Power Development Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Power Development Department - PDD Tender
Excavation
Eprocure
Opening Date6 Sep 2021
Closing Date20 Oct 2021
Tender Amount₹ 53,05,000
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_PDD_137970_1Bid Award Id
ViewTender No
eNIT No. 8 of 2021Tender Authority
Power Development Department ViewPurchaser Address
-Website
http://http://www.jkpdd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Shifting of 33 KV G4 and Canal Medical Line of self supporting structure at Jewel Jammu
Shifting of 33 KV G4 and Canal Medical Line of self supporting structure at Jewel Jammu
BOQ Items
Lean pad with ratio of 1:5:10 = 1.9x1.9x0.1
0.36
-
-
RCC with ratio 1:1.5:3 including the cost of sand agg. And cement but excluding the cost of steel volume (a)1.6x1.6x0.5 (b)1.3x1.3x2.5
5.51
-
-
Carriage of fabricated pieces of steel (12 mm risers) and reinforcement making reinforcement mesh as per design and with the help of winding wire by Mechanical Transport Av. Lead 15 Km.
0.66
-
-
Carriage of fabricated stubs. Base cleats and top belts from fabrication site,assembling of four no. stubs with the help of 56x56x6 mm brasses, fittting of base cleats leveling the base of foundation from top of plum concrete and concreting
0.35
-
-
Form work of supple planks up to the ground level = 4 sides x 1.6x0.5+4 sidesx1.3x2.5
16.2
-
-
Plastering 20 mm with coarse sand with the ratio of 1:4 for 4 sides ( 1.3x0.30)
1.56
-
-
Steel reinforcement for R.C.C work including straighting, Cutting, Bending, Placing in position and binding all complete upto plinth level Cold twisted bars for foundation ( Concrete quantity =1.28+4.23=5.51 Cum @120kg per cum)
661.2
-
-
Carriage of sand and agg. from collection site to loading site by manual labour volume = 78.63+155.2=233.83sqft/6.62m3 average distance = 300 Mtrs
7.57
-
-
Carriage of sand and agg. From loading site by empty vol = 21.72 m3 average Distance = 25 Kms
7.57
-
-
Watch and ward of materials 2 labour
10
-
-
Provision of misc items
1
-
-
Cost of stub of galavanised iron (130x130x12 mm 3.04 m long)
286
-
-
Angle Iron (65x65x6 mm) for braces
18
-
-
Channel iron (100x50x6 mm) for top base
26
-
-
Cleats for base of stub
12
-
-
Nuts and Bolts of sizes
5
-
-
Fabrication charges
342
-
-
Part-B
Galvanized M.S. Channel (a) Belts 16 Nos x 1 M = 16 Mtrs (b) X-arm = 2 x 3 MT + 2 x1 MT = 8 MT + 10% wastage
260
-
-
Galvanized M.S. Angle Iron 130x130x10 mm = CI = 4 x5 MTs cleats 0-5x4 = 2 MTS Total 22 MTS + 10 % wastage
480
-
-
Galvanized M.S. Angle Iron 100x100x10 mm (C2C3) = 4x5 MTS + 2 Nos x 4x2.5 = 40 MTS Cleats 3x4x0.5 = 6 MTS total 46 MTs + 10 % wastage
770
-
-
Galvanized M.S. Angle 75x75x6 mm = 4x12x1.80 = 86.40 MTS +10% wastage = 95 MTS
646
-
-
Galvanized Nuts & Bolts of different sizes i.e. 4''x3'' & 2''
150
-
-
Provision of drill bit, PVC wire, chisel, oxygen gas, sharpening of tools
1
-
-
Welding Rod
10
-
-
Misc. items / Unforessen items
1
-
-
Fabrication charges for 15 MTS Self Supporting Structure (including GST @18%)
2156
-
-
Part-C
33 KV Disc Insulator Polymer with panther fitting
24
-
-
33 KV Polymer Pin Insulators
12
-
-
Cross arm channel 10' - 08 Nos.
(100 x 50 x 6 ) 80' i.e.24.39m x 9.2 Kg/m
224
-
-
Guard netting cross (65 x 6 ) Angle 14' - 04 Nos.
56' i.e. 17.07m x 5.8 kg/m
100
-
-
ACSR Panther conductor
1.5
-
-
G.I.Wire for guard netting
50
-
-
Jumper sets
4
-
-
Part-D
33 KV Disc Insulator Polymer with panther fitting
12
-
-
33 KV Polymer Pin Insulators
9
-
-
Cross arm channel 10' - 04 Nos.
(100 x 50 x 6 ) 40' i.e 12.19m x 9.2 Kg/m
112
-
-
Guard netting cross (65 x 6 ) Angle 14' - 06 Nos.84' i.e. 25.60 m x 5.8 kg/m
148
-
-
ACSR Panther conductor
1.5
-
-
G.I.Wire for guard netting
50
-
-
Jumper sets
4
-
-
ST Pole 16 mtrs.
1
-
-
Cross arm channel 08' - 01 No.
(100 x 50 x 6 ) 08' i.e.2.43 m x 9.2 Kg/m
22.35
-
-
Bracesses 6' - 02 Nos. (65 x 6 ) Angle 12' - .i.e. 3.65 m x 5.8 kg/m
21.17
-
-
Part-E
ST Pole / Rail 13 Mtr
6
-
-
ST Pole 11 Mtr
3
-
-
33 KV Disc Insulator Porcelian with panther fitting
54
-
-
33 KV Pin Insulators with pins
12
-
-
Cross arms 10'
250
-
-
Guard netting cross
125
-
-
Belts 8 '
255
-
-
Braces 12'
509
-
-
Jumpers set
3
-
-
GI wire
50
-
-
ACSR Panther Conductor
1.2
-
-
Part-F
ST Pole / Rail 13 Mtr
2
-
-
ST Pole 11 Mtr
3
-
-
33 KV Disc Insulator Porcelian with panther fitting
36
-
-
Pin Insulators 33 KV
3
-
-
Cross arms 10'
6
-
-
Guard netting cross
1
-
-
Belts 8 '
4
-
-
Braces 12'
4
-
-
Jumpers set
6
-
-
ACSR Wolf Conductor
1.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements