Himachal Pradesh State Electricity Board Limited Tender
... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Eprocure
Opening Date11 Nov 2021
Closing Date1 Dec 2021
Tender Amount₹ 62,89,053 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,25,785Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_HPSEB_53377_1Bid Award Id
ViewTender No
SEES/SHIMLA-290/2021-22Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://www.hpseb.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Demolition of stone masonary above G.L. upto floor two level including stacking of serviceable materials and disposal of unserviceable materials within 20 metres lead rubble masonary in cement mortar.
122.33
-
-
... More
Removal of Existing gravel of the yard area and stacking the same in aproprate position within the yard area so that it may not hamper the routine working in yard.
150.8
-
-
... More
Cutting in earth work and disposal of excavated soil up to all leads as per site condition and direction from Engineer-in-charge in all kinds of soil. (50% Pick Work + 50% Jumper Work.)
66.08
-
-
... More
Excavation in foundation, trench etc. In earth work, lift up to 1.5 meters. work, in all kinds of soil, Stacking and excavation soil more not than 3 meters clear from the edges of the excavation and then returning the stacked soil in 15 CM. Layers, when required in to plinths sides of foundations etc. consolidating each deposited of all surplus excavated earth at approval dumping site within all leads and lifts as directed by the Engineer-in-Charge. in all kinds of soil .
259.57
-
-
... More
Providing and laying cement concrete 1:3:6 ( 1 cement: 3 sand :6 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth
13.31
-
-
... More
Providing and laying cement concrete 1:6:12 (1 cement : 6 sand : 12 Graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth including all leads and lifts of material. Foundation and plinth
30.62
-
-
... More
Providing and laying cement concrete 1:5:10 (1cement :5sand :10 graded stone aggregate 40mm nominal size) with 15 % plum and curing complete excluding cost of form work in retaining walls/ Breast walls, the size of plums shall usually be 150mm. to 300mm. as per H.P.P.W.D. Specification
540.55
-
-
... More
Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battening and soiling height of propping and centering below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for in situ-reinforced concrete and plain concrete work including all leads and lifts of materials in (Sub analysis of rates for manufacturing steel plates) Foundation, footings base of columns etc and mass concrete.
966.86
-
-
... More
Providing Mild/Tor steel reinforcement for RCC work i/c bending, binding and placing in position including all lead and lift of material. Tor Steel
7862.35
-
-
... More
Providing and laying cement concrete 1:1.5:3 (1cement :1.5 sand :3 graded stone aggregate 20mm. nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in foundation and plinth
139.77
-
-
... More
Boulder filling dry hand packed tightly as in wire crtates
28.52
-
-
... More
Steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of red lead paint.
-
-
-
... More
a) In beams, josists, channels, angles, tee, flats with connecting plates or angle cleats as in main and cross beams, hip and jack rafters, purlins connected to common rafters and the like.
31.26
-
-
... More
b) In gratings framed guard bars, ladders, railing, brackets and similar works. (i) Through Rate
14.52
-
-
... More
(ii) Labour Rate
4
-
-
... More
Brick work using common brunt clay building bricks 1st class in cement mortar 1:6 (1cement:6sand) i/c all lead and lift of materials in super structure above plinth level upto floor two level.
5.74
-
-
... More
Random rubble masonry/polygonal rubble masonry (un-coursed/brought to courses) with hard stones of approved quality in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 sand : 12 Graded stone aggregate 20 mm nominal size) at plinth level in cement mortar 1:6 (1 cement: 6 sand) in Breast walls and Retaining walls. a) Labour rate
19.18
-
-
... More
Providing and laying cement concrete 1:2:4 ( 1 cement: 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work in foundation and plinth
1.38
-
-
... More
Providing and laying P.V.C. pipe for weep holes 75 mm dia.
322.4
-
-
... More
Stone filling behind Retaining walls a) Labour Rate
54.21
-
-
... More
b) Through Rate
97.5
-
-
... More
Painting two coats (excluding priming coat) on new steel and other metal surface under coat with ready mixed paint brushing to give an even shade including cleaning the surface all dirt, dust and other foreign matter : With ready mixed paint other than white.
120.84
-
-
... More
Providing and laying precast RCC slab cover 65 mm thick 1:2:4 (1 cement: 2 sand: 4 graded stone aggregate 20 mm nominal size) for outdoor cable trenches with outerframe of M.S. Angle 50x50x5 mm welded with reinforced steel bar as per design i/c making grooves for lifting arrangement complete with placing the cover on cable trench in proper position in all respect as per the direction of Engineer-in-charge i/c removal of old/damaged cable trench covers within a lead of 20 mtrs. beyond yard area.
22.13
-
-
... More
15 mm cement plaster in single coat on fair side/ rough side of brick/concrete/stone walls for interior plastering up to floor to level including arrises, internal rounded angles chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth including all leads and lifts of materials. Cement mortar 1:6 (1 cement: 6 sand)
45.9
-
-
... More
Finishing wall with water proofing cement paint of approved brand and of required shade on undecorated wall surfaces (two coats) to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials.
45.9
-
-
... More
Cutting/Excavation in earthwork and filling in 15 cm layers in foundation and plinths including ramming watering and consolidating upto a lead of 20 meters and lifts upto 1.5 metres.
760.96
-
-
... More
Providing and fixing M.S. Round holding down and anchor bolts with nuts and washer plate complete.
1.59
-
-
... More
Providing dry stone Kharanja drain 45 cm wide including 25 cm side stone laid in cement mortar 1:6 (1 cement : 6 sand) complete as per HPPWD Specifications
33
-
-
... More
Providing and laying cement concrete 1:4:8 ( 1 cement: 4 sand :8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth
17.72
-
-
... More
Providing and laying filter media with granular crushed aggregate in pocket of size 300mm x 300mm x 300mm @2.00 mt. Staggered spacing (or as per site availability) in sub-base compacted to firm condition complete as per drawing and as per the direction of Engineer-in-charge to allow the passage of rain water into sub-soil.
1.22
-
-
... More
Laying of shingle/ aggregate (Gravel) removed above in item No. 5 in the yard area in three layers 50 mm thickness each.
37.7
-
-
... More
Providing and laying shingle/ aggregate (Gravel) 40 mm and down gauge in yard area in three layers 50 mm thickness each.
166.03
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements