Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Rural Development Department - RDD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date28 Nov 2024
Closing Date3 Dec 2024
Tender Amount₹ 2,91,21,056 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm)

78

8162

636706.2

... More
Providing Steel Liner 10 mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing.

10.84

95570

1035987.47

... More
Providing and laying of PCC M15 levelling course 100 mm thick below the pile cap. PCC Grade M15 using batching plant & Concrete pump

9.43

3405

32114.81

... More
Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification (RCC M30)

159.73

4355

695751.93

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

7.74

3376

26131.01

... More
Filling Annular Space around footing in rock.

17.9

3376

60432.19

... More
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. (G) RCC Grade M30 Case - I (RCC Grade M30 using batching plant & Concrete pump)

98.26

4438

436107.36

... More
Supplying,Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.

43.36

87394

3789438.53

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications. G) RCC Grade M30 RCC Grade M30 using batching plant, transit mixer & concrete pump Height upto 5m

109.68

4694

514881.79

... More
Height 5m to 10m

73.65

4826

355486.46

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications

24.59

87744

2157647.09

... More
Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications (B) Sandy Materials

230.81

874

201866.43

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.

90.77

1645

149343.88

... More
Supplying , fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) section IX and clause 2005 of Mort&H specification complete including all accessories as per drwaing and technical specifications.

161280

-

130636.8

... More
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.

231

110

25525.5

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. C) RCC Grade M30 Using Batching Plant,Transite Mixer and Concrete Pump. (ii) For T-beam & slab, (q) Height 5m to 10m

156

5495

857360.4

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

22.96

87893

2018041.65

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.

25.72

10876

279743.58

... More
PCC M15 Grade levelling course below approach slab complete as per drawing and Technical Specification.

7.88

3405

26836.44

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification

15.75

8747

137774.7

... More
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

91.44

1987

181746.14

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

25.35

10290

260851.5

... More
Drainage Spouts complete as per drawing and Technical specification

16

817

13086.4

... More
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. (A) Stone/Boulder

451.23

1158

522704.83

... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification.

225.61

1840

415257.77

... More
APPROACH ROAD PART Clearing and grubbing road land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.)

0.19

88499

16814.91

... More
Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment /dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)

399.92

154

61827.63

... More
Embankment Construction with Material Obtained from Borrow Pits (Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.)

3681.71

129

478254.13

... More
Compacting original ground supporting embankment (Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.)

555.75

52

29232.45

... More
Granular Sub-Base with Graded Material (Table:- 400-1) Gr-I (By Mix in Place Method) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.

242.68

1437

348876.77

... More
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

147.38

1701

250708.12

... More
Prime Coat over WMM/WBM (Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.)

982.5

80

78894.75

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.)

982.5

12

12379.5

... More
Open graded Premix surfacing (Providing, laying and rolling of open-graded pemix surfacing of 20mm thickness composed of 13.2mm to 5.6mm aggregates using viscosity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capcity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller finished to required level and grades.)

982.5

148

145803

... More
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using ) Type B seal coats.

982.5

54

53153.25

... More
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting).

100

545

54580

... More
RETAINING WALL Excavation for structures in Ordinary soil - (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I (B) - Mechanical Means (i) (Depth upto 3m)

262.4

57

15061.76

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

16.4

3376

55368.04

... More
FILTER MEDIA - Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.

86.4

1645

142153.92

... More
RePlain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. (E) RCC Grade M25 Case - I (RCC Grade M25 using batching plant & Concrete pump)

104.4

4378

457094.52

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications. F) RCC Grade M25 RCC Grade M25 using batching plant, transit mixer & concrete pump (p) Height upto 5m

86.4

4630

400109.76

... More
Supplying,Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.

6.81

87394

595158.59

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications

7.61

87744

667738.69

... More
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.

120

110

13260

... More
GUARD WALL Excavation for structures in Ordinary soil - (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I (B) - Mechanical Means (i) (Depth upto 3m)

186

57

10676.4

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

37.2

3376

125590.92

... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification. (b) Random Rubble Masonry

116.1

3458

401543.46

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications (A) Random Rubble Masonry

98.48

3468

341607.42

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. PCC M20

1.84

4168

7669.49

... More
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.

45

110

4972.5

... More
CARRIAGE PART Sand, Manoharpur 10 Km (P) + 1 Km (K).

892.66

297

265905.56

... More
Stone Chips, Noamundi 90 Km (P) + 1 Km (K).

1127.62

1488

1678214.29

... More
Stone Metal, Noamundi 90 Km (P) + 1 Km (K).

455.62

1608

732837.43

... More
Stone Boulder, Noamundi 90 Km (P) + 1 Km (K).

1048.25

1548

1623068.37

... More
Bitumin, Bokaro 305 Km (P) + 0 Km (K).

2.1

3246

6816.81

... More
Cement, Manoharpur 10 Km (P) + 0 Km (K).

436.29

502

219279.35

... More
Steel, Manoharpur 10 Km (P) + 0 Km (K).

119.14

502

59879.76

... More
Emulsion, Bokaro 305 Km (P) + 0 Km (K).

0.88

3246

2856.57

... More
G.S.T @ 18%

24434515.22

-

4398212.74

... More
Labour Cess 1%

28832727.96

-

288327.28



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.