Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date19 Aug 2024
Closing Date2 Sep 2024
Tender Amount₹ 1,33,85,594 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
7/3.15 Sqmm Earth wire

0.85

30090

35400

... More
Composite Polymer Insulator 90 kN

96

189600

1975

... More
Double Tension H/W for WOLF

48

36074

751.55

... More
Tension Clamp for Earthwire with copper bond

8

3267

408.49

... More
Vibration damper for WOLF

48

14361

299.2

... More
Midspan joint for wolf

12

9504

792

... More
Work- Labour

-

-

-

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by head load.

-

-

-

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

1.31

1109

846.85

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

31.29

18739

598.91

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by lorry (up to 5 Km)

-

-

-

... More
Line conductor and earth conductor.

1.01

952

942.65

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

1.31

1371

1046.81

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

31.29

19918

636.57

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by lorry (Over 9 Km and up to 10Km)

-

-

-

... More
Line conductor and earth conductor.

1.01

1059

1048.75

... More
Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc.

1.31

1523

1162.62

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

31.29

22131

707.31

... More
Transport of materials issued departmentally for the works from dept. stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by lorry ( Additional kms after 10km )

-

-

-

... More
Towers, tower extensions and other structure and all other materials including earthing materials.

8761.2

123182

14.06

... More
Clearing light jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m out side the periphery of the area cleared.

3000

43740

14.58

... More
Conducting Check survey,setting out tower positions on ground, pit marking ,all confirming to the approved profile and tower schedule using Digital Theodolites/Total station etc as directed by Board staff

3

12174

4058.19

... More
Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges: In cement mortar

22

44863

2039.23

... More
Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm depth,1.5 min width as well as 10 sq m on plan), including getting out and disposal of excavated earth lead up to 50 M and lift up to 1.5 M. :All kinds of soil

315.26

66633

211.36

... More
Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm depth,1.5min width as well as 10 sq m on plan),including getting out and disposal of excavated earth lead up to 50 M and lift 1.5 M to 3M.:All kinds of soil

245.9

77807

316.42

... More
Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm depth,1.5min width as well as 10 sq m on plan),including getting out and disposal of excavated earth lead up to 50 M and lift 3M to 4.5M.:All kinds of soil

163.93

69093

421.48

... More
Earth work excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm depth,1.5min width as well as 10 sq m on plan),including getting out and disposal of excavated earth lead up to 50 M and lift 1.5 M to 3M.:Ordinary Rock

208.08

124456

598.12

... More
Earth work excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm depth,1.5min width as well as 10 sq m on plan),including getting out and disposal of excavated earth lead up to 50 M and lift 3M to 4.5M.:Ordinary Rock

138.72

109107

786.53

... More
Providing Sheet piles where ever required using MS plates, angles etc. of suitable size and thickness and to maintain the areas of activity without any damage till the works are completed including cost of all materials , labour charges erection and dismantling charges etc. complete

289.6

331988

1146.37

... More
Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete

2000

758540

379.27

... More
Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete

1000

434970

434.97

... More
Cement concrete 1:3:6 mixture with 40 mm metal for tower footing in accordance with the specification including the cost of cement to be supplied by the contractor at site, conveyance charges of cement to site of work, all hire charges, watering, curing, etc, complete.

31.53

242889

7703.45

... More
Stub setting (using template/ probe) for 110kV towers. Erection of stub, stub template, fixing of jack for supporting template, allignment and leveling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of Cement concrete, movement of template from one location to another complete, as directed by Board staff. - general area (For 110 kV DC Tower)

3

29910

9970.25

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns

233.28

77246

331.13

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level with Thermo-Mechanically Treated bars

19581.53

1900779

97.07

... More
Cement concrete 1:2:4 mixture with 20 mm metal for tower footing in accordance with the specification including the cost of cement to be supplied by the contractor at site, conveyance charges of cement to site of work, all hire charges, watering, curing, etc, complete.

43.44

366697

8441.46

... More
Providing and laying in position readymixed M-25 grade concrete for reinforced cement concrete, using cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of RMC from Transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing including cost of curing admixtures in recommended proportion as perIS:9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in charge Note-:Cement content in this item is@330kg/M3, Excess/less cement used than specified in this item is payable/recovered seperately : All work up to plinth level

248.82

2429182

9762.81

... More
Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum)

248.82

20174

81.08

... More
Add for using extra cement in the items of design mix over and above the specified cement content therein

1430.72

11202

7.83

... More
Providing earthing in terminal tower as per standard specification by providing 150 mm dia bore hole for a depth of 3.6 m and placing of GI pipes 50 mm dia GI ''C" class 3m long into the bore including cost of 600 mm dia RCC collar placing over the earth pipe and connecting the earth pipe and tower leg using 7/3.66 mm GI earth wire with lugs connecting to the pipe and fixing necessary GI clamp etc., including drilling of bore cost of all lead and lifts etc., complete

6

66237

11039.62

... More
Supplying and stacking good earth at site

160

90001

562.51

... More
Filling available excavated earth (excluding rock) in trenches, plinth, side of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.

756.82

193246

255.34

... More
Drilling of holes

100

16697

166.97

... More
Filing of holes / (Enlarging)

100

9074

90.74

... More
Cutting of steel angles

100

33393

333.93

... More
Erection of tower superstructure above ground level including erection of normal and special hill side extension member wherever necessary, providing tower accessories like phase, danger and number plate, bird guards, anti climbing devices, including tightening, punching and tack welding upto bottom cross arm in the bolt and nut after punching and applying zinc rich primer wherever necessary etc. complete, as directed by board staff (For 110kV DC Tower - Average height is 22 Mtrs.) general area 110 kV MC Tower ((a1) x 1.91) Average height 42m

28.29

832500

29427.37

... More
Dismantling of tower super structure above ground level including normal and special hill side extension members, detaching tower accessories,Nut and bolts(whereever necessary)from the tower angles and stacking the same at site

16.57

127647

7703.5

... More
Paving out, stringing and tensioning OF POWER CONDUCTORS (6 line Wolf conductor) including attaching insulator strings with arcing horns or rings on to the tower cross arms, clamping the conductor to the insulator strings using suspension clamps with armour rods and tension clamps, jumpering the conductors at tension points, jointing the conductors and pilot wire wherever necessary, installation of vibration dampers, hire charges of tractor and stringing tools, etc. complete.

0.85

260176

306089.51

... More
Dismantling 6 Line Wolf from the tower detaching the clamps, connectors and line accessories from the conductor, winding and stacking the same at site.

0.85

130088

153044.76

... More
Pavingout, stringing and tensioning as per standard of one 7/10 OR 7/3.15 stranded steel earth wire including fixing the conductors on to the tower top using tension clamps and suspension clamps, jumpering the conductors at tension points, jointing the conductor wherever necessary,erection of earthbonds, hire charges of tractor and stringing tools,etc. Complete.

0.85

41636

48984.39

... More
Dismantling of existing 7/10 or 7/3.15mm earth conductor from the tower detaching the clamps, connectors and line accessories from the conductor,winding and stacking the same at site.

0.85

20818

24492.19

... More
Random rubble masonry with hard stone in foundation and plinth including levelling up up to plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand)

10

71149

7114.95

... More
Plastering on the top of revetment with1:4 cement mortar 20mm thick .

12.8

5434

424.58

... More
Pointing the outer faces of revetment with cement mortar 1:3

10

3317

331.78

... More
Laterite masonry with neatly dressed laterite stones of size 40X20X15 cm or nearest size in cement mortar 1:6 for foundation and basement including cost of materials labour charges etc complete.(CPWD DSR 2018- Code No. 50.6.7.1)

1.05

7517

7159.08

... More
Laterite masonry using Departmental stone with neatly dressed laterite stones of size 40X20X15 cm or nearest size in cement mortar 1:6 for foundation and basement including cost of materials labour charges etc complete.(CPWD DSR 2018- Code No. 50.6.7.1)

1.65

5024

3045.05

... More
Laterite masonry with neatly dressed laterite stones of size 40X20X15 cm or nearest size in cement mortar 1:6 for superstructure above plinth including cost of materials labour charges etc complete.(CPWD DSR 2018- Code No. 50.6.7.2)

13.8

108978

7896.97

... More
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate)finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate

72

41711

579.32

... More
Clearing grass and removal of rubbish upto a distance of 50M out side the periphery of area cleared.

500

3715

7.43

... More
Forming temporary Road 1 M ( Footpath -3 M Wide)

150

54984

366.56

... More
Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work- Based on DSR 2016 (ULD2018) Sl No.451)

10

640

64

... More
Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. (Labour Data for Distribution Works in KSEB - Based on DSR 2016 (ULD2018) Sl No. 565)

1

4952

4952

... More
Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. (Labour Data for Distribution Works in KSEB - Based on DSR 2016 (ULD2018) Sl No. 566)

1

9401

9401

... More
Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. (Labour Data for Distribution Works in KSEB - Based on DSR 2016 (ULD2018) Sl No. 513)

1

9198

9198

... More
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials except poles) from stacking place. (Labour Data for Distribution Works in KSEB - Based on DSR 2016 (ULD2018) Sl No. 212)

1

11277

11277

... More
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. (Labour Data for Distribution Works in KSEB - Based on DSR 2016 (ULD2018) Sl No. 214)

1

21250

21250

... More
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works. (Labour Data for Distribution Works in KSEB - Based on DSR 2016 (ULD2018) Sl No. 135)

1

23128

23128

... More
Providing special type trussels For NH/SH road crossing, railway crossings

5

52704

10540.93

... More
Providing derrick support and temporary stay arrangement for a tower

2

9286

4643.32



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.