Directorate Of Municipal Administration Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Directorate Of Municipal Administration - DMA Tender

Works
Paints and Enamels
Opening Date27 Nov 2024
Closing Date9 Dec 2024
Tender Amount₹ 4,18,857.79 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
004 - Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete 160mm (weight of pipe -3.923 kg) 6 Kg/m2 (vol 5,2023-24.,item no:10.14.13 Page no:120) 63mm 6 Kg/m2 (weight of pipe -0.662 kg)

40

155

6227.2

... More
005 - Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete 160mm (weight of pipe -3.923 kg) 6 Kg/m2 (vol 5,2023-24.,item no:10.14.13 Page no:120) 160mm 6 Kg/m2 (weight of pipe -0.662 kg)

25

723

18088

... More
006 - Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications .(vol 1,2023-24,item no.1.10,page no.7)

8.44

179

1512.448

... More
007 - Providing and fixing 12 mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS: 12823 Grade l Type ll, in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer- in-charge: Pre-laminated particle board with decorative lamination on both sides including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.(vol 2,2023-24,item no.11.36.1,page no.89)

2.31

1004

2320.7184

... More
008 - Removing the old paint from steel and / or other metal surface with hand scraping and making surface even including cost of labour, complete as per specifications.(vol 2,2023-24,item no.20.59,page no.203)

124.7

135

16899.344

... More
009 - Removing white wash or colour wash by steel brushing and / or scraping, sand papering and preparing wall surface smooth including repairs to scraches including cost of labour, material complete as per specifications.(Vol 2,2023-24,item no.20.50,p.no:203)

75.24

14

1095.4944

... More
010 - Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (vol 2,2023-24,item no.8.4.1,page no.41)

2.8

361

1012.928

... More
011 - Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(SR 2023-24 Vol 2 Pg 45 sl no 8.27

75.24

59

4466.2464

... More
012 - Finishing walls with textured exterior paint of required shade :Old worK(Two coats on existing cement paint surface applied @ 3.28 ltr/10m² including preparing the surface after thoroughly cleaning the surfaceto remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(Vol 2,2023-24,item no.8.73.1,p.no:53)

75.24

241

18202.0608

... More
013 - Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One coats on old work as per specification and as per directions of Engineer in charge.(Vol 2,2023-24,item no.8.64,p.no:51)

124.7

85

10614.464

... More
014 - excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m .(Vol 1,2023-24,item no.1.4.1,p.no:5)

0.65

271

176.176

... More
015 - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to coplete the work as per technical specifications.(The cost of steel reinforcement & formwork shall be paid separately)Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates etc complete with all lead and lift as per the direction of the Engineer-in-Charge of the work.(Vol 1,2023-24,item no.2.1.3,p.no:15)

0.65

6707

4359.992

... More
016 - Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer,including welding and bolted with special shaped washers etc. complete.Hot finished seamless type tubes zincluding cost of materials, labour, usagecharges of machinery complete as per specifications and as per directionsof the Engineer-in-Charge.(Vol 2,2023-24,item no.11.16.2,p.no:82)

630.5

164

103805.52

... More
017 - Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineer in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.(Vol 2,2023-24,item no.7.38,p.no:26)

64

636

40714.24

... More
018 - Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete :Gutter (600 mm over all girth).(Vol 2,2023-24,item no.7.39.6,p.no:27)

44

1202

52926.72

... More
019 - Painting with synthetic enamel paint of approved brand and manu facture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(Vol 2,2023-24,item no,8.41.p.no:48)

38.64

187

7227.2256

... More
020 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work1.15.2 In ordinary/soft rock without blasting Depth exceeding 1.5 m, but not exceeding 3 m.(Vol 1,2023-24,item no.1.15.2,p.no:09)

15.83

476

7535.08

... More
021 - Providing to work spot rolling, lowering and placing in position RCC perforated rings in the already excavated pit including loading and unloading at both the destinations with all lead and lift with appurtenances., complete.1200 mmx1250 mm.(vol 5,2023-24.,item no:16.62.2.page no:208)

3

10689

32067.84

... More
022 - Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer in-charge.(vol 2,2023-24.,item no:17.2.page no:175)

2.37

1328

3148.1184

... More
023 - Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates .(vol 1 ,2023-24,item no:2.3.1,page no:16)

0.66

7081

4673.9616

... More
024 - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures. (vol 1 ,2023-24,item no:2.11(h),page no:18)

0.03

88492

2654.7696

... More
025 - Providing and removing centering,shuttering,propping etc,and removal of formwork for base slab ,including cost of all materials,labour complete as per specification. Cement concrete drain walls 35% on finished rate of concrete per cum (Vol-1-2023-2024,sl.no.4,page no.111)

0.66

2478

1635.8892

... More
026 - Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.(vol 5,2023-24.,item no:13.34.page no:123)

1

29500

29500

... More
028 - Supplying heavy gauge PVC conduit pipe . dia . mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 25 mm dia 2 mm thick (vol 6,2023-24,item no.1.1.2,page no.2)

20

81

1620

... More
029 - Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3Mtr from tapping point to out let via switch (vol 6,2023-24,item no.2.1.1,page no.5)

3

285

855

... More
030 - Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6Mtr upto 10Mtr from tapping point to out let via switch (vol 6,2023-24,item no.2.1.3,page no.5)

2

57

114

... More
031 - Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Three outlet in a row, above 6Mts upto 10Mtr from tapping point to out let via switches (vol 6,2023-24,item no.2.1.5,page no.5)

2

1035

2070

... More
032 - Fixing a shunt capacitor of . kVAR capacity with necessary clamps, bolts, and nuts on existing wooden or metal board including banking of more than one capacitor. upto 5 kVAR (vol 6,2023-24,item no.5.4.1,page no.14)

2

154

308

... More
033 - meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia.(vol 5,2023-24.,item no:13.39.page no:157)

1

4200

4200

... More
034 - Supplying and fixing of retrofit type -LED bulb . W with OPAL acrylicdiffuser comprising of LED source with CCT 6500 degree K, CRI 70percent. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5 percent of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20percentage, Life as per LM 79.The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.3W. vol 6,2023-24,item no.11.11.1,page no.47

3

124

372



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.