Archaeological Survey Of India Tender

View complete overview of Goa ASI Tender

Archaeological Survey Of India - ASI Tender

Works
Eprocure
Opening Date11 May 2021
Closing Date29 May 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
1CriticalDateandTimeandWorkframe
4TermsAndConditionsOfContractInstructionsForOnlineBidSubmission
2TechnicalEligibilityRequirementForTendering
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying (0.50 x 0.30 x 0.20m) laterite stone pavement in CM 1:3 (1 cement: 3 sand), including dressing, carrying materials, water, curing, etc complete

370.5

-

-

... More
Providing recessed pointing in cement mortar (1:3) in laterite stone joints including racking of joints etc. complete

1775.7

-

-

... More
Cross drain on pathway from compound wall gate to the water sump. Earthwork in excavation in foundation trenches (not exceeding 1.5 min width and 10 Sqm in plan) including dressing of sides, ramming of bottom lift upto 1.5 m and getting out the excavated soil as directed and disposal of surplus excavated soil as directed with a lead of 5 m. d) All types of lateritic rock (requiring chiseling), where blasting is prohibited.

19.2

-

-

... More
Providing and laying laterite rubble stone soiling of 10cm thick including ramming, consolidating, watering, carrying materials, water, etc complete.

1.92

-

-

... More
Providing and laying C. C. 1:3:6 (1 cement : 3 coarse sand : 6 basaltic or granitic aggregate) 10 cm thick in foundation including carrying material, mixing, curing etc complete

1.92

-

-

... More
Providing and laying nonpressure NP3 class (heavy duty) hume R.C.C. pipes 600 mm in diameter with male female jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete

24

-

-

... More
Retaining wall for retaining soil of pathway of old toilet block. Earthwork in excavation in foundation trenches (not exceeding 1.5 min width and 10 Sqm in plan) including dressing of sides, ramming of bottom lift upto 1.5 m and getting out the excavated soil as directed and disposal of surplus excavated soil as directed with a lead of 5 m. d) All types of lateritic rock (requiring chiseling), where blasting is prohibited.

33.6

-

-

... More
Providing and laying laterite rubble stone soiling of 10cm thick including ramming, consolidating, watering, carrying materials, water, etc, complete.

4.2

-

-

... More
Providing and laying C. C. 1:3:6 (1 cement : 3 coarse sand : 6 basaltic or granitic aggregate) 10 cm thick in foundation including carrying material, mixing, curing etc complete

4.2

-

-

... More
Providing laterite stone masonry in neatly dressed stone of size (40cm X 30cm X 15cm) in cement mortar 1:4 (1 cement: 4 coarse sand) including curing etc complete

87.36

-

-

... More
Dismantling dressed laterite stone masonry water tank manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50m lead etc. complete

3.18

-

-

... More
Providing and fixing G.I. railing on moat wall by using 4” G.I. pipe alround horizontally 3m in length and vertically 1.10m in height with 0.30m inserted in masonry with suitable hold fast on either side and with two 4” G.I. long bends on either top corners.

170

-

-

... More
Repair to the manglore tile roof at water cooler room. Provision for carefully dismantling/removing the manglore tile roof with wooden wall plates, rafters, reapers, manglore tiles, ridge tiles, etc down to the ground including lifting, carrying materials, stacking serviceable and disposing non serviceable materials out side the site etc complete.

48.75

-

-

... More
Providing lean to manglore tile roof with new matti wood wall plates 4” X 3” on either side and purlin at center, 20% new and 80% old matti wood rafters 4” x 2 ½”placed at 40 cm c/c, 100% new matti wood reapers 2” X 1”placed at 30cm c/c, 100% new plain G.I. sheets with one coat of primer, 30% new and 70% old manglore tiles, including applying one coat of wood preservatives, nails etc complete.

48.75

-

-

... More
Repair to the manglore tile roof above steps at SE bastion near light house. Provision for carefully dismantling/removing the manglore tile roof with wooden wall plates, rafters, reapers, manlore tiles, ridge tiles, etc down to the ground including lifting, carrying materials, stacking serviceable and disposing non serviceable materials out side the site etc complete.

30.1

-

-

... More
Providing lean to manglore tile roof with new matti wood wall plates 4” X 3” on either side, 60% new and 40% old matti wood rafters 4” x 2 ½” placed at 50 cm c/c , 100% new matti wood reapers 2” X 1” placed at 30cm c/c, 100% new plain G.I. sheets with one coat of primer, 50% new and 50% old manglore tiles and 100% new ridge tiles, including applying one coat of wood preservatives, nails etc complete.

30.1

-

-

... More
Providing PVC transparent sheet roof at S-E bastion by using purlin of M.S. tube 80X40X3.2 @ 1.2m c/c and one mid support of 80X40X3.2 to support purlin at underneath with inserting M.S. tube 50cm in the laterite stone wall on either side for bearing including making hole in wall and filling with concrete 1:2:4, painting M.S. tube with one coat of primer and two coat of synthetic enamel paint. Laying PVC transparent sheet 6mm thick on purlin and fixing with necessary steel J-hooks including overlapping sheet 30cm in each row including cutting, fixing in position etc. complete

25

-

-

... More
Reconstruction of laterite stone structure near chapel. Provision for providing laterite stone masonry in neatly dressed stone of size 50 X 30 X 20 cm in Lime mortar 1:2 (1 Lime: 2 sand) etc. complete

25.33

-

-

... More
Providing and laying laterite rubble stone soiling of 60cm thick including ramming, consolidating, watering, carrying materials, water, etc, complete.

19.31

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.