Northern Coalfields Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Northern Coalfields Limited - NCL Tender
Civil And Construction
Eprocure
Opening Date26 Apr 2021
Closing Date12 May 2021
Tender Amount₹ 32,60,510 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Operation And Maintenance Of Etp
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_NCL_205009_1Bid Award Id
ViewTender No
JRD/GM/Tender/2021-22/NETN/32Tender Authority
Northern Coalfields Limited ViewPurchaser Address
-Website
http://http://nclcil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply of polyelcteolyte, Solubility : Soluble in Water in all proportions, pH 3 to 11, specific gravity 1.00 to 1.10, Viscocity as per manufacture's recommendations for industrial effluent, Toxicity : Product should be non toxic. Certificate of non-toxicity from standard laboratories by the manufacturer is mandatory
730
-
63.88
Carriage of material by mechanical transport including loading, unloading and stacking. Earth, lead up to 1.00 Km
900
-
98.34
Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.
90
-
878
Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
488
-
85.15
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : New work (two or more coats) over and including water thinnable priming coat with cement primer.
65
-
90.8
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work.
128
-
48.05
Re-lettering with black Japan paint of approved brand and manufacture.
2000
-
1.7
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete
553
-
79.4
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
270
-
125.95
Supplying at site. R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate
12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-incharge (cost of earth works in excavation, concrete works in foundation to be paid separately).
6.3
-
17490.05
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post
and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals
interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I.
staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
2000
-
11.4
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).
60.5
-
4982.3
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements