Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 84,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Conducting Final Location Survey, Traffic Survey With Eirr/firr, Preparation Of Lop For engineering / Electrical / S&t Works, Esp, L-section, General Arrangement Drawings Of bridges / Rub/rob, Preparation Of Detailed Project Report (dpr), Epc/boq Tender document And Other Preliminary Activities For Preparing Detailed Estimate On Actual Realistic cost In Connection With New Koderma Ror Bypass Bg Line (08km),jamuniatand Ror (06 km) And Koderma Bye-pass By Creating Y - Connection Between Pipradih And Larabad Bg line (8.44km) Under Dy. Ce/con/dhanbad In Dhanbad Division Of East Central Railway.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
ECR-CAO-C-S-ETEN-65-23-24-CAO-C-SOUTH-HQ-ENGINEERING/EAST CENTRAL RLYTender No
ECR-CAO-C-S-ETEN-65-23-24Tender Authority
East Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Preparation of GAD and submission (including assistance in approval) of final drawings (on tracing paper) for Minor Bridges/RUB for 25T/32.5T loading & necessary detailed design to work out proposed foundation of abutment, piers etc. and superstructure. Design calculation shall be submitted by contractor. After approval of 01 drawings on tracing, the drawings will be got scanned and ten copies of white print for each drawing will be submitted by the contractor. Note:-1) The drawings will be prepared as per provision of Railway Codes/Manuals. 2) For superstructure, Railway RDSO standard drawings shall be used, wherever feasible. Payment schedule : 1. Submission of final tracing including signature of construction officers : 70% 2. Final Approval of drawing by Railway: 30%. Running
20
8665
173309.4
Preparation of LWR / CWR and Weld Plans: For Continuously Welded Rail (CWR) track for as much length a s possible, for which the Contractor shall prepare the CWR plans for the approval of the Employer in accordance with the design principles /provisions contained in I R LWR (Long Welded Rail) Manual based on approved Track Structure. T he consultant shall submit advance copy of the Weld Plans on white paper for approval of Employer. After the approval of Employer, the Consultant shall submit drawings in 3 (three) hard 01 coloured copies on Polyester based tracing paper (100 to 150 Microns) and two soft copies on CD. The scope includes required corrections and modifications as suggested by approving authorities of Railways till its final approval. Required follow up with various approving authorities including required explanations on various provisions/facilities in the ESP shall be arranged by consultant. Note: i) The colour scheme to be followed in the drawing shall be as per standard practice of IR. ii) Payment will be done as per Stages given below - Submission of Weld Plans and approval by engineer in charge : 60% - Submission of Weld Plans and approval by Divisional HQ : 15% - Submission of Weld Plans and approval by Zonal H Q : 15% - Submission of Weld Plans in hard & soft copies : 10%.
22.44
241
5414.77
Transferring the finalized alignment on ground using total station, contractor shall fix up a RCC pillar at every 500m in straight portion of alignment and in curves the RCC pillar should be fixed at every junction 01 points of the straight and curve & junction points of transition and circular curve. In addition to above pillars contractor shall required to fix the CC mattam at every 100m in straight and at every 20m in curve portion. Alignment pillars shall be fixed at both ends of each major bridge. This item includes all labour, material etc. complete, nothing shall be paid extra on any account.
22
11733
258129.74
"Preparation of EPC documents as per specified packages specific to the project in accordance with the model EPC document (Agreement and RFP) published by Railway board and assist in bidding process management."
1
304230
304230
Conducting Traffic Survey as per latest Railway Board's guidelines vide letter no. 2022/Gatishakti/EU/49 New Delhi, Dated 19.08.2022 and as per Chapter 3 of Engineering Code with latest 01 version. The work includes:- 1. Conducting Traffic Demand survey as detailed in Railway Board's guidelines vide letter no. 2022/Gatishakti/EU/49 New Delhi, Dated 19.08.2022 and as per Chapter 3 of Engineering Code with latest version. 2. Calculating data required for calculation of various direct and indirect benefits as detailed in Railway Board's letter no. 2022/Gatishakti/EU/49 New Delhi, Dated 19.08.2022. 3. Calculation of FIRR and EIRR. 4. Submission of detailed report indicating the details of surveys undertaken and sources of various data considerd, for calculating FIRR and EIRR.
8
11588
92704.96
Preparing (including all alterations till final approval) SIP, Cable Route Plan, LOP, Building Layout Plans & drawings of level crossings, other Engg/S&T/TRD plans etc. Note- 1. Payment of this item shall be made 01 on the basis of actual area of final tracing after approval of Railway. 2. The rate includes various alterations in drawing till its finalization/approval by Railway. 3. Tracing quality as per minimum 100 GSM. 4. The payment under this item includes all Labour (Draftsman etc) & Material (Equipments, Stationery, Cartridge etc) required to prepare/print /alter/submit the drawings. Payment schedule- 1. Submission of final tracing including signature of construction officers : 70% 2. Final Approval of drawing by Railway: 30%
200
406
81228
Soil Investigation
-
-
2318402