Indian Oil Corporation Limited Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Indian Oil Corporation Limited - IOCL Tender

Works
Security and Emergency Services
Eprocure
Opening Date20 Jul 2024
Closing Date30 Aug 2024
Tender Amount₹ 72,22,040 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hydrostatic testing, inspection of safety valve, changing of rupture disc, and refilling of high pressure cylinder through CCE approved party and charging upto required pressure including taking delivery of the cylinder from the station and returning the same inclusive of all labour material, transportation and all the other incidental expenses). The cylinder is to be returned back to the station within 20 days from the date of receiving from the station. (For 2 Kg CO2 cyl.)

34

24199

603.19

... More
Hydrostatic testing, inspection of safety valve, changing of rupture disc, and refilling of high pressure cylinder through CCE approved party and charging upto required pressure including taking delivery of the cylinder from the station and returning the same inclusive of all labour material, transportation and all the other incidental expenses). The cylinder is to be returned back to the station within 20 days from the date of receiving from the station. (For 4.5 Kg CO2 cyl.)

52

27721

451.78

... More
Hydrostatic testing, inspection of safety valve, changing of rupture disc and refilling of high pressure cylinder through CCE approved party and charging upto required pressure including taking delivery of the cylinder from the station and returning the same inclusive of all labour material, transportation and all the other incidental expenses). The cylinder is to be returned back to the station within 25 days from the date of receiving from the station.(For 6.8 Kg/6.5 Kg CO2 cyl.)

8

6573

696.33

... More
For 5 KL FOAM TROLLEY - Oiling & greasing through grease nipple provided on bearing, worm wheel and worm shaft, suspension plate, cleaning, performance checking including air charging of tyres of foam filled trolley, strainer inspection, reporting foam level in foam trolleys by taking measurement from dip hatch checking proper functionality, movement of trolley by tractor (arranged by vendor) & carrying out road test for complete plant area on once in two months basis.

120

64071

452.48

... More
Flushing the sprinkler line by removing the end flanges of the sprinkler line segment & refitting the same after flushing, inclusive of tools tackles , nut bolts if required complete in all respect as per direction of Site Engineer/ EIC. (Rates are per segment)

768

47215

52.1

... More
Cleaning/ De-chocking of nozzles of water spray system at oil storage tanks by opening nozzle, dechocking & refitting the same as per direction of site engineer/ EIC complete in all respect including labours, tools tackles , consumable etc

10368

351367

28.72

... More
Filling of owner supplied foam compound/foam solution in foam tanks of fire fighting system like foam tank , foam trolley, portable trolley etc in station area through 30L /200L jerry cans including labour, collecting foam cans , transportation etc. in all respect. (Rates per KL )

200

1614

6.84

... More
Performance checking of foam pourer (12 nos per tank) and sprinkler system including greasing of all associated valve by opening related valves and other labour assistance with the involvement of CISF fire wing and submitting a report as per directions of Engineer-in-Charge on monthly basis.Rates per testing per tank

96

16903

149.22

... More
Replacement of defective foam pourer with supply and installation of new foam pourer (supply by owner) as per existing specification inclusive of studs/ nut bolts ,tools tackles, labour charges etc. complete in all respects.

30

15773

445.59

... More
Dechoking of foam makers by opening of venturi and air inlets and flushing with water, refitting back the foam maker & making it leak tight & testing the same including all labour, materials, tools and tackles complete in all respect (except the gaskets, nuts and bolts)

288

37382

110

... More
Removing old damaged wire mesh in foam pourer outlet and replacing with new one (approx size 1'2'X1'2") as directed by EIC including supply of mesh, studs, tools tackles complete in all respects.

150

27955

157.94

... More
Cleaning of strainers of Size 10" and 8 " installed in Fire water network (Sprinkler and Foam Flooding system)

288

141597

416.66

... More
Removal or Installation of valves upto 8 inch size including transportation either from owners storage point to workshop or work site including tools tackles, labour, etc as per directions of engineer in charge. For removing of valves it may be required to cut jammed stud & bolts etc.)

30

19952

563.63

... More
Dismantling of gate valves of sizes up to 12" of fire hydrant line & foam pourer line etc from bonnet and cleaning the gate and refixing it with new gasket alongwith all tools, tackles, material, manpower etc

46

53375

983.33

... More
Checking, inspection, greasing, cleaning, oiling etc. of all fire water/ foam line valves, firewater manifold valves (MOV/HOV) of all sizes upto 36" , non-return valves (check valve) including Oiling, Greasing and all labour, tools & tackles complete as per direction of Site Engineer / EIC and provided by contractor. All such valves shall be fully closed and opened and restored in original condition as per advise by EIC/ Site Engineer.Note: The valve sizes may vary from 3" to 36". Rates are per valve.

9528

594531

52.88

... More
Delivery hose of dia 100 mm

96

8314

73.4

... More
Delivery hose of dia 63 mm

1176

48499

34.95

... More
Repair of adaptor lug of hydrant/hose

80

9526

100.92

... More
Supply and fitting of Fire hydrant spindle assembly ( Gun metal)

60

83529

1179.8

... More
Supply and fitting of blank cap (as per IS 5290 , red colour with GI chain) suitable for 63 mm hydrant outlet as per direction of EIC

180

16771

78.96

... More
Painting of Hydrant outlet (both side) by luminous yellow & fire red (2 coat) , cleaning and metal primer (one coat) as per direction of EIC complete in all respect including labour, paint, tools tackles, consumable etc. rate per double headed hydrant.

348

44045

107.26

... More
Supplying and fitting of Fire Hydrant/ Fire Hose coupling washer

600

37467

52.92

... More
Supplying and fitting of neoprene Hydrant Disc Washer as per directions of Engineer-in-Charge/SIC

500

27529

46.66

... More
Checking, inspection, servicing, maintenance, greasing, cleaning, oiling , replacement of disc washer , blank cap if any including complete overhauling etc. of Double headed hydrant valves (on quarterly basis) alongwith all tools, tackles, manpower, material etc.

1392

47075

28.66

... More
Installation of Owner supplied gate/globe valve/NRV by dismantling the faulty valve and NRV, shifting new valve, isolating fire water line, fitting new SWMG gasket etc including all labours, consumables, equipments, tools & tackles as per EIC except Valve/NRV and gasket (to be supplied by IOCL) for sprinkler and foam pourer system having size 6 "

50

16209

274.74

... More
Supply & changing of level pipes (hollow) of Acrylic/glass in foam tank of foam pourer and fire tender, foam trolley unit, Foam Flooding system etc. inclusive of all tools & tackles, consumable, transportation etc dia and height may varry from 8 mm to 12 mm and 1 to 2 m subsequently . Rates per unit meter

80

25192

266.87

... More
Replacement of defective sprinkler nozzle with owner supplied new sprinkler nozzle in sprinkler line of crude oil tank inclusive of tools tackles, labour charges etc. complete in all respect.

778

126625

137.93

... More
Hydrostatic testing, inspection of safety valve, changing of rupture disc and refilling of high pressure cylinder through CCE approved party and charging upto required pressure including taking delivery of the cylinder from the station and returning the same inclusive of all labour material, transportation and all the other incidental expenses). The cylinder is to be returned back to the station within 25 days from the date of receiving from the station.(For 45 Kg CO2 cyl.)

30

90435

2554.68

... More
Refilling of CO2 gas in cartridges for using in DCP extinguishers including all labour, transportation etc. complete as per specification and direction of EIC/Site-Engineer.( CO2 CARTRIDGE of 200gms)

160

26883

142.39

... More
Painting of 2Kg CO2 extinguisher with one coat of red oxide primer & two coats of Fire red synthetic enamel paint (Asian Paint/ Berger/ Nerolac) including writting work for hydrotesting date &d ue date & Sr no, surface preparation cleaning, transportation, labour, material etc in all respects as per direction of EIC.

34

8868

221.05

... More
Painting of 4.5 kg / 6.8 Kg CO2 /9 Kg CO2/ 9 Kg DCP/10 Kg DCP extinguisher with one coat of red oxide primer & two coats of Fire red synthetic enamel paint (Asian Paint / Berger / Nerolac) including writting work for hydrotesting date & due date & Sr no, surface preparation, cleaning, transportation, labour, material etc in all respect as per direction of EIC.

80

22236

235.56

... More
Painting of 75/25 Kg DCP extinguisher with one coat of red oxide primer & two coats of Fire red synthetic enamel paint (Asian Paint / Berger / Nerolac) including writting work for hydrotesting date &due date& Sr no, surface preparation cleaning, transportation , labour , material etc in all respect. As per direction of EIC approx 6 sqm

8

3962

419.8

... More
Discharge hose with squeeze grip , hose should not burst or show leakage before 50Kgf/cm2

30

3220

90.98

... More
Safety clip ( metal) with nylon thread

30

583

16.49

... More
DCP extinguisher cap washer

30

1996

56.41

... More
Inner container

30

6131

173.2

... More
Cap Assembly Gun Metal

30

21307

601.91

... More
Discharge tube washer

30

590

16.67

... More
Painting stand of sand buckets with one coat of red oxide primer, two coats of synthetic enamel paint (fire red) complete in all respect including labour,transportation material, writing letters on stand by stencil etc. as per direction of EIC.

10

1348

114.32

... More
Erection and supply of stand post of wind sock in place damaged stand post as per specification of IOC and EIC including tools and tackle , labour charges ets complete in all respect.

16

44783

2372

... More
Maintenance of foam deluge valve of Mainline pumping shed fixed foam flooding system on half yearly basis

24

68311

2412.12

... More
Servicing of solenoid valve of deluge valve of foam flooding system/sprinkler system on half yearly basis

4

1518

321.61

... More
Butterfly valve repair and maintenance of 6"/8"/12" including replacement of handles, pins,etc and making the valve healthy as per the direction of EIC

15

6726

380

... More
Diaphragm sheet replacement of deluge valve of size 6" installed in Foam Flodding system , procurement and installation including all labours, tools and tackles

3

24189

6833.33

... More
Providing of hydra/Crain for load testing EOT and HOT of MLPU ,booster shed ,firefighting engine shed including 2 man power. Rates per Hour

50

36382

616.66

... More
Pickup tube with stainer for WCFM

128

60416

400

... More
Cap washer

8

618

65.54

... More
Trolley wheel set with required fittings

8

5610

594.29

... More
HDPE discharge horn for 2Kg CO2 extinguisher along with bend pipe fitting complete in all respect as per direction of EIC.

20

6687

283.37

... More
HDPE discharge horn for 4.5Kg capacity CO2 extinguishers with fittings as per direction of EIC.

40

16408

347.63

... More
High pressure discharge hose for 6.8Kg CO2 extinguisher with fittings as per direction of EIC.

6

2775

391.98

... More
Trolley wheel set for 6.8Kg CO2 extinguisher along with handle complete with fittings as per direction of EIC.

6

2067

292

... More
Handle for 2Kg/3.2Kg/4.5Kg extinguisher

60

7034

99.36

... More
Safety pin with nylon string for CO2 extinguisher

100

3417

28.96

... More
Carry out Load test (prescribed under rule 60) of EOT/HOT crane/sling wire/chain pulley block between 1 to 5 Ton capacity and certification as per factory act.

2

3325

1409.28

... More
Supply of Safety Helmet Make 3M model H-702 IR hard hat with vented & 4 Point Ratchet Suspension in any color as per IOCL specifications

100

30462

258.16

... More
Writing of slogans (in Hindi, English, Gujarati) at all heights with approved paints and shade as per the direction of EIC, date changing on Pressure vessels, HOT crane, instructions etc. alongwith all tools,tackles, material etc. The rate covers back ground painting (application of 1 coat primer and 2 coat paint on the board before writing)

7000

11977

1.45

... More
Supply of Discharge hose of 6 .8 CO2 extinguishers as per the BIS standards

70

19732

238.89

... More
Supply & Fitting of transparent Fiber glass thickness 3 mm of hose box inclusive of rubber beeding by fixing it with proper adhesive wherever required complete in all respect inclusive of material, labours, consumables etc. (inclusive of rates for both glasses and rubber beading)

300

63022

178.03

... More
Supply and Fitting of new wind sock (floroscent in two colour), removing of old wind sock made out of synthetic cloth in flood light tower , buildings, upto height of 10 M/ 15 M, as per direction of site engineer/ EIC.Approval to be granted for wind sock prior to supply

120

182103

1286.04

... More
Painting of sand buckets with one coat of redoxide primer & two coats of synthetic enamel paint ( fire red from outside & white from inside), writing letters on sand buckets (by stencil) complete in all respect including labour charges , material, removing of old sand filling back the sand after painting etc. as per direction of EIC

50

2996

50.79

... More
Refilling of breathing apparatus set of Compressed air upto a pressure of 200/300 bar as per the direction of EIC, inclusive of transportation, handling charges, hydrotesting from CCE approved party, complete in all aspects.

16

21063

1115.66

... More
Complete Overhauling of Hand operated Siren including oiling,greasing,painting and testing as per direction of EIC inclusive of all tools & tackles,transportation ,man-power etc

120

24825

175.32

... More
PPE maintenance/ upkeep on monthly basis like Safety Helmets,Breathing apparatus,water jel blanket, Resucitator set,Fire proximity suit,ear plugs,Googles,first-aid box maintenance,Full Body Harness near control rooms and other rooms as per the instruction of Site Engineer/EIC

24

25760

909.63

... More
Testing of AFFF as per BIS:4989 from reputed institutes like GIRDA or any other approved laboratory approved by NABL in all respect by providing cans,transportation, man power etc.

4

54073

11456.29

... More
Cleaning of Portable fire fighting equipment e.g. Fire Extinguishers, Sand buckets, Stand, Hose boxes (90 nos), deluge system of foam Flooding (01 no), Gas cylinders of CO2 flooding system (40), Sand buckets (25), sand bucket stand (5). making it stain free as and when required as per directions of EIC on monthly basis. Rates per month per equipment as mentioned above.

14376

27650

1.63

... More
Discharge hose with clamps(6.5mtr length). Hose should not burst or show leakage before a pressure of 50Kgf/cm2.

8

8558

906.63

... More
Brass connection tube between CO2 cylinder & DCP cylinder with leather washer.

8

2579

273.29

... More
Inspection, house keeping and cleaning of foam station/building on weekly basis, monitoring and maintaining of pressure in the deluge valve on dalily basis and reporting the same to EIC on daily report, inclusive all labour, tools and tackles (Rate per month)

24

60415

2133.33

... More
Overhauling, Repairing and Maintenace like Oiling, Greasing of HOV(4")

576

543744

800

... More
Refilling of CO2 gas in cartridges for using in DCP extinguishers of 75kg including all labour, transportation etc. complete as per specification and direction of EIC/Site-Engineer.( CO2 CARTRIDGE OF 2.5Kg)

14

19824

1200

... More
Painting of Zebra marking for Extinguisher identification along with the Letter writing in 3M radium sticker

150

156349

883.33

... More
Supply of water gel blanket

2

26768

11342.46

... More
STRETCHER with blancket

2

8724

3696.7

... More
Supply, Printing & Fixing of multi colour Flex Banner as per required size & design complete in all the respect as per direction of EIC.

1000

18950

16.06

... More
Carry out Load test (prescribed under rule 60) of EOT/HOT crane of 10 Ton capacity installed in Pump Shed and certification as per factory act.

2

14852

6293.28

... More
Carry out Load test (prescribed under rule 60) of EOT/HOT crane/sling wire/chain pulley block of 5 Ton capacity installed in FF Shed & Mainline Strainer and certification as per factory act.

2

9024

3823.99

... More
"Supply & installation of EYE WASH AND SAFETY SHOWER as per specification Eye wash & safety shower made from heavy duty GI pipe, eye wash bowl and shower head are made from ABS grade noncorrosive plastic with special foam generating atomiser and filter. Operating valve made of brass and pipe are powder coated paint with hand operated shower and pedal operated eyewash as par I.S:10592 of 82 with ISI marked."

3

45312

12800

... More
Supply of F-key made from 8mm Size(MS Rod with primer /painting) as per sample

250

40884

138.59

... More
Monthly maintenance of Emergency trolley, cleaning, greasing, oiling, maintenance of equipments kept inside the trolley, updation of the Equipment List, Refilling of air in tyres if required and repair of punctures, painting wherever required . Rates to be inclusive of all materials, tools and tackles.

24

47388

1673.33

... More
Painting of HVLR platforms after removing rust, scrubbing with sand paper/ brush, application of vinyl paint 1 coat as per the direction of EIC inclusive of all tools & tackles, consumable, transportation, labour charges,etc

48

74575

1316.66

... More
Patch welding in fire fighting systems or fire fighting line, including welding works, welding rod, cutting of plates or sleves as available in IOC, completing the work in all aspects of labours, tools and tackles.as per the direction of EIC

25

38841

1316.66

... More
Supply of API 6D Ball Valve 2"x ANSI 150# HOV F/F API 6D Ball

12

337689

23848.1

... More
Supply of API 6D Ball Valve 3"x ANSI 150# HOV F/F API 6D Ball

5

204652

34686.84

... More
Supply of 6"x ANSI 150# HOV F/F API 6D Gate valve

24

2291182

80903.32

... More
Installation of BALL/GATE Valves MOV/HOV 6", 150#/300#, F/F: Taking delivery of valves of all types and pressure rating from the designated location within station premises, transporting the same to site, erecting above ground on preconstructed foundations or underground including earth work in excavation and filling for under ground valves at elevations specified in the drawings, priming and painting of above ground valves, PU Painting of under ground portions (if applicable) or flood coating and wrapping of under ground portions (if applicable) including all inputs, labour, material and consumable (other than those specifically undertaken to be supplied by the owner) and completing the work in all respects in accordance with the drawings, manufacturer's installation instructions and specifications and instructions of the Site Engineer / EIC.

24

267061

9430.14

... More
Installation of BALL/GATE Valves MOV/HOV 3", 150#/300#, F/F: Taking delivery of valves of all types and pressure rating from the designated location within station premises, transporting the same to site, erecting above ground on preconstructed foundations or underground including earth work in excavation and filling for under ground valves at elevations specified in the drawings, priming and painting of above ground valves, PU Painting of under ground portions (if applicable) or flood coating and wrapping of under ground portions (if applicable) including all inputs, labour, material and consumable (other than those specifically undertaken to be supplied by the owner) and completing the work in all respects in accordance with the drawings, manufacturer's installation instructions and specifications and instructions of the Site Engineer / EIC.

5

27815

4714.55

... More
Installation of BALL/GATE Valves MOV/HOV 2", 150#/300#, F/F: Taking delivery of valves of all types and pressure rating from the designated location within station premises, transporting the same to site, erecting above ground on preconstructed foundations or underground including earth work in excavation and filling for under ground valves at elevations specified in the drawings, priming and painting of above ground valves, PU Painting of under ground portions (if applicable) or flood coating and wrapping of under ground portions (if applicable) including all inputs, labour, material and consumable (other than those specifically undertaken to be supplied by the owner) and completing the work in all respects in accordance with the drawings, manufacturer's installation instructions and specifications and instructions of the Site Engineer / EIC.

12

44505

3143.03



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.