Andaman Lakshadweep Harbour Works Tender
View complete overview of Lakshadweep ALHW Tender
Andaman Lakshadweep Harbour Works - ALHW Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date21 Aug 2024
Closing DateCancelled
Tender Amount₹ 1,12,16,812
Costs
EMD
₹ 2,24,350Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ALHW_822176_1Tender No
DCE/KVT/T-39/2024-25/1298 dated 9.8.2024Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Centering and shuttering for Hand rail posts, handrails and light post etc including cost of all materials (Cement, M Sand, 20mm Chips), form work, transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools as per the direction of EIC etc complete
125.09
-
-
Fabrication and fixing of reinforcement cages as per drawing for cast-in-situ piles as per the direction of EIC including cost of steel and fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Chetlath, cost of binding wires, all T& P required for the work and minor tools etc. complete.
150
-
-
Providing and laying PCC with 1:2:4 7 cm to 10 cm thick mix (1cement 2 Msand,4 20mmchips) for wearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete
25.2
-
-
Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials for primer coat and ready mixed acrylic plastic emulsion paint and labour charges etc complete.
167.16
-
-
Shedule- ll- Bearthing Head. Dismantling of existing damaged concretes of slab, longitudinal beams,cross beams, hand rails, electric posts, low landings, screen walls, mid tide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy machineries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete
65.79
-
-
R.C.C. 1:0.9:1.8 using 2 cm size jelly for Pre-cast R.C.C. piles and for extending R.C.C. Piles In situ, excluding cost of fabrication charges which will be paid separately but including cost of cement, stone chips, river sand, shuttering materials, all labour charges for screening and washing of both the aggregates providing all shuttering, centering toggle holes and lifting holes, mixing concrete conveying and placing, consolidation with vibrator, curing, all labour charges for fixing pile shoes, transportation charges and running expenses of concrete mixer machine and vibrator etc., complete.
56.42
-
-
Fabrication and fixing of reinforcement cages as per drawing for cast-in-situ piles as per the direction of EIC including cost of steel and fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Chetlath, cost of binding wires, all T& P required for the work and minor tools etc. complete.
100
-
-
Providing and laying PCC with 1:2:4 7 cm to 10 cm thick mix (1cement 2 M sand,4 20mmchips) for wearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete
13.69
-
-
Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials for primer coat and ready mixed acrylic plastic emulsion paint and labour charges etc complete.
24.94
-
-
Shedule- lll- Approach jetty - South side . Dismantling of existing damaged concretes of slab, longitudinal beams,cross beams, hand rails, electric posts, low landings, screen walls, mid tide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy machineries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete
99.95
-
-
R.C.C. 1:0.9:1.8 using 2 cm size jelly for Pre-cast R.C.C. piles and for extending R.C.C. Piles In situ, excluding cost of fabrication charges which will be paid separately but including cost of cement, stone chips, river sand, shuttering materials, all labour charges for screening and washing of both the aggregates providing all shuttering, centering toggle holes and lifting holes, mixing concrete conveying and placing, consolidation with vibrator, curing, all labour charges for fixing pile shoes, transportation charges and running expenses of concrete mixer machine and vibrator etc., complete.
82.17
-
-
Providing and laying RCC with 1:11/2:3 mix (1cement 11/2 Msand,3 20mmchips) for Hand rail posts, handrails and light post etc as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete
4.31
-
-
Centering and shuttering for Hand rail posts, handrails and light post etc including cost of all materials (Cement, M Sand, 20mm Chips), form work, transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools as per the direction of EIC etc complete
95
-
-
Fabrication and fixing of reinforcement cages as per drawing for cast-in-situ piles as per the direction of EIC including cost of steel and fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Chetlath, cost of binding wires, all T& P required for the work and minor tools etc. complete.
145
-
-
Providing and laying PCC with 1:2:4 7 cm to 10 cm thick mix (1cement 2 Msand,4 20mmchips) for wearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete
25.2
-
-
Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials for primer coat and ready mixed acrylic plastic emulsion paint and labour charges etc complete.
137.16
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements