Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

QTY ITEM RATE Rs = Ps PER AMOUNT Item No.1:-Excavation for foundations / pipe trenches in earth soil of all types, sand gravel , soft murum, including removing excavated materials up to a distance of 50m,and lift as below, stacking and spreading as directed, normal dewatering preparing the bed for foundation and excluding backfilling etc.complete (Bd.A.1/259) MJP -DSR -2018-19 -P.No. 47 Item No. 1. 575.44 a) Lift 0.00 to 1.50m 152.25 Cum 87610.74 246.62 b) Lift 1.50 to 3.00m 164.85 Cum 40655.30 Item No.2:-Excavation for foundations/pipe trenches in hard murum including removing excavated materials up to a distance of 50m and lifts as below,stacking and spreading as directed by engineer-in-charge, normal dewatering preparing the bed for foundation and excluding backfilling etc.complete (Bd.A.2 /259) MJP -DSR - 2018-19 -P.No. 47 Item No.2. 493.24 a) Lift 0.00 to 1.50m 173.25 Cum 85453.83 328.82 b) Lift 1.50 to 3.00m 185.85 Cum 61111.19 Item No.3:- Excavation for foundation/ pipe trenches in hard murum and boulders, W.B.M road including removing the excavated material up to a distance of 50m beyond the area and lifts as below , stacking as directed by Engg.- in.charge,normal dewatering , preparing the bed for foundation and excluding back filling etc. complete.(Bd.A.3/259) MJP - DSR - 2018-19 - P.No. 47 Item No. 3. 219.22 a) Lift 0.00 to 1.50m 194.25 Cum 42583.48 328.82 b) Lift 1.50 to 3.00m 206.85 Cum 68016.41 Item No.4:- Excavation for foundation/ pipe trenches in soft rock and old cement/lime masonry foundation asphalt including removing the excavated material up to a distance of 50m beyond the area and lifts as below, stacking as directed by Engg.-in.charge,normal dewatering , preparing the bed for foundation and excluding back filling etc. complete.(Bd.A.4/259) MJP -DSR - 2018-19 -P.No. 47 Item No. 5. 109.61 a) Lift 0.00 to 1.50m 476.7 Cum 52251.08 164.41 b) Lift 1.50 to 3.00m 498.75 Cum. 81999.48 Memorandum Showing List Of Items To Be Executed PIMPRI CHINCHAWAD MUNICIPAL CORPORATION,PIMPRI:-18 Schedule B Name of Work - Drainage improvement works in Gavalinagar, Adarshnagar area in Prabhag No. 5 ,under Kasarwadi STP. SCH B प्रभाग क्र. ५ - गवळी नगर, आदर्शनगर 1 QTY ITEM RATE Rs = Ps PER AMOUNT Item No.5:- Excavation for foundation/pipe trenches in hard rock and concrete road by chiseling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and leveling the bed. removing the excavated material up to a distance of 50m beyond the area and lifts as below, stacking as directed by Engg.-in.charge,normal dewatering , preparing the bed for foundation and excluding back filling etc. complete.(Bd.A.6/259)MJP -DSR - 2018-19 -P.No. 48 Item No. 7. 137.01 a) Lift 0.00 to 1.50m 808.5 Cum. 110772.58 95.91 b) Lift 1.50 to 3.00m 830.55 Cum. 79658.05 41.10 c) Lift 3.00 to 4.50m 852.60 Cum. 35041.86 0.00 d) Lift 4.50 to 6.00m 874.65 Cum. 0.00 100.00 Item No. 6:- Dewatering the excavated trenches & pools of water in building trenches/pipe line trenches well works by using pumps and other devices including disposing off water to safe distance As directed. By Engineer in charge (including cost of machinery labour and fuel)etc complete spec. No.Bd-A-9/261 MJP/DSR/2018- 19,P.NO.50 Item No.14 67.20 HP/ Hr. 6720.00 151.18 Item No. 7:- Filling in plinth & floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction etc.complete.(Bd.A.10,/263) MJP/DSR/2018-19 P.NO. 51 Item No.16 69.30 Cum. 10476.77 0.30 Item No. 8:-Filling in plinth and floors with contractors soil sand or murum in 15 cm to 20cm, layers including watering and compaction complete. Spec. No.:Bd.A.11 Page No. 263 - SSR 2018-19 Code No 21.37 714.20 Cum. 214.26 Item No. 9:- Providing, lowering and joining ISI standard RCC pipes in standard length of following class and diameter suitable for either collar joints or rubber ring

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.