Kerala State Electricity Board Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date19 Aug 2024
Closing Date6 Sep 2024
Tender Amount₹ 37,68,914 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m over initial lift (1.50m to 3.00m), including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock

7

4996

713.85

... More
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil

250

73775

295.1

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

27

182862

6772.67

... More
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns

250

83310

333.24

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

75

640145

8535.27

... More
Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 (1 cement :6 coarse sand) etc complete

70

435290

6218.43

... More
12 mm cement plaster of mix: 1:4 (1 cement : 4 fine sand)

45

14046

312.15

... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more

4200

410298

97.69

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m

250

64242

256.97

... More
Stub setting or fixing foundation bolts in position in correct line and levels for 110kV circuit breaker by using the templates supplied departmentally and taking back the templates after setting etc., complete as directed by the departmental officers at site.

2

3281

1640.53

... More
Stub setting or fixing foundation bolts in position in correct line and levels for 110kV isolator by using the templates supplied departmentally and taking back the templates after setting etc., complete as directed by the departmental officers at site.

3

7943

2647.81

... More
Stub setting or fixing foundation bolts in position in correct line and levels for 110kV CT/LA/PT by using the templates supplied departmentally and taking back the templates after setting etc., complete as directed by the departmental officers at site.

12

10264

855.37

... More
Stub setting or fixing foundation bolts in position in correct line and levels for columns by using the templates supplied departmentally and taking back the templates after setting etc., complete as directed by the departmental officers at site.

2

16881

8440.62

... More
Fixing in position 90lbs rails and MS angles 50*50*5 mm to the foundation of transformer plinth in correct line and levels as directed by the departmental officers at site. (materials are supplied by departmentaly)

300

2781

9.27

... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil

1100

31350

28.5

... More
Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete

25

7071

282.84

... More
Cutting of steel angle in yard structure erection

20

4041

202.09

... More
Drilling holes in yard structure

60

3317

55.29

... More
Laying of earth mat of required size as specified using 40/32/25mm MS rod including levelling lowering and placing in trenches, complete as per the direction of departmental officers.

5

5170

1034.06

... More
Driving down the ground electrode upto a depth of 3m from the already taken earth pit as directed by the departmental officers.

6

1016

169.43

... More
Welding of overlapping joints for mat,riser lap joints with 32/25mm MS rod placed in trenches, having 150mm in length 6mm in thick on both sides of the rod and both ends of overlapped MS rods with 6mm welding thickness after cleaning the surfaces neatly. Charges includes cost of low hydrogen DC electrode (No. E7018), hire charges of DC arc welding set and tools and plants required, current charges including labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of department officers.

60

38017

633.63

... More
Welding the nodal points (cross joints ) in the trenches at two sides to a thickness of 6mm after cleaning the surface neatly. Charges includes cost of low hydrogen DC electrodes (No. E7018), hire charges of DC welding set and tools and plants required, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers.

65

19470

299.55

... More
Welding the ground electrode with the main electrode , after cleaning the surface neatly. Charges includes cost of low hydrogen content DC electrodes (No. E7018), hire charges of DC arc welding set, tools and plants, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers.

10

3832

383.28

... More
Laying of departmentally supplied GI strip/Copper strip of suitable size including cleaning and neatly bending of strips, cutting, removing of metal/earth in the yard and burying earth strip to the required depth re-doing the yard metalling as per the direction of the departmental officers.

150

26961

179.74

... More
Welding overlapping joints of 50x6mm GI strip with 50mm long, 6mm thick welding on all three sides after doing 2 Nos. bolted joints at the centre as specified after cleaning the surface. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes( No.E7018) cost of anti corrosive paint etc. complete.

50

13621

272.43

... More
Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip and connecting other end with nuts & bolts if required as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost of anti corrosive paint etc. complete.

50

25333

506.66

... More
Spreading 40mm stone aggregate in the yard as per the direction of dept. officers at site

175

105073

600.42

... More
Supply and stacking Stone Aggregate (Single size) : 40mm nominal size as per the direction of departmental officer

175

386958

2211.19

... More
Erection of 1 No. 110kV CT / PT on the already erected structure of above 1.5m height after opening of crates at the place of storage, leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc.

