Irrigation And Flood Control Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department Tender

Civil And Construction
Eprocure
Opening Date19 May 2020
Closing Date28 May 2020
Tender Amount₹ 2,25,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing Jungle including uprooting rank, vegetation, grass, brush wood, trees and sapling of girth upto to 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m. outside the periphery of the area cleared.

1

-

5.85

... More
Construction of Muthu Bunds, comprising boulders and wood bushes in alternate layes , including working in water situations.

1

-

607.15

... More
Silt clearance from canals , inclusive of initial lead and Lift (50 m& 1.5 respectively ) 70 % dry & 30% wet .

1

-

62.7

... More
Supply of empty cement bags.

1

-

2

... More
Filling of empty cement bags with sand/earth, including cost of sewing and strings , excluding cost of bags and earth / sand.

1

-

3.7

... More
Carriage of earth for avg. distance from source to site of work 200M by head load.

1

-

156.25

... More
Loading of sand / earth filled bags in lorries/ Boats lead upto 50M .

1

-

2.3

... More
Uuloading of sand / earth filled bags in lorries/ Boat a) placing in dry.

1

-

4.35

... More
Unloading of sand / earth filled bags in lorries/ Boat : b) Placing of sand / earth filled bags in wet

1

-

8.7

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work up to plinth level 1:4:8 (1 Cement:4 coarse sand : 8 graded stone agg. 40mm nominal size). Crushed

1

-

3112.8

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work upto plinth level. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Crushed.

1

-

3707.4

... More
Dumping stone excluding cost of stones in horizontal on level.

1

-

115.05

... More
Hand packing stone into wire crates excluding cost of crates and stones.

1

-

177.7

... More
Supply of stones.

1

-

212

... More
Carriage of Stone avg. distance from source to site of work 10 Km by MT and 100M by head load.

1

-

337.5

... More
Opening out old wire crates repairing those and re-binding after filling.

1

-

17.05

... More
12 mm cement plaster of mix 1:4 (1 Cement:4 coarse sand).

1

-

158.65

... More
Centering and shuttering incl. strutting, propping etc and removal of form work: For a foundations, footings bases of columns etc for mass concrete.

1

-

179.25

... More
Centering and shuttering incl. strutting, propping etc and removal of form work: Walls ( any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

-

342.8

... More
Carriage of Sand and Bajri avg. distance from sources to site of work 10 Km by MT and 100M by head load.

1

-

286.87

... More
Deployment of JCB machine including POL charges for all sorts of works, not measurable.

1

-

1000

... More
Supply of labour for all sort of works, out of purview of SSR of 2012.

1

-

300

... More
Carriage of crates avg. 10 Km by MT and 100M by head load.

1

-

562.73



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.