Himachal Pradesh University Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh University - HPU Tender

Works
Paints and Enamels
Eprocure
Opening Date15 Jan 2024
Closing Date30 Jan 2024
Tender Amount₹ 20,46,374 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and fixing M.S. B.P. Sheet 1.66mm to 2mm thick in eaves board /fascia/soffits/ceiling including cutting, fixing and welding to steel roof members and applying a coat of red lead primer complete as per the instructions of Engineer-in-charge. (Base members of steel work shall be measured and paid separately).

92.46

-

-

... More
Steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of red lead paint: a) In beams joists channels, angles, tee flats with connecting plates or angle cleats as in main and cross beams, hip and jack rafters, purlins connected to common rafters and the like.

156.93

-

-

... More
Brick work (2nd Class Bricks) using common burnt clay building bricks in foundation andplinthin :-Cement Mortar 1:6 (1 Cement :6 Sand )

29.94

-

-

... More
Half brick masonry (2nd class) using common burnt clay building bricks in Cement mortar 1:4 (1cement: 4 sand).

217.44

-

-

... More
15 mm cement plaster in single coat on rough side of Brick/concrete/stone walls for interior plastering upto floor two level including arrises, internal rounded angles, chamfers and/ or rounded angles not exceeding 80 mm in girth and finished even and smooth. a) Cement Mortar 1:6

434.88

-

-

... More
Providing wood work in frames of false ceiling partitions etc. sawn and put-up in position a) 2nd class Kail wood.

1.02

-

-

... More
Providing and fixing partical board ceiling of approved quality with butt jointing and nail (frame work and cover fillets to be paid for separately. a) Cement bonded particle board.6 mm thick

183.6

-

-

... More
Finishing wall with weather proof exteriorgrade emulsion of approved design(Apexultima) or its equivalent on undecorated wall surfaces (two coats) to give an even shade and final finish after thoroughly cleaning the surface to remove all dirt, dust and other foreign matter etc. including sand paper smooth complete.

331.59

-

-

... More
Painting two coats (excluding priming coat) on new steel and other metal surfaces with enamel paint brushing to give an even shade including cleaning the surface of all dirt, dust and other foregin matters. a) Enamel paint other than white.

92.46

-

-

... More
Applying priming coat over new wood and wood based surfaces after and including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter sand papering and knotting. a) Ready mixed paint brushing wood primer pink.

183.6

-

-

... More
Painting two coats (excluding priming coat) on new wood and wood based surface with enamel paint togive an even shade including cleaning the surface of dirt, dust and other foreign matter, sand papering & stoping. a) With enamel paint other than white.

201.96

-

-

... More
Excavation in foundations, trenches etc. in earth work, lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres. a) Pick & Jumper work.

16.12

-

-

... More
Providing under layer for plinth protection of 75mm thick (unconsolidated) bed dry brick/stone aggregated 40mm nominal size with rammed and consolidated and grouted with fine sand including preparation of ground.

134.4

-

-

... More
Providing Plinth Protection 50mm thick in cement concrete 1:3:6 (1 Cement: 3 Sand: 6 Graded stone aggregated 20mm nominal size).

134.4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.