Bharat Sanchar Nigam Limited Tender
Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.
Costs
EMD
Refer DocumentsDocument Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_BSNL_69642_1Bid Award Id
ViewTender No
45/BSNL/EE/CD/SRT/ 2020-21Tender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://https://www.bsnl.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of tower foundation of 40 M N.B. tower at Kasadbari (Jabalpur Make)(dist.Dang)
Construction of tower foundation of 40 M N.B. tower at Kasadbari (Jabalpur Make)(dist.Dang)
BOQ Items
(a) Hard rock (blasting prohibited)
9
-
-
Filling available excavated earth (including rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
89
-
-
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
-
-
-
(a) All kinds of soil
64
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level.
-
-
-
(a) 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
3
-
-
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level.
-
-
-
(a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).
37
-
-
Centering and shuttering including strutting, propping etc. and removal of form for.
-
-
-
(a) Foundations, footings, bases of columns, etc. for mass concrete.
31
-
-
(b) Lintels, beams, plinth beams, girders, bressumers and cantilevers.
4
-
-
(c) Columns, Pillars, Piers, Abutments, Posts and Struts.
28
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-
-
-
(a) Thermo-Mechanically Treated bars.
3100
-
-
Fixing of all anchor foundation bolts with the help of templete in accurate position and levelling etc. as per standard drawing accurately including necessary equipments or positioning work such as providing platform for bearing/fixing of templetes, anchor bolts etc. complete as per direction of Engineer-in-charge but excluding cost of anchor bolts, templates, nuts and washers which will be supplied by the department.
1
-
-
Structural steel work welded in built up sections in framed work using Tees, angles, flats, bars etc. for feeder support cable tray horizontally from tower to building, vertically on the wall of building and from building to inside equipment room including fixing in position with suitable supporting / fixing arrangements at the tower end, building and floor using connecting plates and rivetting / bolting or embedding in walls / floors etc. complete as required and as directed by Engineer-in-charge and including providing and applying two or more coat of synthetic enamel paint over and above one coat of approved steel primer all complete.
50
-
-
NOTES : (1) Material not to be galvanised. (2) This item is including supply of materials, fabrication, erection, priming and painting all complete. (3) The rate includes all material, their carriage, octroi etc. as well as labour and T& P necessary for straightening, cutting, welding, filing, drilling etc. all complete for above all the operations. (4) Measurement : Weight of all the material supplied (weight of each piece in exact length as required as per drawing) including weight of nuts / bolts and washers shall be measured for payment.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements