Haryana Urban Development Authority Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 2,600Document Cost
₹ 250Tender Fee
₹ 1,180
Summary
Annual Maintenance Of Water Supply And Sewerage Scheme In Sector-13 Bhiwani
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_HBC_152986_1Bid Award Id
ViewTender No
Job No. 225Tender Authority
Haryana Urban Development Authority ViewPurchaser Address
-Website
http://https://www.hsvphry.org.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
6.2 (d)(i) Earth work excavation in ordinary soil exclusive of compensation of earth – (d)(i) Wet earth work
Extra for wet earth work from bottom of excavation upto level of sub soil water.
5
-
304.7
... More
6.2 (ii) Extra for wet earth work from level of sub soil water upto 30 cm. above
5
-
166.2
... More
10.39 Cement Concrete 1:4:8 with stone ballast 40mm nominal size in plinth
5.75
-
403.1
... More
10.65 Providing & laying in position machine batched and machine mixed design mix M-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge in foundation and plinth. (Note: Cement content considered in this item is @300 kg/cum.).
5.5
-
737
... More
11.23 First class brickwork laid in cement stone dust (from crusher) mortar 1:5 in foundation & plinth.
2
-
427.7
... More
15.3+15.75 12 mm thick cement plaster 1:2. Cement rendering on plaster 1mm thick.
18
-
20.85
... More
18.22 Steel reinforcement TMT bars FE-500/ FE-500 D-grade or more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, bangers and annealed steel wire etc. and placing in position complete in all respect for all heights / depths / storey’s / basements etc.
Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps, wastage, overlaps, couplings, welded joints, spacer, bars, chairs stays, hangers and annealed steel wire or other methods for binding and placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement.
5
-
927.05
... More
29.94 Providing and fixing of SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:2 cement sand mortar over manhole including carriage loading, unloading, stacking, handling, re-handling etc. complete in all respect to the satisfaction of Engineer-in-charge.
Type: - Extra heavy duty set (HD-20) 560mm clear opening.
5
-
1100
... More
29.95 Providing salt glazed stone ware pipes grade-A in standard length of 600mm each pipe marked with IS:651 and there lowering, cutting, jointing and testing as described in HSR item No. 29.38, 29.39, 29.40 including the cost of jointing materials as wells as carriage, loading, unloading, stacking, handling, re-handling etc. complete in all respect to the satisfaction to the Engineer in charge.
(i) 200mm i/d
30
-
253
... More
9.1 Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chhajjas, shelves etc. inclination not exceeding 25 degree with horizontal.
6.2
-
40.65
... More
9.5 Centering and shuttering for faces of valves partitions, retaining walls, well staining and the like vertical or battering including attached pilasters, butters etc.
23
-
54.85
... More
App. Item Extra for lowering of the sub soil water level below the foundations of the sewer tobe laid by prov. some other suitable arrangements with the approval of the Engineer-in-charge in order to lay the sewer under water as per site condition including the cost of boring installation pipe and strainers for wall point systems complete with bearing installation pipes for well point system developing prov. & installation of pumping machinery suction and delivering pipes disposal of water to approper place including repair extra running cost of pumping machinery that is electric charges diesel oil charges consumable item including quick setting chemicals and play of the operational staff electric connection of as to be paid to the electricity department machinery and the well point system and shifting of the same to next site for any difficulties met with while execution. This item is only payable for the complete sewer and nothing is payable if the water table is lowered and sewer const. is delayed are not done due to any reason. What so ever. No premium is admissible on this item. The rate quoted by the contractor will be the completed rate for doing this job per mtr. length of sewer laid. The work of laying of different sizes of pipes sewer will be done with other suitable method of the approval of the Engineer-in-charge. The rate provided for approved item will be complete rate for depressing. The water table so that the sewer can be constructed indry condition properly. The lowering of water table done in such a way so that no gravity is formed at all. The rate of the pumping should be so adjust that critical velocity is not exceed which may clause said in flow alongwith water coming out of the box gravel packing may be provided if required in the annual space between pipe and bore to ensure sand free water coming out of the bore. The Subsoil water level will be kept depressed at appropriate level till assisting of jointing of S.W. pipes.
Spring level before drilling well point is between 0 mtr to 1.20 mtr. above the invert level of sewer.
30
-
910