All India Institute Of Medical Sciences

  • Opening Date

    03 Jul 2019

  • Closing Date

    22 Jul 2019

  • Tender Amount

    ₹ 6,47,712

  • EMD

    ₹ 12,954

Are you Looking for Joint Venture Partners, Contractor Consortium, Project Financiers for this tender?
We will help YOU to find the right match for FREE!
Summary

Additional Modification Work In Block No. 22, 3rd Floor Neurosurgery Icu In Hospital Building At Aiims Bhopal.

Are you looking for Materials and Services for this tender?
We will help YOU to find the right partner for your needs for FREE!
BOQ Items

No BOQs Available

ABEU AIIMS CORRECTION__NIL____ INSERTION NIL ______ CUTTING __NIL____OVERWRITING __NIL_______ AE(P) EE(P) 37 P A R T I C U L A R S P E C I F I C A T I O N S & S P E C I A L C O N D I T I O N S 1. GENERAL 1.1 The contractor shall take instructions from the Engineer-in-charge for stacking of materials at site. No excavated earth or building materials shall be stacked on areas where the buildings, roads, services or compound walls are to be constructed. 1.2 Unless otherwise provided in the Schedule of quantities, the rates tendered by the contractor shall be all inclusive and shall apply to all heights, lifts, leads and depths of the building and nothing shall be payable to him on this account. 1.3 The working drawings appearing at para 8.1(iii) of conditions of contract in the form CPWD- 7/8, shall mean to include both architectural and structural drawings respectively. The structural and architectural drawings shall be properly correlated before executing the work. In case of any difference noticed between architectural and structural drawings, final decision, in writing of the Engineer-in-charge shall be obtained by the contractor before proceeding further. 1.4 Some restrictions may be imposed by the security staff etc. on the working and for movement of labour, materials etc. The contractor shall be bound to follow all such restriction / instructions including issue of identity cards to all persons authorized by him to do work / visit the work site and nothing shall be payable on this account. 1.5 Water and electricity will be supplied by department free of cost. (if required) 1.6 The contractor shall conduct his work, so as not to interfere with or hinder the progress or completion of the work being performed by other contractor (s) or by the Engineer-in- Charge and shall as far as possible arrange his work and shall place and dispose off the materials being used or removed, so as not to interfere with the operations of other contractors, or he shall arrange his work with that of the others in an acceptable and coordinated manner and shall perform it in proper sequence to the complete satisfaction of Engineer-in-Charge. The contractor shall be responsible for any damage due to hindrance caused by him. 1.7 Cast iron pipes and fittings without ear shall be used. However, pipes and fittings with ears may be accepted without any extra payment. In such cases, clamps are not required and no extra payment shall be made for fixing the pipes in a different manner. 1.8 Any cement slurry added over base surface for bond or for continuation of concreting, for protecting reinforcement bars, its cost shall be deemed to have been included in the respective items, unless specified otherwise and nothing extra shall be payable nor extra cement shall be considered in the cement consumption on this account. 1.9 Stacking of materials and excavated earth including its disposal shall be done as per the directions of the Engineer-in-Charge. Double handling of materials or excavated earth if required at any stage shall have to be done by the contractor at his own cost. 1.10 No claim for idle establishment & labour, machinery & equipments, tools & plants and the like, for any reason whatsoever, shall be admissible during the execution of work as well as after its completion. 1.11 Only Star headed Stainless Steel screws shall be used unless otherwise specified. ABEU AIIMS CORRECTION__NIL____ INSERTION NIL ______ CUTTING __NIL____OVERWRITING __NIL_______ AE(P) EE(P) 38 1.12 Work shall be carried out in professional manner with finished product serving the intended purpose with specified strength, durability and aesthet

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.