Summary

Installation Of Flue Gas Desulphurization System For 7 X 210mw, Units 1 To 7 And 1 X 250 Mw, Unit 8 Of Raichur Thermal Power Station Of Kpcl, Shakthinagar, Raichur District, Karnataka

KARNATAKA POWER CORPORATION LIMITED (A premier Power Generating Company of Govt. of Karnataka) DOMESTIC COMPETITIVE BIDDING BRIEF BID NOTIFICATION No: KPCL/2018-19/PS/WORK_INDENT8464 Date: 09.03.2019 RAICHUR POWER CORPORATION LIMITED invites bids through GOK e-procurement platform www.eproc.karnataka.gov.in from the qualified bidders for “Design, engineering, manufacture, Quality Surveillance, inspection & testing at supplier’s works, supply, packing, forwarding to site, transportation, F.O.R-RTPS, unloading, storage, preservation, handling at site, all mechanical, C&I systems, electrical equipment and systems, steel structures, civil works with new chimney, insurance, erection, painting, start-up, trial operation, testing, commissioning, performance guarantee testing and warranty for wet lime stone flue gas desulphurization plant for 7 X 210MW, units-1 to 7 and 1 X 250MW, unit-8 of Raichur Thermal Power Station of KPCL, Shakthinagar, Raichur District, Karnataka and handing over to the Owner an operating plant and Operation & Maintenance of FGD systems including supply of spares and consumables for five years as per scope identified in the technical specifications of the bid document of RTPS, 7 X 210MW, Units 1 to 7 and 1 X 250MW, Unit-8 project”. BRIEF SCOPE OF WORK FOR WET LIMESTONE FLUE GAS DESULPHURIZATION PLANT FOR RTPS 7 X 210MW, Units 1 to 7 and 1 X 250 MW, Unit 8 . 1.0 BRIEF SCOPE OF WORK FOR WET LIMESTONE FLUE GAS DESULPHURIZATION PLANT FOR RAICHUR THERMAL POWER STATION 7 X 210MW, UNIT-1 to 7 and 1 X 250MW, UNIT-8. The scope of this enquiry covers the following: “Design, engineering, manufacture, Quality Surveillance, inspection & testing at supplier’s works, supply, packing, forwarding to site, transportation, F.O.R-RTPS, unloading, storage, preservation, handling at site, all mechanical, C&I systems, electrical equipment and systems, steel structures, civil works with new chimney, insurance, erection, painting, start-up, trial operation, testing, commissioning, performance guarantee testing and warranty for wet lime stone flue gas desulphurization plant for 7 X 210MW, units-1 to 7 and 1 X 250MW, Unit-8 of Raichur Thermal Power Station of KPCL, Shakthinagar, Raichur District, Karnataka and handing over to the Owner an operating plant and Operation & Maintenance of FGD systems including supply of spares and consumables for five years as per scope identified in the technical specifications of the bid document of RTPS, 7 X 210MW, Units 1 to 7 and 1 X 250MW, Unit-8 project”. 2.0 BRIEF SCOPE OF WORKS. The brief scope of works consists of: “Design, engineering, manufacture, Quality Surveillance, inspection & testing at supplier’s works, supply, packing, forwarding to site, transportation, F.O.R-RTPS, unloading, storage, preservation, handling at site, all mechanical, C&I systems, electrical equipment and systems, steel structures, civil works with new chimney, insurance, erection, painting, start-up, trial operation, testing, commissioning, performance guarantee testing and warranty for wet lime stone flue gas desulphurization plant for 7 x 210MW, units-1 to 7 and 1 X 250MW, Unit-8 of Raichur Thermal Power Station of KPCL, Shakthinagar, Raichur District, Karnataka and handing over to the Owner an operating plant and Operation & Maintenance of FGD systems including supply of spares and consumables for five years as per scope identified in the technical specifications of the bid document of RTPS, 7 X 210MW, Units 1 to 7 and 1 X 250MW, Unit-8 project”. FGD shall be based on Wet Limestone Forced Oxidation process complete with Limestone Storage and handling system, Limestone storage silos, Crushers, wet ball mills, limestone slurry pumps, slurry tank for each mill, complete with all accessories and agitator(s), recycle tank, Recycle pumps for

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.