Ministry Of Road Transport And Highways Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

Ministry Of Road Transport And Highways - MORTH Tender

Services
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date4 May 2023
Closing Date9 Jun 2023
Tender Amount₹ 90,69,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bridge/Structural Engineer

1

-

-

... More
Senior Pavement Specialist

1

-

-

... More
Senior Quality cum Material Expert

1

-

-

... More
Road Safety Expert

1

-

-

... More
Sub Professional Staff (To be assessed by consultant as per requirement of assignment)

-

-

-

... More
Survey Engineer (1nos)

1

-

-

... More
Assistant Highway Engineer (1nos)

1

-

-

... More
Assistant Bridge Engineer (1nos)

1

-

-

... More
Assistant Quality cum Material Engineer

1

-

-

... More
Quantity Surveyor

1

-

-

... More
Support Staff ( At Specified Site Office)

-

-

-

... More
Office Manager - TBN

1

-

-

... More
Accountant Cum Cashier - TBN

1

-

-

... More
Steno cum Computer Operator - TBN

1

-

-

... More
Office Boy (1 No.) -TBN

1

-

-

... More
Note : Billing rates as indicated above shall be increased in accordance of clause 6.2(a) Special Conditions of Contract for the personnel of all categories namely (i) key Personnel; (ii) sub-Professional personnel and (iii) Support staff. The increase as above shall be payable only on the remuneration part of Key Personnel, Sub-Professional Personnel and support staff. However, for evaluation of Bid proposals, the quoted initial rate shall be multiplied by the total time input for each position on this contract, i.e. without considering the increase in the billing rates

-

-

-

... More
Transportation (Fixed rate on rental basis)

-

-

-

... More
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run

-

-

-

... More
Innova Crysta or equivalent (not more than 1 years old) (01 no.) [during Construction period ]

1

-

-

... More
Ertiga/Bolero or equivalent (not more than 1 years old)(2 no.)

1

-

-

... More
Duty Travel to Site (Fixed Costs, Professional and Sub-Professional Staff)

-

-

-

... More
The employer may require the Key Personnel to visit the Employer’s Site/Regional office. The quoted amount should include travel fare for 10 round trip to Employer’s Head Office and 10 round trip to Employer’s regional office (including Hotel charges, travel costs etc. Complete).

-

-

-

... More
Trip to Employer’s Head Office

10

-

-

... More
Trip to Employer’s regional office (including Hotel charges, travel costs etc. Complete).

10

-

-

... More
V. Office Rent (Fixed Costs)– office shall be rented.

-

-

-

... More
The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.

-

-

-

... More
Office Rent

1

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs) (for single or two or more projects clubbed together)

-

-

-

... More
Office Supplies

1

-

-

... More
Drafting Supplies

1

-

-

... More
Computer Running Costs

1

-

-

... More
Domestic and International Communication

1

-

-

... More
Office Furniture and Equipment (Rental/Hire ) [Fixed monthly cost]

-

-

-

... More
The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.

-

-

-

... More
Office Furniture and Equipment (Rent)

1

-

-

... More
Reports and Document Printing (for single or two or more projects clubbed together)

-

-

-

... More
Monthly Reports ( 30 Reports in 6 no.of copies) (78*3=234)

234

-

-

... More
Half yearly Reports ( 8 Reports in 6 no.of copies) (13*3=39)

39

-

-

... More
Various others reports as provided in the Concession Agreement such as Completion Report ( 10 Reports in 3 no.of copies) (10X3=30)

30

-

-

... More
Road Survey Equipment The cost shall include carrying out survey using equipment, manpower, software and report processing.

-

-

-

... More
Surface defects detection and roughness measurement using Network Survey Vehicle

5

-

-

... More
Pavement strength measurement using FWD

3

-

-

... More
Bridge inspection using Mobile Bridge Inspection Unit

4

-

-

... More
Road signs inspection using Retro Reflectometer

4

-

-

... More
Contingencies

-

-

-

... More
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Competent Authority in Chief Engineer P.W.D National Highway Zone Bhopal MP

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.