Public Health Engineering Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date21 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 4,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)with 20% boulders.

3.5

7564

26476.8

... More
Dumping of stone boulder

1.5

437

656.85

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides.

15.75

180

2843.66

... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

5.5

9412

51766.28

... More
Providing and laying in position 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) for Sink,walling and slab Concreat Work LMR

2.8

8000

22400

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1.79

8021

14357.77

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1.05

10377

10896.01

... More
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete.

15.25

286

4366.84

... More
Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

61.23

628

38510.61

... More
Centering and shuttering including strutting, propping etc. and removal of form forArches, domes, vaults upto 6 m span

9.55

2281

21785.46

... More
Centering and shuttering including strutting, propping etc. and removal of form for:Edges of slabs and breaks in floors and walls Lintel, beams, plinth beams, girders, bressumers and cantilevers.

12

577

6930.6

... More
Extra for shuttering in circular work in foundation.

4.52

57

258.86

... More
Extra for shuttering in circular work in walls.

61.23

125

7702.12

... More
Extra for shuttering in circular work in dome.

9.55

1118

10685.02

... More
15mm Cement plaster on the rough side of single or half brick wall of mix 1 : 4 ( 1 cement : 4 fine sand)

85.5

327

28031.18

... More
Extra for Cement plaster in circular work

85.5

37

3231.9

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level

7.5

115

865.13

... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as requiredIn gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.Man hole cover etc.

75

181

13620

... More
Supply of PVC airband.(LMR)

4

128

512

... More
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)

30.1

98

2972.38

... More
Strectual Steel in Built up section for Jungla,Manhole angle frame and 1mm ms sheet complet job.LMR

300

150

45000

... More
Labour engaged for fixing of jungla (Massion)

2

734

1468

... More
Labour engaged for fixing of jungla (Labour)

2

553

1106

... More
Providing and fixinf of G.I pipe,GM Gate valve GI union Tee, Reduser and auto stop valve etc Complet job

1

20000

20000

... More
Providing and fixing Inlet /outlet GI pipe (65mm M)

12

1018

12216.6

... More
Febrication of joints along with welding plant,transpotation,welder complete job

1

15000

15000

... More
Removing of executed earth from spot to stocking place at batar nallah complete job.

1

25000

25000

... More
carriage of material from sources to site of work cement / steel avg distance 1KM by mechanical transport

9.25

114

1061.35

... More
carriage of material from sources to site of work sand avg distance 5KM by mechanical transport

10.2

200

2047.55

... More
carriage of material from sources to site of work stone aggregate avg distance 5 KM by mechanical transport

18.5

200

3713.69

... More
carriage of material from sources to site of work cement avg distance 200 Mtr by H L

8.5

167

1422.65

... More
carriage of material from sources to site of work / steel avg distance 200 Mtr by H L

0.75

359

269.63

... More
carriage of material from sources to site of work sand/ aggregate avg distance 200mtr by H L

28.7

331

9520.94

... More
carriage of material from sources to site of work stone /boulders avg distance 200 mtr by H L

0.8

390

312.22



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.