Irrigation And Flood Control Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Irrigation And Flood Control Department Tender
Civil And Construction
Eprocure
Opening Date19 May 2020
Closing Date28 May 2020
Tender Amount₹ 2,25,000
Costs
EMD
₹ 4,500Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_IFC_97044_7Bid Award Id
ViewTender No
eNIT No. 06 of 05/2020-21Tender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-Website
http://www.mstcindia.co.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Clearing Jungle including uprooting rank, vegetation, grass, brush wood, trees and sapling of girth upto to 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m. outside the periphery of the area cleared.
1
-
5.85
Construction of Muthu Bunds, comprising boulders and wood bushes in alternate layes , including working in water situations.
1
-
607.15
Silt clearance from canals , inclusive of initial lead and Lift (50 m& 1.5 respectively ) 70 % dry & 30% wet .
1
-
62.7
Supply of empty cement bags.
1
-
2
Filling of empty cement bags with sand/earth, including cost of sewing and strings , excluding cost of bags and earth / sand.
1
-
3.7
Carriage of earth for avg. distance from source to site of work 200M by head load.
1
-
156.25
Loading of sand / earth filled bags in lorries/ Boats lead upto 50M .
1
-
2.3
Uuloading of sand / earth filled bags in lorries/ Boat a) placing in dry.
1
-
4.35
Unloading of sand / earth filled bags in lorries/ Boat : b) Placing of sand / earth filled bags in wet
1
-
8.7
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work up to plinth level 1:4:8 (1 Cement:4 coarse sand : 8 graded stone agg. 40mm nominal size). Crushed
1
-
3112.8
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work upto plinth level. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Crushed.
1
-
3707.4
Dumping stone excluding cost of stones in horizontal on level.
1
-
115.05
Hand packing stone into wire crates excluding cost of crates and stones.
1
-
177.7
Supply of stones.
1
-
212
Carriage of Stone avg. distance from source to site of work 10 Km by MT and 100M by head load.
1
-
337.5
Opening out old wire crates repairing those and re-binding after filling.
1
-
17.05
12 mm cement plaster of mix 1:4 (1 Cement:4 coarse sand).
1
-
158.65
Centering and shuttering incl. strutting, propping etc and removal of form work: For a foundations, footings bases of columns etc for mass concrete.
1
-
179.25
Centering and shuttering incl. strutting, propping etc and removal of form work: Walls ( any thickness) including attached pilasters, buttresses, plinth and string courses etc.
1
-
342.8
Carriage of Sand and Bajri avg. distance from sources to site of work 10 Km by MT and 100M by head load.
1
-
286.87
Deployment of JCB machine including POL charges for all sorts of works, not measurable.
1
-
1000
Supply of labour for all sort of works, out of purview of SSR of 2012.
1
-
300
Carriage of crates avg. 10 Km by MT and 100M by head load.
1
-
562.73
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements