Public Works Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Works Department - PWD Tender

Works
Machinery and Tools
Eprocure
Opening Date20 Jan 2024
Closing Date30 Jan 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
b) Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer. = 106.56 m2

106.56

-

-

... More
C) Reinforced cement concrete work in beams, Columns, suspended floors, roofs having slope up to 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to five level including curing but excluding the cost of centering, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) = 15 m3

15

-

-

... More
d) Providing and fixing of granite slabs (first quality) on walls incl. all lead lift, carriage, laying, rubbing and polishing complete. = 15 m2

15

-

-

... More
e) Brick work with common burnt clay machine molded perforated bricks of class designation 12.5 conforming to I:S: 2222 in Superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand ) and curing complete in: 6.3.1 With (non-modular) bricks. = 10 m3

10

-

-

... More
f) Anchoring for beams incl. all charges i.e., labour, welding set, cutter, etc. incl. all lift lead charges. a) Charges for welding set, electricity connection charges, welding rods, etc, and all lead lift, carriages complete.i.e., 4x Rs 2500/day b) Labour (welder) for anchoring. i.e., 2 x 4 x Rs 1000/day

1

-

-

... More
g) Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts. = 15 m2

15

-

-

... More
Providing and fixing double scaffolding system (cup lock type) on the ext side , upto seven storey height made with 40mm dia M.S. tube 1.5m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. challies, M.S. clamps and M.S. staircase system in the scaffoldings for working platform etc. and maintain it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for the payment purpose. The payment will be made once irrespective of duration of scaffolding.

1

-

-

... More
Providing and Fitting of 03 No. Load Hooks having Capacity of Min 3 tonnes

1

-

-

... More
Disposal of Mulba (by Mech. means outside municipal limits)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.