Military Engineer Services Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Military Engineer Services - MES Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date4 May 2024
Closing Date28 May 2024
Tender Amount₹ 45,00,000
Costs
EMD
₹ 90,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_652377_1Bid Award Id
ViewTender No
8465/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
All as per Sl Item No.02 above but one three pin socket outlet 6 amps socket on the same board with other switches all as specified and directed.
45
-
-
All as per Sl Item No.02 above but one 3 pin socket point 6 Amps on the independent board with other switches all as specified and directed.
90
-
-
All as per Sl Item No.02 above one bell point controlled by one bell push all as specified and directed.
5
-
-
All as per Sl Item No.02 here-in-before but using copper conductor 2.5 sq.mm PVC insulated unsheathed FRLS cable with copper conductor size 1.5 sq.mm PVC insulated unsheathed continuous earth continuity for 3 pin 15 amps soket outlet independently all as specified and as directed by engr-in-charge.
95
-
-
Material and labour for switch modular type single pole 1 way 6 Amp 230 volt complete all as specified and as directed
435
-
-
Material and labour for switch modular type single pole 2 way 6 Amp 230 volt complete all as specified and as directed
10
-
-
Material and labour for socket 6 Amps 2/3 pin modular type, 230 volts all as specified and as directed
135
-
-
Material and labour for switch modular type 1 way 16A, 1 module all as specified and directed.
95
-
-
Material and labour for Socket Modular type 6A/16A 2-3pin combined 2 module 230Volts grade all as directed.
95
-
-
Material and labour for Modular switch bell push 6 Amps one module all as specified and directed by Engr-in-Charge.
5
-
-
Material and labour for modular type fan regulator 120 W two module complete all as specified and directed by Engr-in-Charge .
60
-
-
Material and labour for bell music AC 230V single phase all as specififed and directed by Engr-in-Charge.
5
-
-
Material and labour for ceiling rose surface bakelite two to three terminal complete all as specififed and directed
290
-
-
Material and labour for angle holder polycarbonate/bakelite type with back plate complete all as specified and directed .
10
-
-
Material and labour for replacement of LED type 4 feet tube light batten fitting surface mounted of 20 Watts extruded aluminium housing high lumen output complete all as specified and directed.
150
-
-
Material and labour for replacement of LED mirror light fitting surface mounted of capacity of 10W with plastic body and accessories complete all as specified including connecting to ceiling rose with twin copper conductor of size 0/0.24 complete all as specified and as directed.
30
-
-
Material and labour for replacement of LED type surface mounted decorative bulk head fitting of 10Watts complete including connecting to ceiling rose with twin copper conductor of size 0/0.24 all as specified and directed.
10
-
-
Material and labour for LED luminaire 600 mm x 600 mm, 35/36 watt, 220 V AC recessed type with high efficiency PMMA diffuser soft glare free light complete with driver, holders & LED lamp suitable for roof ceiling including connecting up with driver three core flexible copper conductor cable of suitable size including taking down old one all as specified and directed.
230
-
-
Material and labour for LED luminaire 600 mm x 600 mm,35/36 watt, 220 V AC surface type with high efficiency PMMA diffuser soft glare free light complete with driver, holders & LED lamp suitable for roof ceiling including connecting up with driver three core flexible copper conductor cable of suitable size complete including taking down old one all as specified and directed.
20
-
-
Material and labour for LED luminaire suspended type suitable for 36 watt, 1x4 ft, 220V AC commercial surface with complete fitting with driver, holders & LED lamp with all fixing arrangements in roof/ ceiling including all connecting up with driver three core flexible copper conductor cable of suitable size complete including taking down old one all as specified and directed.
20
-
-
Material and labour for LED luminaire Recess type suitable for 36 watt, 1x4 ft, 220 V AC with complete fitting with driver, holders & LED lamp with all fixing arrangements in all type of spaces such as office reception area ,meeting room and corridors including connecting up with driver three core flexible copper conductor cable of suitable size complete including taking down old one all as specified and directed.
100
-
-
Material and labour for LED round shape 6 watt 220 volts AC recessed type with high efficiency PMMA diffuser soft glare free light complete with drivers, holders, LED lamp suitable for roof ceiling including connecting up with three core flexible copper conductor cable of suitable size complete all as specified and directed.
10
-
-
All as per item No -25 above but 12 watt all as specified and directed.
20
-
-
All as per item No - 25 but 15 watt all as specified and directed.
50
-
-
All as per item No - 25 but 18 watt all as specified and directed.
50
-
-
Material and labour for high efficiancy LED tube rod with in built driver and superior lumens in lower wattage of 18 watt 220 volts AC complete with drivers, holders, LED lamp suitable for fixing in old tube light fitting including connecting up with three core flexible copper conductor cable of suitable size complete all as specified and directed.
40
-
-
Material and labour for high efficacy LED tube 4 pin with in built driver and superior lumens in lower wattage of 18 watt 220 volts AC complete with drivers, holders, LED lamp suitable for fixing in old tube light fitting including connecting up with three core flexible copper conductor cable of suitable size complete all as specified and directed. MAKE :- Philips HSN Code : 85395000 or techno commercially equivalent models in Havells / Crompton Greaves
60
-
-
Dismantling the ceiling fan / exhaust fan complete of any type and size from the various buildings and cleaning, servicing, greasing to bearings checking of nuts bolts , safety split pin, bushes , capacitor and complete testing after painting the ceiling fan ,blades ,down rod etc and refixing the site / bldg with complete connection all as directed and specified by Engr in charge.
Note :- Expendable stores like cotton waste/cleaning materials, grease, lubricants, machine screws, safety split pin, bots/nuts and transportation to and from site to work place are deemed to be included in rate quoted
185
-
-
Dismantling of all components of ceiling fan 1200mm sweep, cutting and removing burnt out copper winding from the rotor assy and rewinding with super enamelled copper winding wire of suitable gauge and turns with necessary insulation materials , varnishing, reassembling , greasing to bearing , replacing bushes, replacment of capacitor and two coats of white spray paiting complete testing all as specified and directed.
Note:- (a) The spares like ball bearing, capacitor and GM bush required for repair the ceiling fan will be measured and paid separately under respective item.
(b) Expendable stores like cotton waste /cleaning materials, grease, lubricants, machine screws, safety split pin, bolts, nuts and transportation to and fro from site to work place are deemed to be included in rate quoted.
120
-
-
All as per item No.32 herein before but for 1400mm sweep ceiling fan all as specified and directed.
30
-
-
All as per item No.32 herein before but for 300mm sweep exhaust fan all as specified and directed.
25
-
-
All as per item No.32 herein before but for 450mm sweep exhaust fan all as specified and directed.
10
-
-
Material and labour for replacement of worn out fan bearings of the existing size of superior quality complete all as specified and directed .
150
-
-
Supply only capacitor 2.5mfd suitable for 1200mm sweep ceiling fan complete all as specified and directed .
100
-
-
Supply only capacitor 4.0mfd suitable for exhaust fan complete all as specified and directed .
40
-
-
Supply and replace rubber reel of superior quality along with gun metal frame and split pin complete all as specified .
100
-
-
Material and labour for exhaust fan louvers on outside of the external wall suitable for 300/ 380mm sweep for G+4 buildings including all fixing arrangement like ladder/scaffolding required if any complete all as specified and as directed .
10
-
-
Material and labour for exhaust fan louvers on outside of the external wall suitable for 300/ 450 mm sweep for G+4 buildings including all fixing arrangement like ladder/scaffolding required if any complete all as specified and as directed .
10
-
-
Material and labour for submain wiring of 2 run 4 sq.mm size PVC insulated unsheathed multi stranded copper conductor cable 1100 Volts FRLS grade drawn through and including suitable size of PVC conduit with accessories concealed in wall / roof including one run of 4.0 sq.mm PVC insulated multistranded copper wire for earth , ISI marked and connecting up complete including removing old unserviceable cables all as specified and directed by Engr-in-Charge. NOTE :- 3 run of 4 sq.mm cable & one run of PVC conduit shall be measured as RM
280
-
-
Material and labour for submain wiring of 2 runs of 6 sq.mm size PVC insulated unsheathed multistranded copper conductor cable 1100 Volts FRLS grade drawn through and including suitable size of PVC conduit with accessories concealed in wall/roof including one run of 6.0 sq.mm PVC insulated multistranded copper wire for earth , ISI marked and connecting up complete including removing old unserviceable cables all as specified and directed by Engr-in-Charge. NOTE :- 3 run of 6 sq.mm cbale & one run of PVC conduit measured as RM
150
-
-
Material and labour for submain wiring of 4 run 10 sq.mm size PVC insulated unsheathed multistranded copper conductor cable 1100 Volts FRLS grade drawn through and including suitable size of PVC conduit with accessories concealed in wall/roof including one run of 10.0 sq.mm PVC insulated multi stranded copper wire for earth , ISI marked and connecting up complete including removing old unserviceable cables all as specified and directed by Engr-in-Charge. NOTE :- 5 run of 4 sq.mm cable & one run of PVC conduit measured as RM
170
-
-
Material and labour for submain wiring of 4 run 16 sq.mm size PVC insulated unsheathed multi stranded copper conductor 1100 Volts FRLS grade drawn through and including suitable size of PVC conduit with accessories concealed in wall/roof including one run of 16.0 sq.mm PVC insulated multistranded copper wire for earth , ISI marked and connecting up complete including removing old unserviceable cables all as specified and directed by Engr-in-Charge. NOTE :- 5 runs of 4 sq.mm cable & one run of PVC conduit measured as RM
250
-
-
Material and labour for single pole and neutral enclosure with a two pin and earth plug and socket complete with one No 20 Amps MCB SP C curve type with complete connections all as directed and specified.
15
-
-
Material and labour for triple pole and neutral enclosure with a three pin and earth plug and socket complete with one No 32 Amps MCB TP C curve type with complete connection all as directed and specified.
10
-
-
Material and labour for replacement of MCB DB TPN 4 way DB double door type three phase 415 Volts complete all as specified and directed
5
-
-
Material and labour for replacement of MCB DB SPN 4 way DB double door type single phase 230 Volts complete including dismantling the old one all as specified and directed
5
-
-
Material and labour for replacement of MCB DB SPN 8 way DB double door type single phase 230 Volts complete all as specified and directed .
8
-
-
Material and labour for replacement of MCB DB SPN 12 way DB double door type single phase 230 Volts complete all as specified and directed .
4
-
-
Material and labour for replacement of MCB DB SPN 16 way DB double door type single phase 230 Volts complete all as specified and directed .
2
-
-
Material and labour for replacement of MCB SPN 6-32 Amps C Curve type 230 Volts single phase all as specified complete all as specified and directed .
35
-
-
All as per above item No 53 above but capacity of MCB SPN (40-63) Amps all as specified and directed .
25
-
-
Material and labour for replacement of MCB SP (6-32) Amps C Curve 230 Volts single phase all as specified and directed
140
-
-
Material and labour for replacement of MCB TP (25- 63) Amps C Curve type 415 Volts three phase all as specified and directed
10
-
-
Material and labour for replacement of MCB TPN (16-32) Amps C Curve 415 Volts three phase all as specified and directed
16
-
-
Material and labour for replacement of MCB TPN (40-100) Amps C Curve 415 Volts three phase all as specified and directed
10
-
-
Material and labour for replacement of Hylem sheet with not less than 3mm thick of size 4" x 4" all as specified and directed
8
-
-
Material and labour for replacement of Hylem sheet with not less than 3mm thick of size 4" x 6" all as specified and directed
6
-
-
Material and labour for replacement of switch piano flush type 6 amps one way type all as specified and directed
30
-
-
Material and labour for replacement of switch piano flush type 16 amps two way type all as specified and directed
22
-
-
Material and labour for replacement of socket 5 pin flush type 6 amps all as specified and directed
17
-
-
Material and labour for replacement of fan regulator flush type switch type 450 watt all as specified and directed
22
-
-
Material and labour for replacement of fan regulator flush type socket type 100/120 watt all as specified and directed
15
-
-
Material and labour for replacement of Switch socket combination 2 in 1, 6A flush type all as specified and directed
25
-
-
Material and labour for replacement of Switch socket combination 2 in 1, 3 pin, 6 and 16 Amp flush type universal type all as specified and directed
15
-
-
Material and labour for repair to existing broken switch board by taking out the old exisiting switches, sockets, regulators flush type and refixing the same after replacement of hylum sheet of required size under mentioned with complete electric connections and making screws and made functional with all electric connections as per speciifed and directed by Engr-in- charge.
30
-
-
Material and labour for Earthing complete with galvanised steel earth plate electrode of size 60cm x 60cm x 6mm buried directly in ground( earth pit not less than 2.25metres deep below the normal ground level) with top edge of the plate not less than 1.5m below normal GL connected as required 4.0 MM GI wire upto 7.5Mtr GI strip by means of GI bolts, nuts , check nuts and washers and connected to building panel / DB all as shown in electrical plate No. 3 of SSR Part I and all as specified including testing on completion, taking down old unserviceable earthing complete all as specified and directed by Engr-in-Charge.
3
-
-
Material and labour for Earthing complete with galvanised steel earth plate electrode of size 60cm x 60cm x 6mm buried directly in ground( earth pit not less than 2.25metres deep below the normal ground level) with top edge of the plate not less than 1.5m below normal GL connected as required 32 x 6mm GI strip upto 7.5Mtr by means of GI bolts, nuts , check nuts and washers and connected to building panel/ DB all as shown in electrical plate No. 3 of SSR Part I and all as specified including testing on completion, taking down old unserviceable earthing complete all as specified and directed by Engr-in-Charge.
3
-
-
Material and labour for Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or burried in ground or drawn in conduit/GI pipe or fixed to poles or any other indicated situation for loop earthing etc as required of GI strip 32 x 6 mm complete all as specified and as directed.
25
-
-
Material and labour for Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or burried in ground or drawn in conduit/GI pipe or fixed to poles or any other indicated situation for loop earthing etc as required of 4mm dia galvanised iron or steel wire complete all as specified and as directed.
20
-
-
Material and labour for cleaning of TPN DB box in each building by blower and checking the all incommer/outgoing MCBs/TPNs etc and tight the all electric loose connections and fixing of copper lugs through existing MCBs and after painting the complete TPN DB Box as directed by Engr in charge
22
-
-
Taking down defective geyser/ storage water heater of any pattern/ capacities from existing position/place comprising of the following tasks:-
(a) Inspection, taking down (dismantling), descalling, brushing, cleaning of storage tank and painting internally with one coat of proprietary bitumnous composition not liable to impart taste or odour or otherwise contaminated water.
(b) Examine water tightness of storage tank after cleaning. (c)Carryout operation of all stopcock, pressure reducing valves etc to ensure free movement of the working parts.
(d) Replace washers and glands of all taps & ball valves to ensure water tigtness. (e) Inspect overflow / vent pipes and remove blockages obstructions if any.
(f) Check and correct earth continuity of electrical parts.
(g) Check, maintain and rent thermostats and tests its functioning.
(h) Checking and adjustment of pressure reducing valve (j) Checking of dead weight type high pressure release valve (HPRV) by removing dead weight position cleaning the seat & ensuring that the vent hole is not blocked /chocked
6
-
-
Material and labour for replacement of heating element of 2.0 KW rating as required at site (round & traingle) including rubber washers of ISI marked all as specified and directed
4
-
-
Material and labour for replacement of thermostat for the 25 Ltr geyser all as specified and directed
2
-
-
All as per item no. 76 above but 50 Ltr geyser all as specified and directed
3
-
-
Material and labour for replacement of PVC connection pipe with two brass adaptors 450mm long & connecting up complete all as specified and as directed
8
-
-
Material and labour for replacement of Geyser indicator (red /green) all as specified and directed.
5
-
-
Material and labour for painting external part of the geyser body at site/ existing position with one finishing coat of synthetic enamel paint by spraying including filling cavities with filler, after cleaning complete all as specified and as directed.
NOTE :- Above work / Item will be operated / executed on as per planning / break down and user requirment basis,so contractor will depute their man power as per requirment basis as directed by JE/Engr in Charge on telephonically . No extra cost will provided to the contractor.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements