Irrigation And Flood Control Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date29 Apr 2024
Closing Date6 May 2024
Tender Amount₹ 3,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ordinary Rock

1

392

392.8

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material :

-

-

-

... More
All kinds of soil

1

89

89.75

... More
Ordinary Rock

1

161

161

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

218

218.4

... More
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil:

1

467

467.3

... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.

1

1249

1249.1

... More
Providing and Laying PVC (Type B) Pipes with all required accessories (if any) all carriages included, for outlets (Complete)

-

-

-

... More
150mm Dia

1

500

500

... More
200mm Dia

1

650

650

... More
300mm Dia

1

850

850

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones

1

371

371.15

... More
Dumping stone excluding cost of stones.

-

-

-

... More
In Horizontal on level

1

237

237.9

... More
On Slopes (Behind pitching)

1

261

261.45

... More
Opening out old wire crates those and re-binding after filling.

1

35

35.6

... More
Supply of Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%)

1

700

700

... More
Supply of Stone boulder (quarry) nominal size 225 mm (Stack measurements reduced by 15%)

1

1175

1175

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.

1

7

7.8

... More
Unloading sand/earth filled bags from boats

-

-

-

... More
Placing in dry

1

9

9.25

... More
Placing in Water

1

18

18.5

... More
Shingle clearance from canals.

1

148

148

... More
Weed clearance, From canals (including extraction of roots)

1

13

13.45

... More
Slip Clearance

-

-

-

... More
In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.

1

154

154.15

... More
In soils ; mixed with moorum /Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.

1

331

331.15

... More
Engagement of Labourer (Skilled)

1

734

734

... More
Engagement of Labourer (Unskilled)

1

553

553

... More
Engagement of Boatman

1

625

625

... More
Engagement of Boat (Capacity Upto 20.00 Cum)

1

1050

1050

... More
Engagement of Cutting Saw Machine Including POL and Operator(Complete)

1

1350

1350

... More
Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment)

1

281

281.3

... More
Suuplying and Stacking of Stone Dust at Site Including Royality(Complete)

1

770

770

... More
Suuplying and Stacking of Sand at Site Including Royality(Complete)

1

770

770

... More
Engagement of JCB including POL and driver complete for variou canal operations including removal of encroachments

1

1400

1400

... More
Idle Chrages

1

800

800

... More
Engagement of Poclain/L&T(Chain Driven or Wheel Driven) Including POL and driver Complete.

1

3000

3000

... More
Idle Chrages

1

2000

2000

... More
Hire Charges of Contract Carrier (vehicle) Like Sumo/Scorpio/Tawera during day or night alongwith licensed comercial driver for site inspection/Emergency Situations/ movement of officials within the Divisional jurisdiction including Driver and POL on need basis only within an average of 20Km's Journey or a Part thereof (complete).

1

1500

1500

... More
For additional Lead of every Km beyond 20Km Lead

1

50

50

... More
Spreading, laying and fixing of LDP/HDP to check/stop the leakages of canals including the fixing/locking arrangements by any means through the entire length/breadth as per the requirement at site of work and as desired by Engineer Incharge. Complete in all respects.

1

20

20

... More
Providing wood work in frames of false ceiling, partitions, flumes etc, sawn and fixed in position including all sorts of carriages and other incidentals /accessories etc (Complete Job). Poplar Wood

1

850

850

... More
Providing and fixing 0. 50mm thick (zinc coating not less than 275gm's/Sqm), Plane G.S. Sheets over wooden frames for flumes incuding curved, vertical surfaces fixed with G.I. limpet washers, nails and other accessories. excluding the cost of wood work but including cutting to size and shape weherever required including all sorts of carriages as per the directions of the Engineer-In-Charge Complete Job in all respects.

1

500

500

... More
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.66

... More
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.

1

286

286.35

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded

1

138

138.2

... More
Engagement of Contract Carrier for carriage of material within jurisdiction including Driver and (POL) if and when needed Upto an average lead of 20Km's Journey or a part thereof. (Complete) a) Auto Having a load carrying capacity of 1MT.

1

800

800

... More
For additional Lead of every Km beyond 20Km Lead

1

50

50

... More
Providing refreshment to supervisory staff for restoration of water during night /day or the participants of the Independence Day , Republic day or other official Functions complete job including packing at venue with following Menu :

-

-

-

... More
Water Bottle One litre.

1

20

20

... More
Boiled Egg.

1

10

10

... More
Dal 50 g Pack.

1

10

10

... More
Banana.

1

10

10

... More
Tea Sugar each Cup.

1

20

20

... More
Tea Namkeen each Cup.

1

20

20

... More
Butter Toast

1

20

20

... More
Bread Slice

1

10

10

... More
Normal Chicken Biryani One Plate for Each Person.

1

150

150

... More
Veg Fried Rice/Biryani Veg One Plate for Each Person

1

120

120

... More
Mutton Kabab Kanti With Naan

1

240

240

... More
Chicken Kanti With Naan

1

220

220

... More
Mutton Kanti With Naan

1

250

250

... More
Normal Mutton Kabab

1

100

100

... More
Carriage of material from Approved Source up to dumping site of work, including loading, unloading and stacking etc. complete by Mechanical Transport

-

-

-

... More
Crates for an avg. lead upto 01 Kms

1

343

343.32

... More
Crates for an avg. lead upto 02 Kms

1

393

393.17

... More
Crates for an avg. lead upto 03 Kms

1

442

442.23

... More
Crates for an avg. lead upto 04 Kms

1

489

489.56

... More
Crates for an avg. lead upto 05 Kms

1

535

535.3

... More
Crates for an avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

41

41.77

... More
Crates from an avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

34

34.9

... More
Crates from an avg. lead beyond 20 Kms per additional Km

1

29

29.43

... More
Sand/20mm Agg/Stone Dust for an average lead of upto 01 Kms

1

128

128.75

... More
Sand/20mm Agg/Stone Dust for an average lead upto 02 Kms

1

147

147.44

... More
Sand/20mm Agg/Stone Dust for an average lead upto 03 Kms

1

165

165.84

... More
Sand/20mm Agg/Stone Dust for an average lead upto 04 Kms

1

183

183.58

... More
Sand/20mm Agg/Stone Dust for an average lead upto 05 Kms

1

200

200.74

... More
Sand/20mm Agg/Stone Dust for an average lead beyond 5 Kms upto 10 Kms (per Km)

1

15

15.66

... More
Sand/20mm Agg/Stone Dust for an average lead beyond 10 Kms upto 20 Kms (per Km)

1

13

13.09

... More
Sand/20mm Agg/Stone Dust for an average lead beyond 20 Kms per additional Km

1

11

11.04

... More
Earth for an avg. lead of upto 01 Kms

1

160

160.93

... More
Earth for an avg. lead upto 02 Kms

1

184

184.3

... More
Earth for an avg. lead upto 03 Kms

1

207

207.3

... More
Earth for an avg. lead upto 04 Kms

1

229

229.48

... More
Earth for an avg. lead upto 05 Kms

1

250

250.92

... More
Earth for an avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

19

19.58

... More
Earth for an avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

16

16.38

... More
Earth for an avg. lead beyond 20 Kms per additional Km

1

13

13.8

... More
Empty Cement Bags for an avg. lead of upto 01 Kms

1

51

51.5

... More
Empty Cement Bags for an avg. lead upto 02 Kms

1

58

58.98

... More
Empty Cement Bags for an avg. lead upto 03 Kms

1

66

66.33

... More
Empty Cement Bags for an avg. lead upto 04 Kms

1

73

73.43

... More
Empty Cement Bags for an avg. lead upto 05 Kms

1

80

80.3

... More
Empty Cement Bags for an avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

6

6.27

... More
Empty Cement Bags for an avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

5

5.23

... More
Empty Cement Bags for an avg. lead beyond 20 Kms per additional Km

1

4

4.41

... More
Stone soling avg. lead of upto 1 Km

1

151

151.47

... More
Stone soling avg. lead upto 2 Kms

1

173

173.46

... More
Stone soling avg. lead upto 3 Kms

1

195

195.1

... More
Stone soling avg. lead upto 4 Kms

1

215

215.98

... More
Stone soling avg. lead upto 5 Kms

1

236

236.16

... More
Stone soling avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

18

18.43

... More
Stone soling avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

15

15.4

... More
Stone soling avg. lead beyond 20 Kms per additional Km

1

12

12.98

... More
Extra Carriage of material from dumping site to actual site of work, including loading, unloading and stacking etc. complete by manual labour

-

-

-

... More
Cement for an avg. lead upto 50 mtr.

1

116

116.22

... More
Cement for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

17

17.05

... More
Steel for an average lead upto 50Mtr

1

249

249.61

... More
Steel for an every additionaal lead of 50Mtrs or part thereof beyond 1st 50Mtrs

1

36

36.63

... More
Soling for an avg. lead upto 50 mtr.

1

236

236.08

... More
Soling for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

51

51.4

... More
Sand/20mm Agg/Stone Dust for an average lead upto 50Mtr

1

200

200.67

... More
Sand/20mm Agg/Stone Dust for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
Earth for an average lead upto 50Mtrs

1

200

200.67

... More
Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
Empty Cement bags for an average lead upto 50Mtrs

1

37

37.46

... More
Empty Cement bags for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

8

8.16

... More
Crates for an average lead upto 50Mtrs

1

146

146.51

... More
Crates for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

21

21.5

... More
Providing and fixing of Sign boards/ Flex banners of required size as per the directions of Engineer In-charge attached with light wieght square section Mild steel frame including all sorts of carraige complete.

1

40

40



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.