Public Works Department Tender

View complete overview of Goa PWD Tender

Public Works Department - PWD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date20 Dec 2021
Closing Date23 Aug 2022
Tender Amount₹ 4,53,812 
Notes
Download

Costs

  • EMD

    ₹ 9,076
  • Document Cost

    ₹ 3,000
  • Tender Fee

    ₹ 500

Summary

Construction Of Observatory Tower And Viewing Gallaries

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing water proofing treatment over the new R.C.C. roofs terrace toilet by spreading cement slurry over the R.C.C. slab and laying of 10cms. Average laterite stone ballast coba with the necessary gradient for easy flow of rain water and the coba in covered with damp proof of Hindustan water proofing co. Or equivalentjointless water proofing plaster of mix 1:3 ( 1 cement : 3 find sand), finished smooth with wooden trowel with false marking of 30 cms square. The vertical surface of the adjoining walls are to be treated upto a height of 30cms including rounding of junction (the rate includes for complete items including labour and materials and including cost of initial treatment of roof slab as follows. The injunction of damp proof or equivalent compound with cement solution will be given as and when found necessary for filling honey comb, cracks etc. in the R.C.C. slabs). NOTE: cement consumption 25kg/sq.m.

24.8

-

872

... More
Providing and fixing anodised aluminium sliding windows with two sliding shutters 20 mm sections and 5 mm clear float glass.

4.2

-

2971

... More
Providing and fixing anodized aluminium shutters in accordance with the specification annexed with Goa schedule of Rates (2004) Vol & II including all taxes, transportation, scaffolding and handling etc. complete as per direction of the Engineer-in-charge: Single or double leaf door shutters.

-

-

-

... More
a)Acrylic sheet

23.91

-

3393

... More
Providing and fixing anodized aluminium shutters in accordance with the specification annexed with Goa schedule of Rates (2004) Vol & II including all taxes, transportation, scaffolding and handling etc. complete as per direction of the Engineer-in-charge: Fixed windows/ ventilators matching with 18 mm series shutters.

-

-

-

... More
b) Plain glass

2.64

-

1698

... More
Providing and fixing anodized aluminium shutters in accordance with the specification annexed with Goa schedule of Rates (2004) Vol & II including all taxes, transportation, scaffolding and handling etc. complete as per direction of the Engineer-in-charge: Fixed partitions

-

-

-

... More
a) Acrylic sheet

13.5

-

2378

... More
HIRE CHARGES OF MACHINERIES

2

-

8824

... More
Charges for transporting, Scrap material from 30MLD WTP to 12MLD Godown Crane-5Mt capacity.

-

-

-

... More
BASIC RATES OF LABOURS

-

-

-

... More
Supply of helper for lifting of scrap and unwanted material from pump house and shifting the same with crane.

8

-

374

... More
HIRE CHARGES FOR MACHINERIES

2

-

4800

... More
Tipper -Hire charges of Tipper for transporting scrap & unwanted material for pump house to dodown 5cum/7cum.

-

-

-

... More
Pre-cast cement concrete solid block masonry of compressive strength 70 kg / cm2 in cement mortar 1:4 (1 cement : 4 corase sand ) in foundation and plinth size of blocks (30 x 23 x 15)

3.08

-

7067

... More
Earthwork in excavation by mechanical means (hydraulic excavation)/manual means in over areas in all types of soft stratas comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties shingles, pebbles all types of conglomerates, laterite rocks, ordinary rocks, soft rock disintergrated rocks fissured, shuttered/decomposed rock weathered rocks and all such other materials as described under appendix A to these specification either in full or in parts as the case may be adopting any method / method as may be convenient or permitted inclusive of chiseling, wedging etc. In all conditions such as dry , moist , foul, saturated submerged etc. and as directed by the Engineer -in-charge etc. All complete in foundation pipeline trenches/ drains ( exceeding 1.5m in width 30cms in depth 10 sq. m. on plan) as well as including dressing of sides ramming of bottoms including getting out the excavated soil & disposal of surplus excavated soil for all lead & all lift including barricading, danger lighting guarding as directed by Engineer-in-charge etc all complete

28

-

259

... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.

1.05

-

1291

... More
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :

-

-

-

... More
a) All works upto plinth level.

12.25

-

5999

... More
Centering & shuttering including Strutting, Propping & removal of forms for :

-

-

-

... More
i Foundations, Footings, Bases for columns

24.5

-

394



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.