9

53548

5949.86

... More
Dismantling of 1 No. 110kV CT/PT on the already erected structure of above 1.5m height after opening of crates at the place of storage, leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc.

6

17849

2974.93

... More
Erection of 1 No. 110kV LA on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers.

6

18697

3116.25

... More
Dismantling of 1 No. 110kV LA on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers.

3

4674

1558.12

... More
Unpacking carefully and leading one set of 3 pole EHT110kV Circuit Breaker from the place of storage, including support structure, mechanism box compressor, pipe lines etc. to site, cleaning and erecting on foundation using suitable lifting tools, after disassembling necessary parts if required, to lines and levels and assembling all the parts, connecting mechanism etc. in complete shape and making ready for commissioning as per the direction of departmental officers.

2

72025

36012.95

... More
Dismantling one set of 3 pole EHT110kV Circuit Breaker from the place of storage, including support structure, mechanism box compressor, pipe lines etc. to site , cleaning and erecting on foundation using suitable lifting tools, after disassembling necessary parts if required, to lines and levels and assembling all the parts , connecting mechanism etc. in complete shape and making ready for commissioning as per the direction of departmental officers

1

18006

18006.47

... More
Erection of one set 110kV Bus Isolator on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels, erection of mechanism box , checking operation and aligning properly, including cutting, welding etc. complete as per the direction of departmental officers.

2

27336

13668.18

... More
Erection of one set 110kV line Isolator on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers.

1

15034

15034.99

... More
Dismantling of one set 110KV line Isolator on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers.

1

7517

7517.5

... More
Unpacking the transformer / feeder C&R panels, 110V battery charger, OLTC cubicle LT panel at the place of storage transporting to the place of erection and erecting after providing foundation bolt keeping to lines and levels as per the direction of departmental officers.

2

9803

4901.77

... More
Dismantling the transformer / feeder C&R panels, 110V battery charger, OLTC cubicle LT panel at the place of storage transporting to the place of erection and erecting after providing foundation bolt keeping to lines and levels as per the direction of departmental officers.

1

2450

2450.89

... More
Uncoiling 20/19 core 2.5sqmm, 12 core 4 sqmm control cable (Armoured or un armoured) from cable drums cutting to required length and laying through trench/pipe/cable tray grouping the same neatly using cable tie and carefully including for providing loop wherever necessary and providing cable marker at both ends of cable as per direction of departmental staff at site.

650

33215

51.1

... More
Uncoiling 12/7/6 core 2.5 sq mm control cable (armoured and un armoured) from cable drums and cutting to required length and laying through trench/pipe/cable tray grouping the same neatly using cable tie and carefully including for providing loops wherever necessary and cable marker, at both ends of cable as per direction of departmental staff at site.

300

11433

38.11

... More
Uncoiling 4/2 core 2.5sqmm control cable (armored or unarmored) from cable drums and cutting to required length and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessary and cable marker at both ends of cable as per direction of departmental staff at site.

500

18515

37.03

... More
Uncoiling 5/4/3/2 core 4sqmm control cable(armoured or un armoured) from cable drums and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessary and cable marker at both ends of cable as per direction of departmental staff at site.

200

7154

35.77

... More
Termination of 20/19 core 2.5sqmm cable/12 core 4 sqmm cables in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc.

30

7607

253.58

... More
Termination of 12/7/6 core 2.5 sqmm cables in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc.

30

6503

216.78

... More
Termination of4/2 core 2.5 sq mm cable / 4/2 core 4 sq mm cable in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc.

90

19466

216.29

... More
Doing termination of all sizes of PVC insulated copper control cable 2.5 mm², pealing, providing number and letter ferrules in the wire, stripping ends, crimping with suitable lugs and connecting to the terminals in the panel board and marshalling kiosk etc., neatly and carefully including cost of copper sockets and ferrules as per the direction of Departmental Officers at site.

750

47790

63.72

... More
Doing termination of all sizes of PVC insulated copper control cable 4.0 mm², pealing, providing number and letter ferrules in the wire, stripping ends, crimping with suitable lugs and connecting to the terminals in the panel board and marshalling kiosk etc., using cable tie and cable tie neatly and carefully including cost of copper sockets and ferrules as per the direction of Departmental Officers at site.

200

12842

64.21

... More
Collecting from store or substation wherever available tools and materials such as jacks pulling and lifting machines, rails, sleepers, plies, ropes, empty drums, dummy plates, bolts and nuts gaskets, etc. including loading and unloading in department vehicle and accompanying and returning the same after completing the work as per the direction of departmental officers.

1

13311

13311.28

... More
Pulling the power transformers of weight 20T to 30T, on the rail track, travelling for a distance up to 30M, using sleepers, rails, jacking, pulling and keeping ready for placing on the correct plinth as per the direction of departmental officers at site, safely without damaging any equipments and observing all safety precautions.

1

18415

18415.6

... More
Dismantling, Loading and unloading at Mannarkkad 110kV Substation, Resin cast partition barrier between Main tank & OLTC weighing approximately 300kg and fitting the same in 110/11kV, 10MVA transformer and giving tap connections from Tap winding to Tap selector (19 taps) etc completing, checking continuity and commissioning including coveyance

1

14933

14933.52

... More
Assembling of all accessories like HV & LV bushings, conservator tank, all pipelines, cooling fins valves and relays etc. For 10MVA, 110/11KV transformer

1

34663

34663.56

... More
Hot oil circulation after draining oil from transformer, evacuating the transformer by using vacuum pump after providing LT connection to the pump , connecting the hose to transformer, operating carefully and continuously for attaining sufficient vacuum and keeping in vacuum for 24 hours and operating filter unit carefully and continuously for 24 hours except halt due to poor voltage and trouble in filter plant etc complete as per the direction of dept. officers.

10

54570

5457.01

... More
Loading of the 6000/5000litre/hr.or above transformer oil filter plant to lorry using tripod, chain block, pulley block, rope etc., after pulling it to the convenient position for lifting and fixing it firmly for safe transportation to the location as directed by department officers, unloading the same without causing any damage and placing it carefully at convenient place etc. complete as directed by department officers at site where ever required.

1

12536

12536.53

... More
Unloading of the 6000/5000litre/hr.or above transformer oil filter plant to lorry using tripod, chain block, pulley block, rope etc., after pulling it to the convenient position for lifting and fixing it firmly for safe transportation to the location as directed by department officers, unloading the same without causing any damage and placing it carefully at convenient place etc. complete as directed by department officers at site where ever required.

1

12401

12401.71

... More
Overhauling of OLTC of 110/11kV transformers by lifting diverter switch after draining oil inside the OLTC chamber , cleaning the contacts, removing sledges from the tank, refilling the chamber with new oil supplied by the board.

1

9496

9496.1

... More
Erection of yard structures and assembling of columns, beams and equipment structures using bolt and nut including punching of holes.

6

46054

7675.72

... More
Providing interconnection between equipments using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers.

36

37092

1030.34

... More
Providing droppers and connecting to lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase)

12

14835

1236.32

... More
Unpacking at the place of storage and transporting 11kV indoor VCB/SF6 switch gear panel and its accessories to the place of erection and erecting after fixing foundation bolts by chipping concrete wherever necessary, tightening, keeping lines and levels taking all safety precautions including erection of potential transformers as per the direction of departmental officers

6

58074

9679.04

... More
Loading one set 11kV indoor VCB panel with truck from the place of its storage to department lorry using required lifting device, without causing any damage to equipment & its parts

2

7604

3802

... More
Transporting the materials in motor lorries from different places Palakkad, Angamaly..etc or other specified places in plane/hilly to Angamaly or other specified sites and transporting materials from Angamaly store or other specified places in plane or hilly areas as per the direction of departmental officers. (Transporting 11kV panels from Malampuzha to Mannarkkad)

54

543

10.06

... More
Unloading one set 11kV indoor VCB panel with its truck from department lorry to substation site by using required lifting device, without causing any damage to equipment parts and lift the same to a pace for safe storage.

2

5703

2851.5

... More
Interconnection of panels and 11kV bus bars after opening covers, earthing, inter panel wiring, etc. and making ready for commissioning of breaker as per the direction of the departmental officers.

5

15953

3190.77

... More
Laying 3 x 300 sq mm XLPE cables in trench including drawing through pipes wherever necessary.

400

97948

244.87

... More
Laying 1 x 500 sq mm XLPE cables in trench including drawing through pipes wherever necessary.

450

55098

122.44

... More
Doing out door/indoor cable termination of 3x300 mm2 11KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket

6

21817

3636.33

... More
Doing out door/indoor cable termination of 1x500 mm2 11KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket

6

13090

2181.8

... More
Mounting one 3x300 mm2 XLPE outdoor cable termination of structures very carefully without causing any damaged to the drilling holes wherever necessary as directed by the departmental officers

3

4241

1413.92

... More
Mounting one 3x300 mm2 XLPE indoor cable termination of structures very carefully without causing any damaged to the drilling holes wherever necessary as directed by the departmental officers

3

2969

989.75

... More
Mounting one 1x500 mm2 XLPE indoor/Outdoor cable termination of structures very carefully without causing any damaged to the drilling holes wherever necessary as directed by the departmental officers

6

5090

848.35

... More
Uncoiling, paving out, stringing and fixing of bus bar using ACSR Kundah / Moose single conductor for one phase of 110KV bus of span up to 30M by cutting the conductor to sufficient length, crimping using compressor / bolting the two ends, washing, cleaning and drying the insulator discs, fixing the conductors to the yard structure with sufficient tension using string of insulators and hardware complete. at both ends, fixing of arcing hornes including transportation of materials from the stockyard to the site under the supervision and direction of department staff at site. (All materials will be supplied departmentally at free of cost).

3

14260

4753.52

... More
Stringing and fixing earth wire of size 7/9, 7/10 or 7/3.15 between top of the columns and to terminal tower at 33/66/110/220KV substations with compressed / bolted ends at proper tension including uncoiling and cutting of conductor , jumpering, giving earth bond connections by drawing the end of the conductor through the columns, jointing where ever necessary providing back stays at the time of stringing etc. as per the direction of the departmental officers.

10

25905

2590.57

... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.

2

6284

3142.26

... More
Loading HT 'A' type pole of all sizes to Hand cart from the stacking place and unloading the same at work site.

6

3036

506

... More
Fitting and erecting one HT Double Pole Structure using 'A' type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).

3

31420

10473.36

... More
Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.

6

24169

4028.29

... More
Fitting one additional 2.4/3m channel Xarm,in existing 11KV DP including conveyance of materials

10

5425

542.59

... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

6

8242

1373.73

... More
Erection of one set 11KV Isolator / AB switch (station class) on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers.

3

15670

5223.6

... More
Loading one set 11KV Bus Isolator with its insulator stacks, supporting channels, connecting pipes, isolating rods, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices to department lorry and fastening for transportation.

3

541

180.53

... More
Unloading one set 11KV bus isolator with its insulator stacks, supporting channels, connecting pipes, isolating rods, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices from department lorry to substation compound and stacking properly for safe storage.

3

406

135.4

... More
Erection of 1 No. 11KV LA (station type ) /11KV Post insulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers

12

9343

778.63

... More
Loading one 11KV LA from the place of its storage to department lorry, if required, after dragging up to 50M using suitable lifting device carefully without causing any damage to equipments and fastening in the lorry make it ready for transportation as per the direction of the department officers.

12

585

48.78

... More
Unloading one 11KV LA from department lorry to substation site using suitable lifting device and dragging to safe place without causing any damage to CT as per the direction of the department officers.

12

438

36.58

... More
Conveying to the erection site and erecting carefully 1 No. 33KV CT/PT/110KV NCT & RVT/NCT(52/36kV) on the already erected structure after opening of crates at the place of storage leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc.

1

1604

1604.31

... More
Erection of 1 No. 11KV CT/PT/11KV NCT on the already erected structure after opening of crates at the place of storage leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers.

1

636

636.36

... More
Providing one Earth using GI earth pipe of size 40mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. (excludes cost of earthpipe, earth chamber and covering slab).

6

13599

2266.55



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.