Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Municipal Corporation

  • Opening Date

    30 Jul 2019

  • Closing Date

    13 Aug 2019

  • Tender Amount

    ₹ 44,99,997

  • EMD

    ₹ 45,000

Are you Looking for Joint Venture Partners, Contractor Consortium, Project Financiers for this tender?
We will help YOU to find the right match for FREE!
Summary

Providing And Laying Sewerage Lines As Per Requirement In Kalbhor Nagar, Mohannagar And Other Area At Prabhag No. 14 Under Chinchwad Stp.

Are you looking for Materials and Services for this tender?
We will help YOU to find the right partner for your needs for FREE!
BOQ Items

No BOQs Available

QTY ITEM RATE Rs = Ps RATE IN WORDS PER AMOUNT Item No.1:-Excavation for foundations / pipe trenches in earth soil of all types, sand gravel , soft murum, including removing excavated materials up to a distance of 50m,and lift as below, stacking and spreading as directed, normal dewatering preparing the bed for foundation and excluding backfilling etc.complete (Bd.A.1/259) MJP -DSR -2018- 19 -P.No. 47 Item No. 1. 293.04 a) Lift 0.00 to 1.50m 152.25 Rs. One Hundred Fifty Two and Paise Twenty Five Only Cum 44615.34 126.35 b) Lift 1.50 to 3.00m 164.85 Rs. One Hundred Sixty Four and Paise Eighty Five Only Cum 20829.09 Memorandum Showing The Items To Be Carried Out PIMPRI CHINCHAWAD MUNICIPAL CORPORATION,PIMPRI:-18 SCHEDULE - B Name of Work -Providing and Laying Sewerage lines as per requirement in Kalbhor nagar, Mohannagar and other area at Prabhag no. 14 under Chinchwad STP. 422_04 1SCHEDULED B Item No.2:-Excavation for foundations/pipe trenches in hard murum including removing excavated materials up to a distance of 50m and lifts as below,stacking and spreading as directed by engineer-in-charge, normal dewatering preparing the bed for foundation and excluding backfilling etc.complete (Bd.A.2 /259) MJP -DSR -2018-19 -P.No. 47 Item No.2. 125.59 a) Lift 0.00 to 1.50m 173.25 Rs. One Hundred Seventy Three and Paise Twenty Five Only Cum 21758.46 83.73 b) Lift 1.50 to 3.00m 185.85 Rs. One Hundred Eighty Five and Paise Eighty Five Only Cum 15561.22 Item No.3:- Excavation for foundation/ pipe trenches in hard murum and boulders, W.B.M road including removing the excavated material up to a distance of 50m beyond the area and lifts as below , stacking as directed by Engg.-in.charge,normal dewatering , preparing the bed for foundation and excluding back filling etc. complete.(Bd.A.3/259) MJP - DSR - 2018-19 - P.No. 47 Item No. 3. 41.86 a) Lift 0.00 to 1.50m 194.25 Rs. One Hundred Ninety Four and Paise Twenty Five Only Cum 8131.30 62.80 b) Lift 1.50 to 3.00m 206.85 Rs. Two Hundred Six and Paise Eighty Five Only Cum 12990.18 QTY ITEM RATE Rs = Ps RATE IN WORDS PER AMOUNT Item No.4:- Excavation for foundation/ pipe trenches in soft rock and old cement/lime masonry foundation asphalt including removing the excavated material up to a distance of 50m beyond the area and lifts as below, stacking as directed by Engg.- in.charge,normal dewatering , preparing the bed for foundation and excluding back filling etc. complete.(Bd.A.4/259) MJP -DSR -2018- 19 -P.No. 47 Item No. 5. 83.73 a) Lift 0.00 to 1.50m 476.70 Rs. Four Hundred Seventy Six and Paise Seventy Only Cum 39914.09 125.59 b) Lift 1.50 to 3.00m 498.75 Rs. Four Hundred Ninety Eight and Paise Seventy Five Only Cum. 62638.01 Item No.5:- Excavation for foundation/pipe trenches in hard rock and concrete road by chiseling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and leveling the bed. removing the excavated material up to a distance of 50m beyond the area and lifts as below, stacking as directed by Engg.- in.charge,normal dewatering , preparing the bed for foundation and excluding back filling etc. complete.(Bd.A.6/259)MJP -DSR -2018- 19 -P.No. 48 Item No. 7. 422_04 2SCHEDULED B 575.62 a) Lift 0.00 to 1.50m 808.50 Rs. Eight Hundred Eight and Paise Fifty Only Cum. 465388.77 575.62 b) Lift 1.50 to 3.00m 830.55 Rs. Eight Hundred Thirty and Paise Fifty Five Only Cum. 478081.19 0.00 c) Lift 3.00 to 4.50m 852.60 Rs. Eight Hundred Fifty Two and Paise Sixty Only Cum. 0.00 0.00 d) Lift 4.50 to 6.00m 874.65 Rs. Eight Hundred Seventy Four and Paise Sixty Five Only Cum. 0.00 100.00 Item No. 6:- Dewatering the excavated trenches & pools of water in building trenches/pipe line trenches well works by using pumps and other devices including disposing off water to safe distance As directed. By Engineer in charge (including cost of machinery labour and fuel)etc complete spec. No.Bd-A-9/261 MJP/DSR/2018-19,P.NO.50 Item No.14 67.20 Rs. Sixty Seven and Paise

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.