Gujarat State Petronet Limited Tender
Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.
Gujarat State Petronet Limited - GSPL Tender
Telecommunication Services
Opening Date2 Aug 2024
Closing Date21 Aug 2024
Tender Amount₹ 72,42,750
Costs
EMD
₹ 1,21,140Document Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
86694Tender No
GSPL/PROC/2024/07/O/392Tender Authority
Gujarat State Petronet Limited ViewPurchaser Address
-Website
http://tender.nprocure.com
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender-OFC Maintenance Restoration.pdf
Annexure 3 Approved Vendor list.pdf
Annexure-7_Address of stores.pdf
Bid Qualification Criteria.pdf
Annexure 6 General Instructions for nProcure.pdf
Annexure 4 Pre bid queries form.xlsx
Annexure-2 SOR-Maintenance Restoration of OFC.xlsx
BOQ Items
Excavation of Trench (min. dimension of RM is LxBxD i.e. 1meter x 1 meter x 2.5 meters) and back filling in all type of soil / rock up to depth level of existing GSPL gas pipeline/OFC / identification of third party utilities if any as per GSPL procedure.
2500
2587500
1035
HDD / Manual boring below ground level in all type of soil / rock up to depth level of existing GSPL gas pipeline/fiber as per GSPL standard and specification
1500
675000
450
Supply of PLB HDPE duct upto 50mm dia as per GSPL Standard Specification and approved make (Jain Irrigation System Ltd. / Parixit Induatries Ltd. / Pennwalt Agru Plastics Ltd. / Vee Kay Plast / Dura-Line India Pvt. Ltd)
2000
60000
30
Supply of PLB HDPE duct ˃ 50mm to 100 mm dia as per GSPL Standard Specification and approved make. (Jain Irrigation System Ltd. / Parixit Induatries Ltd. / Pennwalt Agru Plastics Ltd. / Vee Kay Plast / Dura-Line India Pvt. Ltd)
200
8000
40
HDPE duct integrity testing for HDPE duct length ˃1000 mtr after laying/pulling.
2
50000
25000
OFC 24 / 48 cores cable blowing/pulling/laying in PLB HDPE duct upto 50mm dia as per GSPL standard and specification
2000
24000
12
OFC 24/48 core blowing/pulling/laying /replacement in existing GSPL HDPE duct already laid parallel to GSPL Gas pipeline including GSPL Pipeline route survey for identifing under / above ground utilities and permission (including all liaisoning) from owner of that third party utilities, protection of that utilities, removal of vegetation, cleaning the water logged area by de-watering pump, GSPL pipeline locating & marking, Pits Excavation & backfilling for HDPE existing duct find & open, Traceable rodder push-pull to check insertion path of the duct for smooth OFC blowing, Pulling old cable from existing duct after OFC replacement, Duct fault locating and rectification if duct bend/break and any other work if required are included in this activity. Note: 1. No separate charges shall be paid for transportation, site survey, permission (including all liaisoning), pipeline & cable route locator, Traceable rodder push-pull to check insertion path of the duct for smooth OFC blowing, protection & compensation for third party utilities/ farmer crops, mobilizing the material & rectification team to site, manpower, consumables, equipments, tools & tackles used during execution of this activity. Bidders/contractor shall pay compensation & penalty to the third party if any & applicable other than statutory fees. 2. Seprate charges shall be provided for Pits excavation at obstacle point in existing duct/old joints etc.and Backfilling. 3.Separate charges shall not be paid for transportation, loading and unloading, excavation, backfilling, manpower & equipment including JCB/Backhoe/ Dewatering pump.
-
-
-
OFC 24 / 48 cores cable Laying / replacement / blowing / pulling in existing GSPL HDPE duct
2000
24000
12
Pit excavation and back filling in all type of soil / rock upto the depth of existing GSPL pipeline & HDPE duct / identification of third party utilities if any etc.
125
187500
1500
Supply of 24 Core OFC Cable of standard aceptable losses as per GSPL Standard Specification and approved make (Finolex Cables Ltd./ Sterlite / Himachal Futuristic Communications Ltd. / Birla Ericsson Optical Ltd. / Aksh Otpifibre Ltd.), Rate is inclusive of charges for manpower, transportation & equipments used during this activity.
4000
156000
39
Supply & Installation of Jointing Enclosure for 24 Fiber Cable joint, Weather proof at Site, as per Standard Specification and approved make. (Raychem, 3 M , R&M, Commscope ) Rate is inclusive of charges for transportation, manpower, consumables, equipments, tools & tackles used during execution of this activity
150
420000
2800
OFC-24 Fiber Cable Jointing at pit location including preparation of fiber, removal of the sheath, cleaning of the fiber, fixing the fiber to the LIU with proper clamping / ties. Numbering of the fiber using ferrules, splicing the fiber within acceptable dB loss i.e. maintain splicing loss ≤ 0.1 db, if loss above acceptable dB loss then resplcing the fiber,proper routing of the fiber in the cassette. Proper closure of the cassette, connecting the pigtail to the adapter, and marking the same, for 1-24 fibers joints, proper placing the same in OFC chamber. No separate charges will be paid for Pit Excavation & back-filling for particular joint location.
150
360000
2400
Supply and installation of OFC Pit of RCC along with cover with Marker and GPS co-ordinate. Rate is inclusive of charges for excavation, backfilling, manpower & equipment including JCB.
-
-
-
Supply and installation of OFC Chamber/Pit of RCC along with RCC cover
150
1125000
7500
Supply & Installation of OFC joint Pit Marker as per GSPL standard specifications
150
180000
1200
Complete Link Testing End to End with Power Source, Laser Source, OTDR meter working with 1310 nm and 1550 nm from both end including Pigtails, Patch cord for testing. And submission of all OTDR traces between two terminals or across the joints.
-
-
-
For Link testing of 24 Core of OFC
40
48000
1200
For Link testing of 48 Core of OFC
40
96000
2400
Supply & Termination of fibre Terminal Closure (FTC) for 24 / 48 / 72 fibre Cable (FC / LC / SC type) in Telecom panel including fiber splcing & termination, as per Standard Specification and approved make (3M/ Raychem/Molex/commscope/R&M). OFC-24 Fiber splicing at FTC including pigtail by preparation of fiber, removal of the sheath, cleaning of the fiber, fixing the fiber to the LIU with proper clamping / ties. Numbering of the fiber using ferrules, splicing the fiber within acceptable dB loss i.e. maintain splicing loss ≤ 0.1 db, if loss above acceptable dB loss then resplcing the fiber,proper routing of the fiber in the cassette. Proper closure of the cassette, connecting the pigtail to the adapter. Rate is inclusive of charges for transportation, manpower, consumables, equipments, tools & tackles used during execution of this activity.
-
-
-
Wall mounted / Rack mounted FTC with 24 core pig tail including OFC Splicing and termination
10
59000
5900
Wall mounted / Rack mounted FTC with 48 core pig tail including OFC Splicing and termination
20
214000
10700
Wall mounted / Rack mounted FTC with 72 core pig tail including OFC Splicing and termination
5
77500
15500
Zero dB connector for telecom panel FTC.
50
1250
25
Supply of different type of Optical Patch cord (SM/MM, Simplex/Duplex) upto the length of 20 mtr i.e. FC-FC, FC-SC, FC-LC, FC-ST, SC-SC, MTRJ-ST, SC-ST etc. as per GSPL requirement & specification. Rate is inclusive of charges for transportation, manpower, consumables, equipments, tools & tackles used during execution of this activity.
250
87500
350
Hiring of following equipments for doing any emergency work with all required valid test certificates. The period of hiring will start after the equipment reaches at site and ends when equipment leaves the site. No charges will be paid for Break down period of equipment. Normal working time per day will be 8 Hrs. Rate for idle time shall be 50%. Night is not included in idle time except if works will continue in night. Rate is inclusive of charges for diesel, operators, maintenance cost, loading/unloading of equipments by JCB/ Hydra/manual at site.
-
-
-
Dewatering pump of capacity 20KL with required capacity D.G.Set
100
200000
2000
Backhoe
100
110000
1100
Air Compressor of capacity 75 CFM with required capacity D.G.Set
20
40000
2000
Schedule of rates for OFC Technician with OTDR & Splicing Machine for miscelleaneous work (Terminal visit for fibre splicing for link establishment, OTDR for link, Link changeover, Duct cutting, Link testing, fibre trecing, fibre connector & Patch Cord replacement and miscelleneous work etc.). Separate charges shall be paid for fibre splicing & OTDR (Less than 24 fibre), fibre connector & Patch chord OTDR in fibre per fibre as per relevent SOR. Rate is inclusive of charges for travelling, transportation, equipments, handling, tools & tackles used during execution of this activity.
25
27500
1100
Schedule of Rates for Extra Works related to OFC Helper. Rate is inclusive of charges for travelling, transportation, equipments, handling, tools & tackles used during execution of this activity.
25
12500
500
Base rates are provided, bidder to quote % (-) Discount or % (+) Accreation only. Bidder shall strictly quote as per price bid format (latest revision) only. Any bid not conforming to the price bid formats shall be liable for rejection.
-
-
-
Based on the SOR price, the contractor shall be liable to execute each SOR items at awarded rates as per the requirement given by GSPL. In case contractor deny to execute any of the SOR item within the specified timeline given in the work request then the work shall be carried out by any other agency at the risk & cost of engaged ARC contractor. Cost of the same shall be recovered from the ARC contractor either from RA Bills or from Performanace Bank Garuentee (PBG).
-
-
-
The above quantity is indicative for evaluation purpose only and during execution of contract, quantity may vary as per actual requirement of site / field conditions.
-
-
-
The description given under the items of work in Schedule of Rates shall be deemed to include, wherever applicable, mobilisation ,labour, equipments, materials and fixing in position of all materials and equipments, disposal of wastages, desludging and allied operations at any stage of the work and all other labours and operations necessary whether specifically stated/implied or not, for the full and entire execution and completion of the relative works in all respects according to the contract. Cost of materials under the scope of Contractor’s supply & all other consumables/inputs required for carrying out the works & for permanent incorporation in the works for which rates are quoted in the "Schedule of Rates" shall be inclusive of all duties, taxes (excluding GST), etc as applicable.
-
-
-
Bidder confirm that he has noted the contents of notes to the price schedule, bid document and quoted his prices accordingly without any deviation.
-
-
-
The taxes and duties indicated above shall be paid against documentary evidence.
-
-
-
Bidder should strictly quote as per price bid format only. Any bid not conforming to the price bid formats shall be liable to be rejected.
-
-
-
GSPL shall deduct all necessary taxes from source before making the payment. All such deduction shall deemed to be included in quoted rates.
-
-
-
The above prices is for the complete scope of work /services/ supplies as defined in the bid/enquiry document. Any materials, works/services required for completion of the work as per scope but not defined in the SOR (schedule of rates), the same is deemed to be included in the quoted price as above.
-
-
-
No separate mobilisation and demobilisation charges will be paid for personnel working at site.
-
-
-
No standby payment shall be made for personnel /equipment.
-
-
-
Scope mentioned to be read along with scope of work mentioned in RFP document in tender.
-
-
-
GSPL reserves the right to reject any bid without assigning any reason whatsoever
-
-
-
Bidder shall quote the fix lump sum price in the format given under after referring detailed schedule of items, specifications, SOW, scope drawing, pre-bid clarifications, post-bid clarifications & addendums etc.
-
-
-
The quoted rates shall be inclusive of all associated costs like personal protective equipments, chemicals & consumables wherever applicable etc. for performing the services defined in the tender but not limited to applicable taxes, duties, statutory levies, travelling, boarding, lodging etc. except GST, which shall be paid by GSPL at prevailing rate as extra.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements