Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Electrical and Electronics
Eprocure
Opening Date12 Jun 2024
Closing Date28 Jun 2024
Tender Amount₹ 77,45,360 
Notes
Download

Costs

Summary

Utility Shifting Of Lt Line And 11 Kv Ug Cable

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying HT XLPE UG cable (of sizes beyond 3x185 sqmm and upto and incl. 3x300 sqmm) as per specificationexcl. excavation and backfilling.

11000

3839000

349

... More
Doing straight joint on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally as per specification.

10

21480

2148

... More
Doing one cable end termination on cables of sizes upto and incl. 3x185 sqmm using the cable jointing kit supplied departmentally.

2

2446

1223

... More
Constructing double pillar transformer plinth as per approved drawing inclusive of cost of all materials and labour involved including applying one coat of water thinnable cement primer of approved brand as per direction of departmental officers.

1

29316

29316.92

... More
Erecting one LT PSC Pole in position incl. digging & back filling pit.

119

159698

1342

... More
Providing Stay for LT poles incl. digging & back filling pit.

95

59375

625

... More
Providing Strut using LT PSC pole incl. digging & back filling pit.

1

1256

1256

... More
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

56

37576

671

... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

103

131840

1280

... More
Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking.

1

1057

1057

... More
Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.

6.5

61106

9401

... More
Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.

0.65

3218

4952

... More
Dismantling one section fuse

25

3200

128

... More
Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling

90

28080

312

... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

65

59410

914

... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.

2

4066

2033

... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.

1

3197

3197

... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.

3

69384

23128

... More
Erecting one 160kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.

1

4919

4919

... More
Erecting one 500kVA Transformer to existing Plinth/Platform and giving connections, incl. loading & unloading, excluding transportation.

1

5832

5832

... More
Installing one DTR Meter with box on existing poles and giving the complete connections incl. conveyance of materials.

2

4998

2499

... More
Erection of LT 4 way distribution box on existing cross arm giving connection incl. cable and earth connection (excluding earthing).

1

2851

2851

... More
Erection of LT 3 way distribution box on existing cross arm giving connection incl. cable and earth connection (excluding earthing).

1

2675

2675

... More
Providing one Earth using earth pipe incl. Digging separate pit at standard distance away from the pole/structure & backfilling.

6

9048

1508

... More
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.

25

18075

723

... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.

3

960

320

... More
Fitting one additional HT pin with insulator

5

495

99

... More
Fitting one additional F top bracket

15

1485

99

... More
Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls.

7.15

15944

2230

... More
Stringing one km LT Sph 3 wire line (Rabbit for Ph&N, Weasel for St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials.

0.65

10268

15798

... More
Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials.

6.5

167511

25771

... More
Re-joining snapped one LT conductor after removing damaged portion incl. Reshackling and conveyance of all materials complete.

144

67248

467

... More
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.

148

33596

227

... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

80

94640

1183

... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.

450

28800

64

... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.

58

5742

99

... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.

79

25833

327

... More
Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

35

41790

1194

... More
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).

2

1206

603

... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

20

10140

507

... More
Loading HT 4 legged pole from the stacking place and unloading the same at work site (transport by vehicle).

1

846

846

... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.

18

25714

1428.57

... More
Transporting 4 legged pole by Hand cart (limited to 4km).

1

529

529

... More
Transporting A type pole by Hand cart (limited to 4km)

8

3016

377

... More
Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

51

16269

319

... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

46

95726

2081

... More
Dismantling one damaged 11kV 4 legged pole after disconnecting stays, strut etc. and stacking the same.

1

2225

2225

... More
Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store.

50

30050

601

... More
Dismantling one damaged 11kV A type pole after disconnecting stays, strut etc. and stacking the same.

2

2968

1484

... More
Dismantling one damaged HT PSC/RCC Strut pole incl. removal of clamps and stacking.

2

2034

1017

... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.

3

27594

9198

... More
Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking.

18

34326

1907

... More
Dismantling transformer station in DP structure excluding the rate of dismantling earthing

1

9935

9935

... More
DismantlingoneTransformer upto 160kVA from structure and loading to vehicle incl. disconnecting HT/LT/Earth connections.

1

1311

1311

... More
DismantlingoneTransformer above 160kVA from plinth and loading to vehicle incl. disconnecting HT/LT/Earth connections.

1

1616

1616

... More
Dismantling one Channel cross arm from existing DP structure, and bringing back to section store.

4

752

188

... More
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads

65

141570

2178

... More
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

2

5512

2756

... More
Fitting and erecting one HT 4 legged pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

1

3974

3974

... More
Additional rate for providing one disc set on any type of HT pole for making cut point.

36

3780

105

... More
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

2

11620

5810

... More
Dismantling one 2x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole and reconnecting.

45

22545

501

... More
Providing WP support with PSC pole incl. digging & back filling pit.

35

45255

1293

... More
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.

25

4000

160



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.