Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

West Central Railway

Guna, Madhya Pradesh

  • Opening Date

    06 Aug 2019

  • Closing Date

    16 Aug 2019

  • Tender Amount

    Refer document

  • EMD

    -

Are you Looking for Joint Venture Partners, Contractor Consortium, Back-to-Back Contractor, Project Financier?
We will help you to find the right match for FREE.
Summary

Description :supply & Erection Of 110v, 40ah Lead Acid Batteries For Sp & Ssp. Rdso/pe/spec/tl/0040- 2003 (rev-0)

Don't have sufficient eligibility, BG funds or resources?
We will help you to find the right match for FREE.
BOQ Items

No BOQs Available

Sr.DMM acting for and on behalf of The President of India invites E-Tenders against Tender No 98195312A Closing Date/Time 16/08/2019 12:30 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored. 1. NIT HEADER Bidding type Normal Tender Template Normal Contract type Goods Contract Category Expenditure Tender No 98195312A Tender Type Limited - Indigenous Evaluation Criteria Itemwise/Consigneewise Bidding System Single Packet Pre-Bid Conference Required No Pre-Bid Conference Date Time Not Applicable Tendering Section 98 Inspection Agency RITES Publishing Date / Time 06/08/2019 15:32 Procure From Approved Sources No Approving Agency Not Applicable Closing Date Time 16/08/2019 12:30 Validity of Offer ( Days) 60 Ranking Order for Bids Lowest to Highest Tender Doc. Cost (INR) 0.00 Earnest Money (INR) 0.00 Tender Title 110V, 40AH Lead Acid Batteries 2. ITEM DETAILS S.No. PL Code (Group) Item Type GST(Y/N) Stock / NonStock Ordering Consider For Eval Approving Agency Inspection Agency Currency Allowed Estimated Rate 1 30XXN01 Goods (Y) Non Stock --- Yes RITES INR Description :Supply & Erection of 110V, 40AH Lead Acid Batteries for SP & SSP. RDSO/PE/SPEC/TL/0040- 2003 (Rev-0) Consignee SSE TRD GUNA Madhya Pradesh 6.00 Set 3. T AND C F.O.R Description Destination Delivery Period Description Delivery /Completion Rate of Supply For all items Completion : Within 90 Days --- Payment Terms S.No Description Payment Terms 1 100% payment against receipt, inspection and acceptance of material by the consignee at destination. Standard Governing Conditions Page 1 of 4 Run Date/Time: 06/08/2019 15:33:21 BHOPAL DIV./WEST CENTRAL RLY TENDER DOCUMENT Tender No: 98195312A Closing Date/Time: 16/08/2019 12:30 S.No Description 1 IRS Conditions of Contract: The contract shall be governed by latest version (along with all correction slips) of IRS conditions of contract, and all other terms and conditions incorporated in the tender documents. 4. ELIGIBILITY CONDITIONS Special Eligibility Criteria S.No. Description Confirmation Required Remarks Allowed Documents Uploading 1 (I) Material should be procured through RDSO approved firm only. (II) Warranty / Guarantee Certificate from OEM to be provided. (III) RITES Inspection certificate for the material under procurement should be provided. Yes Yes Allowed (Optional) 5. COMPLIANCE CONDITIONS Commercial-Compliance S.No. Description Confirmation Required Remarks Allowed Documents Uploading 1 Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions. No Yes Not Allowed General Instructions S.No. Description Confirmation Required Remarks Allowed Documents Uploading 1 (1)IRS conditions of contract will apply in this case. (2)Prior to placing of PO, successful tenderer will be required to furnish Security Deposit (SD) @ 10% of total value of PO, failing which their offer will be passed over. (3)For delay in supply, LD will be levied @ 2% per month, as per extent rules. (4)In case of default i.e. failure to supply the ordered material within D/P, PO can be cancelled, duly imposing penalty i.e. 10% General Damages (GD). (5) Offer with abnormally long delivery schedule is likely to be passed over/rejected. (6)In case, any discrepancy is noticed in PO (if placed) then a representation should be made within 10 days from PO date, for issue of amendment. Requests made thereafter, or at the fag end of D/P, will not be entertained, including requests for re-fixing of DP. (7)Satisfactory past performance is desirable and hence firm may submit past supply performance/POs for same/similar item/s along with their offer, failing which their offer cannot

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.