Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
South East Central Railway - SECR Tender
Civil And Construction
Excavation
Ireps
Opening Date26 Feb 2024
Closing Date22 Mar 2024
Tender Amount₹ 52,42,240.11
Costs
EMD
₹ 1,04,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Miscellaneous P.way Work For Maintenance Of Track Under The Jurisdiction Of sse/p.way/chhindwara For A Period Of 01 Year.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
N-31-NGP-2023-2024-NAGPUR-SECR-DIVISION-ENGINEERING/SOUTH EAST CENTRAL RLYTender No
N-31-NGP-2023-2024Tender Authority
South East Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Hiring of Road Crane of 25 MT capacity including necessary fuel, oil and operator etc. complete as directed by engineer in-charge. The contractor shall be responsible for arranging all types of permits required for movement of the Crane. Payment shall be made for actual working hours at site.
40
2006
80240.8
Removal of excavated/slip earth/ debris/ malba from the site of works to any other place outside Railway land/premises, including all excavations, handling, re-handling, loading, unloading and leading, etc. all labour and material as a complete job. Removal of Earth (all kinds of soils)/ROCKS, BOULDERS including mud/slush, slipped earth in catch water drains, side drains, over berms in cutting, water way of bridges, over coping of toe/breast/retaining walls etc. including crossing of nallah, railway tracks, making/repairing approach roads if required, all lead, lift, ascent, descents, or any other obstruction. Earth spoils to be dumped outside the cutting or railway embankments as per direction of Engineer in charge
100
119
11952
Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) including disposal of the debris, soil, muck etc. as directed by the engineer. Note - Rates are for disposal at the end of cutting. Disposal of debris/soil/muck beyond end of cutting to be paid for under relevant lead item. lead within cutting is up to 50 m
1000
99
99700
Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) including disposal of the 7 debris, soil, muck etc. as directed by the engineer. Note - Rates are for disposal at the end of cutting. Disposal of debris/soil/muck beyond end of cutting to be paid for under relevant lead item. lead within cutting is over 50 m and up to 200 m - for every 50 m or part thereof
2000
30
61400
Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) including disposal of the 8 debris, soil, muck etc. as directed by the engineer. Note - Rates are for disposal at the end of cutting. Disposal of debris/soil/muck beyond end of cutting to be paid for under relevant lead item. lead within cutting exceeds 200 m - for every 100 m or part thereof
2000
30
61400
White washing with lime to give an even shade New work (three or more coats)
500
8
4375
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work
500
47
23840
Supplying skilled/artisan staff like welder,moulder, chipper,lutter, aligner,striker/hammerman & adequate Nos.of semi-skilled and unskilled labour and supplying petrol @ 1liters/join for facilitating welding works on track by shifting the joint sleepers upto 30cm.(1'-0")on either side, providing suitable gap of about 23mm.to 1 25mm by pulling back of rail including removing keys, spikes & other fastenings and required and refixing the same after welding, clearing the rail ends, fixing the Petrol Tank & heating the rail, ends by railways/approved Contractors equipment and chipping the excess materials if required, bringing the shifted joint sleepers to the specific spacing and packing them to the required specification as directed including adjustment of required gaps for welding, aligning, levelling etc. complete including Contractor's own files for filling after welding in running track.(Z/100)(NIR-CHUA)(M/L)
250
333
145072.5
Drilling holes 32mm dia in rails 90R/52 Kg section 90 UTS in running track. (Note :- Contractor is to use his own equipment, martials and labour etc. and the rate is inclusive of this and is for the complete job)(Z/47)
250
18
8178
Drilling holes 32mm dia in rails 60/65 kg section 90 UTS in running track(Note :- Contractor is to use his own equipment, materials and labour etc.and the rate is inclusive of this and is for the complete job) (Z/48).
250
20
8961
Cutting rails upto 90R/52Kg section with hacksaw in running track.(Note Contractor is to use his own equipment, materials and labour etc. and the rate is inclusive of this and is for the complete job)(Z/53)
100
53
9248.1
Cutting rails upto 60/65 kg section with hacksaw in running track.(Note:- Contractor is to use his own equipment, materials and labour etc. and the rate is inclusive of this and is for the compete job)(Z/55)(NIR- PUE) Per Metre of Z18 1000.00 14.55 14550.00 74.00 25317.00 Rail 6
100
58
10161.6
Pulling back creep in short welded pannals of 39m and 65m and refixing achors and all other fittings including slack packing and squaring of displaced sleepers (average creep 30cm in two sides)i.e.15cm on each side rail in running track.(Z/94)
11
5066
96980.47
Renewal of concrete sleepers by concrete sleepers irrespective of any sleeper density existed and to be provided for.(Z/23) Z36 2500.00 Numbers 10.70 26750.00 74.00 46545.00
200
46
16182
Unloading of PSC sleepers from BFR on to the cess along the track in block period.(Z/36)
2500
10
46545
Trolleying rails and sleepers under traffic Block by Rly.'s displorry including loading into diplorry upto 30m. lead, unloading and stacking at the destination as per direction of Engineer-in-charge with a free lead upto 30m. and carrying the rails over diplorries upto 1 km. (Z/74) Per Track Z81 60.00 630.60 37836.00 74.00 65834.64
200
121
42195
Conventional through packing of screened track following 3rd packing as per Indian Rly.'s Permanent Way Manual. The item also includes picking up slacks between 3rd packing and consolidation packing.(Through Packing)(ML)(Z/7).
8000
3
50808
Extra over and above item 5 or 6 or 7 for heavy lifting of track, more than 25mm,but not exceeding 75mm, if done along with the packing of the track as per item 5 or 6 or 7.(Extra Over Z/7(ML) Z115 10000.00 Track metre 21.00 210000.00 74.00 365400.00
8000
2
39672
Lifting of track upto 100mm Z115x2
10000
21
365400
Cutting of Rail 60/52 Kg by abrasive rail cutter with contractor labour,disk,fuel and consumables etc. complete.
200
394
78800
Greasing of Elastic Rail Clips on PSC sleepers with contractor's own grease confirming to IS:408 of reputed make, and labour etc. complete as per para 1411 (5) (b) of IRPWM. Greasing work includes cleaning of 3 ERC, metal liners, and contact surface or rail amd eyes of inserts, first with wire brush and subsequently with sand/emry paper and than cleaning of the above surface with soft brush and subsequently application of grease using soft brush. ERC should be correctly driven so that leg of clip is flush with the end face of the insert. Over driving or under driving of the ERC should not be done. Per Track
80000
4
337600
Refilling of high pressure seamless industrial Oxygen cylinder 7cum capacity
10
382
3825.3
Refilling of Desolved Acetylene gas cylinder 7kg capacity.
7
1912
13388.9
Painting two coats with black bituminous paint to weld collers (i.e. flash but weld as well as AT welds) on track/on cess on any rail section with anti-corrosive paint of reputed manufacturer confirming to 7 IS:9862/1981 specifications on the welded area up to 10 cm on either side including on the under side of the rail foot as per Railway's AT weld manual including surface preparation by way of wire brushing for removal of sand,dust,loose rust & mill seal and lattering/numbering of weld joints as directed with contractor's labour, materials, tools, plants, paints and brushes etc. including crossing of Railway lines,all lead, lift, transportation,taxes/charges leviable by the Government etc. complete as per direction of Engineer-In-Charge.
1500
12
18375
Manufacturing and supplying various Engineering Indicator Boards, fully retro reflective of high intensity grade made out of 2mm thick aluminum alloy sheet conforming to IS:736 with with 12 mm dia holes drilled for fixing of bolt and nut of 10 mm dia. The entire face of sign board shall be covered with yellow high intensity grade reflective encapsulated lence type sheeting processed with heat lamp vacum applicator 8 machine.The black letters, black, banded or any other black part of the front face shall be cut out of CAL FILM. The CAL FILM should be of make KIWACAL or SCOTCHACAL or HI-SCAL that can be detected from inscription of the release paper of the CAL FILM. The backside of sign plate including frame shall be painted with non peelable weather proof one coat of zinc chromate stoving primer and two coats of grey stove enamel to IS. shade No.630 trench grey conforming to respective IS specification. Note: 1.0 Size & numbers of various Engineering boards shall be furnished by Engineer - In- Charge from time to time.
25
4394
109870
Profiling and boxing of ballast section in track by redistribution of excess ballast to different location in the same/adjacent TP and dressing of ballast as per standard ballast profile prescribed in IRPWM, it also include tidiness of existing cess by removing vegetation with phowrah as per direction of Engineer-in- Charge.
2000
33
67980
46
1963
90321
Execution of various works against Pre & post temping operation and other enabling works at turn outs in connection with UNIMATE working. The item includes: i) Tidying of full cess width is to be done, removal of vegetation (upto 2" girth) from roots completely and cutting of earth ridges (upto 150mm) wherever existing on cess for effective drainage.Heaping up of ballast in tamping zone including collecting scattered, spilled ballast from cess, bank slope and spreading in tamping zone. ii) Low cess (upto 150 mm) to be made up and high cess should be cut upto a depth (upto 150 mm) and giving a cross slope of 1 in 30 to 1 in 40 sloping away from toe of ballast and then dressing of cess neatly iii) Slewing of sleeper laterally to bring them in central position with rail foot i.e. gap between rail foot and inserts on both sides should be made equal. iv) Squaring of sleepers and adjustment of sleeper spacings wherever required. v) Making elastic rail clips visible,removing extra ballast (if any) for visibility of operators. Clearing of ballast for about half of rail height and removing joggled fish plates in advance to ensure proper clamping by lifting lining rollers of the tamper. vi)Removal of all obstructions infringements such as embedded rail posts, tie bars etc. in a width of 2300 mm on either side of the centre of track to avoid infringements. vii) Shifting, removal, handling of scattered P.Way materials lying in the working zone from the full ballast section and keeping the same within a free lead of 30 metre neatly stacked. viii) Attention to 11 low joints and cleaning of pumping joints. ix) Compaction of shoulder and crib ballast boxing and profiling the ballast to standard approved profile with contractor's own wooden/steel rammers, labour etc.complete. x) The ballast profile should be dressed to the specified dimension with suitable template. The top and bottom edge of the ballast section should be neatly lined using hemp chords of 6 mm dia. Re-distribution of ballast within a free lead of 100 metre to make the ballast section and ballast profile uniform. xi) Removal of wooden blocks, clamp etc. for smooth working of tamping machine. xii) Cleaning & Greasing of elastic rail clips on PSC sleepers with Contractor's own grease conforming to IS-408 and labour complete as per Para 1411(5)(b) of IRPWM. xiii) Recoupment of deficient fittings and proper driving of all fittings to correct position.Face of central leg of pandrol clip should be flushed with the end of inserts i.e. the end of the leg should not remain inside nor should it project beyond the eye of insert. xiv) One round of slack picking after tamping,including through packing of spots where machine tamping does not work like, glued joints and fish plated portions etc. xv) Removing the ballast from shoulder from one end of sleeper for facilitating alignment correction and raking in ballast immediately after correcting the alignment and packing the other end of sleeper to retain packing of sleeper wherever required as per direction of Engineer-in-charge or his authorised representative. Note:- (I) In case of night working, the contractor has to make his own arrangements for lighting, such as generator, fuel, labour etc. "Pre & post tamping of Points & Xing 1 in 8.5 etc."
10
1567
15675
Daily inspection of track and patrolling of track to the prescribed standard as per IRPWM/LWR 12 manual or as directed by engineer-in-charge or his representative for the safe and satisfactory running of trains.The rate includes complete cost of one labour per day including ESI & EPF contribution taxes,like GST etc.complete rate of item also includes provision of tools & plats, safty equipment's consumables etc.
3150
519
1634850
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements