Housing And Urban Development Authority Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Housing And Urban Development Authority - HIMUDA Tender

Works
Civil And Construction
Eprocure
Opening Date5 Oct 2024
Closing DateCancelled
Tender Amount₹ 15,67,195 
Notes
Download

Costs

Summary

Self Financing Scheme At Basal Distt Solan Hp

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and apply a cement based polymer modified rebar corrosion protection system to existing reinforcement Corrosion Inhibitor, Product requirements: Carbonation resistance: 2mm of Corrosion inhibitor corresponds to 20mm of normal mortar ; bond strength 1N/mm2 according to ASTM C 882-78 including carriage of material in all leads and lifts.

30

4260

142

... More
P & F of Extra 12mmX 120MM deep L-type shear rebar connector Providing and supplying heavy duty Resin Epoxy Chemical Mortar with Steel Rebar. The product should be approved by ETA,ICC, CSTB, COLA, BZS with Shock approval, Seismic approval in Rebars to use in cracked/un-cracked concrete, tested for service temperature of -40deg C to +80 deg C. The chemical should have ETA for service life of 100 years & seismic rebar as a minimum qualifying criteria. The installation depth shall be supported by design based on EC2/TR069/TR066/HIT-Rebar Design Method using Profis Rebar Software. Drilling hole with double flute type drill bits/hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A12 battery dispenser along with piston plug and extension hose for longer depths to ensure no air bubbles are in the hole and then fixing with Rods, conducting occasional site inspection, executing work by trained personnel and occasional supervision from the manufacturer’s representative in India. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. Scanning before drilling to be done with HILTI PS 300 to avoid hitting existing rebars. Pull out test report shall be submitted to the Structure engineer to validate the installation quality including carriage of material in all leads and lifts.

366.66

212662

580

... More
P & F of Extra rebar 20mm dia*300mm depth Vertically: Providing and supplying heavy duty Resin Epoxy Chemical Mortar with Steel Rebar. The product should be approved by ETA,ICC, CSTB, COLA, BZS with Shock approval, Seismic approval in Rebars to use in cracked/un-cracked concrete, tested for service temperature of -40deg C to +80 deg C. The chemical should have ETA for service life of 100 years & seismic rebar as a minimum qualifying criteria. The installation depth shall be supported by design based on EC2/TR069/TR066/HIT-Rebar Design Method using Profis Rebar Software and approved. Drilling hole with double flute type drill bits/hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A12 battery dispenser along with piston plug and extension hose for longer depths to ensure no air bubbles are in the hole and then fixing with Rods, conducting occasional site inspection, executing work by trained personnel and occasional supervision from the manufacturer’s representative in India. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. Scanning before drilling to be done with HILTI PS 300 to avoid hitting existing rebars. Pull out test report shall be submitted to the Structure engineer to validate the installation quality including carriage of material in all leads and lifts.

66

231768

3511.65

... More
P & F of Extra rebar 16mm dia*300mm depth Vertically: Providing and supplying heavy duty Resin Epoxy Chemical Mortar with Steel Rebar. The product should be approved by ETA,ICC, CSTB, COLA, BZS with Shock approval, Seismic approval in Rebars to use in cracked/un-cracked concrete, tested for service temperature of -40deg C to +80 deg C. The chemical should have ETA for service life of 100 years & seismic rebar as a minimum qualifying criteria. The installation depth shall be supported by design based on EC2/TR069/TR066/HIT-Rebar Design Method using Profis Rebar Software and approved. Drilling hole with double flute type drill bits/hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A12 battery dispenser along with piston plug and extension hose for longer depths to ensure no air bubbles are in the hole and then fixing with Rods, conducting occasional site inspection, executing work by trained personnel and occasional supervision from the manufacturer’s representative in India. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. Scanning before drilling to be done with HILTI PS 300 to avoid hitting existing rebars. Pull out test report shall be submitted to the Structure engineer to validate the installation quality including carriage of material in all leads and lifts.

76

70300

925

... More
Providing extra reinforcement with TMT bars as per site design requirement including straightning, cutting, bending, placing in position, binding with G.i. wire of 18 gauge etc. complete in all respects. Additional reinforcement with adequate lap length & rings at required spacing shall be tied with existing reinforcement using binding wire or welded complete as per site requirements and direction of EIC including carriage of material in all leads and lifts.

1724.42

187961

109

... More
P, M & A of epoxy resin bonding agent concrete: Providing, mixing & applying two component epoxy resin concrete bonding coat on prepared Rcc surfaces as per manufacture specification excluding preparation of surface by chippimg and thoroughly cleaning of surface complete wherever required including carriage of material in all leads and lifts.

18.33

10594

578

... More
Centering and shuttering including strutting, propping etc. and removal of form including carriage of material in all leads and lifts. Columns, Pillars, Piers, Abutments, Posts and Struts

31.85

20479

643

... More
S & A of non-shrink cement micro concrete Supply and apply a ready to use non shrink, cementitious free flow microconcrete Product: Microconcrete ready to use material Yield: Approx 17ltr/bag (30kg) Product requirements: Compressive strength60 N/mm2(28 days) according to ASTM C 1107-99 including carriage of material in all leads and lifts.

4.17

285494

68464

... More
Drilling and fixing injection packers in RC members including, Drilling Holes: Drilling holes in structural members at the intervals as per recommendation of engineer in charge. Cleaning of holes: Clean the holes by air blower prior to fixing nozzles. Fixing of Packers: Insert 12 mm dia., 50~75 mm non corrosive type long injection packers in cleaned holes with mositure insensitive epoxy resin based putty or equivalent. Cutting of Packers: Cut the packers by cut of wheel after completion of grouting without damaging structural elements. including carriage of material in all leads and lifts.

500

137000

274

... More
Supply a moisture intensive, epoxy resin based injection grout for wet or damp location. Very Low viscosity epoxy material: 100 cps at 35 deg cel Mixed Density: 1060 kg/m3 Product requirements: Tensile strength 30 N/mm2 ; compressive strength 93 N/mm2 after 7 days. including carriage of material in all leads and lifts.

200

391200

1956



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.