Power Development Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Power Development Department - PDD Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date22 Feb 2025
Closing Date13 Mar 2025
Tender Amount₹ 1,41,080 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Route clearance for making path for safe working

1

-

1.05

... More
Unloading of PCC 8 Mtr Pole

1

-

131.25

... More
Average carriage of PCC 8 Mtr Pole upto 100 Mtr

1

-

147

... More
Average carriage of PCC 8 Mtr Pole upto 100 - 200 Mtr

1

-

152.25

... More
Average carriage of PCC 8 Mtr Pole above 200 Mtr

1

-

346.5

... More
Erection of PCC 8 Mtr Pole

1

-

840

... More
Dismantling of PCC Pole 8 Mtr Long

1

-

840

... More
Unloading of ST 8 Mtr Pole

1

-

42

... More
Average carriage of ST 8 Mtr Pole upto 100 Mtr

1

-

57.75

... More
Average carriage of ST 8 Mtr Pole upto 100 - 200 Mtr

1

-

96.6

... More
Average carriage of ST 8 Mtr Pole above 200 Mtr

1

-

231

... More
Erection of ST 8 Mtr Pole

1

-

761.25

... More
Dismantling of ST Pole 8 Mtr Long

1

-

472.5

... More
Unloading of PCC 9 Mtr Pole

1

-

147

... More
Average carriage of PCC 9 Mtr Pole upto 100 Mtr

1

-

162.75

... More
Average carriage of PCC 9 Mtr Pole upto 100 - 200 Mtr

1

-

178.5

... More
Average carriage of PCC 9 Mtr Pole above 200 Mtr

1

-

399

... More
Erection of PCC 9 Mtr Pole

1

-

1333.5

... More
Dismantling of PCC Pole 9 Mtr Long

1

-

1338.75

... More
Unloading of ST 9 Mtr Pole

1

-

47.25

... More
Average carriage of ST 9 Mtr Pole upto 100 Mtr

1

-

84

... More
Average carriage of ST 9 Mtr Pole upto 100 - 200 Mtr

1

-

110.25

... More
Average carriage of ST 9 Mtr Pole above 200 Mtr

1

-

336

... More
Erection of ST 9 Mtr Pole

1

-

955.5

... More
Dismantling of ST Pole 9 Mtr Long

1

-

577.5

... More
Unloading of PCC 11 Mtr Pole

1

-

189

... More
Average carriage of PCC 11 Mtr Pole upto 100 Mtr

1

-

199.5

... More
Average carriage of PCC 11 Mtr Pole upto 100 - 200 Mtr

1

-

220.5

... More
Average carriage of PCC 11 Mtr Pole above 200 Mtr

1

-

367.5

... More
Erection of PCC 11 Mtr Pole

1

-

1575

... More
Dismantling of PCC Pole11 Mtr Long

1

-

1575

... More
Unloading of ST 11 Mtr Pole

1

-

84

... More
Average carriage of ST 11 Mtr Pole upto 100 Mtr

1

-

126

... More
Average carriage of ST 11 Mtr Pole upto 100 - 200 Mtr

1

-

178.5

... More
Average carriage of ST 11 Mtr Pole above 200 Mtr

1

-

367.5

... More
Erection of ST 11 Mtr Pole

1

-

1165.5

... More
Dismantling of ST Pole 11 Mtr Long

1

-

708.75

... More
Unloading of ST 13 Mtr Pole

1

-

173.25

... More
Average carriage of ST 13 Mtr Pole upto 100 Mtr

1

-

225.75

... More
Average carriage of ST 13 Mtr Pole upto 100 - 200 Mtr

1

-

315

... More
Average carriage of ST 13 Mtr Pole above 200 Mtr

1

-

472.5

... More
Erection of ST 13 Mtr Pole

1

-

1365

... More
Dismantling of ST Pole 13 Mtr Long

1

-

861

... More
Straightening of tilted 8Mtr PCC pole

1

-

220.5

... More
Straightening of tilted 9Mtr PCC pole

1

-

262.5

... More
Straightening of tilted 11Mtr PCC pole

1

-

945

... More
Straightening of tilted 8Mtr ST pole

1

-

472.5

... More
Straightening of tilted 9Mtr ST pole

1

-

577.5

... More
Straightening of tilted 11Mtr ST pole

1

-

693

... More
Straightening of tilted 13Mtr ST pole

1

-

840

... More
Fixing of Barbed Wire for anti Climbing

1

-

42

... More
Erection of Danger Plates with Clamps

1

-

42

... More
Erection of Anti Climbing Device with Clamps

1

-

136.5

... More
Painting of LT ST Poles (8Mtr,9Mtr,11Mtr) and allied material

1

-

514.5

... More
Painting of HT ST Poles (8Mtr,9Mtr,11Mtr) and allied material

1

-

514.5

... More
Painting of HT ST Poles (13Mtr) and allied material

1

-

630

... More
Painting of Substation Poles and allied material

1

-

945

... More
Cement Bottoming of PCC/ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor)

1

-

3360

... More
Unloading of Line Materials

1

-

210

... More
Watch and Ward of Material

1

-

367.5

... More
Punching/Making of Holes on M S Channel

1

-

5.25

... More
Punching/Making of Holes on M S Angle Iron/Braces

1

-

4.2

... More
Fabrication of Ms Steel i.e Channel , Angle Braces etc at site as requirements

1

-

21

... More
Fixing of M S Channels 9 feet long

1

-

199.5

... More
Fixing of MS Channels 4.5/3 feet long along with Braces

1

-

204.75

... More
Fixing of M S Angle Iron 9 feet long

1

-

204.75

... More
Fixing of MS Angle Iron 5/4.5/3 feet long

1

-

173.25

... More
Dismantling of M S Channels 9 feet long

1

-

105

... More
Dismantling of MS Channels 4.5/3 feet long along with Braces

1

-

115.5

... More
Dismantling of M S Angle Iron 9 feet long

1

-

94.5

... More
Dismantling of MS Angle Iron 5/4.5/3 feet long

1

-

94.5

... More
Fixing of U-Clamps and Shackle Insulators

1

-

173.25

... More
Fixing/Installation of 11 KV Pin Insulators with Pins

1

-

89.25

... More
Fixing/Installation of 11 KV Disc Insulators with fittings

1

-

105

... More
Dismantling of Pin/ Disc/Shackle Insulators

1

-

52.5

... More
Installation of Link/DO/HG/Knife/LA Set

1

-

241.5

... More
Dismantling of Link/DO/HG/Knife/LA Set

1

-

137.55

... More
Installation of GO Set

1

-

1942.5

... More
Dismantling of GO Set

1

-

1480.5

... More
Unloading of CT/PT Unit

1

-

945

... More
Average carriage of CT/PT Unit upto 100 Mtr

1

-

892.5

... More
Average carriage of CT/PT upto 100 - 200 Mtr

1

-

892.5

... More
Erection of CT/PT Unit along with Trivector Meter

1

-

1942.5

... More
Erection of CTPT Unit

1

-

1627.5

... More
Testing and commissioning of CT/PT Unit

1

-

420

... More
Earthing of CT/PT Unit

1

-

945

... More
Unloading of 25/63/100KVA Transformer

1

-

1207.5

... More
Unloading of 250/400/500/630 KVA Transformer

1

-

3255

... More
Construction of Cement Platform (8x8x6), 3feet below ground level & 3feet below ground level for Distribution transformer 400/500/630 KVA (Matrerial to be provided by contractor)

1

-

57750

... More
Average carriage of 25/63/100 KVA upto 100 Mtr

1

-

1443.75

... More
Average carriage of 25/63/100 KVA 100 - 200 Mtr

1

-

1785

... More
Average carriage of 25/63/100 KVA above 200 Mtr

1

-

2310

... More
Average carriage of 250/400/500/630 KVA upto 100 Mtr

1

-

4068.75

... More
Average carriage of 250/400/500/630 KVA 100 - 200 Mtr

1

-

4882.5

... More
Average carriage of 250/400/500/630 KVA above 200 Mtr

1

-

5775

... More
Mounting of 25/63/100 KVA Transformer

1

-

2362.5

... More
Mounting of 250/400/500/630 KVA Transformer

1

-

3517.5

... More
Unmounting of 25/63/100 KVA Transformer

1

-

1496.25

... More
Unmounting of 250/400/500/630 KVA Transformer

1

-

2362.5

... More
Erection of HVDS 25KVA

1

-

2152.5

... More
Dismantling of HVDS 25KVA

1

-

1396.5

... More
Earthing of HVDS 25KVA

1

-

2100

... More
Fixing of Jumpers

1

-

147

... More
Dismantling of Jumper

1

-

136.5

... More
Earthing of poles for HT Line

1

-

472.5

... More
Earthing of poles for LT Line

1

-

472.5

... More
Earthing of Substation complete(Poles,Transformer,LA)

1

-

787.5

... More
Fixing of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCB with Box

1

-

1102.5

... More
Dismantling of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCB with Box

3

-

2047.5

... More
Testing and commissioning of Substation

1

-

1207.5

... More
De-Reeling & Laying of ACSR Conductor on Ground 20/30 mmsq

1

-

1.63

... More
Stringing of ACSR Conductor 20/30mmsq/Squirel /Weasel

1

-

3.1

... More
Dismantling of Old Squirell ACSR Conductor

1

-

2.1

... More
Dismantling of Old Weasel ACSR Conductor

1

-

2.1

... More
De-Reeling & Laying of ACSR Conductor on Ground 50/100 mmsq

1

-

1.63

... More
Stringing of ACSR Conductor 50/100 mmsq/Rabbit/Dog

1

-

4.2

... More
Dismantling of Old Rabbit ACSR Conductor

1

-

2.63

... More
Dismantling of Old Dog ACSR Conductor

1

-

2.63

... More
Tightening of loose conductor

1

-

1.05

... More
Erection of Guys in HT/LT Line

1

-

787.5

... More
Dismantling of Guys in HT/LT Line

1

-

472.5

... More
Fixing of Suspension/Anchoring Clamps

1

-

173.25

... More
De-Reeling & Laying of HT AB/XLPE Cable (25/35/50 mmsq) on ground

1

-

3.15

... More
Erection/Stringining of HT AB/XLPE Cable (25/35/50 mmsq)

1

-

8.4

... More
Dismantling of HT AB/XLPE Cable 25/35/50 mmsq

1

-

4.2

... More
De-Reeling & Laying of HT AB/XLPE Cable 70/95/120 mmsq on ground

1

-

6.3

... More
Erection/Stringining of HT AB/XLPE Cable 70/95/120 mmsq

1

-

9.45

... More
Dismantling of HT AB/XLPE Cable 70/95/120 mmsq

1

-

6.3

... More
De-Reeling & Laying of HT AB/XLPE Cable 150/185mmsq on ground

1

-

9.45

... More
Erection/Stringining of HT AB/XLPE Cable 150/185mmsq

1

-

12.6

... More
Dismantling of HT AB/XLPE Cable 150/185mmsq

1

-

8.4

... More
De-Reeling & Laying of HT AB/XLPE Cable 240/300 mmsq on ground

1

-

9.45

... More
Erection/Stringining of HT AB/XLPE Cable 240/300 mmsq

1

-

12.6

... More
Dismantling of LT AB/XLPE Cable 240/300 mmsq

1

-

9.45

... More
De-Reeling & Laying of LT AB/XLPE Cable 25/35/50 mmsq on ground

1

-

4.2

... More
Erection/Stringining of LT AB/XLPE Cable 25/35/50 mmsq

1

-

7.35

... More
Dismantling of LT AB/XLPE Cable 25/35/50 mmsq

1

-

3.15

... More
De-Reeling & Laying of LT AB/XLPE Cable 70/95/120 mmsq on ground

1

-

6.3

... More
Erection/Stringining of LT AB/XLPE Cable 70/95/120 mmsq

1

-

9.45

... More
Dismantling of LT AB/XLPE Cable 70/95/120 mmsq

1

-

6.3

... More
De-Reeling & Laying of LT AB/XLPE Cable 150/185mmsq on ground

1

-

9.45

... More
Erection/Stringining of LT AB/XLPE Cable 150/185mmsq

1

-

12.6

... More
Dismantling of LT AB/XLPE Cable 150/185mmsq

1

-

6.3

... More
De-Reeling & Laying of LT AB/XLPE Cable 240/300 mmsq on ground

1

-

12.6

... More
Erection/Stringining of LT AB/XLPE Cable 240/300 mmsq

1

-

15.75

... More
Dismantling of HT AB/XLPE Cable 240/300 mmsq

1

-

9.45

... More
Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables of HT/LT Lines

1

-

1627.5

... More
Fixing of Mid Span Straight Jointer Kit for AB/XLPE cables of HT/LT Lines

1

-

1627.5

... More
Earthing of Cable

1

-

1207.5

... More
Testing and commissioning of AB/XLPE cables of HT/LT Lines

1

-

2.1

... More
Testing and commissioning of HT/LT Lines

1

-

2.1

... More
Inspection of AB/XLPE cables of HT/LT Lines

1

-

4.2

... More
Inspection of HT/LT Lines

1

-

4.2

... More
Fixing of IPC 120/50mm

1

-

173.25

... More
Fixing of Single Phase Meters

1

-

126

... More
Fixing of Three Phase Meters

1

-

577.5

... More
Dismantling of Single Phase Meters

1

-

105

... More
Dismantling of Three Phase Meters

1

-

367.5

... More
Laying & Erection of Service Wire Twin Core 4/6 mmsq

1

-

2.1

... More
Laying & Erection of Service Wire Twin Core 10/16 mmsq

1

-

2.63

... More
Dismantling of Service Wire Twin Core 4/6 mmsq

1

-

1.31

... More
Dismantling of Service Wire Twin Core 10/16 mmsq

1

-

1.58

... More
Installation of 3 Phase 4 Wire Progidy Energy Meter

1

-

2625

... More
Dismantling of 3 Phase 4 Wire Progidy Energy Meter

1

-

1575

... More
Erection of DB/METER Box on PCC/ST Poles

1

-

126

... More
Fixing of Guard netting of HT/LT Line

1

-

1680

... More
Dismantling of Guard netting of HT/LT Line

1

-

1050

... More
Supply and installation of Chain link Fencing of 11/0.415 kV Yard of Substation by way of Mass Concrete in Foundations and chain link fencing of 6 ft height with access door facility including Painting with aluminum paint of approved brand and Manufacture to give an even shade.

1

-

3360

... More
Electrical illumination of Government buildings including laying and dismantling of LED Laries/Stripes of 15 Mtr length of different colors for Ist day on rental basis (Under Jurisdiction of ED-II Jammu).

1

-

45

... More
Electrical illumination of Government buildings including laying and dismantling of LED Laries/Stripes of 30 Mtr length of different colors for Ist day on rental basis (Under Jurisdiction of ED-II Jammu).

1

-

75

... More
Collection & Manual Carriage of Un-Utilized 8/9 Mtr. PCC Poles lying on Ground to Stacking Site (Average carriage 100 Mtr), under the Municipal Limits of Jammu City falling under the jurisdiction Electric Division-II, JPDC Jammu.

1

-

700

... More
Dismantling of Un-utilized/Idle PCC Poles 8/9 Mtr, back filling of Pit with earth, Manual Carriage of Dismantled Poles from dismantling site to Stacking Site (Average carriage 100 Mtr), under the Municipal Limits of Jammu City falling under the jurisdiction of Electric Division-II, JPDC Jammu.

1

-

1200

... More
Collection & Manual Carriage of Un-utilized 8/9 Mtr ST Poles lying on ground to stacking site (Average carriage 100 Mtr), under the Municipal Limits of Jammu City falling under the jurisdiction of Electric Division-II, JPDC Jammu and Write Back to Divisional Store Miran-Sahib.

1

-

500

... More
Dismantling of Un-Utilized/Idle 8/9 Mtr ST Poles, Back filling of Pit with earth, Manual Carriage of Dismantling Poles from dismantling site to Stacking Site (Average carriage 100 Mtr), under the Municipal Limits of Jammu City falling under the jurisdiction of Electric Division-II, JPDC Jammu and Write Back to Divisional Store Miran-Sahib.

1

-

1500

... More
Loading of Dismantled Un-Utilized/Idle 8/9 Mtr PCC Poles from stacking sites in the Truck at different locations falling under the jurisdiction of ED-II Jammu and Mechanical carriage including unloading at Dumping site Bhagwati Nagar near Fourth Tawi Bridge and if any healthy/un-broken PCC poles found shall be write back to divisional stores.

1

-

400

... More
Loading of Dismantled Un-Utilized/Idle 8/9 Mtr ST Poles from stacking sites in the Truck at different locations falling under the jurisdiction of ED-II Jammu and Mechanical carriage including unloading and Stacking at Divisional Stores Miran Sahib.

1

-

500

... More
Providing and fixing of Twin core LT AB cable 16 mm Sq. with 16 mm sq. messanger wire with suitable IPC for new street light and for functioning of existing Street Lights.

1

-

155

... More
Write Back of Dismantled Material to Divisional Store

1

-

1575

... More
Unloading of write back Material at Divisional Store Miran Sahib Jammu

1

-

262.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.