Himachal Pradesh State Electricity Board Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Eprocure
Opening Date1 Nov 2023
Closing Date7 Nov 2023
Tender Amount₹ 7,39,093 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthing:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.

5

3525

705

... More
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.

5

6680

1336

... More
Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect.

1.14

15340

13457

... More
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.

0.38

1072

2822.01

... More
Erection of GO switch complete in all respect.

1

6980

6980

... More
Fixing jumper complete in all respect.

3

429

143

... More
Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.

1

4130

4130

... More
Erection Part of 11/0.4 KV, 63 KVA Transformer (T.S. No 20 /2023-24)

-

-

-

... More
Erection of 63 KVA S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 5 Nos., Erection of LT cable, brabed wire and painting, 5 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 63 KVA Transformer)

1

39362

39362.38

... More
Loading of S/Stn. complete and allied materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage Of DTR and allied Material For Average Distance From Road To Site Of Work .(If required as per site).

1

5310

5310

... More
Erection Part 3-Phase and 1-Phase LT line (T.S. No 20/2023-24)

-

-

-

... More
Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

12

22236

1853

... More
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

9

9531

1059

... More
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.

8

6144

768

... More
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 1-Ph. and 3-Ph. L.T Line complete in all respect.

2.38

21773

9148.54

... More
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.

0.68

1927

2822.01

... More
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).

1

4956

4956

... More
Erection Part 3-Phase and 1-Phase LT line (T.S. No 21/2023-24)

-

-

-

... More
Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

12

22236

1853

... More
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

9

9531

1059

... More
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.

8

6144

768

... More
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 1-Ph. and 3-Ph. LT Line and complete in all respect.

2.45

22413

9148.54

... More
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.

0.71

1995

2822.01

... More
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).

1

4956

4956

... More
Erection Part 3-Phase LT line (T.S. No 33/2023-24)

-

-

-

... More
Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

15

27795

1853

... More
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

10

10590

1059

... More
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.

9

6912

768

... More
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. LT line complete in all respect.

3.75

34307

9148.54

... More
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.

0.94

2647

2822.01

... More
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).

1

6195

6195

... More
Transformer LT distribution Box & GO Switch fixing Assembly (T.S. No 20/2023-24)

-

-

-

... More
Prov. RCC Muffs with concerete filling

2

3538

1769

... More
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line

2

4084

2042

... More
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.

1

1024

1024

... More
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch

4

6232

1558

... More
Transformer Belting & Knee Bracing

-

-

-

... More
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]

2

4084

2042

... More
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]

2

672

336

... More
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos

2

2048

1024

... More
Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos

2

230

115

... More
Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)

2

693

346.92

... More
Transformer L.T Distribution Box and GO Switch fixing Assembly

-

-

-

... More
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos

2

2048

1024

... More
Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.

1

165

165

... More
Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm

1

256

256

... More
Prov. GO AB Switch Unit (11kV, 400A, 25 KA) Tripple Pole O/d Type

1

6739

6739

... More
Prov. D.O Fuse Unit

1

2173

2173

... More
Prov. Surge Arrester, 11 KV Porcelain(9kV, 5KA)

1

1165

1165

... More
Prov. Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)

3

4350

1450

... More
Prov. Stay set complete

4

4280

1070

... More
Prov. HT Stay Wire

40

3120

78

... More
Prov. Pipe Earthing Set

5

16950

3390

... More
Prov. Panel(Distribution Box LT MS Sheet od 1.6 mm (900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x5mm)inside .painted /powder coated after primar coating MCCB 100 amp 3P 35kA ,ICS =100 % ICU, KIT-KAT 200 Amp

1

14068

14068

... More
Prov. Half Clamp (M.S. Flat 50X6 mm)

17

2686

158

... More
Prov. Full Clamp (M.S. Flat 50X6 mm)

9

2457

273

... More
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]

27

3186

118

... More
Prov. Aluminium Thimble

16

672

42

... More
Prov. Aluminium Thimble

4

1348

337

... More
Prov. Barbed Wire

15

1170

78

... More
Prov. LT Cable (3.5 Core) 95 mm²

15

3735

249

... More
Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri-Vector meter with Box(CT-100/5A) for 63 KVA Transformer

1

14250

14250

... More
Prov. Aluminium Paint.

4

1380

345

... More
Prov. Red Oxide

3

453

151

... More
Supply Part of 11 KV HT Line (TS No. 20/2023-24)

-

-

-

... More
Prov. RCC Muff with Concrete filling

7

12383

1769

... More
Run Through Str. ( ∆) Formation on Singl Pole Str.

-

-

-

... More
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole

6

5556

926.01

... More
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure

12

3288

274

... More
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm

6

1781

296.99

... More
Dead End Str.

-

-

-

... More
Prov Belt Set Angle Iron (50x50x6) Length 1800mm x2 Nos.

2

1316

658

... More
Prov.X-Bracing Set.MS Angle Iron (50x50x6 mm) Length 2125 mm x2 Nos.

2

1554

777

... More
Prov.X-Arm (Horizontal) MS-Channel Iron (100x50x6mm) Length 2340 mm x2 Nos. ( ∆) Formation

2

3414

1707

... More
For G.O. Switch and D.O. Fuse.

-

-

-

... More
X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm) X 4 Nos] for supporting DO fuse unit & GO switch

4

6232

1558

... More
G.O. Switch Handle Supporting (Channle Iron 75x40x6 mm) Length 460mm

1

256

256

... More
Prov.Nuts and Bolts of Various Sizes

14

1652

118

... More
Prov.MS Half Clamp

24

3792

158

... More
Prov.MS Full Clamp

16

4368

273

... More
Prov.Barbed Wire

21

1638

78

... More
Prov.Eye/Earth Hook

7

350

50

... More
Prov. Earth Wire Clamp

7

1911

273

... More
Prov.Prov. Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)

3

4350

1450.22

... More
Prov.11kv Pin Insulator with pin complete in all respect

21

3234

154

... More
Prov.11kv Stay Set

5

5350

1070

... More
Prov. HT Stay Wire

50

3900

78

... More
Prov.Red Oxide (1.5 Ltr. Per Pole)

10.5

1585

151

... More
Prov.Alluminum Paint

14

4830

345

... More
Prov. 11kv D.O.Fuse unit.

1

2173

2173

... More
Prov. 11kv G.O.Switch complete.

1

6443

6443

... More
Supply Part 3-Phase and 1-Phase LT line (T.S. No 20/2023-24)

-

-

-

... More
Prov. RCC muff with concrete filling

12

21228

1769

... More
Prov. Eye Hook for earth wire

12

600

50

... More
Prov. Shackle Insulator (16 kN)

42

1764

42

... More
Prov. D-Iron

42

3612

86

... More
Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]

33

9009

273

... More
Prov. L.T Stay wire @ 6Kg P/set

54

4212

78

... More
Prov. L.T Stay Set complete

9

7920

880

... More
Prov. Nut & Bolt off sizes.

24

2832

118

... More
Prov. Superior PVC Sapacer

24

1632

68

... More
Prov. Aluminium Paint

24

8280

345

... More
Prov. Red Oxide

18

2718

151

... More
Prov. Prov. Earthing Set Complete

8

5336

667

... More
Supply Part 3-Phase and 1-Phase LT line (T.S. No 21/2023-24)

-

-

-

... More
Prov. RCC muff with concrete filling

12

21228

1769

... More
Prov. Eye Hook for earth wire

12

600

50

... More
Prov. Shackle Insulator (16 kN)

42

1764

42

... More
Prov. D-Iron

42

3612

86

... More
Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]

33

9009

273

... More
Prov. L.T Stay wire @ 6Kg P/set

54

4212

78

... More
Prov. L.T Stay Set complete

9

7920

880

... More
Prov. Nut & Bolt off sizes.

24

2832

118

... More
Prov. Superior PVC Sapacer

24

1632

68

... More
Prov. Aluminium Paint

24

8280

345

... More
Prov. Red Oxide

18

2718

151

... More
Prov. Prov. Earthing Set Complete

8

5336

667

... More
Supply Part 3-Phase LT line (T.S. No 33/2023-24)

-

-

-

... More
Prov. RCC muff with concrete filling

15

26535

1769

... More
Prov. Eye Hook for earth wire

15

750

50

... More
Prov. Shackle Insulator (16 kN)

60

2520

42

... More
Prov. D-Iron

60

5160

86

... More
Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]

40

10920

273

... More
Prov. L.T Stay wire @ 6Kg P/set

60

4680

78

... More
Prov. L.T Stay Set complete

10

8800

880

... More
Prov. Nut & Bolt off sizes.

30

3540

118

... More
Prov. Superior PVC Sapacer

30

2040

68

... More
Prov. Aluminium Paint

30

10350

345

... More
Prov. Red Oxide

22.5

3397

151

... More
Prov. Prov. Earthing Set Complete

9

6003

667



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.