Water Resources Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 17,000Document Cost
₹ 1,250Tender Fee
Refer Documents
Summary
Const. Of Boulder Masonary Drain(g.n.-1)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_80150_1Tender No
PMAAGY/F2-9/2023-24(G-1)Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://wrdjharkhand.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
31.84
146416
4598.23
Providing randam rubble stone masonry in CM (1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening raking out joints to 20 mm depth, curing taxes and royalty
all complete as per building specification and direction of E/I.
45.34
124203
2739.68
Providing 25mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water,
scaffolding taxes and royalty all complete as per building specification and direction of E/I.
442.09
114444
258.87
providing 1.5mm thick cement punning including curing etc. complete job as per specification and direction of E/I.
442.09
24063
54.43
Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering
and finishing. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal
4.93
24481
4961.73
Providing T.M.T Reinforcement (Tor Steel) of 8mm dia TMT Fe 500 as per approved design and drawing removal of rust, cutting, bending, binding, including supplying of annealed wire and placing in position at site all complete as per specification and direction of E/I.
0.26
21620
83349.94
Providing shuttering including strutting, propping etc. and its removal after use in foundation work as per specification and direction of E/I.
85.97
16725
194.56
Carriage of Materials
-
-
-
(i) cement + steel 30 km ( Manmani )
8.85
6094
688.6
(ii)Sand 12 km (Manmani )
23.02
6756
293.56
(iii)Chips 65 KM (P) ( Manmani)
11.67
12631
1082.2
(iv) Boulder 65 km ( Manmani )
26.41
29703
1124.52
(i) cement + steel 30 km ( Nichitpur)
8.75
6027
688.6
(ii)Sand 12 km (Nichitpur )
22.76
6682
293.56
(iii)Chips 70 KM(P) (Nichitpur )
11.55
13352
1156.6
(iv) Boulder 70 km (Nichitpur )
26.12
31405
1202.17
(i) cement + steel 30 km ( Balakhel )
8
5508
688.6
(ii)Sand 12 km ( Balakhel )
18.98
5572
293.56
(iii)Chips 70 KM(P) ( Balakhel )
9.63
11135
1156.6
(iv) Boulder 70 km (Balakhel )
21.79
26190
1202.17
After adding GST @18% on total estimated value the total estimated amount is
712530.57
128255
0.12
Labour Cess @1% on above total estimated amount
840786.07
8407
0.01
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements