Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Vadodara Gas Limited

  • Opening Date

    -

  • Closing Date

    22 Jul 2019

  • Tender Amount

    Refer document

  • EMD

    ₹ 6,36,310

Are you Looking for Joint Venture Partners, Contractor Consortium, Project Financiers for this tender?
We will help YOU to find the right match for FREE!
Summary

Purchase Of Domestic Diaphragm Type Gas Meter (g 1.6) On Arc Basis For A Period Of Two Years

Are you looking for Materials and Services for this tender?
We will help YOU to find the right partner for your needs for FREE!
BOQ Items

No BOQs Available

Vendor TPIA 1 External Leak tightness / External Soundness Test Test Pressure i.e. (750 mbarg: 1.5 Times MAOP) Test duration: 30 s after removing any trapped air BS EN 1359, Clause No. 6.2.2 Perform Witness At Qmin Flow rate Perform Witness At Qmax Flow rate Perform Witness At 0.1Qmax Flow rate Perform Witness 3 Pressure absorption - BS EN 1359, Clause No. 5.2 Perform Witness Centre to Centre of end connections Perform Witness Inlet & Outlet end connection size and threading (3/4" (Male) as per the requirements of BSP standard) Perform Witness Type of Check Quantum of Check Scope Remarks Calibration of test for Accuracy of registration testing 2 BS EN 1359, Clause No. 5.1 Conforming CharacteristicsS. No. Vadodara Gas Limited QUALITY ASSURANCE PLAN FOR DOMESTIC DIAPHRAGM GAS METER Project : City Gas Distribution Project in Vadodara 4 Acceptance Norms Reference Documents 100% Inspection by Manufacturer and 5% Inspection by TPIA Format of Record Dimensional Inspection Fascia plate marking Perform Witness Powder coating thickness (minimum 40 microns) Perform Witness Index readinq and arrow marking Perform Witness Safety Sticker affixed on meter Perform Witness Color and appearance Perform Witness Markinq and Packing Perform Witness 6 Fire resistance - Resistance to high temperature Test - BS EN 1359, Clause No. 6.5.5 Perform Review 7 Calibration Report for all measuring instruments - BS EN 1359, Clause No. 6.5.5 Perform Review 8 AMR Compatibility test - VGL technical Specification Perform Witness 100% Inspection by Manufacturer and 5% Inspection by TPIA LEGENDS: TPIA - Third Party Inspection Agency 100% to VGL Technical Specification s and BS EN 1359 Vendor Inspection Report 5 Visual inspection VGL technical Specification Review of Test Certificates by TPIA / Client Vadodara Gas Limited QUALITY ASSURANCE PLAN FOR DOMESTIC DIAPHRAGM GAS METER Project : City Gas Distribution Project in Vadodara Notes 1 2 3 4 5 6 7 8 9 10 TPIA shall also review the test certificates submitted by the manufacturer. Supplier shall in coordination with sub vendor shall issue detailed production and inspection schedule indicating the dates and the locations to facilitate Owner / Owner's representative to organise Inspection. The above mentioned testing and acceptance criteria are minimum requirements; however, supplier shall ensure that the product also complies the additional requirements as per technical specifications and data sheets. Supplier shall submit meter index format duly signed and stamped. TPIA shall review all the reports 100% All measuring instruements shall be duly calibrated at the time of inspection. Calibration certificates of all measuring instruements shall be reviewed by TPIA at the time of inspection, along with Master Calibration Certificate of the measuring instruments from which the instrument is calibrated. The same shall be submitted along with submission of inspection report , and the same shall be traceable to national / international standards. The Master Calibration Certificate shall be checked as a must at the time of inspection and submitted along with the inspection report. The supplier shall submit their own detailed QAP prepared on the basis of the above for approval of Owner / Owner's representative and TPIA. TPIA shall have right to inspect minimum 5% of all manufacturing activities or as specified above. TPIA along with Owner / Owner's representative shall review / approve all the documents related to QAP / Quality Manuals Drawings etc. submitted by supplier. 11 After satisfactory inspection, TPIA to apply their mark (stamp / sticker / embossing etc.) on each gas meter for testing. TPIA has also to apply their mark with unique identification (e.g. stickers which cannot be removed / embossing / stamp along with details such as batch no., date of manufacture, serial no.) on the outer box / gunny bags carrying the inspected materials after varifying the infoormation mentioned

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.