painted with two coats of synthetic enamel paint of fire red colour over a coat of primer (ISC code 536 as per IS 2932 of 2003) complete, as per specification no. FF-MFP/SSC/DP

1

-

-

... More
Supplying, installation, testing and commissioning of booster fire pump [BP] suitable for water discharge of 900 LPM at 35 m head driven by electric motor 415 volts, 3 phase 50 Hz, AC supply of 7.5 kW or of suitable kW capacity for manual/automatic operation and consisting of following : (a) Horizontal/vertical type, single/multi stage, centrifugal casing pump of cast iron body & bronze/CI impeller with stainless steel shaft (SS410 grade), mechanical seal conforming to IS 1520. (b) Squirrel cage induction motor, TEFC, synchronous speed 3000 RPM, suitable for operation on with IP 55 protection for enclosure, horizontal foot mounted type with Class-'F' insulation, conforming to IS-325. (c) M.S. fabricated common base plate, coupling, coupling guard, foundation bolts etc. as required. (d)Erected on provided suitable size cement concrete foundation duly plastered with anti vibration pads with perfect aligning, proper levelling complete pump set with accessories duly painted with two coats of synthetic enamel paint of fire red colour over a coat of primer (ISC code 536 as per IS 2932 of 2003) complete, as per specification no. FF-MFP/BP

2

-

-

... More
Supplying, erecting, testing & commissioning of fire pump control panel (FCP) of cubical construction, floor mounted type, fabricated from minimum 2 mm thick CRCA sheet, compartmentalised with hinged lockable doors, with enclosure protection class IP54, duly powder coated or painted with accessories duly painted with two coats of synthetic enamel paint of fire red colour over a coat of primer (ISC code 536 as per IS 2932 of 2003), cable alley, interconnection with suitable size solid copper busbar strip of adequate size for all power connections having switchgears and accessories, mountings and internal wiring with adequate size copper conductor cable, earth terminals, numbering etc. complete in all respect, suitable for satisfactory operation of main fire pump and jockey (pressurisation) pumps (1working+1standby) with necessary accessories, wiring & cabling along with allied accessories with following incoming and outgoings, suitable for automatic & manual operation on 415V, 3 phase, 50Hz ac supply as per specifications the capacity of electric motor driven pump are as follows a. Main fire pump(MFP) having capacity of 22kW 1no (1 working) b. Jockey pump(JP) capacity of suitable capacity 2 nos(1 working +1 standby, alternate run per start in auto mode) comprises of the following features & switchgears: 1. Main incomer FP SFU having rotary handle with HRC fuses of suitable rating. 2. Electrolytic grade copper strips for busbar of suitable sizes for main incomer and branches to motor SFU's, starters & outgoing terminals with necessary accessories like stainless steel nut bolts with spring washers for connections, mounted on required no of epoxy or porcelain support insulators of suitable ratings etc. 3. Individual pump TPN SFU having rotary handle with HRC fuses of suitable rating. Add For main electric motor driven fire hydrant system pump of 75kW capacity & relevant capacity jockey pump add Rs 99983 For main electric motor driven fire sprinkler system pump of 75kW capacity (1Working) & relevant capacity jockey pumps (1working+1standby, alternate run per start in auto mode, add Rs 304846 For standby main electric driven fire hydrant/sprinkler system pump of 75kW capacity, add Rs 54517

1

-

-

... More
Supplying & erecting D.O.L Starter suitable for 415 V, 3 phase 50 cycles with no volt coil and overload element with necessary materials and connected to supply up to 7.5 H.P.

2

-

-

... More
Making cement concrete foundation in 1:2:4 cement concrete with foundation bolts and nuts complete. (cost of wooden box is included) (for pumps).

11

-

-

... More
Supplying and erecting 300 mm dia 1.5m in height air vessel / tank fabricated from min 5mm thick M.S. sheet complete as per specification no. FF-FFA/ACT

1

-

-

... More
Supplying and erecting 20/25mm dia gun metal air release cock, with necessary G.I. coupling to be fitted on top of air vessel or on wet riser complete as per specification no. FF-FFA/ARV

12

-

-

... More
Supplying and erecting 100 mm dia. pressure gauge , 0-300 PSI or 0-14 kg per cm square fitted with 12/15 mm dia. pad cock valve, erected with provided G.I. pipe, elbow etc. complete as per specification no. FF-FFA/PG

45

-

-

... More
Supplying and erecting 12/15 mm dia pressure switch with provided isolation valve, G.I. nipple, elbow, etc complete as per specification no. FF-FFA/PS

5

-

-

... More
Supplying and erecting G.I. pipe ‘C’ class ERW 25 mm dia with necessary fittings complete as per specification no. FF-PP

5156

-

-

... More
Supplying and erecting G.I. pipe ‘C’ class ERW 50 mm dia with necessary fittings complete as per specification no. FF-PP

4325

-

-

... More
Supplying and erecting G.I. pipe ‘C’ class ERW 65 mm dia with necessary fittings complete as per specification no. FF-PP

494

-

-

... More
Supplying and erecting G.I. pipe ‘C’ class ERW 75/80 mm dia with necessary fittings complete as per specification no. FF-PP

603

-

-

... More
Supplying and erecting G.I. pipe ‘C’ class ERW 100 mm dia with necessary fittings complete as per specification no. FF-PP

1250

-

-

... More
Supplying and erecting G.I. pipe ‘C’ class ERW 150 mm dia with necessary fittings complete as per specification no. FF-PP

2127.01

-

-

... More
Supplying and erecting G.I. pipe ‘C’ class ERW 200 mm dia with necessary fittings complete as per specification no. FF-PP

4

-

-

... More
Providing coating of bitumen paint & 4mm thick wrapping for underground 150 mm ring main of fire fighting system.

1875

-

-

... More
Excavating hard murum / stone metal road by chiselling for preparing pit for poles stay or earth plates or for laying cables, pipes & clearing the site by removing debris & making the site as required complete.

563

-

-

... More
Excavating soft murum / soft soil road by chiselling for preparing pit for poles stay or earth plates or for laying cables, pipes & clearing the site by removing debris & making the site good complete.

1125

-

-

... More
Supplying and erecting 150 mm dia cast iron foot valve ball type/flap type with strainer for negative suction complete as per specification no. FF-VL/FV

1

-

-

... More
Supplying and erecting 100 mm dia Cast Iron end line strainer of T-Pot type flanged end pattern, PN16 pressure rating, screen of SS and end connection with flanged, for positive suction complete as per specification no. FF-VL/ELS

2

-

-

... More
Supplying and erecting 75/80 mm dia. cast iron double flange sluice valve complete with PN16 pressure rating, as per specification no. FF-VL/SV

2

-

-

... More
Supplying and erecting 150 mm dia. cast iron double flange sluice valve complete with PN16 pressure rating, as per specification no. FF-VL/SV

3

-

-

... More
Supplying and erecting 50 mm dia. cast iron double flange butterfly valve of size complete with PN16 pressure rating, as per specification no. FF-VL/BFV

2

-

-

... More
Supplying and erecting 75/80 mm dia. cast iron double flange butterfly valve of size complete with PN16 pressure rating, as per specification no. FF-VL/BFV

2

-

-

... More
Supplying and erecting 100 mm dia. cast iron double flange butterfly valve of size complete with PN16 pressure rating, as per specification no. FF-VL/BFV

16

-

-

... More
Supplying and erecting 150 mm dia. cast iron double flange butterfly valve of size complete with PN16 pressure rating, as per specification no. FF-VL/BFV

21

-

-

... More
Supplying and erecting 75/80 mm dia cast iron double flange NRV complete with PN16 pressure rating, as per specification no. FF-VL/NRV

2

-

-

... More
Supplying and erecting 100 mm dia cast iron double flange NRV complete with PN16 pressure rating, as per specification no. FF-VL/NRV

4

-

-

... More
Supplying and erecting 150 mm dia cast iron double flange NRV complete with PN16 pressure rating, as per specification no. FF-VL/NRV

3

-

-

... More
Supplying and erecting 25 mm dia gun metal gate valve complete with PN16 pressure rating, as per specification no. FF-VL/GV

65

-

-

... More
Supplying and erecting 50 mm dia gun metal gate valve complete with PN16 pressure rating, as per specification no. FF-VL/GV

24

-

-

... More
Supplying and erecting stainless steel single outlet hydrant valve fitted with necessary accessories complete as per specification no. FF-VL/HV

57

-

-

... More
Supplying and installing wall mounting swinging hose reel drum fitted with 19 mm dia. 30m long high pressure polypropylene (Polyhose) along with necessary accessories complete as per specification no. FF-FFA/HV

40

-

-

... More
Supplying and erecting 63mm dia, reinforced rubber lined (R.R.L.) hose pipe, 15m in length, fitted with necessary accessories complete as per specification no. FF-FFA/RRL

114

-

-

... More
Supplying and erecting stainless steel branch pipe 63 mm dia fitted with 20 mm dia detachable hexagonal nozzle complete as per specifications no. FF-FFA/NZ

57

-

-

... More
Supplying and erecting 150 mm dia fire brigade header suitable for supplying water in fire tank complete as per specification no. FF-FA/FBC

2

-

-

... More
Supplying and erecting fire brigade header ( Siamese connection )of 150 mm dia, for supplying water in fire tank complete as per specification no. FF-FA/FMC

1

-

-

... More
Supplying and erecting M.S./CRCA cabinet for housing Fire Brigade / SIEMESE connections (size 1250 x 400 x 300 mm.) made from 16 SWG sheet and angle iron 25 mm. x 25 mm. x 4 mm. having front doors with viewing glass (8" x 6") and locking arrangement with necessary fixing material such as rubber bidding etc. duly painted in post box red colour( Code 538 of IS 5)

57

-

-

... More
Supplying and erecting brass orifice plate having 6 mm. thickness, 160 mm outer dia with required diameter of inner hole at every double outlet hydrant valve as per specification no. FF-FFA/OP

32

-

-

... More
Supplying, erecting, testing and commissioning of quartzoid bulb sprinkler, 15 mm (½") dia. NBCM Body chrome finished, 68º C fixed temperature rating with deflector disc of conventional construction complete as per specification no. FF-SPR.

2995

-

-

... More
Supplying, erecting, testing and commissioning vane type water flow detector 100 mm dia. with 1) Visual switch activation 2) Rugged switch assembly 3) Heavy duty aluminium pipe saddles 4)Durable metal enclosure 5) Steel U bolts for secure mounting 6) Two SPDT ( Single pole double track ) synchronised switches 7) serviceable without draining pipes.

24

-

-

... More
Providing Round bottom FIRE Bucket of 9 Litres capacity as per IS : 2546 made out of 24 gauge G.I. sheet with extra handle at bottom duly painted white inside and red outside with FIRE Mark, on provided stand/ wall hook.

12

-

-

... More
Providing Floor mounting stand for keeping 4 Nos. of FIRE buckets 1500mm in length, 900mm in height frame made out of 30x30x4 mm angle iron with cross supports for legs, welded with 4 hooks and duly painted with one coat of red lead and two coats of silver paint.

3

-

-

... More
Supplying & erecting Carbon Dioxide (CO2) fire extinguisher of 4.5 kg. capacity cartridge type conform to IS 2878 /15683 complete erected with necessary clamp made from 50 x 6 mm. M. S. flat with nut & bolts routed in wall complete.

5

-

-

... More
Supplying and erecting ABC powder type fire extinguisher as per IS : 13849 /15683 of 6 kg capacity with necessary clamp for erection on wall.

102

-

-

... More
Carrying out core cutting of size 3" to 5" dia x 15" length in the C.C./rock/stone wall with the help of specialized core cutting machine in proper manner and finishing the site as original.

10

-

-

... More
Providing, laying, testing & commissioning of 'C' class heavy duty 250 mm dia (wall thickness 6.3 mm) MS pipe conforming to IS 3589/IS 1239 including Welding, fittings like elbows, tees, flanges,tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall / ceiling with suitable clamp / support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required

28

-

-

... More
Supplying, fixing, testing & commissioning of double flanged 250 mm diameter sluice valve of rating PN 1.6 with non rising spindle, bronze / gun metal seat, ISI marked complete with nuts, bolts, washers, gaskets and conforming to IS 780.

2

-

-

... More
Providing, installation, testing and commissioning of stainless steel 250 mm diameter Y-strainer fabricated out of 1.6 mm thick stainless steel, Grade 304, sheet with 3 mm dia holes with stainless steel flange.

2

-

-

... More
Supplying, fixing, testing and commissioning of 250 mm dia butterfly valve of PN 1.6 rating with bronze / gunmetal seat duly ISI marked complete with nuts, bolts, washers, gaskets conforming to IS 13095 of following sizes as required.

2

-

-

... More
Providing, installation, testing and commissioning of 250 mm dia non-return valve of following sizes confirming to IS:5312 complete with rubber gasket, GI bolts, nuts,washers etc.as required.

1

-

-

... More
Providing, laying, testing & commissioning of resilient rubber neoprene lined single arch Vibration eliminators (Expansion bellows) 80mm dia suitable for Design Pressure 16 kg/sq cm and test pressure 24 kg/sq cm. complete all the work up to the satisfaction of the Engineer in charge.

4

-

-

... More
Providing, laying, testing & commissioning of resilient rubber neoprene lined single arch Vibration eliminators (Expansion bellows) 150mm dia suitable for Design Pressure 16 kg/sq cm and test pressure 24 kg/sq cm. complete all the work up to the satisfaction of the Engineer in charge.

6

-

-

... More
Providing and fixing 150 mm dia installation valve with Hydraulic trim type automatic alarm to be connected with control valve drain and test valve as per manufacturer's recommendations . with accessories like water motor gong bell, Test & drain valve , Flow switch etc UL listed etc complete to satisfaction of Architect/ PM

1

-

-

... More
Providing, fixing, testing & commissioning of 15mm dia quartzoid bulb type Sidewall sprinklers of rating 68 degree centigrade with required accessories.

38

-

-

... More
Supplying, installation, testing & commissioning of sprinkler flexible pipe (UL Listed) of stainless steel complete with 15 NPT on reducer thread with maximum working pressure of 175 PSI test pressure of 875 PSI (Burst) with branch line (Inlet) 25mm NPTmale thread to sprinkler head (Outlet) 15mm NPT female thread with reducer, nipple, 2 side brackets,center bracket, stockbar of following sizes complete as required. (1500 mm long)

2970

-

-

... More
Providing, installation, testing & commissioning of adjustable rosette plate for 15mm dia in white finish UL Listed or FM approved complete as required

2970

-

-

... More
Providing and fixing 25 mm dia Inspection & Testing Assembly with 25mm gunmetal ball valve, gun metal sight glass bypass valve & connected to drain line etc complete as per drawing.

24

-

-

... More
SUB WORK-4 :- Providing HVAC System For Construction of Commissioner of Police Office (G + 7 FL) At Pune. Supplying, erecting, testing and commissioning of 10HP, VRF/VRV air conditioning system outdoor unit (ODU) complies type-IV OEM standards working on HFC refrigerant R410A or other required/suitable green equivalent refrigerant, for minimum cooling capacity as delivering 100% capacity at 47° C, non stop cooling even at 56° C and coefficient of performance (COP) 3.00 to 4.00, modular type vertical hot air discharge suitable for longer piping range upto 1000m operation in cooling mode with inverter/digital VRF/VRV technology microprocessor based control compressor starter/control panel with scroll compressor, air cooled copper condenser coil of suitable shape for increasing maximum heat transfer area, rain protection cover, built in oil separator, accumulator and oil receiver, copper tube aluminium fin air cooled condenser, condenser fan with motor suitable for 415V±10%, 50 Hz, 3 phase power supply (all suitable for high ambient conditions), internal copper refrigerant piping, internal wiring and refrigerant, etc. all housed in powder coated weather proof cabinet complete.

2

-

-

... More
Supplying, erecting, testing and commissioning of 14HP, VRF/VRV air conditioning system outdoor unit (ODU) complies type-IV OEM standards working on HFC refrigerant R410A or other required/suitable green equivalent refrigerant, for minimum cooling capacity as delivering 100% capacity at 47° C, non stop cooling even at 56° C and coefficient of performance (COP) 3.00 to 4.00, modular type vertical hot air discharge suitable for longer piping range upto 1000 metre operation in cooling mode with inverter/digital VRF/VRV technology microprocessor based control compressor starter/control panel with scroll compressor, air cooled copper condenser coil of suitable shape for increasing maximum heat transfer area, rain protection cover, built in oil separator, accumulator and oil receiver, copper tube aluminium fin air cooled condenser, condenser fan with motor suitable for 415V±10%, 50 Hz, 3 phase power supply (all suitable for high ambient conditions), internal copper refrigerant piping, internal wiring and refrigerant, etc. all housed in powder coated weather proof cabinet complete.

3

-

-

... More
Supplying, erecting, testing and commissioning of 16HP, VRF/VRV air conditioning system outdoor unit (ODU) complies type-IV OEM standards working on HFC refrigerant R410A or other required/suitable green equivalent refrigerant, for minimum cooling capacity as delivering 100% capacity at 47° C, non stop cooling even at 56° C and coefficient of performance (COP) 3.00 to 4.00, modular type vertical hot air discharge suitable for longer piping range upto 1000 metre operation in cooling mode with inverter/digital VRF/VRV technology microprocessor based control compressor starter/control panel with scroll compressor, air cooled copper condenser coil of suitable shape for increasing maximum heat transfer area, rain protection cover, built in oil separator, accumulator and oil receiver, copper tube aluminium fin air cooled condenser, condenser fan with motor suitable for 415V±10%, 50 Hz, 3 phase power supply (all suitable for high ambient conditions), internal copper refrigerant piping, internal wiring and refrigerant, etc. all housed in powder coated weather proof cabinet complete

7

-

-

... More
Supplying, erecting, testing and commissioning of 18HP, VRF/VRV air conditioning system outdoor unit (ODU) complies type-IV OEM standards working on HFC refrigerant R410A or other required/suitable green equivalent refrigerant, for minimum cooling capacity as delivering 100% capacity at 47° C, non stop cooling even at 56° C and coefficient of performance (COP) 3.00 to 4.00, modular type vertical hot air discharge suitable for longer piping range upto 1000 metre operation in cooling mode with inverter/digital VRF/VRV technology microprocessor based control compressor starter/control panel with scroll compressor, air cooled copper condenser coil of suitable shape for increasing maximum heat transfer area, rain protection cover, built in oil separator, accumulator and oil receiver, copper tube aluminium fin air cooled condenser, condenser fan with motor suitable for 415V±10%, 50 Hz, 3 phase power supply (all suitable for high ambient conditions), internal copper refrigerant piping, internal wiring and refrigerant, etc. all housed in powder coated weather proof cabinet complete

2

-

-

... More
Supplying, erecting, testing and commissioning of 20HP, VRF/VRV air conditioning system outdoor unit (ODU) complies type-IV OEM standards working on HFC refrigerant R410A or other required/suitable green equivalent refrigerant, for minimum cooling capacity as delivering 100% capacity at 47° C, non stop cooling even at 56°C and coefficient of performance (COP) 3.00 to 4.00, modular type vertical hot air discharge suitable for longer piping range upto 1000 metre operation in cooling mode with inverter/digital VRF/VRV technology microprocessor based control compressor starter/control panel with scroll compressor, air cooled copper condenser coil of suitable shape for increasing maximum heat transfer area, rain protection cover, built in oil separator, accumulator and oil receiver, copper tube aluminium fin air cooled condenser, condenser fan with motor suitable for 415V±10%, 50 Hz, 3 phase power supply (all suitable for high ambient conditions), internal copper refrigerant piping, internal wiring and refrigerant, etc. all housed in powder coated weather proof cabinet complete.

12

-

-

... More
Supply, installation, testing and commissioning of VRF/VRV based ceiling suspended 4 Way cassette room/indoor unit (IDU-compact/standard size) of nominal cooling capacity 1.0TR ( 441 cfm ) to 1.3TR (512 cfm ) having EER as per BEE standards and specifications, suitable as per site requirement with swing louvers and adjustable blades from sides. IDU with drainage arrangements, fan, refrigerant liquid and refrigerant piping, cordless remote control, and fresh air port etc. IDU shall have anti corrosive coating suitable for coastal area in all respects suitable to operate on 1-phase, 230V, 50Hz, AC supply complete. The unit consisting with any additional refrigerant and oil charge as per requirement during installation.

21

-

-

... More
Supply, installation, testing and commissioning of VRF/VRV based ceiling suspended 4 Way cassette room/indoor unit (IDU-compact/standard size) of nominal cooling capacity 1.5TR (512 cfm) to 1.8TR (618 cfm) having EER as per BEE standards and specifications, suitable as per site requirement with swing louvers and adjustable blades from sides. IDU with drainage arrangements, fan, refrigerant liquid and refrigerant piping, cordless remote control, and fresh air port etc. IDU shall have anti corrosive coating suitable for coastal area in all respects suitable to operate on 1-phase, 230V, 50Hz, AC supply complete. The unit consisting with any additional refrigerant and oil charge as per requirement during installation.

3

-

-

... More
Supply, installation, testing and commissioning of VRF/VRV based ceiling suspended 4 Way cassette room/indoor unit (IDU-compact/standard size) of nominal cooling capacity 2.0TR (618 cfm) to 2.3TR (671 cfm) having EER as per BEE standards and specifications, suitable as per site requirement with swing louvers and adjustable blades from sides. IDU with drainage arrangements, fan, refrigerant liquid and refrigerant piping, cordless remote control, and fresh air port etc. IDU shall have anti corrosive coating suitable for coastal area in all respects suitable to operate on 1-phase, 230V, 50Hz, AC supply complete. The unit consisting with any additional refrigerant and oil charge as per requirement during installation.

2

-

-

... More
Supply, installation, testing and commissioning of VRF/VRV based ceiling suspended 4 Way cassette room/indoor unit (IDU-compact / standard size) of nominal cooling capacity 2.6TR (918 cfm) to 2.8TR ( 1100 cfm ) having EER as per BEE standards and specifications, suitable as per site requirement with swing louvers and adjustable blades from sides. IDU with drainage arrangements, fan, refrigerant liquid and refrigerant piping, cordless remote control, and fresh air port etc. IDU shall have anti corrosive coating suitable for coastal area in all respects suitable to operate on 1-phase, 230V, 50Hz, AC supply complete. The unit consisting with any additional refrigerant and oil charge as per requirement during installation.

19

-

-

... More
Supply, installation, testing and commissioning of VRF/VRV based ceiling suspended 4 Way cassette room/indoor unit (IDU-compact / standard size) of nominal cooling capacity 3.0TR (1100 cfm) to 3.2TR (1165 cfm) having EER as per BEE standards and specifications, suitable as per site requirement with swing louvers and adjustable blades from sides. IDU with drainage arrangements, fan, refrigerant liquid and refrigerant piping, cordless remote control, and fresh air port etc. IDU shall have anti corrosive coating suitable for coastal area in all respects suitable to operate on 1-phase, 230V, 50Hz, AC supply complete. The unit consisting with any additional refrigerant and oil charge as per requirement during installation.

16

-

-

... More
Supply, installation, testing and commissioning of VRF/VRV based ceiling suspended 4 Way cassette room/indoor unit (IDU-compact / standard size) of nominal cooling capacity 3.3TR (1165 cfm) to 4.0TR (1218 cfm ) having EER as per BEE standards and specifications, suitable as per site requirement with swing louvers and adjustable blades from sides. IDU with drainage arrangements, fan, refrigerant liquid and refrigerant piping, cordless remote control, and fresh air port etc. IDU shall have anti corrosive coating suitable for coastal area in all respects suitable to operate on 1-phase, 230V, 50Hz, AC supply complete. The unit consisting with any additional refrigerant and oil charge as per requirement during installation.

27

-

-

... More
Supplying and erecting circular flexible/rigid PVC pipe duct of size 100mm dia, 4mm thickness with required couplers, reducers, T-joints, Y-joints elbows and necessary supports etc. with sealing with provided control/air flow regulating valves / dampers, filters at position complete.

105

-

-

... More
Supplying and installation of high pressure grade required size copper connection Y or T- Joints/refnet complete erected on wall/ceiling with supports/raceways, Nitrile rubber insulation, painting etc. with brazing and testing for leakages confirming the normal operation of the VRV/VRF air conditioning system.

94

-

-

... More
Supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 41.3mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultra violet radiations with OEM standards of VRV/VRF air conditioning system complete.

162

-

-

... More
Supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 34.9mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultra violet radiations with OEM standards of VRV/VRF air conditioning system complete.

246

-

-

... More
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 28.6mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultra violet radiations with OEM standards of VRV/VRF air conditioning system complete.

132

-

-

... More
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 22.2mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiation with OEM standards of VRV/VRF air conditioning system complete.

204

-

-

... More
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 19.1mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19 mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete.

312

-

-

... More
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 15.9 mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete.

366

-

-

... More
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 12.7mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete.

192

-

-

... More
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 9.5 mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete.

372

-

-

... More
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 6.4mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete.

114

-

-

... More
Supplying and erecting mains with 2x1.5 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places as per specification No: WG-MA/BW

1041

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 10 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU

342

-

-

... More
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 200 mm width & 75 mm height complete with necessary coupler plates & hardware.

324

-

-

... More
Providing & erecting hot dipped galvanised cover suitable for perforated type Cable tray manufactured from 18 SWG (1.2 mm thick) GI sheet of 200 mm width & 20 mm height complete with necessary hardware.

324

-

-

... More
Supplying, installing, testing & commissioning split type variable speed inverter technology with minimum 3 to 1 convertible mode for compressor, room air conditioning unit 1.0TR to 1.2TR capacity having ISEER minimum 3.8 to maximum 4.39 suitable to operate on 250V, 50 Hz, A.C. supply having 1 no of air handling unit hi-wall/floor mounting type complete with refrigerant R32 having copper condenser, minimum 2.5PM filter, self diagnosis feature, stabilizer free operation & temperature display on indoor unit, noise level maximum 50dBA at position as per specification no. APAC/ WAC

1

-

-

... More
Supplying & erecting seamless outside & inside, smooth, dry and clean copper pipe with ROHS compliant suitable for refrigerant having 22SWG thickness and inner dia/size 16mm complete.

18

-

-

... More
Supplying & erecting seamless outside & inside, smooth, dry and clean copper pipe with ROHS compliant suitable for refrigerant having 22SWG thickness and inner dia/size 12mm complete.

18

-

-

... More
Supplying and erecting elastomeric nitrile rubber / foam tube type sleeves for coating and insulating on provided PC / copper pipes having 9 mm thickness and inner diameter / sizes 16 mm for solar water heater/AC system.

18

-

-

... More
Supplying and erecting elastomeric nitrile rubber / foam tube type sleeves for coating and insulating on provided PC / copper pipes having 9 mm thickness and inner diameter / sizes 12 mm for solar water heater/AC system.

18

-

-

... More
Supplying and erecting GI sheet 0.6 mm (24 SWG) having zinc coating of 275 microns with galvanization process compliance to IS 2629:1985 to be used for fabrication of boxes panel boards etc. including cutting, bending, drilling, welding, riveting etc. and painting with one coat of red lead paint and 2 coats of enamel paint.

1425

-

-

... More
Supplying and erecting GI sheet 0.8 mm (22 SWG) having zinc coating of 275 microns with galvanization process compliance to IS 2629:1985 to be used for fabrication of boxes panel boards etc. including cutting, bending, drilling, welding, riveting etc. and painting with one coat of red lead paint and 2 coats of enamel paint.

327

-

-

... More
Providing adhesive thermal insulation for supply return air duct with 19mm nitrile rubber insulation having R-value as per the prevailing provisions in ECBC-2017.

666

-

-

... More
Providing and applying of acoustic insulation for air ducts with 25mm thick, 48 kg/cu.m fiber glass faced with RP tissue and covered with 26 SWG perforated aluminium sheets complete.

130

-

-

... More
Supplying and erecting aluminium powder coated linear grill of suitable size for width length without collar dampers having matching colour with the existing false ceiling and suitable for deflection of 15/30/45°.

91

-

-

... More
Supplying, erecting, testing and commissioning centralised programmable remote control panel (HMI) touch manager controls minimum 16 system of 64 ODU's can be controlled and up to 992 IDU's can be individually mounted and controlled indoor units having colour min 200mm size LCD touch panel, yearly schedule, power proportional distribution function, temperature limitation, history function complete erected on wall integrated with provided fire alarm system.

2

-

-

... More
Supply, installation, testing and commissioning of manually operated, opposed blade, duct mounted, flanged volume control dampers of required sizes in GI construction with operating mechanism, mounting arrangement, rubber refrigerant kits etc. complete.

14

-

-

... More
Supply, installation, testing and commissioning of volume control box with collar for control damper of required sizes in GI construction with operating mechanism, mounting arrangement, rubber refrigerant kits etc. complete.

96

-

-

... More
Supplying and erecting an air flow regulating valves/dampers in provided flexible or rigid duct/pipe of 100 mm size with an alteration for existing flexible PVC pipe duct and necessary joints, sealing, couplings at position complete.

88

-

-

... More
Supply, fabrication, installation and testing of flexible canvas connections constructed between ductable unit/dampers/ducting of suitable size with fire resist flexible double canvas sleeve complete.

4

-

-

... More
Supplying and erecting slotted angles, frames etc. for panel board or any other purposes complete with bending, cutting, drilling and welding complete erected at the position with necessary materials duly painted with one coat of red oxide and two coats of enamel paint to match the switchgears or as per directions by the authority

480

-

-

... More
Drain Piping - 40 NB PVC hard pipe having minimum 3 mm wall thickness, insulated with with 6 mm thick cross linked Polyethylene tube sections laminated with aluminium foil, joints to be sealed with solvent based adhesive & 2" aluminium adhesive tape.

126

-

-

... More
Drain Piping - 50 NB PVC hard pipe having minimum 3 mm wall thickness, insulated with with 6 mm thick cross linked Polyethylene tube sections laminated with aluminium foil, joints to be sealed with solvent based adhesive & 2" aluminium adhesive tape.

678

-

-

... More
Supply, Installation, Testing and Commissioning of Air Handling Units, 50 mm Thick Double skin type, suitable for Outdoor installation, Pre EU-4 Filter, DX Coil, UV Lamps, Plug type Blower, VFD compatible IE3 efficient Motors, Post EU-8 Filter, Vibration Isolators, Opposed blade type Dampers at Supply / Return /Fresh / Relief Air, Fire rated flexible connections etc. ( Fan Motor should be Flame Proof and Fan to be Spark resistant construction.) AHU ESP: 100mm AHU : Floor Mounted -10TR Dehudified CFM - 4000, FA CFM - 800 Coil In 22.9 deg.C DB / 13.7 deg.C WB Coil Out 8.4 deg.C DB / 7.9 deg.C WB

4

-

-

... More
Supply, installation, testing and commissioning of One to One ductable type, high static room/indoor unit (IDU) having nominal cooling capacity of 8.0TR (3200 cfm) having EER as per BEE standards with Outdoor Unit having sroll/Rotary compressor and specifications with evaporator fan with motor, copper tube aluminium fin evaporator coil, washable air filter, insulated drain tray, in built drain pump, expansion device, cordless remote control with necessary controls and electrical terminal to receive power supply, etc. having anti-corrosive coating suitable for coastal area and decorative slim dimension suitable for ceiling suspended arrangement with an electronic control console and any additional refrigerant and oil charge as per requirement during installation complete.

8

-

-

... More
Supply, installation, testing and commissioning of ceiling /Floor mounted Tube Axial flow fans - For Basement Ventilation with adjustable pitch blade, MS / GI long casing (2mm thick up to 1300 mm dia fan, 3 mm thick from 900 to 1250 mm dia & 4 mm thick above 1300 mm dia) , cast aluminium alloy impeller complete with TEFC Sq. Cage Induction motor suitable for 415 volts ± 10%, 50Hz ± 3 %, three phase A.C supply with support, mountings, vibration isolators, fire retardant flexible canvass connector 150 mm deep (Inlet & Outlet as required), bird screen (Inlet & Outlet as required) etc. & of following capacity. The complete fan along with motor shall be high efficient(IE -3 or EQUIVALENT) with fire rated (class H) suitable for with standing 250 °C temperature rated for 2 hours.Exhaust fan shall be connected using circuit integrity cable. Fan outlet velocity shall be limited to maximum of 16 m/sec. Fan & Fan motor KW given below are for guideline & actual Dia / KW shall be as per manufacturer selection based on maximum 16 m/sec outlet velocity. Axial Fan shall be AMCA certified for Air and Sound performance in accordance to AMCA 210 and AMCA 300. Complete Fan shall be tested and approved by UL in accordance with "Power Ventilators for Smoke Control Systems" for min 250 °C for 2 hours. Manufacturer shall furnish AMCA Test Certificate for air & sound performance along with UL fire test certificate (Latest) for No. fan sourced from that particular factory. The noise level of axial fan shall be less than 80 dB at a distance of 3.0 mt from the fan. The fan shall be low RPM (less than or equal to 1450 RPM) and capacities shall be as follows :Air Quantity : 34500 CFM Static Pressure : 20 mm wg ( Staircase Pressurization FAN)

2

-

-

... More
Supply, installation, testing and commissioning of ceiling /Floor mounted Tube Axial flow fans - For Basement Ventilation with adjustable pitch blade, MS / GI long casing (2mm thick up to 1300 mm dia fan, 3 mm thick from 900 to 1250 mm dia & 4 mm thick above 1300 mm dia) , cast aluminium alloy impeller complete with TEFC Sq. Cage Induction motor suitable for 415 volts ± 10%, 50Hz ± 3 %, three phase A.C supply with support, mountings, vibration isolators, fire retardant flexible canvass connector 150 mm deep (Inlet & Outlet as required), bird screen (Inlet & Outlet as required) etc. & of following capacity. The complete fan along with motor shall be high efficient(IE -3 or EQUIVALENT) with fire rated (class H) suitable for with standing 250 °C temperature rated for 2 hours.Exhaust fan shall be connected using circuit integrity cable. Fan outlet velocity shall be limited to maximum of 16 m/sec. Fan & Fan motor KW given below are for guideline & actual Dia / KW shall be as per manufacturer selection based on maximum 16 m/sec outlet velocity. Axial Fan shall be AMCA certified for Air and Sound performance in accordance to AMCA 210 and AMCA 300. Complete Fan shall be tested and approved by UL in accordance with "Power Ventilators for Smoke Control Systems" for min 250 °C for 2 hours. Manufacturer shall furnish AMCA Test Certificate for air & sound performance along with UL fire test certificate (Latest) for No. fan sourced from that particular factory. The noise level of axial fan shall be less than 80 dB at a distance of 3.0 mt from the fan. The fan shall be low RPM (less than or equal to 1450 RPM) and capacities shall be as follows :Air Quantity : 14000 CFM Static Pressure : 20 mm wg ( Liftwell Pressurization FAN)

2

-

-

... More
Supplying, installing, testing and commissioning of backward curved DIDW fans suitable for installing in any position vertical or horizontal . The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. with efficient motor, fire retardent double layer canvass connection, etc complete in all respect & of following capacities. The casing shall be selected for lower noise level. Motor shall be with class F insulation. Supporting/mounting arrangement complete with all accessories is in contractor's scope. Fan dia. shall be selected such that it meets the functional requirements. Air Quantity : 7000 CFM, External Static Pressure : 15 mm wg (Mechanical Ventilation Exhaust Air)

2

-

-

... More
Supplying, installing, testing and commissioning of backward curved DIDW fans suitable for installing in any position vertical or horizontal . The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. with efficient motor, fire retardent double layer canvass connection, etc complete in all respect & of following capacities. The casing shall be selected for lower noise level. Motor shall be with class F insulation. Supporting/mounting arrangement complete with all accessories is in contractor's scope. Fan dia. shall be selected such that it meets the functional requirements. Air Quantity : 6000 CFM, External Static Pressure : 15 mm wg (Mechanical Ventilation Exhaust Air)

2

-

-

... More
Supply, Installation, Testing, And Commissioning Of Starter Panel For Staircase Pressurization/ Lift Pressurization Fan. Panel Should Have VFD For Modulating The Fan Speed, Panel Will Incomer Coming From Electrical DB And It Will Have Outgoing For Staircase/ Lift Fan. Panel Should Have Provision For Incoming Signal From Fire Alarm System. Fan Will Be Operated Based On The Signal Received From Fire Alarm System. Fan Should Have Necessary MCB / MCCB / Stop Buttons / Auto Manual Switch / Indicator For On Off.

4

-

-

... More
Supply, Installation testing & Commissioning of DP/Pressure Sensor with Display Unit /Switch / - For Air Pressure Measurement that should be maintain 50 P in Staircase Area, 2 Sensors in each staircase, at first floor and top floor.

4

-

-

... More
100 mm dia disc valve for toilet exhaust

222

-

-

... More
Supplying, erecting, testing and commissioning of VRF/VRV Air conditioning system working on HFC refrigerant R410A and for extended piping lenghts top up of HFC refrigerant R410A, as per actual requirement derived while system commissioning.

192

-

-

... More
Supply, Installation, Testing, and Commissioning of Extruded Aluminum 4-Way Grills of 600 x 600 mm For Supply Air. Grill Should Be 0 Deflection Type .Grill Color Should Match With Interior Color.

30

-

-

... More
SUB WORK-5 :- Providing 08 Nos of Passenger Cum Stretcher Lifts For Construction of Commissioner of Police Office (G + 7 FL) At Pune. SITC of Electric Traction Passenger cum Stretcher/Hospital Lift with   Rated capacity :- 20 Passenger/1360Kg Floors :- G+7 floor (8 Stops/8 Landings)    Travel :- 21 to 32.4 mtrs    Location of Lift Machine:- MR/MRL Rated speed :- 1.5mps VS

4

-

-

... More
SITC of Electric Traction Passenger Lift with      Rated capacity :- 13 Passenger/884Kg ·       Floors :- G+7 floor (8 Stops/8 Landings) ·       Travel :- 21 to 32.4 mtrs ·       Rated speed :- 1.5mps VS ·       Car/Landing door clear opening of 900/1000 mm wide x 2000 mm high

4

-

-

... More
SITC of Duplex Lift control system for two nos. microprocessor/PLC based simplex lift controllers along with necessary software with programming and hardware e.g. logic board, necessary communication/control/data cabling laying in rigid PVC conduits/trunking etc. complete.

4

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 6 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU

956

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 2 core 2.5 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU

1263

-

-

... More
Supplying, erecting & marking SPMCB 6A to 32A, C-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB

32

-

-

... More
Supplying, erecting & marking DPMCB 6A to 32A, C-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB

8

-

-

... More
Supplying, erecting & commissioning 2 pole RCCB 16/25A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB

8

-

-

... More
Supplying and erecting single pole and neutral distribution board (SPNDB), with 2 ways for incoming and 6 ways (6 poles) for outgoing SP MCBs, with door, 1.2mm thickness surface / flush mounted, IP 43 Protection on iron / GI frame as per specification no. SW-SWR/MCBDB

8

-

-

... More
Supplying, erecting & marking FPMCB 40A to 63A, with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB

8

-

-

... More
Supplying, erecting & commissioning 4 pole RCCB 40A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB

8

-

-

... More
Supplying & erecting CRCA sheet metal one way enclosures of 1.2mm thickness suitable for DP MCB /TP MCB/FP MCB/RCCB/RCBO complete erected on angle iron/GI frame.

16

-

-

... More
Supplying and erecting modular type switch 6A / 10A duly erected on provided plate and box with wiring connections complete.

160

-

-

... More
Supplying and erecting modular type 3 pin 6A multi socket with safety shutter, duly erected on provided plate and box with wiring connections complete.

80

-

-

... More
Supplying and erecting PVC Surface modular switch box with double mounting plate for 4 module duly erected.

80

-

-

... More
Supplying and erecting bulk head LED fitting max. 10W with high transitivity diffuser with system lumens output of min. 1100 lumens, min. efficacy of 110 lumen/W, CRI80, CCT upto 6500K, Beam Angle of 120 deg., THD10%, p.f. 0.95, operating range of 140-260V, in built surge protection of 2.5 kV, Life class of 50,000 Hrs. at L70B50, including driver, IP66, IK09 rated on provided PVC Block / wooden board with 3 years warranty.

80

-

-

... More
Supplying and erecting Ceiling rose / Batten holder / Slanting holder / hanging cord switch / hanging bell push / pendant holder bakelite base 6A. erected on filled polypropylene board or polished double wooden block/ PVC junction box.

80

-

-

... More
Providing earthing with copper earth plate size 30 x 30 x 0.315 cm complete with all materials, testing & recording the results as per specification no. EA-EP

16

-

-

... More
Supplying and erecting annealed bare copper wire of high purity of required sizes used for earthing on wall with necessary copper clamps fixed on wall/cable/conduit with screws complete.

119

-

-

... More
SUB WORK-6 :- Providing External Street Lighting For Construction of Commissioner of Police Office (G + 7 FL) At Pune. Providing & erecting 6 m high (clear height) galvanised octagonal pole with foundation bolts having bottom of 130 mm A/F, top 70 mm A/F on provided foundation as per specification no. OH-PL/OPL

50

-

-

... More
Supplying and laying (including excavation of suitable width & depth up to 90 cm) 50 mm outside dia. double wall corrugated pipes (DWC) of HDPE for enclosing cable below ground/road surface, to required depth complete.

690

-

-

... More
Supplying and erecting integrated LED street light fitting 60W IP65 & IK08 class having single piece pressure die-cast aluminium housing, having system lumens output of Min. 6600 Lumens, min. efficacy of 110 lumen/W, CRI70, CCT upto 6500K, THD10%, p.f. 0.95, operating range of 140-270V, inbuilt surge protection of 10 kV, Life class of 50,000 Hrs. at L70B50, including driver complete with 3 Years warranty as per specification No FG-ODF/FLS2.

74

-

-

... More
Providing and erecting galvanised 1000mm single arm sword type bracket with FRP dome and ball as per specification no. OH-PL/PBKT

26

-

-

... More
Providing and erecting galvanised 1000mm double arm sword type bracket with FRP dome and ball as per specification no. OH-PL/PBKT

24

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 16 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

220

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 10 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

750

-

-

... More
Supplying and erecting PVC insulated PVC round sheathed 2.5 sq.mm (50 no. x 0.25 mm dia.) 3 core flexible multi stranded copper Industrial cable for voltage grade up to 1.1 kV

350

-

-

... More
Supplying & erecting three phase, 415V, street light control panel up to the max load of 6kW, TPN MCB 40A, powder coated CRCA 14 SWG sheet, outdoor type, having IP54,IK10 protection, suitable rating contactor, 24 hrs. astronomical time switch with minimum 5 years battery back up, auto/manual selector switch, ON/OFF push buttons, indicator lamps, control wiring, metering device, etc. for automatic operation, with overcurrent, short circuit, earth fault protection on provided iron frame / CC foundation.

2

-

-

... More
Supplying and erecting iron work, sheet metal work consisting of CRCA sheets, various sections of iron, plates, chequered plates, rods, bars, MS pipes, etc. for panel board or any other purpose with bending, cutting, drilling and welding complete erected at the position with necessary materials duly painted with one coat of red oxide and two coats of enamel paint to match the switchgears or as per directions by the authority.

5

-

-

... More
Supplying, erecting & marking SPMCB 0.5A to 5A, C-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB

50

-

-

... More
Making M- 20 grade reinforced cement concrete foundation by considering the safe soil bearing capacity at site as 10 T/sq.m at 1.5 m depth including supply of steel, concrete, excavation and fixing provided nut bolts with the help of template, duly plastered as per design complete (for 6m to 8m high octagonal /conical GI pole).

50

-

-

... More
Providing pipe type earthing with 40mm. dia. G.I. pipe or 20 mm dia. G.I. Rod complete with all materials testing and recording the results as per specification no. EA-EP

50

-

-

... More
Providng earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm complete with all materials, testing & recording the results as per specification no. EA-EP

2

-

-

... More
Supplying and erecting integrated LED flood light fitting Max. 155W IP65 & IK07 class having pressure die-cast aluminium housing, having system lumens output of Min. 18600 Lumens, min. efficacy of 120 lumen/W, CRI70, CCT upto 6500K, THD10%, p.f. 0.90, operating range of 140-270V, inbuilt surge protection of 4 kV, Life class of 50,000 Hrs. at L70B50, including driver with U shaped bracket with 3 Years warranty as per specification No FG-ODF/FLS2.

20

-

-

... More
Supplying and erecting integrated LED Bollard Cylindrical/Cubical shaped 800mm 8W IP65 & IK10 class having extrusion aluminium housing with polycarbonate diffuser, having system lumens output of Min. 800 Lumens, min. efficacy of 100 lumen/W, CRI80, CCT upto 6500K, THD10%, p.f. 0.90, operating range of 140-240V, inbuilt surge protection of 2 kV, Life class of 25,000 Hrs. at L50B50, including driver complete with 2 Year warranty as per specification No FG-ODF/FLS2.

20

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 4 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU

600

-

-

... More
SUB WORK-7:- Providing Water Pumping For Construction of Commissioner of Police Office (G + 7 FL) At Pune. Supplying & erecting Pressure Booster Pump, single phase, 50C/s, A.C. supply of 0.75 KW/ 1 H.P., With discharge of 480 to 13 LPM for 10 to 50 Mtr Head & 25 mm suction/ 25 mm delivery pipe, for Domestic Pressure boosting applications.

8

-

-

... More
Supplying & erecting minimum three & above star rated Centrifugal water pump (Monoblock), 415 V, three phase 50 cycles A.C. supply of 3.75 KW/5 HP with discharge 420/120 Litres per Minute (LPM) for head of 18/51 m and 65 mm suction/ 50 mm delivery pipe on provided C.C. foundation as per specification No. WP-CGP

6

-

-

... More
Supplying & erecting Dewatering Monoblock pump set 415V, 3 phase, 50C/s, A.C. supply of 2.25KW/ 3 H.P., of 12 to 26 m head with 560 to 70 LPM discharge, 10.5mm Solid Handling Capacity, non clogging minimised abrasive wear, large impeller clearance & maintenance free pump set with water proof cable duly sealed with epoxy material built in protection to prevent the motor from burn out due to abnormal operation. specially designed high efficiency motor with F class insulation & the pump mechanically sealed in the oil chamber,. etc. complete as per specification no. DWP- SMP

2

-

-

... More
Supplying and erecting 300 mm dia 1.5m in height air vessel / tank fabricated from min 5mm thick M.S. sheet complete as per specification no. FF-FFA/ACT

4

-

-

... More
Supplying and erecting 12/15 mm dia pressure switch with provided isolation valve, G.I. nipple, elbow, etc complete as per specification no. FF-FFA/PS

4

-

-

... More
Supplying & erecting automatic control panel for 1 Ph, 230 volt, A.C. Submersible/centrifugal pump set up to 3 HP consisting of DOL starter Of suitable relay range S.P.P., Combined ammeter/ voltmeter, phase indicating lamp enclosed in CRCA powder coated Vibration proof enclosure with IP 54 protection.

8

-

-

... More
Supplying & erecting automatic control panel for 3 Phase , 415 volt, A.C, Submersible/centrifugal pump set up to 7.5 HP consisting of DOL starter having relay range 9-14 AMP,S.P.P., Combined ammeter/ voltmeter, phase indicating lamp enclosed in CRCA powder coated Vibration proof enclosure with IP 54 protection. Control Panel should offer single phasing, phase reversal, phase imbalance etc .

2

-

-

... More
Supplying & erecting Water level controller 230/415 V, A.C. , Four way under ground & Over head tank operation only.

8

-

-

... More
Supplying & erecting Float sensor switch for water level controller working on 250V & rated current 8A, with 2 mtr. wire & High quality of wire & plastic body.

8

-

-

... More
Supplying and erecting 75/80 mm dia Cast Iron end line strainer of Y-type flanged end pattern, PN16 pressure rating, SS screen, end connection with Flanged / Screwed / Socket Weld / Butt Weld End etc with standard OAR (open area Ratio) for positive suction complete as per specification no. FF-VL/ELS

4

-

-

... More
Supplying and erecting non return valve 50 mm dia in position made of gun metal complete.

8

-

-

... More
Supplying and erecting non return valve 75/80 mm dia in position made of gun metal complete.

4

-

-

... More
Supplying and erecting 50 mm dia. cast iron double flange butterfly valve of size complete with PN16 pressure rating, as per specification no. FF-VL/BFV

8

-

-

... More
Supplying and erecting 65 mm dia. cast iron double flange butterfly valve of size complete with PN16 pressure rating, as per specification no. FF-VL/BFV

6

-

-

... More
Supplying and erecting 75/80 mm dia. cast iron double flange butterfly valve of size complete with PN16 pressure rating, as per specification no. FF-VL/BFV

10

-

-

... More
Supplying and erecting 100 mm dia. pressure gauge , 0-300 PSI or 0-14 kg per cm square fitted with 12/15 mm dia. pad cock valve, erected with provided G.I. pipe, elbow etc. complete as per specification no. FF-FFA/PG

10

-

-

... More
Supplying, erecting, testing and commissioning self contained water cooler 230/250V 50Hz nominal cooling capacity of 40 litres per hour and storage capacity 80 litres with partially stainless steel body As per specification no. APWCR/ WC

14

-

-

... More
Supplying and erecting ultra violet storage type water purifier (RO+UV+UF) with softener for safe drinking water consisting of UV germicidal tube of 8W capacity choke made of copper wire and two indicator lamps with output of purified water minimum 0.33 litre/min with activated carbon filter and softener operating on 230V, single phase A.C. supply with UV fail & filter change indication system .(for TDS more than 200)

14

-

-

... More
Supplying and erecting storage type water heater 15 litres capacity having standing loss 0.419 kWh / 24 hour / 45°C, high impact resistance engineering plastic body with anti corrosive high grade steel inner tank heating element having hard water & corrosion protection, with minimum 3 safety protections (i.e. thermostat & thermal cut-out, multi function valve) with total pressure 8 bar withstanding capacity duly tested and marking sr. no. and date of erection complete. specification no. AP-WH/STWH

7

-

-

... More
SUB WORK-8 :- Providing 3 Nos 100KWP Roof Top on Grid Solar System For Construction of Commissioner of Police Office (G + 7 FL) At Pune. Supplying, installing, testing and commissioning of 100 kWp ON-GRID Solar PV System / Plant consisting Solar PV Poly Crystalline Panel (335 Wp X 300 Nos.) and Solar ON-GRID Inverter of similar capacity (THD3%) with interconnecting wires / cables up to solar ON GRID inverter, proper base plate, canopy box to house Inverter and necessary accessories i.e. ACDB/ DCDB , MCB etc. wiring up to solar Inverter in casing and capping, display board, sign board, two distinct earthing, lightning arrester, liaisoning charges, remote monitoring system with maintaining card / chip for 5 years including net charges for RMS System, complete up to net meter Installation and export to the grid with 5 year ON-SITE warranty and fully comprehensive maintenance contract as per Specification no. ESD-RT-ONG.

3

-

-

... More
Supplying and erecting AC three phase HT CT multifunction net meter DLMS compliance of accuracy class 0.5, 3x 63.5V, 50Hz, with backlit LCD display, optical port & RS 232 port( measures import kWh, kVAh, export kWh, kVAh, net kWh, kVAh, V, I, kW, 6 months history of energy, load survey, TOD, tamper detection & logging, power ON/OFF events, instantaneous parameters of rating 1/5A with display in absence of power) with wiring connections and mounting hardware on provided panels complete with calibration certificate from manufacturer.

1

-

-

... More
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½core 240 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL

102

-

-

... More
Providing & erecting 3 Pole MCCB, 415V, 200A, rated short-circuit breaking capacity 25 kA (Ics=100% of Icu), adjustable thermal (overload) setting and adjustable magnetic setting with provided leads, provision for installation of shunt/UV/trip alarm contact and MCCB should have phase barriers both sides, with insulation withstand capacity 800V, no line-load bias in provided enclosure/panel as per specification no. SW-SWR/MCCB

3

-

-

... More
Providing & erecting 4 Pole MCCB 415V, 400A, rated short-circuit breaking capacity 36 kA (Ics=100% of Icu), adjustable thermal (overload) setting and adjustable magnetic setting with provided leads, provision for installation of shunt/ UV/ trip alarm contact and MCCB should have phase barriers both sides, with insulation withstand capacity 800V, no line-load bias in provided enclosure /panel as per specification no. SW-SWR/MCCB

1

-

-

... More
Providing & erecting floor/wall mounting, MCCB panel board, with door, suitable for four pole incoming 400A, 4 ways four pole outgoing, up to 100 A MCCBs on iron frame, as per specification no. SW-SWR/MCCBPB. (Excluding MCCBs)

1

-

-

... More
Supplying and erecting iron work, sheet metal work consisting of CRCA sheets, various sections of iron, plates, chequered plates, rods, bars, MS pipes, etc. for panel board or any other purpose with bending, cutting, drilling and welding complete erected at the position with necessary materials duly painted with one coat of red oxide and two coats of enamel paint to match the switchgears or as per directions by the authority.

24900

-

-

... More
Providng earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm complete with all materials, testing & recording the results as per specification no. EA-EP

3

-

-

... More
Supplying and erecting GI strip of high purity required size used for earthing on wall and/or any other purpose with necessary GI clamps fixed on wall painted with bituminous paint with joints required. As per specification no EA-EP.

150

-

-

... More
SUB WORK-9 :- Providing 2 Nos of 750kVA DG With Synchronization Panel For Construction of Commissioner of Police Office (G + 7 FL) At Pune. Supplying, erecting, testing and commissioning of diesel generating set with alternator of 750 kVA output continuous rating, 3 Phase, 415 V, 50c/s 0.8 p. f. A.C supply, a totally enclosed air cooled / liquid cooled multi-cylinder diesel engine developing suitable BHP at 1500 rpm with 10% overload for 1 hour in 12 hours, along with standard accessories, self-excited, self-regulated, screen protected alternator with static excitation system running at 1500 RPM as per IS 4722-2001 with voltage regulation +/- 5 %, with performance class G2 and maximum fuel consumption 126.4 Ltr/hr @75% loading. Both the engine and alternator direct coupled on a common fabricated steel base frame and mounted on anti-vibrating pads with standard control panel comprising meters, switchgears, indicators connected with suitable wires/cables, the complete set enclosed in composite acoustic enclosure as fully assembled integral unit made of 16 SWG CRCA sheet, sound absorbing material to restrict sound level up to 75 dB at 1.0 m, provided with first filling of oil, diesel not less than 990 Ltr etc. on provided M20 Grade CC Foundation and obtaining necessary approval from Electrical Inspector as per specification no. GEN-DG

2

-

-

... More
Supplying, erecting, testing and commissioning of Microprocessor based Generator Control Unit (Synchronization panel) panel suitable for diesel generating set of above 500 kVA up to 750 kVA capacity Three phase, 415 Volts, 50Hz A.C. with all standard features and safeties etc as per specification no. GEN-SYNC.

1

-

-

... More
Excavating hard Rock or bituminous road by chiselling for preparing pit for pole / stay/earth plate / for laying cable/ pipe & clearing the site by removing debris & making the site as required complete.

65

-

-

... More
Supplying and erecting fencing of section having size 2450 mm in height from ground level and 1200 mm width with angle iron frame work erected in CC foundation and painted complete as per specification no SS-AS/FSG

23

-

-

... More
Supplying and erecting 50 x 50 x 6 mm angle iron as corner support 2m long fixed at the middle of the fencing frame and the other side inclined at 30 degree angle, in cement concrete foundation of 15 x 15 x 40 cm complete duly painted with one coat of red oxide and two coats aluminium paint complete.

4

-

-

... More
Supplying and erecting double leaf hinged door each 1500 mm in width x 1850 mm in height using B class, GI pipe with angle iron supports, chain link wire mesh (jali) complete supported on channel iron, erected in foundation, and painted complete as per specification no SS-AS/DLD

2

-

-

... More
Providng earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm complete with all materials, testing & recording the results as per specification no. EA-EP

2

-

-

... More
Supplying, installation and testing of maintenance free earthing comprising of Electrode of 17.2 mm diameter Low Carbon Steel with 250 micron molecular copper bonded earthing rod of Length 3m along with 25 kg Carbon based environment friendly back fill ground enhancing compound required to fill up the excavated earth with required quantity complete, and recording the results Specification no. EA-MOBI

10

-

-

... More
Supplying and erecting GI strip of high purity required size used for earthing on wall and/or any other purpose with necessary GI clamps fixed on wall painted with bituminous paint with joints required. As per specification no EA-EP.

258

-

-

... More
Making cement concrete foundation in 1:3:6 cement concrete, (20 to 25) mm. stone metal duly plastered with necessary curing for complete. (pole muffing or any other purpose).

56

-

-

... More
SUB WORK-10 :- Providing 1 Nos of 1000kVA Transformer & HT Equipments For Construction of Commissioner of Police Office (G + 7 FL) At Pune. Supplying, erecting, testing and commissioning 22KV HT metering cubical (compact type) approved by MSEDCL / licensee fabricated with 2 mm (14 SWG) M.S. sheets with supporting angle, painted with powder coating / epoxy paint of required shade, copper bus bar size 25 x 6 mm, heavy duty mechanical lock, with counter meter for measuring no. of times the opening of meter door, top side cover (CT, PT cover) interlock with meter door, epoxy casted 3 nos. CT having required ratio between 5/5A to 25/5A, VA 10 or 15, Class 0.5S, epoxy casted 3 nos. PT having ratio 22000/V3/110/V3 VA 50, Class 0.5 suitable for provided trivector meter, and provision for incoming and outgoing cables complete duly tested by licensee with necessary test certificates and erected on provided plinth/ cc foundation.

1

-

-

... More
Supplying, installing, testing and commissioning SF 6 Insulated 22kV, 630A, 16kA/3sec, 2 way outdoor, extensible motorised SCADA compatible RMU, internal arc tested as per electric supply company specification consisting of 1 no. feeder with 1 LBS and 1 no. feeder with 1 VCB compliant to IEC 62271 -100, 200 and 102, as per specification no. SW-HTS/RMU SCADA

1

-

-

... More
Supplying, installing, testing & commissioning 3 phase, 22/0.433 kV, 50 Hz., 1000 kVA, Mineral oil immersed and naturally cooled outdoor type, Copper wound ,without gas cushioning ,hermetically Sealed transformer, delta/star connected with additional neutral brought out on load side, temperature rise should not exceed 45℃ by thermometer in oil and 50℃ by the resistance method in winding at full load rating, using type A winding insulation (kraft paper) with HV tapping (with on load tap changer) on load +5 to -15 in steps of 2.5%, with standard accessories complete with test certificate with losses below 2930 Watts at 50% load, 8085 Watts at 100% load as per IS:1180 (part 1) : 2014 with necessary permissions of Electrical Inspector, as per specification no SS- TR-SL.

1

-

-

... More
Supplying , erecting & terminating XLPE insulated, galvanised steel formed wire armoured (round) cable 22 kV(E), 3 x 240 sq. mm. aluminium conductor laid in provided trench / pipe as per specification no. CB-HT

2036

-

-

... More
Providing and erecting Heat shrinkable indoor termination kit for 11 kV (UE)/ 22 kV ( E ) XLPE HT cable 3x240 to 400 sq. mm. with necessary material as per specification no. CB-JT/HT

5

-

-

... More
Providing and erecting Heat shrinkable outdoor termination kit for 11 kV (UE)/ 22 kV ( E ) XLPE HT cable 3x240 to 400 sq. mm. with necessary material as per specification no. CB-JT/HT

1

-

-

... More
Supplying & erecting cast iron cable indicator plate buried along with route of cable for PVC / XLPE armoured cable as per specification No. CB-CIP

68

-

-

... More
Supplying & laying (including excavation) half round reinforced cement concrete pipe of IS 458:2003 NP-2 class of 250 mm internal diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete.

1935

-

-

... More
Providing earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm with funnel with a wire mesh for watering and brick masonry block C.l. cover complete with all materials, testing & recording the results as per specification no. EA-EP

13

-

-

... More
Supplying and erecting GI strip of high purity required size used for earthing on wall and/or any other purpose with necessary GI clamps fixed on wall painted with bituminous paint with joints required. As per specification no EA-EP.

305

-

-

... More
Providing printed instruction chart for treating persons suffering from electric shock, printed in English & Marathi and duly laminated complete.

2

-

-

... More
Providing pair of duly tested rubber hand gloves as per IS :47705 suitable for working up to 22 kV supply complete.

1

-

-

... More
Supplying standard first aid box with necessary antiseptic cream, medicine for use on wounds due burn, crepe bandage, gauge bandage, medicated ready to use bandage (Band-Aid) adhesive tape for medicinal use, scissors, anti-septic solution, etc. (All above contents shall be of standard makes)

2

-

-

... More
Supplying and fixing PVC synthetic elastomer electrically insulating mat with class A insulation conforming to IS: 15652 – 2006 having 2 mm thickness up to 3.3 kV

27

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.