The MPPTCL has issued a formal invitation for competitive bids for the MP Power Transmission Company Limited project, for Barwani 132kv 132kv Bus Couper Erection Work in Barwani, Madhya Pradesh, with an estimated contract value of Rs. 2,33,845. The bid opening date for this tender is 10-04-2025 and the last date for bid submission is 01-05-2025. Interested bidders for MP Power Transmission Company Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

MP Power Transmission Company Limited - MPPTCL Tender

Opening Date10 Apr 2025
Closing Date1 May 2025
Tender Amount₹ 2,33,845 
Notes
Download

Costs

  • EMD

    ₹ 2,759
  • Document Cost

    ₹ 590
  • Tender Fee

    ₹ 295

Summary

Barwani 132kv 132kv Bus Couper Erection Work

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Stringing of ACSR Conductor on overhead gantries, vertical droppers including fixing of insulator string, spacers, clamp etc. ACSR Single Zebra conductor

400

65

26000

... More
Erection of 132 KV Current Transformer: Unloading of CT from the carriage and Shifting of 132 KV Current Transformer and placement on structure and fixing of all accessories, making all connections, checking and installation of insulator base and Surge counters, making all jumpers etc.

3

7200

21600

... More
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables: 8 Core x 2.5 sq.mm.

500

14

7000

... More
Erection of 132 KV Isolator W/o Earth switch : Unloading of Isolator from the from Civil foundation and removing of complete isolator in all three phase of isolator structure and dismantling of mechanism box, Interconnection piping, alignment of contacts and all associated activities to make the installation completed including checking of successful technical and electrical operation.

2

18000

36000

... More
Erection of 132 KV Circuit Breaker (3 Phase): Unloading and shifting of Circuit Breaker from the carriage and placement of C.B. on structure. Complete assembly of C.B. including Erection of control cabinet and mechanism box. Erection of all accessories for the Equipment

1

18000

18000

... More
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end: 19 Core x 2.5 sq.mm.

1

420

420

... More
Stringing of ACSR Conductor on overhead gantries, vertical droppers including fixing of insulator string, spacers, clamp etc. ACSR Twin Zebra conductor

200

126

25200

... More
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables: 2 Core x 2.5 sq.mm.

500

10

5000

... More
Preparation of Earthing Pits (1.5 x 1.5 x 3 meter) as per approved drawing which includes excavation (irrespective of the soil encountered), embedding of 4 nos. GI Pipes of size 40 mm dia3-Meter-long, backfilling with B.C. soil (soil to be arranged by contractor) free from boulders and harmful mixture. These GI Pipes are to be welded with M.S. flats by making mesh frame and cutting of pipes as also making holes in the pipe for water seepage. The earth pit is to be connected with earth mesh by M.S. flat. (G.I. pipe will be provided by MPPTCL).

1

10800

10800

... More
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end: 4 Core x 2.5 sq.mm.

6

120

720

... More
132KV & 33KV Gantries, Busbar equipment, Structure erection: Unloading of structure from the carriage and erection of structure including shifting within Sub-station premises, fixing and alignment of templates for grouted/bolted type structures foundations, lighting of nuts, bolts, washers etc. and including alignment and levelling of structures.

1.21

7616

9215.36

... More
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables: 4 Core x 2.5 sq.mm.

500

12

6000

... More
Control & Relay Panel for 132 KV Feeder: Unloading of C&R Panel, shifting up to control room (including storage if required) and placement complete with all relays &accessories. The placement of C&R panel to be done on MS channel frame and MS channel frame will suitable grouted in control room as per drawing. The cutting welding & fabrication of MS Channel frame is to done as per drawing. Proper alignment of C&R panel to be done. The earthing of control & relay panel to be done. Making of all inter connection for the control & relay panel on terminal block as per drawing including all AC & DC connections.

1

9600

9600

... More
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end: 12 Core x 2.5 sq.mm.

2

240

480

... More
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables: 12 Core x 2.5 sq.mm.

500

18

9000

... More
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end: 2 Core x 2.5 sq.mm.

5

102

510

... More
Erection of HPSV/HPMH lighting fixture (250 Watt) and their connections.

5

480

2400

... More
132 KV P.I./ SOLID CORE INSULATORS: Unloading of P.I. from the carriage and proper Stocking/Storage and Erection of 132 KV P.I. and their Connections.

9

1440

12960

... More
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end: 8 Core x 2.5 sq.mm.

2

180

360

... More
EARTHING INSTALLATION: Installation of steel risers and making earth mat (duly buried at a depth of 0.5 mtrs.) including back filling welding etc. and bolting of risers to the structures/ equipments at desired place: 65x8mm

110

78

8580



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.