Public Health Engineering Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Health Engineering Department - PHED Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date25 Jan 2025
Closing Date3 Feb 2025
Tender Amount₹ 40,00,000 
Notes
Download

Costs

Summary

Annual Rate Contract For Repair And Maintenance Of Power Transformers Of Various Capacities Installed At T-wells And Central Pumping Stations

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas) including head load carriage.

1

-

-

... More
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available

1

-

-

... More
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.

1

-

-

... More
Reconditioning of LV copper coil per kg

1

-

-

... More
Reconditioning of LV Aluminium coil per kg

1

-

-

... More
Providing and fitting of HV leg coil copper S.E (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil copper DPC (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil Aluminium S.E (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil Aluminium DPC (per Kg)

1

-

-

... More
Providing and fitting of LV leg coil copper DPC (per Kg)

1

-

-

... More
Providing and fitting of LV leg coil Aluminium DPC (per Kg)

1

-

-

... More
Providing & fitting of HV bushing

1

-

-

... More
Providing & fitting of LV bushing

1

-

-

... More
Providing & fitting of HV bush rod (metal part) per rod

1

-

-

... More
Providing & fitting of LV bush rod (metal part) per rod

1

-

-

... More
Providing & fitting of gasket set

1

-

-

... More
Providing & fitting of LT terminal plate

1

-

-

... More
Providing & fitting of Oil drain valve

1

-

-

... More
Providing & fitting of core laminations per Kg

1

-

-

... More
Providing & fitting of sundry items

1

-

-

... More
Heat treatment of repaired transformer

1

-

-

... More
Arresting of oil leakages if any by way of welding etc.

1

-

-

... More
Painting of transformer body

1

-

-

... More
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.

1

-

-

... More
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer

1

-

-

... More
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer

1

-

-

... More
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.

1

-

-

... More
Manual carriage/Head load carriage of trabsformer from road side (to & fro)

-

-

-

... More
a) upto 500M

1

-

-

... More
b). Upto 1 km

1

-

-

... More
c). Upto 2km

1

-

-

... More
d). Upto 3km

1

-

-

... More
100 KVA Transformer

-

-

-

... More
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas).

1

-

-

... More
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available

1

-

-

... More
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas) including head load carriage.

1

-

-

... More
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available

1

-

-

... More
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.

1

-

-

... More
Reconditioning of LV copper coil per kg

1

-

-

... More
Reconditioning of LV Aluminium coil per kg

1

-

-

... More
Providing and fitting of HV leg coil copper S.E (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil copper DPC (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil Aluminium S.E (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil Aluminium DPC (per Kg)

1

-

-

... More
Providing and fitting of LV leg coil copper DPC (per Kg)

1

-

-

... More
Providing and fitting of LV leg coil Aluminium DPC (per Kg)

1

-

-

... More
Providing & fitting of HV bushing

1

-

-

... More
Providing & fitting of LV bushing

1

-

-

... More
Providing & fitting of HV bush rod (metal part) per rod

1

-

-

... More
Providing & fitting of LV bush rod (metal part) per rod

1

-

-

... More
Providing & fitting of gasket set

1

-

-

... More
Providing & fitting of LT terminal plate

1

-

-

... More
Providing & fitting of Oil drain valve

1

-

-

... More
Providing & fitting of core laminations per Kg

1

-

-

... More
Providing & fitting of sundry items

1

-

-

... More
Heat treatment of repaired transformer

1

-

-

... More
Arresting of oil leakages if any by way of welding etc.

1

-

-

... More
Painting of transformer body

1

-

-

... More
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.

1

-

-

... More
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer.

1

-

-

... More
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer

1

-

-

... More
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.

1

-

-

... More
Manual carriage/Head load carriage of trabsformer from road side (to & fro)

1

-

-

... More
a) upto 500M

1

-

-

... More
b). Upto 1 km

1

-

-

... More
c). Upto 2km

1

-

-

... More
d). Upto 3km

1

-

-

... More
150 KVA Transformer

-

-

-

... More
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas).

1

-

-

... More
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available

1

-

-

... More
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas) including head load carriage.

1

-

-

... More
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available

1

-

-

... More
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.

1

-

-

... More
Reconditioning of LV copper coil per kg

1

-

-

... More
Reconditioning of LV Aluminium coil per kg

1

-

-

... More
Providing and fitting of HV leg coil copper S.E (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil copper DPC (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil Aluminium S.E (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil Aluminium DPC (per Kg)

1

-

-

... More
Providing and fitting of LV leg coil copper DPC (per Kg)

1

-

-

... More
Providing and fitting of LV leg coil Aluminium DPC (per Kg)

1

-

-

... More
Providing & fitting of HV bushing

1

-

-

... More
Providing & fitting of LV bushing

1

-

-

... More
Providing & fitting of HV bush rod (metal part) per rod

1

-

-

... More
Providing & fitting of LV bush rod (metal part) per rod

1

-

-

... More
Providing & fitting of gasket set

1

-

-

... More
Providing & fitting of LT terminal plate

1

-

-

... More
Providing & fitting of Oil drain valve

1

-

-

... More
Providing & fitting of core laminations per Kg

1

-

-

... More
Providing & fitting of sundry items

1

-

-

... More
Heat treatment of repaired transformer

1

-

-

... More
Arresting of oil leakages if any by way of welding etc.

1

-

-

... More
Painting of transformer body

1

-

-

... More
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.

1

-

-

... More
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer

1

-

-

... More
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer

1

-

-

... More
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.

1

-

-

... More
Manual carriage/Head load carriage of trabsformer from road side (to & fro)

1

-

-

... More
a) upto 500M

1

-

-

... More
b). Upto 1 km

1

-

-

... More
c). Upto 2km

1

-

-

... More
d). Upto 3km

1

-

-

... More
250 KVA Transformer

-

-

-

... More
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas).

1

-

-

... More
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available

1

-

-

... More
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas) including head load carriage.

1

-

-

... More
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available

1

-

-

... More
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.

1

-

-

... More
Reconditioning of LV copper coil per kg

1

-

-

... More
Reconditioning of LV Aluminium coil per kg

1

-

-

... More
Providing and fitting of HV leg coil copper S.E (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil copper DPC (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil Aluminium S.E (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil Aluminium DPC (per Kg)

1

-

-

... More
Providing and fitting of LV leg coil copper DPC (per Kg)

1

-

-

... More
Providing and fitting of LV leg coil Aluminium DPC (per Kg)

1

-

-

... More
Providing & fitting of HV bushing

1

-

-

... More
Providing & fitting of LV bushing

1

-

-

... More
Providing & fitting of HV bush rod (metal part) per rod

1

-

-

... More
Providing & fitting of LV bush rod (metal part) per rod

1

-

-

... More
Providing & fitting of gasket set

1

-

-

... More
Providing & fitting of LT terminal plate

1

-

-

... More
Providing & fitting of Oil drain valve

1

-

-

... More
Providing & fitting of core laminations per Kg

1

-

-

... More
Providing & fitting of sundry items

1

-

-

... More
Heat treatment of repaired transformer

1

-

-

... More
Arresting of oil leakages if any by way of welding etc.

1

-

-

... More
Painting of transformer body

1

-

-

... More
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.

1

-

-

... More
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer

1

-

-

... More
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer

1

-

-

... More
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.

1

-

-

... More
Manual carriage/Head load carriage of trabsformer from road side (to & fro)

1

-

-

... More
a) upto 500M

1

-

-

... More
b). Upto 1 km

1

-

-

... More
c). Upto 2km

1

-

-

... More
d). Upto 3km

1

-

-

... More
400 KVA Transformer

-

-

-

... More
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas).

1

-

-

... More
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available

1

-

-

... More
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas) including head load carriage.

1

-

-

... More
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available

1

-

-

... More
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.

1

-

-

... More
Reconditioning of LV copper coil per kg

1

-

-

... More
Reconditioning of LV Aluminium coil per kg

1

-

-

... More
Providing and fitting of HV leg coil copper S.E (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil copper DPC (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil Aluminium S.E (per Kg)

1

-

-

... More
Providing and fitting of HV leg coil Aluminium DPC (per Kg)

1

-

-

... More
Providing and fitting of LV leg coil copper DPC (per Kg)

1

-

-

... More
Providing and fitting of LV leg coil Aluminium DPC (per Kg)

1

-

-

... More
Providing & fitting of HV bushing

1

-

-

... More
Providing & fitting of LV bushing

1

-

-

... More
Providing & fitting of HV bush rod (metal part) per rod

1

-

-

... More
Providing & fitting of LV bush rod (metal part) per rod

1

-

-

... More
Providing & fitting of gasket set

1

-

-

... More
Providing & fitting of LT terminal plate

1

-

-

... More
Providing & fitting of Oil drain valve

1

-

-

... More
Providing & fitting of core laminations per Kg

1

-

-

... More
Providing & fitting of sundry items

1

-

-

... More
Heat treatment of repaired transformer

1

-

-

... More
Arresting of oil leakages if any by way of welding etc.

1

-

-

... More
Painting of transformer body

1

-

-

... More
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.

1

-

-

... More
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer

1

-

-

... More
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer

1

-

-

... More
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.

1

-

-

... More
Manual carriage/Head load carriage of trabsformer from road side (to & fro)

-

-

-

... More
a) upto 500M

1

-

-

... More
b). Upto 1 km

1

-

-

... More
c). Upto 2km

1

-

-

... More
d). Upto 3km

1

-

-

... More
Providing and filling of transformer oil for topping (per litre)

1

-

-

... More
Rebate of copper scrap per kg

1

-

-

... More
Rebate of Aluminium scrap per kg

1

-

-

... More
Rebate of old T-oil per ltr.

1

-

-

... More
Rebate of burnt core lamination per kg

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.