Wood Tenders

Wood Tenders

Caraga Regional Hospital Tender

Healthcare and Medicine
Philippines
Details: Description Republic Of The Philippines Department Of Health Caraga Regional Hospital Surigao City Ooooooooo @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ Bids And Awards Committee Invitation To Bid Ib No. 2025-02-26 (03) Supply And Delivery Of Various Medical Supplies For Surgery Use Under Single-year Framework Agreement Approved Budget For The Contract: Php 4,728,750.00 ========================================================= 1. The Caraga Regional Hospital (crh), Through The Fy2025 Raf / Gaa Intends To Apply The Sum Of Being The Approved Budget For The Contract (abc) Of Four Million Seven Hundred Twenty Eight Thousand Seven Hundred Fifty Pesos Only ( Php 4,728,750.00 ) As To Payment Under The Contract For Supply And Delivery Of Various Medical Supplies For Surgery Use Under Single-year Framework Agreement (early Procurement Activity). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening And Items Below Are Subject For A Competitive Bidding As Framework Agreement List. This Is A Partial Bid Or Line Item Bid. Line Item No. Description Qty Unit Of Measure Unit Cost Total Cost 1 Cautery Pencil Disposable/pc With Color Code Switch 1,800 Pcs 150.00 270,000.00 2 Water Proof Transparent Dressing With Absorbent Pad Post Operative, With A High Moisture Vapor Transmission Rate Film, 20cm X10 Cm 100 Pcs 300.00 30,000.00 3 Skin Stapler With Skin Remover (sterile) 800 Pcs 400.00 320,000.00 4 Surgical Scrub Brush With 4%chlorhexidine Solution Per Piece 2,200 Pcs 120.00 264,000.00 5 T-tube, Surgical Drain, Sterile Latex Fr14, 10's/box, Sterile With Ethylene Oxide;individually Blister Packed;smooth And Strong Wall 15 Box 2,750.00 41,250.00 6 T-tube, Surgical Drain, Sterile Latex Fr16, 10's/box Sterile With Ethylene Oxide;individually Blister Packed;smooth And Strong Wall 10 Pcs 2,750.00 27,500.00 7 Transparent Surgical Incise Drape 10.2 Cm X 25.4 Cm 100 Pcs 250.00 25,000.00 8 Transparent Surgical Incise Drape 28 Cm X 45 Cm 100 Pcs 250.00 25,000.00 9 Transparent Surgical Incise Drape 40cm X 42 Cm 100 Pcs 250 25,000.00 10 Water Proof Transparent Dressing With Absorbent Pad Post Operative 15.5cm X8.5 Cm, Sterile 26 Pcs 300 7,800.00 11 Water Proof Transparent Dressing With Absorbent Pad Post Operative 20cm X 10 Cm, Sterile 55 Pcs 300 16,500.00 12 Water Proof Transparent Dressing With Absorbent Pad Post Operative 25cm X 10 Cm, Sterile 150 Pcs 300 45,000.00 13 Water Proof Transparent Dressing With Absorbent Pad Post Operative 45cm X 28cm, Sterile 50 Pcs 300 15,000.00 14 Absorbable Hemostat (oxidized Regenerated Cellulose) 3 Inches X 4 Inches, Box Of 12 1 Doz 55,000.00 55,000.00 15 Water Sealed Drainage, 1600ml - 2000ml, Sterile With Connecting Tube 190 Bottle 1,400.00 266,000.00 16 Electrosurgical Grounding Pad Adult Made Of Polyhesive 2.3 To 2.8metre Cable, Disposable 80 Pcs 480 38,400.00 17 Electrosurgical Grounding Pad Pedia Made Of Polyhesive 2.3 To 2.8metre Cable, Disposable 10 Pcs 480 4,800.00 18 Wound Drainage Jp 200ml - 250ml 200 Pcs 1,600.00 320,000.00 19 Abdominal Binder, 10-15 Inches Width, Assorted Length, 5 Medium, 10 Large, 15 Extra Large 30 Pcs 300 9,000.00 20 Bag, Colostomy W/ 56-57mm Base Plate Hydrocolloid Adhesive Skin Protector & Locking System, Leak Proof, With Closed Drainable Integrated Laminar Filter Bag, Sterile; Visually Transparent Bag 132 Pcs 288 38,016.00 21 Lapsponge Surgical 12 X 12x12 Ply, 28x24 Mesh Latex Free ,pre Washed And De-linted For Problem Free Use, X Ray Detectable Absorbent 100% Cotton ;1 Pc/pack 2,000 Pcs 150 300,000.00 22 Lapsponge Surgical 8 X 36''x12plyx24 Mesh Latex Free ,pre Washed And De-linted For Problem Free Use, X Ray Detectable Absorbent 100% Cotton; 1 Pc /pack 500 Pcs 250 125,000.00 23 T-tube, Surgical Drain, Sterile Latex Fr18, 10's/box;sterile With Ethylene Oxide;individually Blister Packed;smooth And Strong Wall 20 Box 2,750.00 55,000.00 24 Surgical Blade No. 15;box Of 100 Pcs;sterilized By Gamma Radiation 2.5m Rads; Surgical Blade Stainless Steel ; Excellent Cutting Quality, Strength And Corrosion Resistant, Disposable Blades ; Individually Wrapped And Sealed In Aluminum Foil And Long Shelf-life ; With Edge’s Micron Sharpness. They Are The Finest Blades Available;excellent Quality Based On The Sample Evaluation Conducted By The End User 10 Box 500 5,000.00 25 Penrose Drain 1/2 Inch; Sterile Penrose Drain Individually Pack Per Piece ; With Lot Number, Manufacturing Date And Expiry Date Label 20 Pcs 95 1,900.00 26 Penrose Drain 1/4 Inch; Sterile Penrose Drain Individually Pack Per Piece ; With Lot Number, Manufacturing Date And Expiry Date Label 300 Pcs 95 28,500.00 27 Penrose Drain 3/4 Inch; Sterile Penrose Drain Individually Pack Per Piece ; With Lot Number, Manufacturing Date And Expiry Date Label 10 Pcs 95 950.00 28 Surgical Blade No. 12 Box Of 100 Pcs;sterilized By Gamma Radiation 2.5m Rads; Surgical Blade Stainless Steel ; Excellent Cutting Quality, Strength And Corrosion Resistant, Disposable Blades ; Individually Wrapped And Sealed In Aluminum Foil And Long Shelf-life ; With Edge’s Micron Sharpness. They Are The Finest Blades Available;excellent Quality Based On The Sample Evaluation Conducted By The End User 5 Box 500.00 2,500.00 29 Surgical Blade No.21 Box Of 100 Pcs;sterilized By Gamma Radiation 2.5m Rads; Surgical Blade Stainless Steel ; Excellent Cutting Quality, Strength And Corrosion Resistant, Disposable Blades ; Individually Wrapped And Sealed In Aluminum Foil And Long Shelf-life ; With Edge’s Micron Sharpness. They Are The Finest Blades Available;excellent Quality Based On The Sample Eval By End User;excellent Quality Based On The Sample Eval By End User 10 Box 500.00 5,000.00 30 Reinforced Adhesive Skin Closure Strips, 1/4" X 2", 10sheets/pack 200 Packs 80.00 16,000.00 31 Reinforced Adhesive Skin Closure Strips, 1/2" X 2" 200 Packs 80.00 16,000.00 32 Tourniquet Quick Slow Release ;plastic Buckle 50 Pcs 65.00 3,250.00 33 Wound Dressing Sterile Medicated Tulle-gras With White Soft Paraffin 10cm X 10cm 50 Pcs 200 10,000.00 34 Structural Aluminum Malleable Non- Toxic Medical Polymer Rolling First Aid Splint For Wrist Arm Thumb Fracture 3.33x35.4 Inch 250 Set 230 57,500.00 35 Surgical Scrub Brush Plain Sterile 1,089 Pcs 28 30,492.00 36 Cotton Gauze Impregnated With White Soft Paraffin Containing 0.5% Chlorhexidine Acetate 10cmx 10cm;10 Pcs/per Box 540 Box 350 189,000.00 37 Surgery Pack (4 Pcs Or Gown Large With Cotton Ribbings;1 Large Sheet 121"x 83 "with 16"x 16 "hole;2 Half Sheet 59"x86 "inches;5 Hand Towel 21"x 26 ";22mayo Cover Pillow Case Size;1 Leggings ,autoclavable Cloth- Does Not Shrink When Exposed To Heat;washable Reusable 100 Pcs 7,000.00 700,000.00 38 Surgical Blade No. 10 ;box Of 100 Pcs; Sterilized By Gamma Radiation 2.5m Rads; Surgical Blade Stainless Steel ; Excellent Cutting Quality, Strength And Corrosion Resistant, Disposable Blades ; Individually Wrapped And Sealed In Aluminum Foil And Long Shelf-life ; With Edge’s Micron Sharpness. They Are The Finest Blades Available ;excellent Quality Based On The Sample Evaluation Conducted By The End User 25 Box 500 12,500.00 39 Surgical Blade No. 11; Box Of 100 Pcs;sterilized By Gamma Radiation 2.5m Rads; Surgical Blade Stainless Steel ; Excellent Cutting Quality, Strength And Corrosion Resistant, Disposable Blades ; Individually Wrapped And Sealed In Aluminum Foil And Long Shelf-life ; With Edge’s Micron Sharpness. They Are The Finest Blades Available;excellent Quality Based On The Sample Evaluation Conducted By The End User 25 Box 500 12,500.00 40 Surgical Blade No.20 Box Of 100 Pcs;sterilized By Gamma Radiation 2.5m Rads; Surgical Blade Stainless Steel ; Excellent Cutting Quality, Strength And Corrosion Resistant, Disposable Blades ; Individually Wrapped And Sealed In Aluminum Foil And Long Shelf-life ; With Edge’s Micron Sharpness. They Are The Finest Blades Available;excellent Quality Based On The Sample Eval By End User;excellent Quality Based On The Sample Evaluation Conducted By The End User 25 Box 500 12,500.00 41 Surgical Blade No.22 Box Of 100 Pcs;sterilized By Gamma Radiation 2.5m Rads; Surgical Blade Stainless Steel ; Excellent Cutting Quality, Strength And Corrosion Resistant, Disposable Blades ; Individually Wrapped And Sealed In Aluminum Foil And Long Shelf-life ; With Edge’s Micron Sharpness. They Are The Finest Blades Available;excellent Quality Based On The Sample Evaluation Conducted By The End User 10 Box 500 5,000.00 42 Lapsheet For Or Use Cloth, Width 70 Inches X Length 125 Inches 150 Roll 420 63,000.00 43 Water Proof Transparent Dressing With Absorbent Pad Post Operative 10cm X10 Cm 100 Pcs 240 24,000.00 44 Water Proof Transparent Dressing With Absorbent Pad Post Operative 5cm X 5cm 100 Pcs 240 24,000.00 45 Absorbable Hemostat, Oxidized Regenerated Cellulose, Size 4inches X 4inches, 12 Pieces Per Box 1 Box 72,000.00 72,000.00 46 Bag, Colostomy W/ 32mm - 40mm Base Plate Hydrocolloid Adhesive Skin Protector & Locking System, Leak Proof, With Closed Drainable Integrated Laminar Filter Bag, Sterile; Visually Transparent Bag 70 Pcs 288 20,160.00 47 Water Proof Transparent Dressing With Absorbent Pad Post Operative 8cm X 8cm 100 Pcs 360 36,000.00 48 Transparent Dressing For I.v. 2 Inches X 2 1/4 Inches ( 1610) 100pcs Per Box;with Waterproof Film Coating;has A Stabilisation Border, Transparent Window, Pattern-coated Adhesive, Deep Notch And Tape Strip To Provide A Secure Hold, Site Visibility And Moisture Management For Central Line 1 Box 5,482.00 5,482.00 49 Trauma Pelvic Orthotic Devices,dimensions: 8.2"h X 9.1"" W X 0.8'', Weight: 12 Oz 5 Pcs 5,000.00 25,000.00 50 Tongue Depressor, Wooden, Sterile, 6", Non- Pyrogenic, Non- Toxic ,100/box 500 Box 360 180,000.00 51 Absorbable Hemostatic Gelatine Sponge Size 3 Inches X 4 Inches 110 Pcs 472 51,920.00 52 Sterile Rolled Gauze 2 X 10 Inches; Individually Pack 100 Roll 25 2,500.00 53 Sterile Rolled Gauze 4x10 Inches ; Individually Pack 100 Roll 40 4,000.00 54 Sterile Rolled Gauze 6x10 Inches; Individually Pack 300 Roll 50 15,000.00 55 Sterile Rolled Gauze 8x8 Inches; Individually Pack 50 Roll 65 3,250.00 56 Absorbable Hemostatic Gelatine Sponge Size 3 Inches X 4 Inches 110 Pcs 2,278.00 250,580.00 57 Universal Or Pack : Consist Of 1 Table Cover 140cm X 190 Cm (60x190cm); 1 Pc Mayo Stand Cover 76cm X 145cm ;4 Pcs Smms Reinforced Surgical Gown Xl Size 130cmx75cm With Adhesive; Side Drape , Absorbent Pp+pe+pp240x 150 Cm With Adhesive; 1 Pc Bottom Drape Absorbent Pp+pe+pp 180 X 150 Cm With Adhesive; 1 Pc Suture Bag 16x 28 Cm ; Tape Strip (op-tape) 10x50cm ;4 Pcs Hand Towel 30x 40cm 20 Packs 2,500.00 50,000.00 58 Laparotomy Pack ,eo Sterilized :1 Pc Table Cover 140 X 190 Cm (60x190cm); 2 Pcs Mayo Stand Cover 76x 145cm; 5 Pcs Reinforced Surgical Gowns Xl; 8 Pcs Hand Towels 30x 40cm; 1 Pcs Laparotmy Drape 200x 250 Cm; 4 Pcs Utility Drape With Adhesive 38x 66cm; 1 Suture Bag16x 28 Cm; 1 Protective Bottom Drape Layer For Lapsheet Support; With Certificate Of Medical Device Notification 20 Unit 3,500.00 70,000.00 59 Surgical Scrub Brush With Povidone 7.5% Solution Per Piece;excellent Quality Based On The Sample Evaluation Conducted By The End User 10,000 Pcs 40 400,000.00 Grand Total 4,728,750.00 Terms Of Reference Terms Of Delivery: 20 Calendar Days Upon Receipt Of Call-off Delivery Schedule: End-user’s Demand Through Call-off This Procurement Is Under Framework Agreement -single Year Framework Agreement Expiration: Minimum Of Two (2) Years Expiry Upon Delivery Terms Of Payment. Payment Shall Be Made Upon Complete Delivery Per Call – Off. Necessary Documents Are Required In Compliance With Auditing Rules And Regulations. This Procurement Is A Partial Bid Or Line Item Bid. Bid Evaluation/post-qualification During The Evaluation And Post – Qualification Stage, The Twg And Bac Shall Consider The Previous Findings From The Product Quality Assurance Evaluation Report. This Includes Incorporating Assessments Of Product Quality, Performance And Suitability. During The Actual Product Sampling Evaluation, The Bidder’s Representative Shall Be Present. The Product Presented Should Demonstrate “excellent” Performance, As Defined By The Twg And The End-user Based On The Pqae. This “excellent” Mark Signifies That The Product Meets The Needs And Expectations Of Both Medical Experts And The End-user, As Determined Through The Actual Product Samples And Previous Performance Evaluation. In Addition To The Evaluation Process, A Product Demo Or Sample Is Strongly Recommended Particularly For Products That Are New, Unfamiliar To The Twg And End-user. The Bidder Shall Comply The Post-qualification Requirements Set By The Procuring Entity Especially During Product Demonstration Or Requiring For A Product Sample On A Given Schedule. Failure To Comply Shall Be Ground For Post-disqualification. The Procuring Entity Shall Require The Bidder To Deliver A Product Sample Or Demo To Caraga Regional Hospital Vicinity. Additionally, The Procuring Entity May Have Preferences Regarding How This Hospital Can Find Reliable And Easily Accessible Procedures During The Post-qualification Phase. Consequently, During This Phase, The Bidder Must Always Be Ready To Comply With Any Requirements Or Standards Made By The Procuring Entity. Validity Of The Contract / Contract Termination Without Prejudice To The Provision Of Applicable Laws, Rules And Guidelines, The Contract Shall Be Automatically Terminated Under The Following Conditions: A. When The Total Quantity Specified In The Contract Has Been Exhausted; Or B. For Any Justifiable Reason Ground Where The Contract Will Not Redound To The Benefit Of The Government Or There Is Violation Of The Contract. Repeat Order: 1. No Repeat Order For An Item In Contract Being Awarded Shall Be Allowed Until After The Procuring Entity Has Exhausted The Estimated Quantity For The Same Item Specified Therein Or After The Contract Has Expired, Whichever Comes First, And Subject To The Conditions Provided In Section 51 Of Ra 9184 And Its Irr. For This Purpose, The Repeat Order Shall Be Availed Of Only Within Six (6) Months From The Date Of The Last Of Final Call-off. 2. In Case Repeat Order Is Allowed And Resorted To, The Twenty-five (25%) Maximum Allowable Quantity Shall Be Based On The Total Quantity Of Awarded Item. General Conditions All Other Rules Governing Contract Implementation And Termination Under Ra 9184 And Its Irr, And Relevant Procurement Policies Shall Be Applicable. Technical Specification And Terms Of Reference Are Hereby Posted In Philgeps And Form An Integral Part Of This Invitation To Bid. 2. The Crh Now Invites Bids For The Procurement Of The Above-captioned Project. Delivery Of The Goods Is Required Within The Period Specified Under Section Vi (schedule Of Requirements). Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. Section 23.4.1.3.(ra 9184). The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty Five Percent ( 25% ) Of The Abc. Slcc Must Be Within 2 Years From The Submission Of Bids. (based On The Completion Date). The Single Largest Completed Contract (slcc) Shall Be The Same Or Similar In Nature, As Determined And Defined By The Bids And Awards Committee ( Bac ). For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: A. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And B. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Secretariat, Caraga Regional Hospital, Surigao City And Inspect The Bidding Documents At The Address Given Above During 8:00 Am – 5:00 Pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 21, 2025 To February 26, 2025 On Or Before 10:00 A.m. From The Address Above And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Specified Below: Bidding Schedule Pre-bidding Conference February 11, 2025 At 9:00 A.m. Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/89018652406?pwd=rxrgx2unbw6b0zobo2lmolkmfzfre5.1 Meeting Id: 890 1865 2406 Passcode: 142810 Deadline Of Submission Of Bids February 26, 2024 At 10:00 A.m... Via Online And Submit Your Bidding Documents To This Email Address: Crhbac2020@gmail.com. Please Be Advised That Failure To Submit Bidding Documents To The Designated Official Email Address Will Result In Automatic Rejection And Disqualification. Opening Of Bids February 26, 2025 At 2:00 P.m. Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/81348230327?pwd=bfkzeodym0i8lapw8jsen9ug0tbsee.1 Meeting Id: 813 4823 0327 Passcode: 491644 Complete Philippine Bidding Documents Please Click The Link Below For The Complete Pbd: Https://drive.google.com/drive/folders/1ttqwf5rpbxvamwrzfeowz1mofaqzpssh?usp=sharing Bidding Documents Php 5,000.00 It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Following Phlippine Bidding Documents Can Be Accessed In The Philgeps And All Form And Part Of This Invitation To Bid, To Wit: A. Technical Specification / Terms Of Reference/ List Of Items B. Instruction To Bidders: B.1. Documents To Be Submitted (checklist- This Will Be Discussed During The Pre-bid Conference) B.2. Memorandum Of Undertaking – Provision Thereof Is Strictly Implemented C. Guidelines On The Conduct Of The Electronic Submission And Receipt Of Bids By The Procuring Entity – Caraga Regional Hospital (crh) D. Philippine Bidding Documents E. Framework Agreement Guidelines F. Framework Agreement Lists G. Other Documents Essential Documents Required By This Procuring Entity And Ra 9184 6. The Crh Will Hold A Pre-bid Conference On The Above-mentioned Date, Time And Venue, Which Shall Be Opened To Prospective Bidders. The Pre-bidding Conference And Opening Of Bids Shall Be Conducted Through Videoconferencing, Webinar Or Virtual. Please Send Your Intent To Participate To Our Email Address As Provided Below. 7. Bids Must Be Duly Received By The Bac Secretariat At Via Designated Email On Or Before February 26, 2025 At 10:00 O’clock In The Morning. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On February 26, 2025 At 2:00 O’clock In The Afternoon At The Bac Conference Room, Beside Procurement Office, Caraga Regional Hospital, Rizal Street, Surigao City As Virtual / Electronic Bidding Via Zoom Platform. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above. Late Bids Shall Not Be Accepted Under Any Circumstances May It Cause. 8. Furthermore, The Standard Philippine Bidding Document (pbd) Is Form And Part Of This Invitation In Accordance To Ra 9184 And Other Applicable Laws, Rules And Policy. 9. The Crh Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. The Opening And Receipt Of Bids Is Strictly Implemented Through Electronic Submission. Given The Covid-19 Pandemic, Procurement Activity Has Been Expedient And One Of This Is The Conduct Of Electronic Submission Of Bids. The Crh Thru The Bids And Awards Committee (bac) Has Submitted Certification, Certified By The Highest Official Managing The Information Technology, Describing The Electronic System Or Procedure To Be Used By The Crh For The Electronic Submission And Receipts Of Bids And A Statement That The Same Is Compliant With The Gppb Resolution No. 12-2020 Requirements. 11. Bidding Documents Shall Be Emailed To This Email Address, With Activated Password To: Crhbac2020@gmail.com. You May Deposit On Line For The Payment Of The Bidding Documents To This Account Below: Bank Name: Land Bank Of The Philippines Account Name: Caraga Regional Hospital-trust Fund Account Number: 0982 -1288 – 70 12. Furthermore Deposit Slip Shall Be Submitted Via Email To: Crhprocurement.bac@gmail.com 13. The Procuring Entity Will No Longer Accept Nor Entertain Any Form Of Bids Submission Except Electronic. Failure To Comply Electronic Submission Will Be Immediately Disqualified. Guideline On The Electronic Submission Is Hereby Attached. 14. Join The Caraga Regional Hospital Supplier Network By Filling Out The Registry Form From This Link : Https://bit.ly/crh_suppliersregistry 15. For Further Information, Please Inquire To: Bac Secretariat Caraga Regional Hospital. Rizal Street, Surigao City Tel. Nos. (086) 826-1575 Local 194 (086) 826-9058 Mobile Nos: Globe: 0953-9212-832 / Smart: 0985-0508-783 E-mail Address: Crhprocurement.bac@gmail.com Fb Page: Caraga Regional Hospital – Bids And Awards Committee Approved By: (sgd) Fermarie C. Dulpina, Rmt, Mpa, Jd Chief Health Program Officer Chairman, Bids And Awards Committee
Closing Date26 Feb 2025
Tender AmountPHP 4.7 Million (USD 81.7 K)

U S COAST GUARD USA Tender

Machinery and Tools...+1Aerospace and Defence
United States
Details: The United States Coast Guard Surface Forces Logistics Center Has A Requirement To Open, Inspect, Report And Possible Overhaul Of The Below Item And Is Requesting Quotations: 1. This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format Outlined In Far Subpart 12.6, And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. 2. Solicitation Number 70z04025qag129 Is Issued As A Request For Quotation (rfq). This Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular (fac) 2025-02, Dated January 3, 2025. It Is Anticipated That A Competitive Price Purchase Order Shall Be Awarded Because Of This Synopsis/solicitation. All Responsible Sources May Submit A Quotation Which If Timely Received, Shall Be Considered By This Agency. 3. This Acquisition Will Be Issued Under Naics 811210. 4. Nsn: 2925-01-603-2033 oem: Electronic Control Arc 3000 M pn: Qcarc3002-aa03 qty: 4 Ea open, Inspect, Report With Possible Repair In Accordance With The Overhaul Description And Oem Specs. inspection Cost $__________ Each (this Cost Will Be Paid If Items Are Beyond Economic Repair) firm Fixed Repair Price $___________ Each. 5. These Parts Are Used For The U. S. Coast Guard Patrol Boat Product Line. Substitute Parts Or Part Numbers Are Not Acceptable. The Uscg Does Not Own The Rights To The Proprietary Data And Therefore Cannot Provide Drawings, Specifications, Or Schematics For These Parts. It Is The Government’s Belief That Only Quantum Marine Engineering, Inc. And Or Their Authorized Repair Facility Can Obtain The Required Technical And Engineering Data, And Genuine Oem Parts, Required To Successfully Repair These Items. Concerns Having The Expertise And Required Capabilities To Repair These Items Are Invited To Submit Complete Information Discussing The Same With Three (3) Calendar Days From The Day This Notice Is Posted. The Information Submitted Must Include A Letter From The Oem Verifying The Offeror Is An Authorized Repair Facility And Verifying The Oem Will Supply Only Genuine Oem Parts. 6. Packing And Marking: each Unit Shall Be Individually Preserved And Wrapped For Protection Against Deterioration For A Period Of 2 Years Minimum. Each Unit Shall Be Packed Individually In It’s Own Wooden Box Which Shall Be Capable Of Providing Adequate Protection To The Item During Multiple Shipments. Mare Each Box In Legible Black Print Lettering With The Following Information. national Stock Number 2925-01-603-2033 item Name Electronic Control Arc 3000 M part Number Qcarc3002-aa03 gov’t Order Number 70z08025p29****** coast Guard Sflc Material, Condition Code “a” 7. Delivery: delivery Is Required 02 Dec 2025. Please Provide Your Proposed Delivery To Address Below. Deliveries Are To Be Made Monday Through Friday Between The Hours Of 7:00 Am To 1:00 Pm. delivery Shall Be F.o.b. Destination To: united States Coast Guard (sflc) receiving Room, Bldg. #88 2401 Hawkins Point Road baltimore, Md 21226. estimated Delivery Date: _________________ 8. Inspection And Acceptance: F.o.b. Destination inspection And Acceptance Shall Take Place After Verification Of Preservation, Individual Packaging And Marking Requirements And Confirmation Of No Damage During Transit. Failure To Comply With Packaging Requirements Will Result In Rejection And Nonpayment. the Provision At 52.212-1, Instructions To Offerors-commercial, Applies To This Acquisition. In Addition, The Following Language Applies To This Provision: 9. Multiple Awards Will Not Be Made. Vendor Shall Provide An All-or-nothing Quote For The Requirement Identified In (5) Above. 10. Award Will Be Made To The Lowest Price Offeror, That Is Deemed Technical Acceptable. the Contractor Shall Provide A Total Firm Fixed Price With Inspection Fee For All Necessary Equipment And Shipping Cost To Addresses Shown Under Delivery. vendor Must Be Registered At Https://www.sam.gov Prior To Quote Submittal. each Offeror’s Record In Fapiis Will Be Reviewed Prior To Award. Award Will Not Be Made To Any Offeror Who Has Any Adverse Financial Information Or Exclusions. 11. Offerors Shall Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services (may 2024), With Their Offer, If This Information Is Not Already Included In Https://www.sam.gov. 12. The Clause At 52.212-4, Contract Terms And Conditions-commercial Items (nov 2023), Applies To This Acquisition. 13. Far 52.212-5 Contract Terms And Conditions Required To Implement Statues Or Executive Orders-commercial Product And Commercial Services (jan 2025) (a)the Contractorshallcomply With The Following Federalacquisitionregulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: (1)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements(jan 2017)(section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (3)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment.(nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232). (4)52.209-10, Prohibition Oncontractingwith Inverted Domestic Corporations(nov 2015). (5)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023)(31 U.s.c. 3903and10 U.s.c. 3801). (6)52.233-3, Protest After Award(aug 1996)(31u.s.c.3553). (7)52.233-4, Applicable Law For Breach Of Contractclaim(oct 2004)(public Laws 108-77 And 108-78 (19u.s.c.3805note)). (b)the Contractorshallcomply With The Far Clauses In This Paragraph (b) That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: [contracting Officercheck As Appropriate.] x(1)52.203-6, Restrictions On Subcontractor Sales To The Government(jun 2020),withalternatei(nov 2021)(41u.s.c.4704and10 U.s.c. 4655). __(2)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509)). __(3)52.203-15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009(jun 2010)(section 1553 Of Pub. L. 111-5). (applies To Contracts Funded By The American Recovery And Reinvestment Act Of 2009.) __(4)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community—see Far3.900(a). __(5)52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards(jun 2020)(pub. L. 109-282) (31u.s.c.6101note). __(6)[reserved]. __(7)52.204-14, Service Contract Reporting Requirements(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(8)52.204-15, Service Contract Reporting Requirements For Indefinite-delivery Contracts(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(9)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). __(10)52.204-28, Federalacquisitionsupply Chain Security Act Orders—federal Supply Schedules, Governmentwideacquisitioncontracts, And Multi-agency Contracts.(dec 2023)(pub. L. 115–390, Title Ii). __(11)(i)52.204-30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). __(ii)alternatei(dec 2023)of 52.204–30. x(12)52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed Fordebarment.(nov 2021)(31u.s.c.6101note). __(13)52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters(oct 2018)(41u.s.c.2313). __(14)[reserved]. __(15)52.219-3, Notice Ofhubzoneset-aside Or Sole-source Award (oct 2022) (15u.s.c.657a). __(16)52.219-4, Notice Of Price Evaluation Preference Forhubzonesmall Business Concerns (oct 2022) (if Theofferorelects To Waive The Preference, Itshallso Indicate In Itsoffer) (15u.s.c.657a). __(17)[reserved] __(18)(i)52.219-6, Notice Of Total Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-6. __(19)(i)52.219-7, Notice Of Partial Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-7. __(20)52.219-8, Utilization Of Small Business Concerns (feb 2024) (15u.s.c.637(d)(2)and (3)). __(21)(i)52.219-9, Small Business Subcontracting Plan (sep 2023) (15u.s.c.637(d)(4)). __(ii)alternatei(nov 2016)of52.219-9. __(iii)alternateii(nov 2016)of52.219-9. __(iv)alternateiii(jun 2020)of52.219-9. __(v)alternateiv (sep 2023) Of52.219-9. __(22)(i)52.219-13, Notice Of Set-aside Of Orders(mar 2020)(15u.s.c.644(r)). __(ii)alternatei(mar 2020)of52.219-13. __(23)52.219-14, Limitations On Subcontracting (oct 2022) (15u.s.c.637s). __(24)52.219-16, Liquidated Damages—subcontracting Plan(sep 2021)(15u.s.c.637(d)(4)(f)(i)). __(25)52.219-27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) (15u.s.c.657f). __(26)(i)52.219-28, Post Award Small Business Program Rerepresentation (feb 2024) (15u.s.c.632(a)(2)). __(ii)alternatei(mar 2020)of52.219-28. __(27)52.219-29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantagedwomen-owned Small Business Concerns(oct 2022) (15u.s.c.637(m)). __(28)52.219-30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15u.s.c.637(m)). __(29)52.219-32, Orders Issued Directly Under Small Business Reserves(mar 2020)(15u.s.c.644(r)). __(30)52.219-33, Nonmanufacturer Rule(sep 2021)(15u.s.c. 637(a)(17)). x(31)52.222-3, Convict Labor(jun 2003)(e.o.11755). x(32)52.222-19, Child Labor-cooperation With Authorities And Remedies(feb 2024). x (33)52.222-21, Prohibition Of Segregated Facilities(apr 2015). x(34)(i)52.222-26, Equal Opportunity(sep 2016)(e.o.11246). __(ii)alternatei(feb 1999)of52.222-26. __(35)(i)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). __(ii)alternatei(jul 2014)of52.222-35. x(36)(i)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). __(ii)alternatei(jul 2014)of52.222-36. __(37)52.222-37, Employment Reports On Veterans (jun 2020) (38u.s.c.4212). __(38)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). __(39)(i)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78and E.o. 13627). __(ii)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78and E.o. 13627). x(40)52.222-54, Employment Eligibility Verification(may2022)(executive Order 12989). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items Or Certain Other Types Ofcommercial Productsorcommercial Servicesas Prescribed In Far22.1803.) __(41)(i)52.223-9, Estimate Of Percentage Ofrecovered Materialcontent For Epa–designated Items (may2008) (42u.s.c.6962(c)(3)(a)(ii)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(ii)alternatei(may2008)of52.223-9(42u.s.c.6962(i)(2)(c)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(42)52.223-11,ozone-depleting Substancesandhigh Global Warming Potential Hydrofluorocarbons(may 2024) (e.o. 13693). __(43)52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners(may 2024)(e.o. 13693). __(49)52.223-20, Aerosols(may 2024)(e.o. 13693). __(50)52.223-21, Foams (may 2024) (e.o. 13693). __(51)(i)52.224-3privacy Training(may 2024)(5 U.s.c. 552 A). __(ii)alternatei(jan 2017)of52.224-3. __(52)(i)52.225-1, Buy American-supplies(oct 2022)(41u.s.c.chapter83). __(ii)alternatei(oct 2022)of52.225-1. x(53)(i)52.225-3, Buy American-free Trade Agreements-israeli Trade Act(nov 2023)(19 U.s.c. 3301 Note,19 U.s.c. 2112 Note,19 U.s.c. 3805 Note,19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43. __(ii)alternatei [reserved]. __(iii)alternateii(jan 2025)of52.225-3. __(iv)alternateiii(nov 2023)of52.225-3. __(v)alternateiv (oct 2022) Of52.225-3. __(54)52.225-5, Trade Agreements(nov 2023)(19u.s.c.2501,et Seq.,19u.s.c.3301note). x(55)52.225-13, Restrictions On Certain Foreign Purchases(feb 2021)(e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). __(56)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016) (section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). __(57)52.226-4, Notice Of Disaster Oremergencyarea Set-aside (nov 2007) (42u.s.c.5150). __(58)52.226-5, Restrictions On Subcontracting Outside Disaster Oremergencyarea (nov2007) (42u.s.c.5150). __(59)52.229-12, Tax On Certain Foreignprocurements(feb 2021). __(60)52.232-29, Terms For Financing Of Purchases Ofcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). __(61)52.232-30, Installment Payments Forcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). x(62)52.232-33, Payment Byelectronic Funds Transfer-system For Award Management(oct2018)(31u.s.c.3332). __(63)52.232-34, Payment Byelectronic Funds Transfer-other Thansystem For Award Management(jul 2013) (31u.s.c.3332). __(64)52.232-36, Payment By Third Party(may2014)(31u.s.c.3332). __(65)52.239-1, Privacy Or Security Safeguards(aug 1996)(5u.s.c.552a). __(66)52.242-5, Payments Tosmall Business Subcontractors(jan 2017)(15u.s.c.637(d)(13)). __(67)(i)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and10u.s.c.2631). __(ii)alternatei(apr 2003)of52.247-64. __(iii)alternateii(nov 2021)of52.247-64. (c)the Contractorshallcomply With The Far Clauses In This Paragraph (c), Applicable Tocommercial Services, That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: [contracting Officercheck As Appropriate.] x(1)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). x(2)52.222-42, Statement Of Equivalent Rates For Federal Hires(may2014)(29u.s.c.206and41u.s.c.chapter67). __(3)52.222-43, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year Andoptioncontracts)(aug 2018)(29u.s.c.206and41u.s.c.chapter67). __(4)52.222-44, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (may2014) (29u.s.c.206and41u.s.c.chapter67). __(5)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). __(6)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). __(7)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). __(8)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). __(9)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42u.s.c.1792). __(10)52.247-69, Reporting Requirement For U.s.-flag Air Carriers Regarding Training To Prevent Human Trafficking(jan 2025)(49 U.s.c. 40118(g)). (d)comptroller General Examination Of Record. The Contractorshallcomply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of Thesimplified Acquisition Threshold, As Defined In Far2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At52.215-2, Audit And Records-negotiation. (1)the Comptroller General Of Theunited States, Or An Authorized Representative Of The Comptroller General,shallhave Access To And Right To Examine Any Of The Contractor’s Directly Pertinent Records Involving Transactions Related To This Contract. (2)the Contractorshallmake Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminatedshallbe Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Ofclaimsarising Under Or Relating To This Contractshallbe Made Available Until Such Appeals, Litigation, Orclaimsare Finally Resolved. (3)as Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law. (e)(1)notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1), In A Subcontract Forcommercial Productsor Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Downshallbe As Required By The Clause- (i)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509). (ii)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712). (iii)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (iv)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (a)definitions. As Used In This Clause— kaspersky Lab Covered Articlemeans Any Hardware, Software, Or Service That– (1)is Developed Or Provided By Akaspersky Lab Covered Entity; (2)includes Any Hardware, Software, Or Service Developed Or Provided In Whole Or In Part By Akaspersky Lab Covered Entity; Or (3)containscomponentsusing Any Hardware Or Software Developed In Whole Or In Part By Akaspersky Lab Covered Entity. kaspersky Lab Covered Entitymeans– (1)kaspersky Lab; (2)any Successor Entity To Kaspersky Lab, Including Any Change In Name, E.g., “kaspersky”; (3)any Entity That Controls, Is Controlled By, Or Is Under Common Control With Kaspersky Lab; Or (4)any Entity Of Which Kaspersky Lab Has A Majority Ownership. (b)prohibition. Section 1634 Of Division A Of Thenational Defenseauthorization Act For Fiscal Year 2018 (pub. L. 115-91) Prohibits Government Use Of Anykaspersky Lab Covered Article. The Contractor Is Prohibited From— (1)providing Anykaspersky Lab Covered Articlethat The Government Will Use On Or After October 1, 2018; And (2)using Anykaspersky Lab Covered Articleon Or After October 1, 2018, In The Development Of Data Or Deliverables First Produced In The Performance Of The Contract. (c)reporting Requirement. (1)in The Event The Contractoridentifies Akaspersky Lab Covered Articleprovided To The Government During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or Any Other Source, The Contractorshallreport,in Writing, To Thecontracting Officeror, In The Case Of The Department Of Defense, To The Website Athttps://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractorshallreport To Thecontracting Officerfor The Indefinite Delivery Contract And Thecontracting Officer(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided Athttps://dibnet.dod.mil. (2)the Contractorshallreport The Following Information Pursuant To Paragraph (c)(1) Of This Clause: (i)within 3 Business Days From The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Brand; Model Number (original Equipment Manufacturer (oem) Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended. (ii)within 10 Business Days Of Submitting The Report Pursuant To Paragraph (c)(1) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractorshalldescribe The Efforts It Undertook To Prevent Use Or Submission Of Akaspersky Lab Covered Article, Any Reasons That Led To The Use Or Submission Of Thekaspersky Lab Covered Article, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Ofkaspersky Lab Covered Articles. (d)subcontracts. The Contractorshallinsert The Substance Of This Clause, Including This Paragraph (d), In All Subcontracts Including Subcontracts For Theacquisitionofcommercial Productsorcommercial Services. (v)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232. definitions. As Used In This Clause- backhaulmeans Intermediate Links Between The Core Network, Or Backbone Network, And The Small Subnetworks At The Edge Of The Network (e.g., Connecting Cell Phones/towers To The Core Telephone Network). Backhaul Can Be Wireless (e.g., Microwave) Or Wired (e.g., Fiber Optic, Coaxial Cable, Ethernet). covered Foreign Countrymeans The People’s Republic Of China. covered Telecommunications Equipment Or Servicesmeans– (1)telecommunications Equipment Produced By Huawei Technologies Company Or Zte Corporation (or Any Subsidiary Or Affiliate Of Such Entities); (2)for The Purpose Of Public Safety, Security Of Government Facilities, Physical Security Surveillance Of Critical Infrastructure, And Other National Security Purposes, Video Surveillance And Telecommunications Equipment Produced By Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, Or Dahua Technology Company (or Any Subsidiary Or Affiliate Of Such Entities); (3)telecommunications Or Video Surveillance Services Provided By Such Entities Or Using Such Equipment; Or (4)telecommunications Or Video Surveillance Equipment Or Services Produced Or Provided By An Entity That The Secretary Of Defense, In Consultation With The Director Of National Intelligence Or The Director Of The Federal Bureau Of Investigation, Reasonably Believes To Be An Entity Owned Or Controlled By, Or Otherwise Connected To, The Government Of Acovered Foreign Country. critical Technologymeans– (1)defense Articles Or Defense Services Included On Theunited Statesmunitions List Set Forth In The International Traffic In Arms Regulations Under Subchapter M Of Chapter I Of Title 22, Code Of Federal Regulations; (2)items Included On The Commerce Control List Set Forth In Supplement No. 1 To Part 774 Of The Export Administration Regulations Under Subchapter C Of Chapter Vii Of Title 15, Code Of Federal Regulations, And Controlled- (i)pursuant To Multilateral Regimes, Including For Reasons Relating To National Security, Chemical And Biological Weapons Proliferation, Nuclear Nonproliferation, Or Missile Technology; Or (ii)for Reasons Relating To Regional Stability Or Surreptitious Listening; (3)specially Designed And Prepared Nuclear Equipment, Parts Andcomponents, Materials, Software, And Technology Covered By Part 810 Of Title 10, Code Of Federal Regulations (relating To Assistance To Foreign Atomic Energy Activities); (4)nuclear Facilities, Equipment, And Material Covered By Part 110 Of Title 10, Code Of Federal Regulations (relating To Export And Import Of Nuclear Equipment And Material); (5)select Agents And Toxins Covered By Part 331 Of Title 7, Code Of Federal Regulations, Part 121 Of Title 9 Of Such Code, Or Part 73 Of Title 42 Of Such Code; Or (6)emerging And Foundational Technologies Controlled Pursuant To Section 1758 Of The Export Control Reform Act Of 2018 (50 U.s.c. 4817). interconnection Arrangementsmeans Arrangements Governing The Physical Connection Of Two Or More Networks To Allow The Use Of Another's Network To Hand Off Traffic Where It Is Ultimately Delivered (e.g., Connection Of A Customer Of Telephone Provider A To A Customer Of Telephone Company B) Or Sharing Data And Other Information Resources. reasonable Inquirymeans An Inquiry Designed To Uncover Any Information In The Entity's Possession About The Identity Of The Producer Or Provider Ofcovered Telecommunications Equipment Or Servicesused By The Entity That Excludes The Need To Include An Internal Or Third-party Audit. roamingmeans Cellular Communications Services (e.g., Voice, Video, Data) Received From A Visited Network When Unable To Connect To The Facilities Of The Home Network Either Because Signal Coverage Is Too Weak Or Because Traffic Is Too High. substantial Or Essential Componentmeans Anycomponentnecessary For The Proper Function Or Performance Of A Piece Of Equipment, System, Or Service. (b)prohibition. (1)section 889(a)(1)(a) Of The John S. Mccainnational Defenseauthorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of Anexecutive Agencyon Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System. The Contractor Is Prohibited From Providing To The Government Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far4.2104. (2)section 889(a)(1)(b) Of The John S. Mccainnational Defenseauthorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of Anexecutive Agencyon Or After August 13, 2020, From Entering Into A Contract, Or Extending Or Renewing A Contract, With An Entity That Uses Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far4.2104. This Prohibition Applies To The Use Ofcovered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. (c)exceptions.this Clause Does Not Prohibit Contractors From Providing— (1)a Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (2)telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (d)reporting Requirement. (1)in The Event The Contractor Identifiescovered Telecommunications Equipment Or Servicesused As Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or By Any Other Source, The Contractorshallreport The Information In Paragraph (d)(2) Of This Clause To Thecontracting Officer, Unless Elsewhere In This Contract Are Established Procedures For Reporting The Information; In The Case Of The Department Of Defense, The Contractorshallreport To The Website Athttps://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractorshallreport To Thecontracting Officerfor The Indefinite Delivery Contract And Thecontracting Officer(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided Athttps://dibnet.dod.mil. (2)the Contractorshallreport The Following Information Pursuant To Paragraph (d)(1) Of This Clause (i)within One Businessdayfrom The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Supplierunique Entity Identifier(if Known); Suppliercommercial And Government Entity (cage) Code(if Known); Brand; Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended. (ii)within 10 Business Days Of Submitting The Information In Paragraph (d)(2)(i) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractorshalldescribe The Efforts It Undertook To Prevent Use Or Submission Ofcovered Telecommunications Equipment Or Services, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Ofcovered Telecommunications Equipment Or Services. (e)subcontracts.the Contractorshallinsert The Substance Of This Clause, Including This Paragraph (e) And Excluding Paragraph (b)(2), In All Subcontracts And Other Contractual Instruments, Including Subcontracts For Theacquisitionofcommercial Productsorcommercial Services. (vi)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). (vii)(a)52.204–30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). (b)alternatei(dec 2023)of 52.204–30. (viii)52.219-8, Utilization Of Small Business Concerns(feb 2024)(15u.s.c.637(d)(2)and (3)), In All Subcontracts Thatofferfurther Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far19.702(a) On The Date Of Subcontract Award, The Subcontractormustinclude52.219-8in Lower Tier Subcontracts Thatoffersubcontracting Opportunities. (ix)52.222-21, Prohibition Of Segregated Facilities(apr 2015). (x)52.222-26, Equal Opportunity(sep 2015)(e.o.11246). (xi)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). (xii)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). (xiii)52.222-37, Employment Reports On Veterans(jun 2020)(38u.s.c.4212). (xiv)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause52.222-40. (xv)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). (xvi) (a)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78and E.o 13627). (b)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78ande.o.13627). (xvii)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). (xviii)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). (xix)52.222-54, Employment Eligibility Verification(may2022)(e.o. 12989). (xx)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). (xxi)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). (xxii) (a)52.224-3, Privacy Training (jan 2017) (5u.s.c.552a). (b)alternatei(jan 2017)of52.224-3. (xxiii)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016)(section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). (xxiv)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations(jun 2020)(42u.s.c.1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause52.226-6. (xxv)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023) (31 U.s.c. 3903and10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of52.232-40. (xxvi)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and10u.s.c.2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause52.247-64. (2)while Not Required, The Contractormayinclude In Its Subcontracts Forcommercial Productsandcommercial Servicesa Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations. 14. Electronic Submission Of Payment Requests (a) Definitions. As Used In These Instructions - (1) “payment Request” Means A Bill, Voucher, Invoice, Or Request For Contract Financing Payment With Associated Supporting Documentation. The Payment Request Must: Comply With The Requirements Identified In Far 32.905(b), “content Of Invoices” And The Applicable Payment Clause Included In This Contract. In Addition, Discount Offerings And Small Business Status If Available Shall Be Stated. If Travel Was Allowable And Approved, Components In Accordance With Far 31.205-46 Shall Be Provided. (b) The Contractor Shall Submit Payment Requests Electronically Using The Invoice Processing Platform (ipp). The Contractor Will Submit Payment Requests Using The Blank Form In Ipp. (c) Information Regarding Ipp, Including Ipp Customer Support Contact Information, Is Available At Www.ipp.gov Or Any Successor Site. (d) Ipp Enrollment Information Is At Https://www.uscg.mil/fincen/ipp/. additional Clauses hsar 3052.212-70contract Terms And Conditions Applicable To Dhs Acquisition Of Commercial Items. as Prescribed In (hsar) 48 Cfr 3012.301, Insert The Following Clause: contract Terms And Conditions Applicable To Dhs Acquisition Of Commercial Items (sep 2012) the Contractor Agrees To Comply With Any Provision Or Clause That Is Incorporated Herein By Reference To Implement Agency Policy Applicable To Acquisition Of Commercial Items Or Components. The Provision Or Clause In Effect Based On The Applicable Regulation Cited On The Date The Solicitation Is Issued Applies Unless Otherwise Stated Herein. The Following Provisions And Clauses Are Incorporated By Reference: [the Contracting Officer Should Either Check The Provisions And Clauses That Apply Or Delete The Provisions And Clauses That Do Not Apply From The List. The Contracting Officer May Add The Date Of The Provision Or Clause If Desired For Clarity.] (a)provisions. x 3052.247-72 F.o.b. Destination Only. (end Of Clause) 15. Defense Priorities And Allocations System (dpas) Ratings Are Not Applicable. 16. Quotes Are Due Not Later Than 22 Jan 2025, By 10:00 Am Eastern Daylight Savings Time (dst). 17. All Questions Regarding This Notice Shall Be Submitted In Writing To Donna Scandaliato No Later Than Jan 22, 2024. Quote Shall Be Emailed To Donna.m.scandaliato@uscg.mil.
Closing Date22 Jan 2025
Tender AmountRefer Documents 

U S COAST GUARD USA Tender

Machinery and Tools...+1Aerospace and Defence
United States
Details: The United States Coast Guard Surface Forces Logistics Center Has A Requirement To Open, Inspect, Report And Possible Overhaul Of The Below Item And Is Requesting Quotations: 1. This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format Outlined In Far Subpart 12.6, And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. 2. Solicitation Number 70z04025qzb018 Is Issued As A Request For Quotation (rfq). This Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular (fac) 2025-02, Dated January 3, 2025. It Is Anticipated That A Competitive Price Purchase Order Shall Be Awarded Because Of This Synopsis/solicitation. All Responsible Sources May Submit A Quotation Which If Timely Received, Shall Be Considered By This Agency. 3. This Acquisition Will Be Issued Under Naics 811210. 4. Nsn: 5895-12-395-9484 Control Monitor oem: Rolls-royce Solutions Gmbh pn: B00e50207391/s0002 qty: 3 Ea open, Inspect, Report With Possible Repair In Accordance With The Overhaul Description And Oem Specs. inspection Cost $__________ Each (this Cost Will Be Paid If Items Are Beyond Economic Repair) firm Fixed Repair Price $___________ Each. 5. These Parts Are Used For The U. S. Coast Guard Patrol Boat Product Line. Substitute Parts Or Part Numbers Are Not Acceptable. The Uscg Does Not Own The Rights To The Proprietary Data And Therefore Cannot Provide Drawings, Specifications, Or Schematics For These Parts. It Is The Government’s Belief That Only Rolls-royce Solutions Gmbh And Or Their Authorized Repair Facility Can Obtain The Required Technical And Engineering Data, And Genuine Oem Parts, Required To Successfully Repair These Items. Concerns Having The Expertise And Required Capabilities To Repair These Items Are Invited To Submit Complete Information Discussing The Same With Three (3) Calendar Days From The Day This Notice Is Posted. The Information Submitted Must Include A Letter From The Oem Verifying The Offeror Is An Authorized Repair Facility And Verifying The Oem Will Supply Only Genuine Oem Parts. 6. Packing And Marking: each Unit Shall Be Individually Preserved And Wrapped For Protection Against Deterioration For A Period Of 2 Years Minimum. Each Unit Shall Be Packed Individually In It’s Own Wooden Box Which Shall Be Capable Of Providing Adequate Protection To The Item During Multiple Shipments. Mare Each Box In Legible Black Print Lettering With The Following Information. national Stock Number 5895-12-395-9484 item Name Control-monitor part Number X00e50204217/s0002 gov’t Order Number 70z08025p29****** coast Guard Sflc Material, Condition Code “a” 7. Delivery: delivery Is Required 02 Dec 2025. Please Provide Your Proposed Delivery To Address Below. Deliveries Are To Be Made Monday Through Friday Between The Hours Of 7:00 Am To 1:00 Pm. delivery Shall Be F.o.b. Destination To: united States Coast Guard (sflc) receiving Room, Bldg. #88 2401 Hawkins Point Road baltimore, Md 21226. estimated Delivery Date: _________________ 8. Inspection And Acceptance: F.o.b. Destination inspection And Acceptance Shall Take Place After Verification Of Preservation, Individual Packaging And Marking Requirements And Confirmation Of No Damage During Transit. Failure To Comply With Packaging Requirements Will Result In Rejection And Nonpayment. the Provision At 52.212-1, Instructions To Offerors-commercial, Applies To This Acquisition. In Addition, The Following Language Applies To This Provision: 9. Multiple Awards Will Not Be Made. Vendor Shall Provide An All-or-nothing Quote For The Requirement Identified In (5) Above. 10. Award Will Be Made To The Lowest Price Offeror, That Is Deemed Technical Acceptable. the Contractor Shall Provide A Total Firm Fixed Price With Inspection Fee For All Necessary Equipment And Shipping Cost To Addresses Shown Under Delivery. vendor Must Be Registered At Https://www.sam.gov Prior To Quote Submittal. each Offeror’s Record In Fapiis Will Be Reviewed Prior To Award. Award Will Not Be Made To Any Offeror Who Has Any Adverse Financial Information Or Exclusions. 11. Offerors Shall Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Products And Commercial Services (may 2024), With Their Offer, If This Information Is Not Already Included In Https://www.sam.gov. 12. The Clause At 52.212-4, Contract Terms And Conditions-commercial Items (nov 2023), Applies To This Acquisition. 13. Far 52.212-5 Contract Terms And Conditions Required To Implement Statues Or Executive Orders-commercial Product And Commercial Services (jan 2025) (a)the Contractorshallcomply With The Following Federalacquisitionregulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: (1)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements(jan 2017)(section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (3)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment.(nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232). (4)52.209-10, Prohibition Oncontractingwith Inverted Domestic Corporations(nov 2015). (5)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023)(31 U.s.c. 3903and10 U.s.c. 3801). (6)52.233-3, Protest After Award(aug 1996)(31u.s.c.3553). (7)52.233-4, Applicable Law For Breach Of Contractclaim(oct 2004)(public Laws 108-77 And 108-78 (19u.s.c.3805note)). (b)the Contractorshallcomply With The Far Clauses In This Paragraph (b) That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: [contracting Officercheck As Appropriate.] x(1)52.203-6, Restrictions On Subcontractor Sales To The Government(jun 2020),withalternatei(nov 2021)(41u.s.c.4704and10 U.s.c. 4655). __(2)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509)). __(3)52.203-15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009(jun 2010)(section 1553 Of Pub. L. 111-5). (applies To Contracts Funded By The American Recovery And Reinvestment Act Of 2009.) __(4)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community—see Far3.900(a). __(5)52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards(jun 2020)(pub. L. 109-282) (31u.s.c.6101note). __(6)[reserved]. __(7)52.204-14, Service Contract Reporting Requirements(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(8)52.204-15, Service Contract Reporting Requirements For Indefinite-delivery Contracts(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(9)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). __(10)52.204-28, Federalacquisitionsupply Chain Security Act Orders—federal Supply Schedules, Governmentwideacquisitioncontracts, And Multi-agency Contracts.(dec 2023)(pub. L. 115–390, Title Ii). __(11)(i)52.204-30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). __(ii)alternatei(dec 2023)of 52.204–30. x(12)52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed Fordebarment.(nov 2021)(31u.s.c.6101note). __(13)52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters(oct 2018)(41u.s.c.2313). __(14)[reserved]. __(15)52.219-3, Notice Ofhubzoneset-aside Or Sole-source Award (oct 2022) (15u.s.c.657a). __(16)52.219-4, Notice Of Price Evaluation Preference Forhubzonesmall Business Concerns (oct 2022) (if Theofferorelects To Waive The Preference, Itshallso Indicate In Itsoffer) (15u.s.c.657a). __(17)[reserved] __(18)(i)52.219-6, Notice Of Total Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-6. __(19)(i)52.219-7, Notice Of Partial Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-7. __(20)52.219-8, Utilization Of Small Business Concerns (feb 2024) (15u.s.c.637(d)(2)and (3)). __(21)(i)52.219-9, Small Business Subcontracting Plan (sep 2023) (15u.s.c.637(d)(4)). __(ii)alternatei(nov 2016)of52.219-9. __(iii)alternateii(nov 2016)of52.219-9. __(iv)alternateiii(jun 2020)of52.219-9. __(v)alternateiv (sep 2023) Of52.219-9. __(22)(i)52.219-13, Notice Of Set-aside Of Orders(mar 2020)(15u.s.c.644(r)). __(ii)alternatei(mar 2020)of52.219-13. __(23)52.219-14, Limitations On Subcontracting (oct 2022) (15u.s.c.637s). __(24)52.219-16, Liquidated Damages—subcontracting Plan(sep 2021)(15u.s.c.637(d)(4)(f)(i)). __(25)52.219-27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) (15u.s.c.657f). __(26)(i)52.219-28, Post Award Small Business Program Rerepresentation (feb 2024) (15u.s.c.632(a)(2)). __(ii)alternatei(mar 2020)of52.219-28. __(27)52.219-29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantagedwomen-owned Small Business Concerns(oct 2022) (15u.s.c.637(m)). __(28)52.219-30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15u.s.c.637(m)). __(29)52.219-32, Orders Issued Directly Under Small Business Reserves(mar 2020)(15u.s.c.644(r)). __(30)52.219-33, Nonmanufacturer Rule(sep 2021)(15u.s.c. 637(a)(17)). x(31)52.222-3, Convict Labor(jun 2003)(e.o.11755). x(32)52.222-19, Child Labor-cooperation With Authorities And Remedies(feb 2024). x (33)52.222-21, Prohibition Of Segregated Facilities(apr 2015). x(34)(i)52.222-26, Equal Opportunity(sep 2016)(e.o.11246). __(ii)alternatei(feb 1999)of52.222-26. __(35)(i)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). __(ii)alternatei(jul 2014)of52.222-35. x(36)(i)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). __(ii)alternatei(jul 2014)of52.222-36. __(37)52.222-37, Employment Reports On Veterans (jun 2020) (38u.s.c.4212). __(38)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). __(39)(i)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78and E.o. 13627). __(ii)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78and E.o. 13627). x(40)52.222-54, Employment Eligibility Verification(may2022)(executive Order 12989). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items Or Certain Other Types Ofcommercial Productsorcommercial Servicesas Prescribed In Far22.1803.) __(41)(i)52.223-9, Estimate Of Percentage Ofrecovered Materialcontent For Epa–designated Items (may2008) (42u.s.c.6962(c)(3)(a)(ii)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(ii)alternatei(may2008)of52.223-9(42u.s.c.6962(i)(2)(c)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(42)52.223-11,ozone-depleting Substancesandhigh Global Warming Potential Hydrofluorocarbons(may 2024) (e.o. 13693). __(43)52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners(may 2024)(e.o. 13693). __(49)52.223-20, Aerosols(may 2024)(e.o. 13693). __(50)52.223-21, Foams (may 2024) (e.o. 13693). __(51)(i)52.224-3privacy Training(may 2024)(5 U.s.c. 552 A). __(ii)alternatei(jan 2017)of52.224-3. __(52)(i)52.225-1, Buy American-supplies(oct 2022)(41u.s.c.chapter83). __(ii)alternatei(oct 2022)of52.225-1. x(53)(i)52.225-3, Buy American-free Trade Agreements-israeli Trade Act(nov 2023)(19 U.s.c. 3301 Note,19 U.s.c. 2112 Note,19 U.s.c. 3805 Note,19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43. __(ii)alternatei [reserved]. __(iii)alternateii(jan 2025)of52.225-3. __(iv)alternateiii(nov 2023)of52.225-3. __(v)alternateiv (oct 2022) Of52.225-3. __(54)52.225-5, Trade Agreements(nov 2023)(19u.s.c.2501,et Seq.,19u.s.c.3301note). x(55)52.225-13, Restrictions On Certain Foreign Purchases(feb 2021)(e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). __(56)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016) (section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). __(57)52.226-4, Notice Of Disaster Oremergencyarea Set-aside (nov 2007) (42u.s.c.5150). __(58)52.226-5, Restrictions On Subcontracting Outside Disaster Oremergencyarea (nov2007) (42u.s.c.5150). __(59)52.229-12, Tax On Certain Foreignprocurements(feb 2021). __(60)52.232-29, Terms For Financing Of Purchases Ofcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). __(61)52.232-30, Installment Payments Forcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). x(62)52.232-33, Payment Byelectronic Funds Transfer-system For Award Management(oct2018)(31u.s.c.3332). __(63)52.232-34, Payment Byelectronic Funds Transfer-other Thansystem For Award Management(jul 2013) (31u.s.c.3332). __(64)52.232-36, Payment By Third Party(may2014)(31u.s.c.3332). __(65)52.239-1, Privacy Or Security Safeguards(aug 1996)(5u.s.c.552a). __(66)52.242-5, Payments Tosmall Business Subcontractors(jan 2017)(15u.s.c.637(d)(13)). __(67)(i)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and10u.s.c.2631). __(ii)alternatei(apr 2003)of52.247-64. __(iii)alternateii(nov 2021)of52.247-64. (c)the Contractorshallcomply With The Far Clauses In This Paragraph (c), Applicable Tocommercial Services, That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: [contracting Officercheck As Appropriate.] x(1)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). x(2)52.222-42, Statement Of Equivalent Rates For Federal Hires(may2014)(29u.s.c.206and41u.s.c.chapter67). __(3)52.222-43, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year Andoptioncontracts)(aug 2018)(29u.s.c.206and41u.s.c.chapter67). __(4)52.222-44, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (may2014) (29u.s.c.206and41u.s.c.chapter67). __(5)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). __(6)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). __(7)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). __(8)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). __(9)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42u.s.c.1792). __(10)52.247-69, Reporting Requirement For U.s.-flag Air Carriers Regarding Training To Prevent Human Trafficking(jan 2025)(49 U.s.c. 40118(g)). (d)comptroller General Examination Of Record. The Contractorshallcomply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of Thesimplified Acquisition Threshold, As Defined In Far2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At52.215-2, Audit And Records-negotiation. (1)the Comptroller General Of Theunited States, Or An Authorized Representative Of The Comptroller General,shallhave Access To And Right To Examine Any Of The Contractor’s Directly Pertinent Records Involving Transactions Related To This Contract. (2)the Contractorshallmake Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminatedshallbe Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Ofclaimsarising Under Or Relating To This Contractshallbe Made Available Until Such Appeals, Litigation, Orclaimsare Finally Resolved. (3)as Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law. (e)(1)notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1), In A Subcontract Forcommercial Productsor Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Downshallbe As Required By The Clause- (i)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509). (ii)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712). (iii)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (iv)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (a)definitions. As Used In This Clause— kaspersky Lab Covered Articlemeans Any Hardware, Software, Or Service That– (1)is Developed Or Provided By Akaspersky Lab Covered Entity; (2)includes Any Hardware, Software, Or Service Developed Or Provided In Whole Or In Part By Akaspersky Lab Covered Entity; Or (3)containscomponentsusing Any Hardware Or Software Developed In Whole Or In Part By Akaspersky Lab Covered Entity. kaspersky Lab Covered Entitymeans– (1)kaspersky Lab; (2)any Successor Entity To Kaspersky Lab, Including Any Change In Name, E.g., “kaspersky”; (3)any Entity That Controls, Is Controlled By, Or Is Under Common Control With Kaspersky Lab; Or (4)any Entity Of Which Kaspersky Lab Has A Majority Ownership. (b)prohibition. Section 1634 Of Division A Of Thenational Defenseauthorization Act For Fiscal Year 2018 (pub. L. 115-91) Prohibits Government Use Of Anykaspersky Lab Covered Article. The Contractor Is Prohibited From— (1)providing Anykaspersky Lab Covered Articlethat The Government Will Use On Or After October 1, 2018; And (2)using Anykaspersky Lab Covered Articleon Or After October 1, 2018, In The Development Of Data Or Deliverables First Produced In The Performance Of The Contract. (c)reporting Requirement. (1)in The Event The Contractoridentifies Akaspersky Lab Covered Articleprovided To The Government During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or Any Other Source, The Contractorshallreport,in Writing, To Thecontracting Officeror, In The Case Of The Department Of Defense, To The Website Athttps://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractorshallreport To Thecontracting Officerfor The Indefinite Delivery Contract And Thecontracting Officer(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided Athttps://dibnet.dod.mil. (2)the Contractorshallreport The Following Information Pursuant To Paragraph (c)(1) Of This Clause: (i)within 3 Business Days From The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Brand; Model Number (original Equipment Manufacturer (oem) Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended. (ii)within 10 Business Days Of Submitting The Report Pursuant To Paragraph (c)(1) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractorshalldescribe The Efforts It Undertook To Prevent Use Or Submission Of Akaspersky Lab Covered Article, Any Reasons That Led To The Use Or Submission Of Thekaspersky Lab Covered Article, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Ofkaspersky Lab Covered Articles. (d)subcontracts. The Contractorshallinsert The Substance Of This Clause, Including This Paragraph (d), In All Subcontracts Including Subcontracts For Theacquisitionofcommercial Productsorcommercial Services. (v)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232. definitions. As Used In This Clause- backhaulmeans Intermediate Links Between The Core Network, Or Backbone Network, And The Small Subnetworks At The Edge Of The Network (e.g., Connecting Cell Phones/towers To The Core Telephone Network). Backhaul Can Be Wireless (e.g., Microwave) Or Wired (e.g., Fiber Optic, Coaxial Cable, Ethernet). covered Foreign Countrymeans The People’s Republic Of China. covered Telecommunications Equipment Or Servicesmeans– (1)telecommunications Equipment Produced By Huawei Technologies Company Or Zte Corporation (or Any Subsidiary Or Affiliate Of Such Entities); (2)for The Purpose Of Public Safety, Security Of Government Facilities, Physical Security Surveillance Of Critical Infrastructure, And Other National Security Purposes, Video Surveillance And Telecommunications Equipment Produced By Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, Or Dahua Technology Company (or Any Subsidiary Or Affiliate Of Such Entities); (3)telecommunications Or Video Surveillance Services Provided By Such Entities Or Using Such Equipment; Or (4)telecommunications Or Video Surveillance Equipment Or Services Produced Or Provided By An Entity That The Secretary Of Defense, In Consultation With The Director Of National Intelligence Or The Director Of The Federal Bureau Of Investigation, Reasonably Believes To Be An Entity Owned Or Controlled By, Or Otherwise Connected To, The Government Of Acovered Foreign Country. critical Technologymeans– (1)defense Articles Or Defense Services Included On Theunited Statesmunitions List Set Forth In The International Traffic In Arms Regulations Under Subchapter M Of Chapter I Of Title 22, Code Of Federal Regulations; (2)items Included On The Commerce Control List Set Forth In Supplement No. 1 To Part 774 Of The Export Administration Regulations Under Subchapter C Of Chapter Vii Of Title 15, Code Of Federal Regulations, And Controlled- (i)pursuant To Multilateral Regimes, Including For Reasons Relating To National Security, Chemical And Biological Weapons Proliferation, Nuclear Nonproliferation, Or Missile Technology; Or (ii)for Reasons Relating To Regional Stability Or Surreptitious Listening; (3)specially Designed And Prepared Nuclear Equipment, Parts Andcomponents, Materials, Software, And Technology Covered By Part 810 Of Title 10, Code Of Federal Regulations (relating To Assistance To Foreign Atomic Energy Activities); (4)nuclear Facilities, Equipment, And Material Covered By Part 110 Of Title 10, Code Of Federal Regulations (relating To Export And Import Of Nuclear Equipment And Material); (5)select Agents And Toxins Covered By Part 331 Of Title 7, Code Of Federal Regulations, Part 121 Of Title 9 Of Such Code, Or Part 73 Of Title 42 Of Such Code; Or (6)emerging And Foundational Technologies Controlled Pursuant To Section 1758 Of The Export Control Reform Act Of 2018 (50 U.s.c. 4817). interconnection Arrangementsmeans Arrangements Governing The Physical Connection Of Two Or More Networks To Allow The Use Of Another's Network To Hand Off Traffic Where It Is Ultimately Delivered (e.g., Connection Of A Customer Of Telephone Provider A To A Customer Of Telephone Company B) Or Sharing Data And Other Information Resources. reasonable Inquirymeans An Inquiry Designed To Uncover Any Information In The Entity's Possession About The Identity Of The Producer Or Provider Ofcovered Telecommunications Equipment Or Servicesused By The Entity That Excludes The Need To Include An Internal Or Third-party Audit. roamingmeans Cellular Communications Services (e.g., Voice, Video, Data) Received From A Visited Network When Unable To Connect To The Facilities Of The Home Network Either Because Signal Coverage Is Too Weak Or Because Traffic Is Too High. substantial Or Essential Componentmeans Anycomponentnecessary For The Proper Function Or Performance Of A Piece Of Equipment, System, Or Service. (b)prohibition. (1)section 889(a)(1)(a) Of The John S. Mccainnational Defenseauthorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of Anexecutive Agencyon Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System. The Contractor Is Prohibited From Providing To The Government Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far4.2104. (2)section 889(a)(1)(b) Of The John S. Mccainnational Defenseauthorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of Anexecutive Agencyon Or After August 13, 2020, From Entering Into A Contract, Or Extending Or Renewing A Contract, With An Entity That Uses Any Equipment, System, Or Service That Usescovered Telecommunications Equipment Or Servicesas Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far4.2104. This Prohibition Applies To The Use Ofcovered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. (c)exceptions.this Clause Does Not Prohibit Contractors From Providing— (1)a Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (2)telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (d)reporting Requirement. (1)in The Event The Contractor Identifiescovered Telecommunications Equipment Or Servicesused As Asubstantial Or Essential Componentof Any System, Or Ascritical Technologyas Part Of Any System, During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or By Any Other Source, The Contractorshallreport The Information In Paragraph (d)(2) Of This Clause To Thecontracting Officer, Unless Elsewhere In This Contract Are Established Procedures For Reporting The Information; In The Case Of The Department Of Defense, The Contractorshallreport To The Website Athttps://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractorshallreport To Thecontracting Officerfor The Indefinite Delivery Contract And Thecontracting Officer(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided Athttps://dibnet.dod.mil. (2)the Contractorshallreport The Following Information Pursuant To Paragraph (d)(1) Of This Clause (i)within One Businessdayfrom The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Supplierunique Entity Identifier(if Known); Suppliercommercial And Government Entity (cage) Code(if Known); Brand; Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended. (ii)within 10 Business Days Of Submitting The Information In Paragraph (d)(2)(i) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractorshalldescribe The Efforts It Undertook To Prevent Use Or Submission Ofcovered Telecommunications Equipment Or Services, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Ofcovered Telecommunications Equipment Or Services. (e)subcontracts.the Contractorshallinsert The Substance Of This Clause, Including This Paragraph (e) And Excluding Paragraph (b)(2), In All Subcontracts And Other Contractual Instruments, Including Subcontracts For Theacquisitionofcommercial Productsorcommercial Services. (vi)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). (vii)(a)52.204–30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). (b)alternatei(dec 2023)of 52.204–30. (viii)52.219-8, Utilization Of Small Business Concerns(feb 2024)(15u.s.c.637(d)(2)and (3)), In All Subcontracts Thatofferfurther Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far19.702(a) On The Date Of Subcontract Award, The Subcontractormustinclude52.219-8in Lower Tier Subcontracts Thatoffersubcontracting Opportunities. (ix)52.222-21, Prohibition Of Segregated Facilities(apr 2015). (x)52.222-26, Equal Opportunity(sep 2015)(e.o.11246). (xi)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). (xii)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). (xiii)52.222-37, Employment Reports On Veterans(jun 2020)(38u.s.c.4212). (xiv)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause52.222-40. (xv)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). (xvi) (a)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78and E.o 13627). (b)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78ande.o.13627). (xvii)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). (xviii)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). (xix)52.222-54, Employment Eligibility Verification(may2022)(e.o. 12989). (xx)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). (xxi)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). (xxii) (a)52.224-3, Privacy Training (jan 2017) (5u.s.c.552a). (b)alternatei(jan 2017)of52.224-3. (xxiii)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016)(section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). (xxiv)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations(jun 2020)(42u.s.c.1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause52.226-6. (xxv)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023) (31 U.s.c. 3903and10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of52.232-40. (xxvi)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and10u.s.c.2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause52.247-64. (2)while Not Required, The Contractormayinclude In Its Subcontracts Forcommercial Productsandcommercial Servicesa Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations. 14. Electronic Submission Of Payment Requests (a) Definitions. As Used In These Instructions - (1) “payment Request” Means A Bill, Voucher, Invoice, Or Request For Contract Financing Payment With Associated Supporting Documentation. The Payment Request Must: Comply With The Requirements Identified In Far 32.905(b), “content Of Invoices” And The Applicable Payment Clause Included In This Contract. In Addition, Discount Offerings And Small Business Status If Available Shall Be Stated. If Travel Was Allowable And Approved, Components In Accordance With Far 31.205-46 Shall Be Provided. (b) The Contractor Shall Submit Payment Requests Electronically Using The Invoice Processing Platform (ipp). The Contractor Will Submit Payment Requests Using The Blank Form In Ipp. (c) Information Regarding Ipp, Including Ipp Customer Support Contact Information, Is Available At Www.ipp.gov Or Any Successor Site. (d) Ipp Enrollment Information Is At Https://www.uscg.mil/fincen/ipp/. additional Clauses hsar 3052.212-70contract Terms And Conditions Applicable To Dhs Acquisition Of Commercial Items. as Prescribed In (hsar) 48 Cfr 3012.301, Insert The Following Clause: contract Terms And Conditions Applicable To Dhs Acquisition Of Commercial Items (sep 2012) the Contractor Agrees To Comply With Any Provision Or Clause That Is Incorporated Herein By Reference To Implement Agency Policy Applicable To Acquisition Of Commercial Items Or Components. The Provision Or Clause In Effect Based On The Applicable Regulation Cited On The Date The Solicitation Is Issued Applies Unless Otherwise Stated Herein. The Following Provisions And Clauses Are Incorporated By Reference: [the Contracting Officer Should Either Check The Provisions And Clauses That Apply Or Delete The Provisions And Clauses That Do Not Apply From The List. The Contracting Officer May Add The Date Of The Provision Or Clause If Desired For Clarity.] (a)provisions. x 3052.247-72 F.o.b. Destination Only. (end Of Clause) 15. Defense Priorities And Allocations System (dpas) Ratings Are Not Applicable. 16. Quotes Are Due Not Later Than 22 Jan 2025, By 10:00 Am Eastern Daylight Savings Time (dst). 17. All Questions Regarding This Notice Shall Be Submitted In Writing To Donna Scandaliato No Later Than Jan 22, 2024. Quote Shall Be Emailed To Donna.m.scandaliato@uscg.mil.
Closing Date22 Jan 2025
Tender AmountRefer Documents 

National Farming Promotion Tender

Civil And Construction...+2Civil Works Others, Excavation
Corrigendum : Closing Date Modified
Poland
Details: Ag.b.0162.1.2024.159.rk Krakow, Dn.26/08/2024 Price Request entitled: "service consisting in repair of the sheathing and roof covering of the Police Station building in Maków Podhalański at ul. Kolejowa 8, 34–220 Maków Podhalański" The proceeding is conducted on the basis of Art.2 Section 1, Item 1 of the Act of 11 September 2019 - Public Procurement Law - hereinafter referred to as the Act, and in accordance with Decision No. 58/2021 of the Provincial Police Commander in Krakow of 4 November 2021. I. General Information: 1. The offer should be sent by: 9 September 2024, by 12:00. In the manner: Please submit offers and any inquiries by 9/09/2024, 12:00 PM. via the Purchasing Platform to the following address: https://malopolska-policja.eb2b.com.pl, "proceedings" tab À "list of open proceedings". In the event of problems with submitting the offer, please contact the Eb2b Helpdesk Department – Contact In the footer of the website. 2. The offer should be prepared in accordance with this inquiry. Ii. Description of the subject of the order: 1. The subject of the order is the performance of a service consisting in the repair of the sheathing and roof covering of the police station building in Maków Podhalański at ul. Kolejowa 8, 34–220 Maków Podhalański. The Scope of Repair Work Include: I. Repair of Partially Collapsed Roof Sheathing Made of Planks, Repair of Part of the Roof Covering Made of Asphalt Felt, Together with Repair of the Bituminous Flashings of the Firewalls. The Scope of Work That Needs to Be Performed in Connection with the Repair of the Partially Collapsed Roof Sheathing, Together with Repair of Part of the Roof Covering and Firewall Flashings Include, at Least: 1. Removal of Damaged Asphalt Felt (roofing felt laid in multi-layers) On the Roof Surface of Approx. 20.0 M2, And from the Firewalls Over a Length of Approx. 16.0 M. 2. Dismantling of Damaged Board Sheathing (on a Surface of Approx. 20 M2), Together with Reinforcement of the Repaired Sheathing by Installing Wooden Beams With a Cross-Section of 10x10 Cm – Impregnated Wood – 0.3 M3 3. Installation of Dismantled Board Sheathing, Replacing the Sheathing Boards with New Impregnated Boards on a Surface of Approx. 8 M2. 4. Execution of Roofing Made of Underlay Thermo-Weldable Roofing Paper and Surface Roofing Paper. 5. Execution of Bituminous Flashings (two layers of turned-up Thermo-Weldable Roofing Paper) Reinforced with Metal Strips On a Length of Approx. 16.0 M. Ii. Repair of the Chimney Shaft, Together with Supplementing and Siliconizing the Grilles Protecting the Channels Against Birds. The Scope of Work That Needs to Be Performed in Connection with the Repair of the Chimney Shaft Together with Supplementing and Siliconizing the Grilles Protecting the Channels Against Birds Include: 1. Removing the scalded plaster on the chimney shaft above the roof slope. 2. Supplementing the cement-lime plaster on a chimney shaft measuring 50x90 cm and 1.0 M high. 3. Painting the repaired chimney shaft in the color of the existing chimney shafts. 4. Supplementing the grilles protecting the channels against birds – 4 pcs., Together with Siliconizing the existing grilles – 60 pcs. 2. The Work Will Be Carried Out in an Active Facility. In connection with this, the Ordering Party requires that the Contractor, before starting the construction works, submits to the Ordering Party a list of persons who will perform the works as part of the Contractor's activities, providing the following data (name and surname, PESEL) and a list of vehicles necessary to perform the works (make and type together with registration numbers). The above requirement results from the fact that the works are to be performed in an active police facility, to which only previously established persons may have access. In the event of the need to perform the works by new (additional) persons, the Contractor is obliged to inform the Ordering Party of this fact in advance, making an appropriate update of the list of persons. In the case of countries other than Poland, please provide the date of birth, father's name and passport series and number. The Ordering Party reserves the right to refuse to allow the persons indicated by the Contractor to perform the work. Iii. Conditions concerning the Offer and Execution of the Order: 1. The price for the execution of the service will be a lump sum and will be payable once after the completion of the order. 2. Payment for the execution of the order will be made within 30 days from the date of receipt of a correctly issued invoice - by transfer to the account indicated by the Contractor. 3. It is possible (optional) to conduct an on-site inspection of the facility in order for the Contractor to precisely determine the lump sum price for the execution of the service. Failure to conduct an on-site inspection of the facility will not be a basis for rejecting the Offer. Conducting an on-site inspection will take place after prior arrangement with the Ordering Party. Deadline for execution of the order: The deadline for execution of the order is 30 business days from the date of receipt of the order. The Commencement Date of Works Is to Be Agreed With the User of the Facility. In the Event of Untimely Completion of the Task by the Contractor, the Contractor Will Pay the Ordering Party a Penalty of 0.5% of the Gross Order Value for Each Day of Delay, However, Not More Than 15% of the Gross Order Remuneration. Place of Order Fulfillment: Police Station in Maków Podhalański, Kolejowa Street 8, 34 – 220 Maków Podhalański. Contact Telephone Numbers in the Matter: Provincial Police Headquarters in Kraków: 47–83–54–917 District Police Headquarters in Sucha Beskidzka: 47–83–28–205 Iv. Criteria for Examination, Evaluation and Selection of Offers: Lowest Price. V. Attachments: Offer Template: Attachment No. 1
Closing Date3 Feb 2025
Tender AmountRefer Documents 

BARANGAY STA ROSA, BALANGIGA EASTERN SAMAR Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description S P E C I F I C A T I O N S B.5 Project Billboard The Contractor Shall Install One (1) Billboard Measuring 8 Ft. X 8 Ft. Tarpaulin, In Front Of The Project Site. Project Billboard Shall Be Installed For Government Information Projects To Inform The Public Of The Implementation Of The Project And To Advise The Road Users Of The On-going Construction. Upon Completion Of The Work, All Signs Installed Shall Be Removed From The Site. 102(1) Roadway Excavation Removal Of Unsuitable Material Where The Plans Show The Top Portion Of The Roadbed To Be Selected Topping, All Unsuitable Materials Shall Be Excavated To The Depth Necessary For Replacement Of The Selected Topping To The Required Compacted Thickness. Where Excavation To The Finished Graded Section Results In A Subgrade Or Slopes Of Unsuitable Soil, The Engineer May Require The Contractor To Remove The Unsuitable Material And Backfill To The Finished Graded Section With Approved Material. The Contractor Shall Conduct His Operations In Such A Way That The Engineer Can Take The Necessary Cross-sectional Measurements Before The Backfill Is Placed. The Excavation Of Muck Shall Be Handled In A Manner That Will Not Permit The Entrapment Of Muck Within The Backfill. The Material Used For Backfilling Up To The Ground Line Or Water Level, Whichever Is Higher, Shall Be Rock Or Other Suitable Granular Material Selected From The Roadway Excavation, If Available. If Not Available, Suitable Material Shall Be Obtained From Other Approved Sources. Unsuitable Material Removed Shall Be Disposed Off In Designated Areas Shown On The Plans Or Approved By The Engineer. Item 201 – Aggregate Base Course 201.1 Description This Item Shall Consist Of Furnishing, Placing And Compacting An Aggregate Base Course On A Prepared Sub-grade/sub-base In Accordance With This Specification And The Lines, Grades, Thickness And Typical Cross-sections Shown On The Plans, Or As Established By The Lgu Project Engineer. 201.2 Material Requirements Aggregate For Base Course Shall Consist Of Hard, Durable Particles Or Fragments Of Crushed Stone, Crushed Slag Or Crushed Or Natural Gravel And Filler Of Natural Or Crushed Sand Or Other Finely Divided Mineral Matter. The Composite Material Shall Be Free From Vegetable Matter And Lumps Or Balls Of Clay, And Shall Be Of Such Nature That It Can Be Compacted Readily To Form A Firm, Stable Base. In Some Areas Where The Conventional Base Course Materials Are Scarce Or Non-available, The Use Of 40% Weathered Limestone Blended With 60% Crushed Stones Or Gravel Shall Be Allowed, Provided That The Blended Materials Meet The Requirements Of This Item. The Base Course Material Shall Conform To Table 201.1, Whichever Is Called For In The Bill Of Quantities Table 201.1 – Grading Requirements Sieve Designation Mass Percent Passing Standard, Mm Alternate Us Standard Grading A Grading B 50 2” 100 37.5 1-1/2” - 100 25.0 1” 60 – 85 - 19.0 ¾” - 60 – 85 12.5 ½” 35 – 65 - 4.75 No. 4 20 – 50 30 – 55 0.425 No. 40 5 – 20 8 – 25 0.075 No. 200 0 – 12 2 – 14 The Fraction Passing The 0.075 Mm (no. 200) Sieve Shall Not Be Greater Than 0.66 (two Thirds) Of The Fraction Passing The 0.425 Mm (no. 40) Sieve. The Fraction Passing The 0.425 Mm (no. 40) Sieve Shall Have A Liquid Limit Not Greater Than 25 And Plasticity Index Not Greater Than 6 As Determined By Aashto T 89 And T 90, Respectively. The Coarse Portion, Retained On A 2.00 Mm (no. 10) Sieve Shall Have A Mass Percent Of Wear Not Exceeding 50 By The Los Angeles Abrasion Test Determined By Aashto T 96. The Material Passing The 19 Mm (3/4 Inch) Sieve Shall Have A Soaked Cbr Value Of Not Less Than 80% As Determined By Aashto T 193. The Cbr Value Shall Be Obtained At The Maximum Dry Density (mdd) As Determined By Aashto T 180, Method D. If Filler, In Addition To That Naturally Present, Is Necessary For Meeting The Grading Requirements Or For Satisfactory Bonding, It Shall Be Uniformly Blended With The Base Course Material On The Road Or In A Pug Mill Unless Otherwise Specified Or Approved. Filler Shall Be Taken From Sources Approved By The Lgu Project Engineer, Shall Be Free From Hard Lumps And Shall Not Contain More Than 15 Percent Of Material Retained On The 4.75 Mm (no. 4) Sieve. 201.3 Construction Requirements 201.3.1 Preparation Of Existing Surface The Existing Surface Shall Be Graded And Finished As Provided Under Item 105, Sub-grade Preparation, Before Placing The Base Material. 201.3.2 Placing It Shall Be In Accordance With All The Requirements Of Subsection 200.3.2, Placing. 201.3.3 Spreading And Compacting It Shall Be In Accordance With All The Requirements Of Subsection 200.3.3, Spreading And Compacting. 201.3.4 Additional Filler Additional Filler, When Required And When Not Added At The Screening Plant, Shall Be Spread In A Uniform Layer Over The Loosely Spread Base Material As Specified By The Lgu Project Engineer, Scarified By Appropriate Heavy Equipment And Then Watered And Mixed As Described Above. These Materials Are Incidental To The Work And No Payment Shall Be Made By The Project To The Contractor. 201.3.5 Trial Sections Trial Sections Shall Conform In All Respects To The Requirements Specified In Subsection 200.3.4. 201.3.6 Tolerances The Aggregate Base Course Shall Be Laid To The Designed Level And Transverse Slopes Shown On The Plans. The Allowable Tolerances Shall Be In Accordance With Following: Permitted Variation From Design Thickness Of Layer ± 10 Mm Permitted Variation From Design Level Of Surface + 5 Mm -10 Mm Permitted Surface Irregularity Measured By 3-m Straight-edge 5 Mm Permitted Variation From Design Crossfall Or Camber ± 0.2% Permitted Variation From Design Longitudinal Grade Over 25 M In Length ± 0.1% 201.4 Environmental Measures During The Course Of Hauling Operations, The Contractor Must At All Times Provide The Necessary Cover For The Dump Body Of The Hauling Equipment To Prevent Accidental Spoilage Of Earth Materials That Will Injure The Travelling Public Or People Living Near By. The Travel Route Of The Hauling Equipment’s Must Always Be Moist To Prevent Blowing Up Of Dusts Particles. Likewise, The Contractor Must Always Observe The Noise Level Of The Exhaust Mufflers Of The Heavy Equipment’s To Be At Minimum. Otherwise, Exhaust Muffler Must Be Provided With Silencers To Reduce Noise Levels Of The Hauling Equipment’s. Travelling Speed Of All Hauling Equipment’s Must Be Reduce When Passing Populated Areas Or At The School Site During School Days. Item 311 – Portland Cement Concrete Pavement 311.1 Description This Item Shall Consist Of Pavement Of Portland Cement Concrete, With Or Without Reinforcement, Constructed On The Prepared Base In Accordance With This Specification And In Conformity With Lines, Grades, Thickness And Typical Cross-section Shown On The Plans. 311.2 Material Requirements 311.2.1 Portland Cement Only Type I Portland Cement Shall Be Used Unless Otherwise Provided For In The Special Provisions. Different Brands Or The Same Brands From Different Mills Shall Not Be Mixed Nor Shall They Be Used Alternately Unless The Mix Is Approved By The Lgu Project Engineer. Cement Which For Any Reason Has Become Partially Set Or Which Contains Lumps Of Caked Cement Will Be Rejected. Cement Salvaged From Discarded Or Used Bags Shall Not Be Used. Samples Of Cement Shall Be Obtained In Accordance With Aashto T 127. 311.2.2 Fine Aggregate It Shall Consist Of Natural Sand, Stone Screenings Or Other Inert Materials With Similar Characteristics, Or Combinations Thereof, Having Hard, Strong And Durable Particles. Fine Aggregate From Different Sources Of Supply Shall Not Be Mixed Or Stored In The Same Pile Nor Used Alternately In The Same Class Of Concrete Without The Approval Of The Lgu Project Engineer. It Shall Not Contain More Than Three (3) Mass Percent Of Material Passing The 0.075 Mm (no. 200 Sieve) By Washing Nor More Than One (1) Mass Percent Each Of Clay Lumps Or Shale. The Use Of Beach Sand Will Not Be Allowed Without The Approval Of The Lgu Project Engineer. If The Fine Aggregate Is Subjected To Five (5) Cycles Of The Sodium Sulfate Soundness Test, The Weighted Loss Shall Not Exceed 10 Mass Percent. The Fine Aggregate Shall Be Free From Injurious Amounts Of Organic Impurities. If Subjected To The Colorimetric Test For Organic Impurities And A Color Darker Than The Standard Is Produced, It Shall Be Rejected. However, When Tested For The Effect Of Organic Impurities Of Strength Of Mortar By Aashto T 71, The Fine Aggregate May Be Used If The Relative Strength At 7 And 28 Days Is Not Less Than 95 Mass Percent. The Fine Aggregate Shall Be Well-graded From Coarse To Fine And Shall Conform To Table 311.1 Table 311.1 – Grading Requirements For Fine Aggregate Sieve Designation Mass Percent Passing 9.5 Mm (3/8 In) 100 4.75 Mm (no. 4) 95 – 100 2.36 Mm (no. 8) - 1.18 Mm (no. 16) 45 – 80 0.600 Mm (no. 30) - 0.300 Mm (no. 50) 5 – 30 0.150 Mm (no. 100) 0 – 10 311.2.3 Coarse Aggregate It Shall Consist Of Crushed Stone, Gravel, Blast Furnace Slag, Or Other Approved Inert Materials Of Similar Characteristics, Or Combinations Thereof, Having Hard, Strong, Durable Pieces And Free From Any Adherent Coatings. It Shall Contain Not More Than One (1) Mass Percent Of Material Passing The 0.075 Mm (no. 200) Sieve, Not More Than 0.25 Mass Percent Of Clay Lumps, Nor More Than 3.5 Mass Percent Of Soft Fragments. If The Coarse Aggregate Is Subjected To Five (5) Cycles Of The Sodium Sulfate Soundness Test, The Weighted Loss Shall Not Exceed 12 Mass Percent. It Shall Have A Mass Percent Of Wear Not Exceeding 40 When Tested By Aashto T 96. If The Slag Is Used, Its Density Shall Not Be Less Than 1120 Kg/m3 (70 Lb./cu. Ft.). The Gradation Of The Coarse Aggregate Shall Conform To Table 311.2. Only One Grading Specification Shall Be Used From Any One Source. Table 311.2 – Grading Requirement For Coarse Aggregate Sieve Designation Mass Percent Passing Standard Mm Alternate U. S. Standard Grading A Grading B Grading C 75.00 3 In. 100 - - 63.00 2-1/2 In. 90-100 100 100 50.00 2 In. - 90-100 95-100 37.5 1-1/2 In. 25-60 35-70 - 25.0 1 In. - 0-15 35-70 19.0 ¾ In. 0-10 - - 12.5 ½ In. 0-5 0-5 10-30 4.75 No. 4 - - 0-5 311.2.4 Water Water Used In Mixing, Curing Or Other Designated Application Shall Be Reasonably Clean And Free Of Oil, Salt, Acid, Alkali, Grass Or Other Substances Injurious To The Finished Product. Water Will Be Tested In Accordance With And Shall Meet The Requirements Of Item 714, Water. Water Which Is Drinkable May Be Used Without Test. Where The Source Of Water Is Shallow, The Intake Shall Be So Enclosed As To Exclude Silt, Mud, Grass Or Other Foreign Materials. 311.2.5 Reinforcing Steel It Shall Conform To The Requirements Of Item 404, Reinforcing Steel. Dowels And Tie Bars Shall Conform To The Requirements Of Aashto M 31 Or M 42, Except That Rail Steel Shall Not Be Used For Tie Bars That Are To Be Bent And Re-straightened During Construction. Tie Bars Shall Be Deformed Bars. Dowels Shall Be Plain Round Bars. Before Delivery To The Site Of Work, One-half Of The Length Of Each Dowel Shall Be Painted With One Coat Of Approved Lead Or Tar Paint. The Sleeves For Dowel Bars Shall Be Metal Of Approved Design To Cover 50 Mm ( 2 Inches), Plus Or Minus 5 Mm (1/4 Inch) Of The Dowel, With A Closed End, And With A Suitable Stop To Hold The End Of The Sleeve At Least 25 Mm (1 Inch) From The End Of The Dowel. Sleeves Shall Be Of Such Design That They Do Not Collapse During Construction. 311.2.6 Joint Fillers Poured Joint Fillers Shall Be Mixed Asphalt And Mineral Or Rubber Filler. Preformed Joint Filler Shall Conform To The Applicable Requirements. It Shall Be Punched To Admit The Dowels Where Called For In The Plans. The Filler For Each Joint Shall Be Furnished In A Single Piece For The Full Depth And Width Required For The Joint. 311.2.7 Admixtures Air-entraining Admixture Shall Conform To The Requirements Of Aashto M 154. Chemical Admixtures, If Specified Or Permitted, Shall Conform To The Requirements Of Aashto M 194. Fly Ash, If Specified Or Permitted As A Mineral Admixture And As 20% Partial Replacement Of Portland Cement In Concrete Mix Shall Conform To The Requirements Of Astm C 618. Admixture Should Be Added Only To The Concrete Mix To Produce Some Desired Modifications To The Properties Of Concrete Where Necessary, But Not As Partial Replacement Of Cement. 311.2.8 Curing Materials Curing Materials Shall Conform To The Following Requirements As Specified; A) Burlap Cloth - Aashto M 182 B) Liquid Membrane Forming Compounds - Aashto M 148 C) Sheeting (film) Materials - Aashto M 171 Cotton Mats And Water-proof Paper Can Be Used. 311.2.9 Calcium Chloride/calcium Nitrate It Shall Conform To Aashto M 144, If Specified Or Permitted By The Lgu Project Engineer, As Accelerator. 311.2.10 Storage Of Cement And Aggregate All Cement Shall Be Stored, Immediately Upon Delivery At The Site, In Weatherproof Building Which Will Protect The Cement From Dampness. The Floor Shall Be Raised From The Ground. The Buildings Shall Be Placed In Locations Approved By The Lgu Project Engineer. Provisions For Storage Shall Be Ample, And The Shipments Of Cement As Received Shall Be Separately Stored In Such A Manner As To Allow The Earliest Deliveries To Be Used First And To Provide Easy Access For Identification And Inspection Of Each Shipment. Storage Buildings Shall Have Capacity For Storage Of A Sufficient Quantity Of Cement To Allow Sampling At Least Twelve (12) Days Before The Cement Is To Be Used. Bulk Cement, If Used, Shall Be Transferred To Elevated Air Tight And Weatherproof Bins. Stored Cement Shall Meet The Test Requirements At Any Time After Storage When Retest Is Ordered By The Lgu Project Engineer. At The Time Of Use, All Cement Shall Be Free-flowing And Free Of Lumps. The Handling And Storing Of Concrete Aggregates Shall Be Such As To Prevent Segregation Or The Inclusion Of Foreign Materials. The Lgu Project Engineer May Require That Aggregates Be Stored On Separate Platforms At Satisfactory Locations. In Order To Secure Greater Uniformity Of Concrete Mix, The Lgu Project Engineer May Require That The Coarse Aggregate Be Separated Into Two Or More Sizes. Different Sizes Of Aggregate Shall Be Stored In Separate Bins Or In Separate Stockpiles Sufficiently Removed From Each Other To Prevent The Material At The Edges Of The Piles From Becoming Intermixed. 311.2.11 Proportioning, Consistency And Strength Of Concrete The Contractor Shall Prepare The Design Mix Based On The Absolute Volume Method As Outlined In The American Concrete Institute (aci) Standard 211.1, “recommended Practice For Selecting Proportions For Normal And Heavyweight Concrete”. It Is The Intent Of This Specification To Require At Least 364 Kg Of Cement Per Cubic Meter Of Concrete To Meet The Minimum Strength Requirements. The Lgu Project Engineer Shall Determine From Laboratory Tests Of The Materials To Be Used, The Cement Content And The Proportions Of Aggregate And Water That Will Produce Workable Concrete Having A Slump Of Between 40 And 75 Mm (1-1/2 And 3 Inches) If Not Vibrated Or Between 10 And 40 Mm (1/2 And 1-1/2 Inches) If Vibrated, And A Flexural Strength Of Not Less Than 3.8 Mpa (550 Psi) When Tested By The Third-point Method Or 4.5 Mps (650 Psi) When Tested By The Mid-point Method At Fourteen (14) Days In Accordance With Aashto T97 And T177, Respectively; Or A Compressive Strength Of 24.1 Mps (3500 Psi) For Cores Taken At Fourteen (14) Days And Tested In Accordance With Aashto T24. Slump Shall Be Determined Using Aashto T 119. The Designer Shall Consider The Use Of Lean Concrete (econcrete) Mixtures Using Local Materials Or Specifically Modified Conventional Concrete Mixes In Base Course And In The Lower Course Composite, Monolithic Concrete Pavements Using A Minimum Of 75 Mm (3 Inches) Of Conventional Concrete As The Surface Course. The Mix Design Shall Be Submitted To The Lgu Project Engineer For Approval And Shall Be Accompanied With Certified Test Data From An Approved Laboratory Demonstrating The Adequacy Of The Mix Design. A Change In The Source Of Materials During The Progress Of Work May Necessitate A New Design Mix. 311.3 Construction Requirements 311.3.1 Quality Control Of Concrete 1. General The Contractor Shall Be Responsible For The Quality Control Of All Materials During The Handling, Blending, And Mixing And Placement Operations. 2. Quality Control Plan The Contractor Shall Furnish The Lgu Project Engineer A Quality Control Plan Detailing His Production Control Procedures And The Type And Frequency Of Sampling And Testing To Insure That The Concrete Produces Complies With The Specifications. The Lgu Project Engineer Shall Be Provided Free Access To Recent Plant Production Records, And If Requested, Informational Copies Of Mix Design, Materials Certifications And Sampling And Testing Reports. 3. Qualification Of Workmen Experienced And Qualified Personnel Shall Perform All Batching Or Mixing Operation For The Concrete Mix, And Shall Be Present At The Plant And Job Site To Control The Concrete Productions Whenever The Plant Is In Operation. They Shall Be Identified And Duties Defined As Follows: A. Concrete Batcher. The Person Performing The Batching Or Mixing Operation Shall Be Capable Of Accurately Conducting Aggregate Surface Moisture Determination And Establishing Correct Scale Weights For Concrete Materials. He Shall Be Capable Of Assuring That The Proportioned Batch Weights Of Materials Are In Accordance With The Mix Design. B. Concrete Technician. The Person Responsible For Concrete Production Control And Sampling And Testing For Quality Control Shall Be Proficient In Concrete Technology And Shall Have A Sound Knowledge Of The Specifications As They Relate To Concrete Production. He Shall Be Capable Of Conducting Tests On Concrete And Concrete Materials In Accordance With These Specifications. He Shall Be Capable Of Adjusting Concrete Mix Designs For Improving Workability And Specification Compliance And Preparing Trial Mix Designs. He Shall Be Qualified To Act As The Concrete Batcher In The Batcher’s Absence. 4. Quality Control Testing The Contractor Shall Perform All Sampling, Testing And Inspection Necessary To Assure Quality Control Of The Component Materials And The Concrete. The Contractor Shall Be Responsible For Determining The Gradation Of Fine And Coarse Aggregates And For Testing The Concrete Mixture For Slump, Air Content, Water-cement Ratio And Temperature. He Shall Conduct His Operations So As To Produce A Mix Conforming To The Approved Mix Design. 5. Documentation The Contractor Shall Maintain Adequate Records Of All Inspections And Tests. The Records Shall Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And Rejected, And Nature Of Any Corrective Action Taken. The Lgu Project Engineer May Take Independent Assurance Samples At Random Location For Acceptance Purposes As He Deems Necessary. 311.3.2 Equipment Equipment And Tools Necessary For Handling Materials And Performing All Parts Of The Work Shall Be Approved By The Lgu Project Engineer As To Design, Capacity And Mechanical Condition. The Equipment Shall Be At The Jobsite Sufficiently Ahead Of The Start Of Construction Operations To Be Examined Thoroughly And Approved. 1. Batching Plant And Equipment A. General. The Batching Shall Include Bins, Weighing Hoppers, And Scales For The Fine Aggregate And For Each Size Of Coarse Aggregate. If Cement Is Used In Bulk, A Bin, A Hopper, And Separate Scale For Cement Shall Be Included. The Weighing Hopper Shall Be Properly Sealed And Vented To Preclude Dusting Operation. The Batch Plant Shall Be Equipped With A Suitable Non-resettable Batch Counter Which Will Correctly Indicate The Number Of Batches Proportioned. B. Bins And Hoppers. Bins With Adequate Separate Compartments For Fine Aggregate And For Each Size Of Coarse Aggregate Shall Be Provided In The Batching Plant. C. Scales. Scales For Weighing Aggregates And Cement Shall Be Of Either The Beam Type Or The Spring-less-dial Type. They Shall Be Accurate Within One-half Percent (0.5%) Throughout The Range Of Use. Poises Shall Be Designed To Be Locked In Any Position And To Prevent Unauthorized Change. Scales Shall Be Inspected And Sealed As Often As The Lgu Project Engineer May Deem Necessary To Assure Their Continued Accuracy. D. Automatic Weighing Devices. Unless Otherwise Allowed On The Contract, Batching Plants Shall Be Equipped With Automatic Weighing Devices Of An Approved Type To Proportion Aggregates And Bulk Cement. 2. Mixers. A. General. Concrete May Be Mixed At The Site Of Construction Or At A Central Plant, Or Wholly Or In Part In Truck Mixers. Each Mixer Shall Have A Manufacturer’s Plate Attached In A Prominent Place Showing The Capacity Of The Drum In Terms Of Volume Of Mixed Concrete And The Speed Of Rotation Of The Mixing Drum Or Blades. B. Mixers At Site Of Construction. Mixing Shall Be Done In An Approved Mixer Capable Of Combining The Aggregates, Cement And Water Into A Thoroughly Mixed And Uniform Mass Within The Specified Mixing Period And Discharging And Distributing The Mixture Without Segregation On The Prepared Grade. The Mixer Shall Be Equipped With An Approved Timing Device Which Will Automatically Lock The Discharge Lever When The Drum Has Been Charged And Released It At The End Of The Mixing Period. In Case Of Failure Of The Timing Device, The Mixer May Be Used For The Balance Of The Day While It Is Being Repaired, Provided That Each Batch Is Mixed 90 Seconds. The Mixer Shall Be Equipped With A Suitable Non-resettable Batch Counter Which Shall Correctly Indicate The Number Of The Batches Mixed. C. Truck Mixer And Truck Agitators. Truck Mixers Used For Mixing And Hauling Concrete, And Truck Agitators Used For Hauling Central-mixed Concrete, Shall Conform To The Requirements Of Aashto M 157. D. Non-agitator Truck. Bodies Of Non-agitating Hauling Equipment For Concrete Shall Be Smooth, Mortar-tight Metal Containers And Shall Be Capable Of Discharging The Concrete At A Satisfactory Controlled Rate Without Segregation. 3. Paving And Finishing Equipment The Concrete Shall Be Placed With An Approved Paver Designed To Spread, Consolidate, Screed And Float Finish The Freshly Placed Concrete In One Complete Pass Of The Machine In Such A Manner That A Minimum Of Hand Finishing Will Be Necessary To Provide A Dense And Homogeneous Pavement In Conformance With The Plans And Specifications. The Finishing Machine Shall Be Equipped With At Least Two (2) Oscillating Type Transverse Screed. Vibrators Shall Operate At A Frequency Of 8,300 To 9,600 Impulses Per Minute Under Load At A Maximum Spacing Of 60 Cm. 4. Concrete Saw The Contractor Shall Provide Sawing Equipment In Adequate Number Of Units And Power To Complete The Sawing With Water-cooled Diamond Edge Saw Blade Or An Abrasive Wheel To The Required Dimensions And At The Required Rate. He Shall Provide At Least One (1) Stand-by Saw In Good Working Condition And With An Ample Supply Of Saw Blades. 5. Forms Forms Shall Be Of Steel, Of An Approved Section, And Of Depth Equal To The Thickness Of The Pavement At The Edge. The Base Of The Forms Shall Be Of Sufficient Width To Provide Necessary Stability In All Directions. The Flange Braces Must Extend Outward On The Base To Not Less Than 2/3 The Height Of The Form. All Forms Shall Be Rigidly Supported On Bed Of Thoroughly Compacted Material During The Entire Operation Of Placing And Finishing The Concrete. Forms Shall Be Provided With Adequate Devices For Secure Setting So That When In Place, They Will Withstand, Without Visible Spring Or Settlement, The Impact And Vibration Of The Consolidation And Finishing Or Paving Equipment. 311.3.3 Preparation Of Grade After The Sub-grade Of Base Has Been Placed And Compacted To The Required Density, The Areas Which Will Support The Paving Machine And The Grade On Which The Pavement Is To Be Constructed Shall Be Trimmed To The Proper Elevation By Means Of A Properly Designed Machine Extending The Prepared Work Areas Compacted At Least 60 Cm Beyond Each Edge Of The Proposed Concrete Pavement. If Loss Of Density Results From The Trimming Operations, It Shall Be Restored By Additional Compaction Before Concrete Is Placed. If Any Traffic Is Allowed To Use The Prepared Sub-grade Or Base, The Surface Shall Be Checked And Corrected Immediately Ahead Of The Placing Concrete. The Sub-grade Or Base Shall Be Uniformly Moist When The Concrete Is Placed. 311.3.4 Setting Forms 1. Base Support. The Foundation Under The Forms Shall Be Hard And True To Grade So That The Form When Set Will Be Firmly In Contact For Its Whole Length And At The Specified Grade. (any Roadbed, Which At The Form Line Is Found Below Established Grade, Shall Be Filled With Approved Granular Materials To Grade In Lifts Of Three (3) Cm Or Less, And Thoroughly Re-rolled Or Tamped.) Imperfections Or Variations Above Grade Shall Be Corrected By Tamping Or By Cutting As Necessary. 2. Form Setting Forms Shall Be Set Sufficiently In Advance Of The Point Where Concrete Is Being Placed. After The Forms Have Been Set To Correct Grade, The Grade Shall Be Thoroughly Tamped, Mechanically Or By Hand, At Both The Inside And Outside Edges Of The Base Of The Forms. The Forms Shall Not Deviate From True Line Bv More Than One (1) Cm At Any Point. 3. Grade And Alignment The Alignment And Grade Elevations Of The Forms Shall Be Checked And Corrections Made By The Contractor Immediately Before Placing The Concrete. Testing As To Crown And Elevation, Prior To Placing Of Concrete Can Be Made By Means Of Holding An Approved Template In A Vertical Position And Moved Backward And Forward On The Forms. When Any Form Has Been Disturbed Or Any Grade Has Become Unstable, The Form Shall Be Reset And Rechecked. 311.3.5 Conditioning Of Sub-grade Or Base Course When Side Forms Have Been Securely Set To Grade, The Sub-grade Or Base Course Shall Be Brought To Proper Cross-section. High Areas Shall Be Trimmed To Proper Elevation. Low Areas Shall Be Filled And Compacted To A Condition Similar To That Of Surrounding Grade. The Finished Grade Shall Be Maintained In A Smooth And Compacted Condition Until The Pavement Is Placed. Unless Waterproof Sub-grade Or Base Course Cover Material Is Specified, The Sub-grade Or Base Course Shall Be Uniformly Moist When The Concrete Is Placed. If It Subsequently Becomes Too Dry, The Sub-grade Or Base Course Shall Be Sprinkled, But The Method Of Sprinkling Shall Not Be Such As To Form Mud Or Pools Of Water. 311.3.6 Handling, Measuring And Batching Materials The Batch Plant Site, Layout, Equipment And Provisions For Transporting Material Shall Be Such As To Assure A Continuous Supply Of Material To The Work. Stockpiles Shall Be Built Up In Layers Of Not More Than One (1) Meter In Thickness. Each Layer Shall Be Completely In Place Before Beginning The Next Which Shall Not Be Allowed To “cone” Down Over The Next Lower Layer. Aggregates From Different Sources And Of Different Grading Shall Not Be Stockpiled Together. All Washed Aggregates And Aggregates Produced Or Handled By Hydraulic Methods, Shall Be Stockpiled Or Binned For Draining At Least Twelve (12) Hours Before Being Batched. When Mixing Is Done At The Side Of The Work, Aggregates Shall Be Transported From The Batching Plant To The Mixer In Batch Boxes, Vehicle Bodies, Or Other Containers Of Adequate Capacity And Construction To Properly Carry The Volume Required. Partitions Separating Batches Shall Be Adequate And Effective To Prevent Spilling From One Compartment To Another While In Transit Or Being Dumped. When Bulk Cement Is Used, The Contractor Shall Use A Suitable Method Of Handling The Cement From Weighing Hopper To Transporting Container Or Into The Batch Itself For Transportation To The Mixer, With Chute, Boot Or Other Approved Device, To Prevent Loss Of Cement, And To Provide Positive Assurance Of The Actual Presence In Each Batch Of The Entire Cement Content Specified. Bulk Cement Shall Be Transported To The Mixer In Tight Compartments Carrying The Full Amount Of Cement Required For The Batch. However, If Allowed In The Special Provisions, It May Be Transported Between The Fine And Coarse Aggregate. When Cement Is Placed In Contact With The Aggregates, Batches May Be Rejected Unless Mixed Within 1-1/2 Hours Of Such Contact. Cement In Original Shipping Packages May Be Transported On Top Of The Aggregates, Each Batch Containing The Number Of Sacks Required By The Job Mix. The Mixer Shall Be Charged Without Loss Of Cement. Batching Shall Be So Conducted As To Result In The Weight To Each Material Required Within A Tolerance Of One (1) Percent For The Cement And Two (2) Percent For Aggregates. Water May Be Measured Either By Volume Or By Weight. The Accuracy Of Measuring The Water Shall Be Within A Range Of Error Of Not Over Than One (1) Percent. Unless The Water Is To Be Weighed, The Water-measuring Equipment Shall Include An Auxiliary Tank From Which The Measuring Tank Shall Be Equipped With An Outside Tap And Valve To Provide Checking The Setting, Unless Other Means Are Provided For Readily And Accurately Determining The Amount Of Water In The Tank. The Volume Of The Auxiliary Tank Shall Be At Least Equal To That Of The Measuring Tank. 311.3.7 Mixing Concrete The Concrete May Be Mixed At The Site Of The Work In A Central-mix Plant, Or In Truck Mixers. The Mixer Shall Be Of An Approved Type And Capacity. Mixing Time Will Be Measured From The Time All Materials, Except Water, Are In The Drum. Ready-mixed Concrete Shall Be Mixed And Delivered In Accordance With Requirements Of Aashto M 157, Except That The Minimum Required Revolutions At The Mixing Speed For Transit-mixed Concrete May Be Reduced To Not Less Than That Recommended By The Mixer Manufacturer. The Number Of Revolutions Recommended By The Mixer Manufacturer Shall Be Indicated On The Manufacturer’s Serial Plate Attached To The Mixer. The Contractor Shall Furnish Test Data Acceptable To The Lgu Project Engineer Verifying That The Make And Model Of The Mixer Will Produce Uniform Concrete Conforming To The Provision Of Aashto M 157 At The Reduced Number Of Revolutions Shown On The Serial Plate. When Mixed At The Site Or In A Central Mixing Plant, The Mixing Time Shall Not Be Less Than Fifty (50) Seconds Nor More Than Ninety (90) Seconds, Unless Mixer Performance Tests Prove Adequate Mixing Of The Concrete Is A Shorter Time Period. Four (4) Seconds Shall Be Added To The Specified Mixing Time If Timing Starts At The Instant The Skip Reaches Its Maximum Raised Positions. Mixing Time Ends When The Discharge Chute Opens. Transfer Time In Multiple Drum Mixers Is Included In Mixing Time. The Contents Of An Individual Mixer Drum Shall Be Removed Before A Succeeding Batch Is Emptied Therein. The Mixer Shall Be Operated At The Drum Speed As Shown On The Manufacturer’s Name Plate Attached On The Mixer. Any Concrete Mixed Less Than The Specified Time Shall Be Discarded And Disposed Off By The Contractor At His Expense. The Volume Of Concrete Mixed Per Batch Shall Not Exceed The Mixer’s Nominal Capacity In Cubic Metre, As Shown On The Manufacturer’s Standard Rating Plate On The Mixer, Except That An Overload Up To Ten (10) Percent Above The Mixer’s Nominal Capacity May Be Permitted Provided Concrete Test Data For Strength, Segregation, And Uniform Consistency Are Satisfactory, And Provided No Spillage Of Concrete Takes Place. The Batches Shall Be So Charged Into The Drum That A Portion Of The Mixing Water Shall Be Entered In Advance Of The Cement And Aggregates. The Flow Of Water Shall Be Uniform And All Water Shall Be In The Drum By The End Of The First Fifteen (15) Seconds Of The Mixing Period. The Throat Of The Drum Shall Be Kept Free Of Such Accumulations As May Restrict The Free Flow Of Materials Into The Drum. Mixed Concrete From The Central Mixing Plant Shall Be Transported In Truck Mixers, Truck Agitators Or Non-agitating Truck Specified In Subsection 311.3.2, Equipment. The Time Elapsed From The Time Water Is Added To The Mix Until The Concrete Is Deposited In Place At The Site Shall Not Exceed Forty Five (45) Minutes When The Concrete Is Hauled In Non-agitating Trucks, Nor Ninety (90) Minutes When Hauled In Truck Mixers Or Truck Agitators, Except That In Hot Weather Or Under Other Conditions Contributing To Quick Hardening Of The Concrete, The Maximum Allowable Time May Be Reduced By The Lgu Project Engineer. In Exceptional Cases And When Volumetric Measurements Are Authorized For Small Project Requiring Less Than 75 Cu.m. Of Concrete Per Day Of Pouring, The Weight Proportions Shall Be Converted To Equivalent Volumetric Proportions. In Such Cases, Suitable Allowance Shall Be Made For Variations In The Moisture Condition Of The Aggregates, Including The Bulking Effect In The Fine Aggregate. Batching And Mixing Shall Be In Accordance With Astm C 685, Section 6 Through 9. Concrete Mixing By Chute Is Allowed Provided That A Weighing Scale For Determining The Batch Weight Will Be Used. Retendering Concrete By Adding Water Or By Other Means Shall Not Be Permitted, Except That When Concrete Is Delivered In Truck Mixers, Additional Water May Be Added To The Batch Materials And Additional Mixing Performed To Increase The Slump To Meet The Specified Requirements, If Permitted By The Lgu Project Engineer, Provided All These Operations Are Performed Within Forty-five (45) Minutes After The Initial Mixing Operation And The Water-cement Ratio Is Not Exceeded. Concrete That Is Not Within The Specified Slump Limits At The Time Of Placement Shall Not Be Used. Admixtures For Increasing The Workability Or For Accelerating The Setting Of The Concrete Will Be Permitted Only When Specifically Approved By The Lgu Project Engineer. 311.3.8 Limitation Of Mixing No Concrete Shall Be Mixed, Placed Or Finished When Natural Light Is Insufficient, Unless An Adequate And Approved Artificial Lighting System Is Operated. During Hot Weather, The Lgu Project Engineer Shall Require That Steps Be Taken To Prevent The Temperature Of Mixed Concrete From Exceeding A Maximum Temperature Of (900f 320c). Concrete Not In Place Within Ninety (90) Minutes From The Time The Ingredients Were Charged Into The Mixing Drum Or That Has Developed Initial Set Shall Not Be Used. Retendering Of Concrete Or Mortar Which Has Partially Hardened, That Is Remixing With Or Without Additional Cement, Aggregate, Or Water, Shall Not Be Permitted. In Order That The Concrete May Be Properly Protected Against The Effects Of Rain Before The Concrete Is Sufficiently Hardened, The Contractor Will Be Required To Have Available At All Times Materials For The Protection Of The Edges And Surface Of The Unhardened Concrete. 311.3.9 Placing Concrete Concrete Shall Be Deposited In Such A Manner To Require Minimal Rehandling. Unless Truck Mixers Or Non-agitating Hauling Equipment Are Equipped With Means To Discharge Concrete Without Segregation Of The Materials, The Concrete Shall Be Unloaded Into An Approved Spreading Device And Mechanically Spread On The Grade In Such A Manner As To Prevent Segregation. Placing Shall Be Continuous Between Transverse Joints Without The Use Of Intermediate Bulkheads. Necessary Hand Spreading Shall Be Done With Shovels, Not Rakes. Workmen Shall Not Be Allowed To Walk In The Freshly Mixed Concrete With Boots Or Shoes Coated With Earth Or Foreign Substances. When Concrete Is To Be Placed Adjoining A Previously Constructed Lane And Mechanical Equipment Will Be Operated Upon The Existing Lane, That Previously Constructed Lane Shall Have Attained The Strength For Fourteen (14) Day Concrete. If Only Finishing Equipment Is Carried On The Existing Lane, Paving In Adjoining Lanes May Be Permitted After Three (3) Days. Concrete Shall Be Thoroughly Consolidated Against And Along The Faces Of All Forms And Along The Full Length And On Both Sides Of All Joint Assemblies, By Means Of Vibrators Inserted In The Concrete. Vibrators Shall Not Be Permitted To Come In Contact With A Joint Assembly, The Grade, Or A Side Form. In No Case Shall The Vibrator Be Operated Longer Than Fifteen (15) Seconds In Any One Location. Concrete Shall Be Deposited As Near As Possible To The Expansion And Contraction Joints Without Disturbing Them, But Shall Not Be Dumped From The Discharge Bucket Or Hopper Into A Joint Assembly Unless The Hopper Is Well Centered On The Joint Assembly. Should Any Concrete Material Fall On Or Be Worked Into The Surface Of A Complete Slab, It Shall Be Removed Immediately. 311.3.10 Test Specimens As Work Progresses, At Least One (1) Set Consisting Of Three (3) Concrete Beam Test Specimens, 150 Mm X 150 Mm X 525 Mm Or 900 Mm Shall Be Taken From Each 330 M2 Of Pavement, 230 Mm Depth, Or Fraction Thereof Placed Each Day. Test Specimens Shall Be Made Under The Supervision Of The Lgu Project Engineer, And The Contractor Shall Provide All Concrete And Other Facilities Necessary In Making The Test Specimens And Shall Protect Them From Damage By Construction Operations. Cylinder Samples Shall Not Be Used As Substitute For Determining The Adequacy Of The Strength Of Concrete. The Beams Shall Be Made, Cured, And Tested In Accordance With Aashto T 23 And T 97. 311.3.11 Strike-off Of Concrete And Placement Of Reinforcement Following The Placing Of The Concrete, It Shall Be Struck Off To Conform To The Cross-section Shown On The Plans And To An Elevation Such That When The Concrete Is Properly Consolidated And Finished, The Surface Of The Pavement Will Be At The Elevation Shown On The Plans. When Reinforced Concrete Pavement Is Placed In Two (2) Layers, The Bottom Layer Shall Be Struck Off And Consolidated To Such Length And Depth That The Sheet Of Fabric Or Bar Mat May Be Laid Full Length On The Concrete In Its Final Position Without Further Manipulation. The Reinforcement Shall Then Be Placed Directly Upon The Concrete, After Which The Top Layer Of The Concrete Shall Be Placed, Struck Off And Screened. Any Portion Of The Bottom Layer Of Concrete Which Has Been Placed More Than 30 Minutes Without Being Covered With The Top Layer Shall Be Removed And Replaced With Freshly Mixed Concrete At The Contractor’s Expense. When Reinforced Concrete Is Placed In One Layer, The Reinforcement May Be Firmly Positioned In Advance Of Concrete Placement Or It May Be Placed At The Depth Shown On The Plans In Plastic Concrete, After Spreading By Mechanical Or Vibratory Means. Reinforcing Steel Shall Be Free From Dirt, Oil, Paint, Grease, Mill Scale And Loose Or Thick Rust Which Could Impair Bond Of The Steel With The Concrete. 311.3.12 Joints Joints Shall Be Constructed Of The Type And Dimensions, And At The Locations Required By The Plans Or Special Provisions. All Joints Shall Be Protected From The Intrusion Of Injurious Foreign Material Until Sealed. 1. Longitudinal Joint Deformed Steel Tie Bars Of Specified Length, Size, Spacing And Materials Shall Be Placed Perpendicular To The Longitudinal Joints, They Shall Be Placed By Approved Mechanical Equipment Or Rigidly Secured By Chair Or Other Approved Supports To Prevent Displacement. Tie Bars Shall Not Be Painted Or Coated With Asphalt Or Other Materials Or Enclosed In Tubes Or Sleeves. When Shown On The Plans And When Adjacent Lanes Of Pavement Are Constructed Separately, Steel Side Forms Shall Be Used Which Will Form A Keyway Along The Construction Joint. Tie Bars, Except Those Made Of Rail Steel, May Be Bent At Right Angles Against The Form Of The First Lane Constructed And Straightened Into Final Position Before The Concrete Of The Adjacent Lane Is Placed, Or In Lieu Of Bent Tie Bars, Approved Two-piece Connectors May Be Used. Longitudinal Formed Joints Shall Consist Of A Groove Or Cleft, Extending Downward From And Normal To, The Surface Of The Pavement. These Joints Shall Be Effected Or Formed By An Approved Mechanically Or Manually Operated Device To The Dimensions And Line Indicated On The Plans And While The Concrete Is In A Plastic State. The Groove Or Cleft Shall Be Filled With Either A Premolded Strip Or Poured Material As Required. The Longitudinal Joints Shall Be Continuous, There Shall Be No Gaps In Either Transverse Or Longitudinal Joints At The Intersection Of The Joints. Longitudinal Sawed Joints Shall Be Cut By Means Of Approved Concrete Saws To The Depth, Width And Line Shown On The Plans. Suitable Guide Lines Or Devices Shall Be Used To Assure Cutting The Longitudinal Joint On The True Line. The Longitudinal Joint Shall Be Sawed Before The End Of The Curing Period Or Shortly Thereafter And Before Any Equipment Or Vehicles Are Allowed On The Pavement. The Sawed Area Shall Be Thoroughly Cleaned And, If Required, The Joint Shall Immediately Be Filled With Sealer. Longitudinal Pavement Insert Type Joints Shall Be Formed By Placing A Continuous Strip Of Plastic Materials Which Will Not React Adversely With The Chemical Constituent Of The Concrete. 2. Transverse Expansion Joint The Expansion Joint Filler Shall Be Continuous From Form To Form, Shaped To Sub-grade And To The Keyway Along The Form. Preformed Joint Filler Shall Be Furnished In Lengths Equal To The Pavement Width Or Equal To The Width Of One Lane. Damaged Or Repaired Joint Filler Shall Not Be Used. The Expansion Joint Filler Shall Be Held In A Vertical Position. An Approved Installing Bar, Or Other Device, Shall Be Used If Required To Secure Preformed Expansion Joint Filler At The Proper Grade And Alignment During Placing And Finishing Of The Concrete. Finished Joint Shall Not Deviate More Than 6 Mm From A Straight Line. If Joint Fillers Are Assembled In Sections, There Shall Be No Offsets Between Adjacent Units. No Plugs Of Concrete Shall Be Permitted Anywhere Within The Expansion Space. 3. Transverse Contraction Joint/weakened Joint When Shown On The Plans, It Shall Consist Of Planes Of Weakness Created By Forming Or Cutting Grooves In The Surface Of The Pavement And Shall Include Load Transfer Assemblies. The Depth Of The Weakened Plane Joint Should At All Times Not Be Less Than 50 Mm, While The Width Should Not Be More Than 6 Mm. A. Transverse Strip Contraction Joint. It Shall Be Formed By Installing A Parting Strip To Be Left In Place As Shown On The Plans. B. Formed Groove. It Shall Be Made By Depressing An Approved Tool Or Device Into The Plastic Concrete. The Tool Or Device Shall Remain In Place At Least Until The Concrete Has Attained Its Initial Set And Shall Then Be Removed Without Disturbing The Adjacent Concrete, Unless The Device Is Designed To Remain In The Joint. C. Sawed Contraction Joint. It Shall Be Created By Sawing Grooves In The Surface Of The Pavement Of The Width Not More Than 6 Mm, Depth Should At All Times Not Be Less Than 50 Mm, And At The Spacing And Lines Shown On The Plans, With An Approved Concrete Saw. After Each Joint Is Sawed, It Shall Be Thoroughly Cleaned Including The Adjacent Concrete Surface. Sawing Of The Joint Shall Commence As Soon As The Concrete Has Hardened Sufficiently To Permit Sawing Without Excessive Raveling, Usually 4 To 24 Hours. All Joints Shall Be Sawed Before Uncontrolled Shrinkage Cracking Takes Place. If Necessary, The Sawing Operations Shall Be Carried On During The Day Or Night, Regardless Of Weather Conditions. The Sawing Of Any Joint Shall Be Omitted If Crack Occurs At Or Near The Joint Location Prior To The Time Of Sawing. Sawing Shall Be Discounted When A Crack Develops Ahead Of The Saw. In General, All Joints Should Be Sawed In Sequence. If Extreme Condition Exist Which Make It Impractical To Prevent Erratic Cracking By Early Sawing, The Contraction Joint Groove Shall Be Formed Prior To Initial Set Of Concrete As Provided Above. 4. Transverse Construction Joint It Shall Be Constructed When There Is An Interruption Of More Than 30 Minutes In The Concreting Operations. No Transverse Joint Shall Be Constructed Within 1.50 M Of An Expansion Joint, Contraction Joint, Or Plane Of Weakness. If Sufficient Concrete Has Been Mixed At The Time Of Interruption To Form A Slab Of At Least 1.5 M Long, The Excess Concrete From The Last Preceding Joint Shall Be Removed And Disposed Off As Directed. 5. Load Transfer Device Dowel, When Used, Shall Be Held In Position Parallel To The Surface And Center Line Of The Slab By A Metal Device That Is Left In The Pavement. The Portion Of Each Dowel Painted With One Coat Of Lead Or Tar, In Conformance With The Requirements Of Item 404, Reinforcing Steel, Shall Be Thoroughly Coated With Approved Bituminous Materials, E.g., Mc-70, Or An Approved Lubricant, To Prevent The Concrete From Binding To That Portion Of The Dowel. The Sleeves For Dowels Shall Be Metal Designed To Cover 50 Mm Plus Or Minus 5 Mm (1/4 Inch), Of The Dowel, With A Watertight Closed End And With A Suitable Stop To Hold The End Of The Sleeves At Least 25 Mm (1 Inch) From The End Of The Dowel. In Lieu Of Using Dowel Assemblies At Contraction Joints, Dowel May Be Placed In The Full Thickness Of Pavement By A Mechanical Device Approved By The Lgu Project Engineer. 311.3.13 Final Strike-off (consolidation And Finishing) 1. Sequence The Sequence Of Operations Shall Be The Strike-off And Consolidation, Floating And Removal Of Laitance, Straight-edging And Final Surface Finish. Work Bridges Or Other Devices Necessary To Provide Access To The Pavement Surface For The Purpose Of Finishing Straight-edging, And Make Corrections As Hereinafter Specified, Shall Be Provided By The Contractor. In General, The Addition Of Water To The Surface Of The Concrete To Assist In Finishing Operations Will Not Be Permitted. If The Application Of Water To The Surface Is Permitted, It Shall Be Applied As Fog Spray By Means Of An Approve Spray Equipment. 2. Finishing Joints The Concrete Adjacent To Joints Shall Be Compacted Or Firmly Placed Without Voids Or Segregation Against The Joint Material Assembly, Also Under And Around All Load Transfer Devices, Joint Assembly Units, And Other Features Designed To Extend Into The Pavement. Concrete Adjacent To Joints Shall Be Mechanically Vibrated As Required In Subsection 311.3.9, Placing Concrete. After The Concrete Has Been Placed And Vibrated Adjacent To The Joints As Required In Subsection 311.3.9, The Finishing Machine Shall Be Brought Forward, Operating In A Manner To Avoid Damage Or Misalignment Of Joints. If Uninterrupted Operation Of The Finishing Machine, To Over And Beyond The Joints Causes Segregation Of Concrete, Damage To, Or Misalignment Of The Joints, The Finishing Machine Shall Be Stopped When The Front Screed Is Approximately 20 Cm (8 Inches) From The Joint. Segregated Concrete Shall Be Removed From In Front Of And Off The Joint. The Front Screed Shall Be Lifted And Set Directly On Top Of The Joint And The Forward Motion Of The Finishing Machine Resumed. When The Second Screed Is Close Enough To Permit The Excess Mortar In Front Of It To Flow Over The Joint, It Shall Be Lifted And Carried Over The Joint. Thereafter, The Finishing Machine May Be Run Over The Joint Without Lifting The Screeds, Provided There Is No Segregated Concrete Immediately Between The Joint And The Screed Or On Top Of The Joint. 3. Machine Finishing A. Non-vibratory Method. The Concrete Shall Be Distributed Or Spread As Soon As Placed. As Soon As The Concrete Has Been Placed, It Shall Be Struck Off And Screwed By An Approved Finishing Machine. The Machine Shall Go Over Each Area Of Pavement As Many Times And At Such Intervals As Necessary To Give The Proper Compaction And Leave A Surface Of Uniform Texture. Excessive Operation Over A Given Area Shall Be Avoided. The Tops Of The Forms Shall Be Kept Clean By An Effective Device Attached To The Machine And The Travel Of The Machine On The Forms Shall Be Maintained True Without Wobbling Or Other Variation Tending To Affect The Precision Finish. During The First Pass Of The Finishing Machine, A Uniform Ridge Of Concrete Shall Be Maintained Ahead Of The Front Screed In Its Entire Length. B. Vibratory Method. When Vibration Is Specified, Vibrators For Full Width Vibration Of Concrete Paving Slabs, Shall Meet The Requirements In Subsection 311.3.2, Equipment. If Uniform And Satisfactory Density Of The Concrete Is Not Obtained By The Vibratory Method At Joints, Along Forms, At Structures, And Throughout The Pavement, The Contractor Will Be Required To Furnish Equipment And Method Which Will Produce Pavement Conforming To The Specifications. All Provisions In Item (a) Above Not In Conflict With The Provisions For The Vibratory Method Shall Govern. 4. Hand Finishing Hand Finishing Methods May Only Be Used Under The Following Conditions: A. In The Event Of Breakdown Of The Mechanical Equipment, Hand Methods May Be Used To Finish The Concrete Already Deposited On The Grade. B. In Narrow Widths Or Areas Of Irregular Dimensions Where Operations Of The Mechanical Equipment Is Impractical, Hand Methods May Be Used. Concrete, As Soon As Placed, Shall Be Struck Off And Screeded. An Approved Portable Screed Shall Be Used. A Second Screed Shall Be Provided For Striking Off The Bottom Layer Of Concrete If Reinforcement Is Used. The Screed For The Surface Shall Be At Least 60 Cm (2 Feet) Longer Than The Maximum Width Of The Slab To Be Struck Off. It Shall Be Of Approved Design, Sufficiently Rigid To Retain Its Shape, And Constructed Either Of Metal Or Other Suitable Material Shod With Metal. Consolidation Shall Be Attained By The Use Of Suitable Vibrator Or Other Approved Equipment. In Operation, The Screed Shall Be Moved Forward On The Forms With A Combined Longitudinal And Transverse Shearing Motion, Moving Always In The Direction In Which The Work Is Progressing And So Manipulated That Neither End Is Raised From The Side Forms During The Striking Off Process. If Necessary, This Shall Be Repeated Until The Surface Is Of Uniform Texture, True To Grade And Cross-section, And Free From Porous Areas. 5. Floating After The Concrete Has Been Struck Off And Consolidated, It Shall Be Further Smoothed, Trued, And Consolidated By Means Of A Longitudinal Float, Either By Hand Or Mechanical Method. A. Hand Method. The Hand-operated Longitudinal Float Shall Be Not Less Than 365 Cm (12 Feet) In Length And 15 Cm (6 Inches) In Width, Properly Stiffened To Prevent Flexibility And Warping. The Longitudinal Float, Operated From Foot Bridges Resting On The Side Forms And Spanning But Not Touching The Concrete, Shall Be Worked With A Sawing Motion While Held In A Floating Position Parallel To The Road Center Line, And Moving Gradually From One Side Of The Pavement To The Other. Movement Ahead Along The Center Line Of The Pavement Shall Be In Successive Advances Of Not More Than One-half The Length Of The Float. Any Excess Water Or Soupy Material Shall Be Wasted Over The Side Forms On Each Pass. B. Mechanical Method. The Mechanical Longitudinal Float Shall Be Of A Design Approved By The Lgu Project Engineer, And Shall Be In Good Working Condition. The Tracks From Which The Float Operates Shall Be Accurately Adjusted To The Required Crown. The Float Shall Be Accurately Adjusted And Coordinated With The Adjustment Of The Transverse Finishing Machine So That A Small Amount Of Mortar Is Carried Ahead Of The Float At All Times. The Forward Screed Shall Be Adjusted So That The Float Will Lap The Distance Specified By The Lgu Project Engineer On Each Transverse Trip. The Float Shall Pass Over Each Areas Of Pavement At Least Two Times, But Excessive Operation Over A Given Area Will Not Be Permitted. Any Excess Water Or Soupy Material Shall Be Wasted Over The Side Forms On Each Pass. C. Alternative Mechanical Method. As An Alternative, The Contractor May Use A Machine Composed Of A Cutting And Smoothing Float Or Floats Suspended From And Guided By A Rigid Frame. The Frame Shall Be Carried By Four Or More Visible Wheels Riding On, And Constantly In Contact With The Side Forms. If Necessary, Following One Of The Preceding Method Of Floating, Long Handled Floats Having Blades Not Less Than 150 Cm (5 Feet) In Length And 15 Cm (6 Inches) In Width May Be Used To Smooth And Fill In Open-textured Areas In The Pavement. Long-handled Floats Shall Not Be Used To Float The Entire Surface Of The Pavement In Lieu Of, Or Supplementing, One Of The Preceding Methods Of Floating. When Strike Off And Consolidation Are Done By The Hand Method And The Crown Of The Pavement Will Not Permit The Use Of The Longitudinal Float, The Surface Shall Be Floated Transversely By Means Of The Long-handled Float. Care Shall Be Taken Not To Work The Crown Out Of The Pavement During The Operation. After Floating, Any Excess Water And Laitance Shall Be Removed From The Surface Of The Pavement By A 3-m Straight-edge Or More In Length. Successive Drags Shall Be Lapped One-half The Length Of The Blade. 6. Straight-edge Testing And Surface Correction After The Floating Has Been Completed And The Excess Water Removed, But While The Concrete Is Still Plastic, The Surface Of The Concrete Shall Be Tested For Trueness With A 300 Cm Long Straight-edge. For This Purpose, The Contractor Shall Furnish And Use An Accurate 300-cm Straight-edge Swung From Handles 100 Cm (3 Feet) Longer Than One-half The Width Of The Slab. The Straight-edge Shall Be Held In Contact With The Surface In Successive Positions Parallel To The Road Center Line And The Whole Area Gone Over From One Side Of The Slab To The Other As Necessary. Advances Along The Road Shall Be In Successive Stages Of Not More Than One-half The Length Of The Straight-edge. Any Depressions Found Shall Be Immediately Filled With Freshly Mixed Concrete, Struck Off, Consolidated And Refinished. High Areas Shall Be Cut Down And Refinished. Special Attention Shall Be Given To Assure That The Surface Across Joints Meets The Requirements For Smoothness. Straight-edge Testing And Surface Corrections Shall Continue Until The Entire Surface Is Found To Be Free From Observable Departures From The Straight-edge And The Slab Conforms To The Required Grade And Cross-section. 7. Final Finish If The Surface Texture Is Broom Finished, It Shall Applied When The Water Sheen Has Practically Disappeared. The Broom Shall Be Drawn From The Center To The Edge Of The Pavement With Adjacent Strokes Slightly Overlapping. The Brooming Operation Should Be So Executed That The Corrugations Produced In The Surface Shall Be Uniform In Appearance And Not More Than 1.5 Mm In Depth. Brooming Shall Be Completed Before The Concrete Is In Such Condition That The Surface Will Be Unduly Roughened By The Operation. The Surface Thus Finished Shall Be Free From Rough And Porous Areas, Irregularities, And Depressions Resulting From Improper Handling Of The Broom. Brooms Shall Be Of The Quality Size And Construction And Be Operated So As To Produce A Surface Finish Meeting The Approval Of The Lgu Project Engineer. Subject To Satisfactory Results Being Obtained And Approval Of The Lgu Project Engineer, The Contractor Will Be Permitted To Substitute Mechanical Brooming In Lieu Of The Manual Brooming Herein Described. If The Surface Texture Is Belt Finished, When Straight-edging Is Complete And Water Sheen Has Practically Disappeared And Just Before The Concrete Becomes Non-plastic, The Surface Shall Be Belted With 2-ply Canvass Belt Not Less Than 20 Cm Wide And At Least 100 Cm Longer Than The Pavement Width. Hand Belts Shall Have Suitable Handles To Permit Controlled, Uniform Manipulation. The Belt Shall Be Operated With Short Strokes Transverse To The Center Line And With A Rapid Advances Parallel To The Center Line. If The Surface Texture Is Drag Finished, A Drag Shall Be Used Which Consists Of A Seamless Strip Of Damp Burlap Or Cotton Fabric, Which Shall Produce A Uniform Of Gritty Texture After Dragging It Longitudinally Along The Full Width Of Pavement. For Pavement 5 M Or More In Width, The Drag Shall Be Mounted On A Bridge Which Travels On The Forms. The Dimensions Of The Drag Shall Be Such That A Strip Of Burlap Or Fabric At Least 100 Cm Wide Is In Contact With The Full Width Of Pavement Surface While The Drag Is Used. The Drag Shall Consist Of Not Less Than 2 Layers Of Burlap With The Bottom Layer Approximately 15 Cm Wider Than The Layer. The Drag Shall Be Maintained In Such Condition That The Resultant Surface Is Of Uniform Appearance And Reasonably Free From Grooves Over 1.5 Mm In Depth. Drag Shall Be Maintained Clean And Free From Encrusted Mortar. Drags That Cannot Be Cleaned Shall Be Discarded And New Drags Be Substituted. Regardless Of The Method Used For Final Finish, The Hardened Surface Of Pavement Shall Have A Coefficient Of Friction Of 0.25 Or More. Completed Pavement That Is Found To Have A Coefficient Of Friction Less Than 0.25 Shall Be Grounded Or Scored By The Contractor At His Expense To Provide The Required Coefficient Of Friction. 8. Edging At Forms And Joints After The Final Finish, But Before The Concrete Has Taken Its Initial Set, The Edges Of The Pavement Along Each Side Of Each Slab, And On Each Side Of Transverse Expansion Joints, Formed Joints, Transverse Construction Joints, And Emergency Construction Joints, Shall Be Worked With An Approved Tool And Rounded To The Radius Required By The Plans. A Well – Defined And Continuous Radius Shall Be Produced And A Smooth, Dense Mortar Finish Obtained. The Surface Of The Slab Shall Not Be Unduly Disturbed By Tilting The Tool During The Use. At All Joints, Any Tool Marks Appearing On The Slab Adjacent To The Joints Shall Be Eliminated By Brooming The Surface. In Doing This, The Rounding Of The Corner Of The Slab Shall Not Be Disturbed. All Concrete On Top Of The Joint Filler Shall Be Completely Removed. All Joints Shall Be Tested With A Straight-edge Before The Concrete Has Set And Correction Made If One Edge Of The Joint Is Higher Than The Other. 311.3.14 Surface Test As Soon As The Concrete Has Hardened Sufficiently, The Pavement Surface Shall Be Tested With A 3-m Straight-edge Or Other Specified Device. Areas Showing High Spots Of More Than 3 Mm But Not Exceeding 12 Mm In 3 M Shall Be Marked And Immediately Ground Down With An Approved Grinding Tool To An Elevation Where The Area Or Spot Will Not Show Surface Deviations In Excess Of 3 Mm When Tested With 3 M Straight-edge. Where The Departure From Correct Cross-section Exceeds 12 Mm, The Pavement Shall Be Removed And Replaced By And At The Expense Of The Contractor. Any Area Or Section So Removed Shall Be Not Less Than 1.5 M In Length And Not Less Than The Full Width Of The Lane Involved. When It Is Necessary To Remove And Replace A Section Of Pavement, Any Remaining Portion Of The Slab Adjacent To The Joints That Is Less Than 1.5 M In Length, Shall Also Be Removed And Replaced. 311.3.15 Curing Immediately After The Finishing Operations Have Been Completed And The Concrete Has Sufficiently Set, The Entire Surface Of The Newly Placed Concrete Shall Be Cured In Accordance With Either One Of The Methods Described Herein. Failure To Provide Sufficient Cover Material Of Whatever Kind The Contractor May Elect To Use, Or The Lack Of Water To Adequately Take Care Of Both Curing And Other Requirements, Shall Be A Cause For Immediate Suspension Of Concreting Operations. The Concrete Shall Not Be Left Exposed For More Than ½ Hour Between Stages Of Curing Or During The Curing Period. In All Congested Places, Concrete Works Should Be Designed So That The Designed Strength Is Attained. 1. Cotton Of Burlap Mats The Surface Of The Pavement Shall Be Entirely Covered With Mats. The Mats Used Shall Be Of Such Length (or Width) That As Laid They Will Extend At Least Twice The Thickness Of The Pavement Beyond The Edges Of The Slab. The Mat Shall Be Placed So That The Entire Surface And The Edges Of The Slab Are Completely Covered. Prior To Being Placed, The Mats Shall Be Saturated Thoroughly With Water. The Mat Shall Be So Placed And Weighted Down So As To Cause Them To Remain In Intimate Contact With The Covered Surface. The Mat Shall Be Maintained Fully Wetted And In Position For 72 Hours After The Concrete Has Been Placed Unless Otherwise Specified. 2. Waterproof Paper The Top Surface And Sides Of The Pavement Shall Be Entirely Covered With Waterproof Paper, The Units Shall Be Lapped At Least 45 Cm. The Paper Shall Be So Placed And Weighted Down So As To Cause It To Remain In Intimate Contact With The Surface Covered. The Paper Shall Have Such Dimension But Each Unit As Laid Will Extend Beyond The Edges Of The Slab At Least Twice The Thickness Of The Pavement, Or At Pavement Width And 60 Cm Strips Of Paper For The Edges. If Laid Longitudinally, Paper Not Manufactured In Sizes Which Will Provide This Width Shall Be Securely Sewed Or Cemented Together, The Joints Being Securely Sealed In Such A Manner That They Do Not Open Up Or Separate During The Curing Period. Unless Otherwise Specified, The Covering Shall Be Maintained In Place For 72 Hours After The Concrete Has Been Placed. The Surface Of The Pavement Shall Be Thoroughly Wetted Prior To The Placing Of The Paper. 3. Straw Curing When This Type Of Curing Is Used, The Pavement Shall Be Cured Initially With Burlap Or Cotton Mats, Until After Final Set Of The Concrete Or, In Any Case, For 12 Hours After Placing The Concrete. As Soon As The Mats Are Removed, The Surface And Sides Of The Pavement Shall Be Thoroughly Wetted And Covered With At Least 20 Cm Of Straw Or Hay, Thickness Of Which Is To Be Measured After Wetting. If The Straw Or Hay Covering Becomes Displaced During The Curing Period, It Shall Be Replaced To The Original Depth And Saturated. It Shall Be Kept Thoroughly Saturated With Water For 72 Hours And Thoroughly Wetted Down During The Morning Of The Fourth Day, And The Cover Shall Remain In Place Until The Concrete Has Attained The Required Strength. 4. Impervious Membrane Method The Entire Surface Of The Pavement Shall Be Sprayed Uniformly With White Pigmented Curing Compound Immediately After The Finishing Of The Surface And Before The Set Of The Concrete Has Taken Place, Or If The Pavement Is Cured Initially With Jute Or Cotton Mats, It May Be Applied Upon Removal Of The Mass. The Curing Compound Shall Not Be Applied During Rain. Curing Compound Shall Be Applied Under Pressure At The Rate 4 L To Not More Than 14 M2 By Mechanical Sprayers. The Spraying Equipment Shall Be Equipped With A Wind Guard. At The Time Of Use, The Compound Shall Be In A Thoroughly Mixed Condition With The Pigment Uniformly Dispersed Throughout The Vehicle. During Application, The Compound Shall Be Stirred Continuously By Effective Mechanical Means. Hand Spraying Of Odd Widths Or Shapes And Concrete Surface Exposed By The Removal Of Forms Will Be Permitted. Curing Compound Shall Not Be Applied To The Inside Faces Of Joints To Be Sealed, But Approved Means Shall Be Used To Insure Proper Curing At Least 72 Hours And To Prevent The Intrusion Of Foreign Material Into The Joint Before Sealing Has Been Completed. The Curing Compound Shall Be Of Such Character That The Film Will Harden Within 30 Minutes After Application. Should The Film Be Damaged From Any Cause Within The 72 Hour Curing Period, The Damaged Portions Shall Be Repaired Immediately With Additional Compound. 5. White Polyethylene Sheet The Top Surface And Sides Of The Pavement Shall Be Entirely Covered With Polyethylene Sheeting. The Units Used Shall Be Lapped At Least 45 Cm. The Sheeting Shall Be So Placed And Weighted Down So As To Cause It To Remain Intimate Contact With The Surface Covered. The Sheeting As Prepared For Use Shall Have Such Dimension That Each Unit As Laid Will Extend Beyond The Edges Of The Slab At Least Twice The Thickness Of The Pavement. Unless Otherwise Specified, The Covering Shall Be Maintained In Place For 72 Hours After The Concrete Has Been Placed. 311.3.16 Removal Of Forms After Forms For Concrete Shall Remain In Place Undisturbed For Not Less Than Twenty Four (24) Hours After Concrete Pouring. In The Removal Of Forms, Crowbars Should Be Used In Pulling Out Nails And Pins. Care Should Be Taken So As Not To Break The Edges Of The Pavement. In Case Portions Of The Concrete Are Spalled, They Shall Be Immediately Repaired With Fresh Mortar Mixed In The Proportion Of One Part Of Portland Cement And Two Parts Fine Aggregates. Major Honeycomb Areas Will Be Considered As Defective Work And Shall Be Removed And Replaced At The Expense Of The Contractor. Any Area Or Section So Removed Shall Not Be Less Than The Distance Between Weakened Plane Joint Nor Less Than The Full Width Of The Lane Involved. 311.3.17 Sealing Joints Joints Shall Be Sealed With Asphalt Sealant Soon After Completion Of The Curing Period And Before The Pavement Is Opened To Traffic, Including The Contractor’s Equipment. Just Prior To Sealing, Each Joint Shall Be Thoroughly Cleaned Of All Foreign Materials Including Membrane Curing Compound And The Joint Faces Shall Be Clean And Surface Dry When The Seal Is Applied. The Sealing Material Shall Be Applied To Each Joint Opening To Conform To The Details Shown On The Plans Or As Directed By The Lgu Project Engineer. Material For Seal Applied Hot Shall Be Stirred During Heating So That Localized Overheating Does Not Occur. The Pouring Shall Be Done In Such A Manner That The Material Will Not Be Spilled On The Exposed Surfaces Of The Concrete. The Use Of Sand Or Similar Material As A Cover For The Seal Will Not Be Permitted. Preformed Elastomeric Gaskets For Sealing Joints Shall Be Of The Cross-sectional Dimensions Shown On The Plans. Seals Shall Be Installed By Suitable Tools, Without Elongation And Secured In Placed With An Approved Lubricant Adhesive Which Shall Cover Both Sides Of The Concrete Joints. The Seals Shall Be Installed In A Compressive Condition And Shall At Time Of Placement Be Below The Level Of The Pavement Surface By Approximately 6 Mm. The Seals Shall Be In One Piece For The Full Width Of Each Transverse Joint. 311.3.18 Protection Of Pavement The Contractor Shall Protect The Pavement And Its Appurtenances Against Both Public Traffic And Traffic Caused By His Own Employees And Agents. This Shall Include Watchmen To Direct Traffic And The Erection Of And Maintenance Of Warning Signs, Lights, Pavement Bridges Or Cross-overs, Etc. The Plans Or Special Provisions Will Indicate The Location And Type Of Device Or Facility Required To Protect The Work And Provide Adequately For Traffic. All Boreholes After Thickness And/or Strength Determinations Of Newly Constructed Asphalt And Concrete Pavements Shall Be Immediately Filled/restored With The Prescribed Concrete/asphalt Mix After Completion Of The Drilling Works. Any Damage To The Pavement, Occurring Prior To Final Acceptance, Shall Be Repaired Or The Pavement Be Replaced. 311.3.19 Concrete Pavement – Slip Form Method If The Contract Calls For The Construction Of Pavement Without The Use Of Fixed Forms, The Following Provisions Shall Apply: 1. Grade After The Grade Or Base Has Been Placed And Compacted To The Required Density, The Areas Which Will Support The Paving Machine Shall Be Cut To The Proper Elevation By Means Of A Properly Designed Machine. The Grade On Which The Pavement Is To Be Constructed Shall Then Be Brought To The Proper Profile By Means Of Properly Designed Machine. If The Density Of The Base Is Disturbed By The Grading Operation, It Shall Be Corrected By Additional Compaction Before Concrete Is Placed. The Grade Should Be Constructed Sufficiently In Advance Of The Placing Of The Concrete. If Any Traffic Is Allowed To Use The Prepared Grade, The Grade Shall Be Checked And Corrected Immediately Before The Placing Of Concrete. 2. Placing Concrete The Concrete Shall Be Placed With An Approved Slip-form Paver Designed To Spread, Consolidate, Screed And Float-finish The Freshly Placed Concrete In One Complete Pass Of The Machine In Such A Manner That A Minimum Of Hand Finish Will Be Necessary To Provide A Dense And Homogenous Pavement In Conformance With The Plans And Specifications. The Machine Shall Vibrate The Concrete For The Full Width And Depth Of The Strip Of Pavement Being Placed. Such Vibration Shall Be Accompanied With Vibrating Tubes Or Arms Working In The Concrete Or With A Vibrating Screed Or Pan Operating On The Surface Of The Concrete. The Sliding Forms Shall Be Rigidly Held Together Laterally To Prevent Spreading Of The Forms. The Forms Shall Trail Behind The Paver For Such A Distance That No Appreciable Slumping Of The Concrete Will Occur, And That Necessary Final Finishing Can Be Accomplished While The Concrete Is Still Within The Forms. Any Edge Slump Of The Pavement, Exclusive Of Edge Rounding, In Excess Of 6 Mm Shall Be Corrected Before The Concrete Has Hardened. The Concrete Shall Be Held At A Uniform Consistency, Having A Slump Of Not More Than 40 Mm (1-12/ Inches). The Slip Form Paver Shall Be Operated With As Nearly As Possible A Continuous Forward Movement And That All Operations Of Mixing, Delivering And Spreading Concrete Shall Be Coordinated So As To Provide Uniform Progress With Stopping And Starting Of The Paver Held To A Minimum. If, For Any Reason, It Is Necessary To Stop The Forward Movement Of The Paver The Vibratory And Tamping Elements Shall Also Be Stopped Immediately. No Tractive Force Shall Be Applied To The Machine, Except That Which Is Controlled From The Machine. 3. Finishing The Surface Smoothness And Texture Shall Meet The Requirements Of Subsections 311.3.13 And 311.3.14. 4. Curing Unless Otherwise Specified, Curing Shall Be Done In Accordance With One Of The Methods Included In Subsection 311.3.15. The Curing Media Shall Be Applied At The Appropriate Time And Shall Be Applied Uniformly And Completely To All Surfaces And Edges Of The Pavement. 5. Joints All Joints Shall Be Constructed In Accordance With Subsection 311.3.12. 6. Protection Against Rain In Order That The Concrete May Be Properly Protected Against Rain Before The Concrete Is Sufficiently Hardened, The Contractor Will Be Required To Have Available At All Times, Materials For The Protection Of The Edges And Surface Of The Unhardened Concrete. Such Protective Materials Shall Consist Of Standard Metal Forms Or Wood Planks Having A Nominal Thickness Of Not Less Than 50 Mm (2 Inches) And A Nominal Width Of Not Less Than The Thickness Of The Pavement At Its Edge For The Protection Of The Pavement Edges, And Covering Material Such As Burlap Or Cotton Mats, Curing Paper Or Plastic Sheeting Materials For The Protection Of The Surface Of The Pavement. When Rain Appears Imminent, All Paving Operations Shall Stop And All Available Personnel Shall Begin Placing Forms Against The Sides Of The Pavement And Covering The Surface Of The Unhardened Concrete With The Protective Covering. 311.3.22 Acceptance Of Concrete The Strength Level Of The Concrete Will Be Considered Satisfactory If The Averages Of All Sets Of Three (3) Consecutive Strength Test Results Equal Or Exceed The Specified Strength, Fc’ And No Individual Strength Test Result Is Deficient By More Than 15% Of The Specified Strength, Fc’. Concrete Deemed To Be Not Acceptable Using The Above Criteria May Be Rejected Unless The Contractor Can Provide Evidence, By Means Of Core Tests, That The Quality Of Concrete Represented By Failed Test Results Is Acceptable In Place. At Least Three (3) Representative Cores Shall Be Taken From Each Member Or Area Of Concrete In Place That Is Considered Deficient. The Location Of Cores Shall Be Determined By The Engineer So That There Will Be At Least Impairment Of Strength Of The Structure. The Obtaining And Testing Of Drilled Cores Shall Be In Accordance With Aashto T 24. Concrete In The Area Represented By The Cores Will Be Considered Adequate If The Average Strength Of The Cores Is Equal To At Least 85% Of, And If No Single Core Is Less Than 75% Of, The Specified Strength, Fc’. If The Strength Of Control Specimens Does Not Meet The Requirements Of This Subsection, And It Is Not Feasible Or Not Advisable To Obtain Cores From The Structure Due To Structural Considerations, Payment Of The Concrete Will Be Made At An Adjusted Price Due To Strength Deficiency Of Concrete Specimens As Specified Hereunder: Deficiency In Strength Of Concrete Specimens, Percent (%) Percent (%) Of Contract Price Allowed Less Than 5 100 5 To Less Than 10 80 10 To Less Than 15 70 15 To Less Than 20 60 20 To Less Than 25 50 25 Or More 0 311.3.23 Opening To Traffic The Engineer Will Decide When The Pavement May Be Opened To Traffic. The Road Will Not Be Opened To Traffic Until Test Specimens Molded And Cured In Accordance With Aashto T 23 Have Attained The Minimum Strength Requirements In Subsection 311.2.11. If Such Tests Are Not Conducted Prior To The Specified Age The Pavement Shall Not Be Operated To Traffic Until 14 Days After The Concrete Was Placed. Before Opening To Traffic, The Pavement Shall Be Cleaned And Joint Sealing Completed. 311.3.24 Tolerance And Pavement Thickness 1. General The Thickness Of The Pavement Will Be Determined By Measurement Of Cores From The Completed Pavement In Accordance With Aashto T 148. The Completed Pavement Shall Be Accepted On A Lot Basis. A Lot Shall Be Considered As 1000 Linear Meters Of Pavement When A Single Traffic Lane Is Poured Or 500 Linear Meters When Two Lanes Are Poured Concurrently. The Last Unit In Each Slab Constitutes A Lot In Itself When Its Length Is At Least ½ Of The Normal Lot Length. If The Length Of The Last Unit Is Shorter Than ½ Of The Normal Lot Length, It Shall Be Included In The Previous Lot. Other Areas Such As Intersections, Entrances, Crossovers, Ramp, Etc., Will Be Grouped Together To Form A Lot. Small Irregular Areas May Be Included With Other Unit Areas To Form A Lot. Each Lot Will Be Divided Into Five (5) Equal Segments And One Core Will Be Obtained From Each Segment In Accordance With Aashto T 24. 2. Pavement Thickness It Is The Intent Of This Specification That The Pavement Has A Uniform Thickness As Called For On The Plans For The Average Of Each Lot As Defined. After The Pavement Has Met All Surface Smoothness Requirements, Cores For Thickness Measurements Will Be Taken. In Calculating The Average Thickness Of The Pavement, Individual Measurements Which Are In Excess Of The Specified Thickness By More Than 5 Mm Will Be Considered As The Specified Thickness Plus 5 Mm And Measurement Which Are Less Than The Specified Thickness By More Than 25 Mm Shall Not Be Included In The Average. When The Average Thickness For The Lot Is Deficient, The Contract Unit Price Will Be Adjusted For Thickness In Accordance With Paragraph (3 Below). Individual Areas Within A Segment Found Deficient In Thickness By More Than 25 Mm Shall Be Evaluated By The Lgu Project Engineer, And If In His Judgment, The Deficient Areas Warrant Removal, They Shall Be Removed And Replaced By The Contractor With Pavement Of The Specified Thickness At His Entire Expense. However, If The Evaluation Of The Lgu Project Engineer Is That The Deficient Area Should Not Be Removed And Replaced, Such Area Will Not Be Paid. When The Measurement Of Any Core Is Less Than The Specified Thickness By More Than 25 Mm, The Actual Thickness Of The Pavement In This Area Will Be Determined By Taking Additional Cores At No Less Than 5 M Intervals Parallel To The Center Line In Each Direction From The Affected Location Until A Core Is Found In Each Direction, Which Is Not Deficient In Thickness By More Than 25 Mm. The Area Of Slab For Which No Payment Will Be Made Shall Be The Product Of The Paving Width Multiplied By The Distance Along The Center Line Of The Road Between Transverse Sections Found Not Deficient In Thickness By More Than 25 Mm. The Thickness Of The Remainder Of The Segment To Be Used To Get The Average Thickness Of Each Lot Shall Be Determined By Taking The Average Thickness Of Additional Cores Which Are Not Deficient By More Than 25 Mm. 3. Adjustment For Thickness When The Average Thickness Of The Pavement Per Lot Is Deficient, Payment For The Lot Shall Be Adjusted As Follows: Deficiency In The Average Thickness Per Lot (mm) Percent (%) Of Contract Price Per Lot 0 – 5 100% Payment 6 – 10 95% Payment 11 – 15 85% Payment 16 – 20 70% Payment 21 – 25 50% Payment More Than 25 Remove And Replace/ No Payment No Acceptance And Final Payment Shall Be Made On Completed Pavement Unless Core Test For Thickness Determination Is Conducted 311.4 Environmental Measures In Loading Cement To The Truck And Unloading It To The Temporary Bodega, And From The Bodega To Batching Plant And During Concrete Work Operation Workers Doing This Job Shall Be Provided With Gears So As To Avoid Inhaling Cement Dust Particles That Could Affect Their Health. Workers In Construction Site Shall Be Provided With Working Gloves, Mask Boots And Clothing To Prevent Workers From Being Contaminated With Concrete Mix. The Contractor Shall See To It That The Noise Level Of The Exhaust Mufflers Of The Equipment Shall Be At The Minimum. Otherwise, The Contractor Must Replace All The Exhaust Mufflers Of The Equipment With A New One And Or Provide Muffler Silencers. All Roads Leading The Construction Site And Batching Plant Shall Be Moist During The Entire Works Operation To Prevent The Blowing Up Of Dust Particles. During Work Operation, Precautionary Signboards Shall Be Provided By The Contractor To Prevent Accidents And Damage To The Freshly Laid Concrete.
Closing Date12 Feb 2025
Tender AmountPHP 500 K (USD 8.6 K)

Provincial Police Headquarters In Krakow Tender

Others
Poland
Details: Provincial Police Headquarters in Krakow Materials and Technical Management Department Tel. (47) 835-46-00 Fax (47) 835-46-18 ∙ Email: Sekretariat.gmt@malopolska.policja.gov.pl Krakow, 13 February 2025 Price Inquiry For Supply of Sofa Beds/Folding Sofas With Sleeping Function For The District Police Headquarters In Zakopane. Case No.: 2025/gmt/23 The Proceeding Is Conducted In The Price Inquiry Mode On The Basis Of §3 Para. 2 Point 1 (Basic procedure) of the Regulations on Awarding Procurements at the Provincial Police Headquarters in Kraków, The Value of which Does Not Exceed PLN 130,000.00 Net, which is Annex No. 1 to Decision No. 58/2021 of 4 November 2021. The Proceedings Are Conducted in Polish on the Ordering Party's Electronic Purchasing Platform Eb2b Under the Name and Case Number of the Proceedings Indicated in the Title. I General Information: 1. Ordering Party: Provincial Police Headquarters in Kraków 31-571 Kraków, Ul. Mogilska 109 Nip: 675-000-55-94 Regon: 351081570 2. Definition of the Subject of the Order: The Subject of the Order Is the delivery, along with bringing in and setting up of sofa beds/folding sofas with sleeping function for the District Police Headquarters in Zakopane. The offer should be submitted in accordance with the Offer Form. Through the Eb2b.com.pl Shopping Platform Assortment Unit Quantity 1. Sofa bed/folding sofa with sleeping function with backrest and armrest cushions, e.g. Casey sofa bed Dimensions: Height - 87 cm Width - 198 cm Depth - 97 cm Dimensions of the sleeping surface 148x195 cm Backrest and armrest cushions made of foam. Loose cushions. Loose Armrests Seat And Backrest Made Of Foam And Bonell Springs, Bedding Container. Legs/feet: Metal Unfolding Method: Automatic Length Construction: Wood Plus Board. On the backrest, two cushions adapted to the width of the bed, matching the two cushions constituting the armrests. Upholstery fabric is resistant to abrasion and light. Colour: Grey Dimension tolerance +/- 2% Pcs. 6 The Ordering Party Specifies the Delivery Date Of The Order Within 21 Days From the Date Of Sending The Order, Execution Will Take Place On The Basis Of The Order (the approved Scan of the Order Will Be Sent To The Contractor's E-mail Address In The Offer). 3. Place of Order Execution: The Subject Of The Order Will Be Executed At The Place Indicated By The Ordering Party, I.e. District Police Headquarters In Zakopane 34-500 Zakopane, Ul. Jagiellońska 32 4. Contact Person for Contractors in the Substantive Scope: Magdalena Nawratil Tel. 47 83 54 618 E-mail: Magdalena.nawratil@malopolska.policja.gov.pl Department of Materials and Technical Management of the Provincial Police Headquarters in Krakow. 5. Deadline and place of submission of offers: The offer should be submitted by February 18, 2025, 10:00 AM Please submit offers via the Purchasing Platform: https://platforma.eb2b.com.pl/ Communication Between the Ordering Party and Contractors, Including All Questions, Declarations, Requests, Offers, Notices and Information, Please Submit in Electronic Form via the Purchasing Platform. Offer Validity Period 30 Days. Ii Material Conditions of the Order: 1. Payment Terms: The Contractor shall issue a VAT invoice indicating the Payer as: Provincial Police Headquarters in Krakow 31-571 Krakow, Ul. Mogilska 109 Tax Identification Number: 675-000-55-94 Regon: 351081570 The invoice should be sent to the following address: Provincial Police Headquarters in Krakow 31-571 Krakow, Ul. Mogilska 109 Materials and Technical Management Department Payment for the Order will be made by bank transfer to the account indicated by the Contractor and will be made within 30 Calendar Days from the date of receipt of a correctly issued invoice. 2. Warranty Conditions: The Contractor Must Guarantee That The Offered Assortment Must Be An Original, Technically Efficient, Brand New Product, Covered By A Warranty For A Minimum Period Of 24 Months, But Not Shorter Than The Manufacturer's Warranty. 3. Method Of Offer Preparation: The offer must be prepared according to the template specified in Appendix No. 1 to this Request for Offers. The form must be signed by a person authorized to represent the company in the submission of commercial offers and placed in electronic form (attached File) on the Purchasing Platform. Iii Additional Information Information Regarding Personal Data Protection: In accordance with Art. 13 Sec. 1 and 2 of Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data and repealing Directive 95/46/EC (General Data Protection Regulation) (OJ EU L 119, 4.5.2016, p. 1), hereinafter referred to as "GDPR", I hereby inform you that: The administrator of your personal data is the Provincial Police Commander in Kraków, Ul. Mogilska 109, 31-571 Kraków, Tel: 47/ 83-54-618 The contact details of the Data Protection Supervisor are as follows: Iod.kwp@malopolska.policja.gov.pl; Your Personal Data Will Be Processed On The Basis Of Art. 6 Section 1 Letter C of the GDPR For The Purpose Of The Public Procurement Proceedings Conducted In The Price And Market Inquiry Mode Named Service Of Creating An Information Board With A Logo For The Police Station In Wojnicz Case No.: 2025/gmt/23 § The recipients of your Personal Data will be persons or entities to whom the Proceedings Documentation Will Be Made Available On The Basis Of The Provisions Of The Act Of 6 September 2001 On Access To Public Information (i.e. Journal of Laws Of 2016, item 1764); § Your Personal Data Will Be Stored For A Period Compliant With The Archiving Regulations; § With Respect to Your Personal Data, Decisions Will Not Be Made in an Automated Manner, Pursuant to Art. 22 of the GDPR; § You have: Under Art. 15 of the GDPR, the right to access your personal data; Under Art. 16 of the GDPR, the right to rectify your personal data; Under Art. 18 of the GDPR, the right to request that the controller restrict the processing of personal data, subject to the cases referred to in Art. 18 Sec. 2 of the GDPR; the right to lodge a complaint with the President of the Personal Data Protection Office if you consider that the processing of your personal data violates the provisions of the GDPR; § You are not entitled to: In connection with Art. 17 Sec. 3 Letters B, D or E of the GDPR, the right to have personal data deleted; The Right to Transfer Personal Data, as Referred to in Art. 20 of the GDPR; Under Art. 21 of the GDPR, the Right to Object to the Processing of Personal Data, Since the Legal Basis for the Processing of Your Personal Data Is Art. 6 Section 1 Letter CIE (ic) of the GDPR. The Ordering Party reserves the right to change the scope of the order in relation to the quantity of the order given in the offer in the event that these quantities are not fully covered by the current expenses of the Police in this respect, and to withdraw from the order at any stage of the proceedings without giving a reason. Note! The Ordering Party reserves the right to choose an offer that will guarantee the expenditure of funds in a purposeful, economical manner, while maintaining the principle of obtaining the best effects from the given expenditure. Enclosures to the Inquiry: No. 1 - Form - Offer No. 2 - Order Template with a Detailed Description of the Subject of the Order Enclosure No. 1 ………..……………………..…………………………………….. ………..……………………..…………………………………….. (Company stamp of the Contractor) (place, date) Provincial Police Headquarters in Kraków Ul. Mogilska 109 31 -571 Kraków Offer Form Concerns Request for Offer No. 2025/gmt/23 …………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… (full name of the Contractor) …………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… (detailed address of the Contractor) Regon: ………………………………… Tax Identification Number: ………………………………… E-mail: ………………………………… Tel. Number: ………………………………… Fax: ………………………………… In Response to the Request for Offer: § We declare that we have become familiar with the requirements contained in the Request for Offer and do not have any reservations thereto, and that the Order will be carried out in accordance with all the requirements of the Ordering Party specified in the Request for Offer. § We declare that we accept the Payment Terms § If Our Offer is selected, we undertake to execute the Order on the terms contained in the Price Inquiry and at the place and time specified by the Ordering Party. Referring to the Announcement for the Supply of Assortment for Kwp in Krakow, we offer delivery of the Subject of the Order in accordance with the Requirements Specified in the Price Inquiry: Assortment Name Quantity Unit Price Gross Gross Value 1. Sofa bed / sofa bed with sleeping function with backrest and armrest cushions, e.g. ……………………………. Dimensions: Height - 87 cm Width - 198 cm Depth - 97 cm Dimensions of the sleeping surface 148x195 cm Backrest and armrest cushions made of foam. Loose cushions. Loose Armrests Seat And Backrest Made Of Foam And Bonell Springs, Bedding Container. Legs/feet: Metal Unfolding Method: Automatic Length Construction: Wood Plus Board. On the backrest, two cushions adapted to the width of the bed, matching the two cushions constituting the armrests. Upholstery fabric resistant to abrasion and light. Colour: Grey Dimension tolerance +/- 2% 6 pcs. Transport: Total: In words: ………………………………………………………………………………………………………… 1. We Offer A Warranty For The Offered Assortment: ……………………. Months (min. 24 Months) 2. The Offer Price Includes All Parts of Remuneration Due To Us Arising From the Preparation, Execution And Settlement of the Subject Of The Order. 3. We have obtained all the necessary information required to reliably calculate our offer. 4. We authorize the following persons to contact the Ordering Party within the scope related to this order: ......................................................................... Tel. …………………………… E-mail: ……………………. ......................................................................... Tel. ……………………………e-mail: …………………….. 5. I declare that I have fulfilled the information obligations provided for in Art. 13 or Art. 14 of the GDPR1) with regard to the natural persons from whom I directly or indirectly obtained personal data in order to apply for the award of a public contract in this procedure. The Following Documents Constitute an Integral Part of the Submitted Offer: ……………………………………………….…………….… …………………………………………….…………….… ……………………………….……………………… (signature and stamp of the person authorised to make declarations of intent on behalf of the contractor) Order Form Provincial Police Headquarters in Krakow Materials and Technical Management Department ∙ Ul. Mogilska 109 ∙ 31-571 Krakow ∙ Tel. ( 012)47 835-46-00 ∙ Fax (012) 47 835-46- 06∙ ∙ Email: Sekretariat.gmt@malopolska.policja.gov.pl∙ Date of Receipt Symb. Doc. Registration No. Shipping Address (recipient): Accommodation and Office Warehouse Provincial Police Headquarters in Krakow Ul. Mogilska 109 31-571 Krakow 8.00 – 14.00 Ordering Party: Provincial Police Headquarters in Krakow Ul. Mogilska 109 31-571 Krakow Addressee: Payment Terms: Transfer - 30 Days Payer, Bank Account: District Branch of NBP 29101012700055842230000000 Nip: 675-000-55-94 General Order With Boxes Statistical Number of the Ordering Party Gus (stamp): 351081570 Doc. Symb. Dated No. 13.06.2018 /2025 Ordering Party ID Recipient ID Payer ID Agreement No./assignment Regon Regon Regon In Connection with the Proceedings Conducted in the Price and Market Inquiry Mode, I am asking you to fulfill the subject order for the equipment listed in the table below in accordance with the submitted offer …………………………………………….of ………………………… Name of Assortment Quantity Gross Unit Price Gross Value 1. 6pcs. Transport: Total: In words: ………………………………………………………………………………………………….. Agreed Terms: Invoice Issued to: Provincial Police Headquarters in Kraków 31-571 Kraków, Ul. Mogilska 109 Tax Identification Number (NIP) 675-000-55-94 Warranty - …………………………………. Form of Payment: 30 Days From the Date of Receipt of a Correctly Issued Invoice Deadline for Order Completion: ………………………… Place of Delivery: Kwp In Kraków Ul. Mogilska 109 The Contractor Declares That It Has Fulfilled the Information Obligations Provided for in Art. 13 or Art. 14 of the GDPR Towards the Natural Persons from Whom It Directly or Indirectly Obtained Personal Data for the Purpose of Fulfilling This Order and Which It Has Made Available to the Ordering Party. The Ordering Party Declares That It Has Fulfilled the Information Obligations Provided for in Art. 13 or Art. 14 of the GDPR Towards the Natural Persons from Whom It Directly or Indirectly Obtained Personal Data for the Purpose of Fulfilling This Order and Which It Has Made Available to the Contractor.
Closing Date18 Feb 2025
Tender AmountRefer Documents 

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Facility Enhancement/repair & Maintenance(super Health Center) 1. The Local Government Unit Of Irosin, Through The Trust Fund(philhealth) Intends To Apply The Sum Of Seven Hundred Fourteen Thousand Seven Hundred Three Pesos (p 714,703.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Facility Enhancement/repair & Maintenance(super Health Center), Infr-01-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Facility Enhancement/repair & Maintenance(super Health Center) Brief Description: Chb Laying And Plastering/fabrication/installation Of Forms & Rsb And Tile Setting For Lavatories And Counters/installation Of Plumbing And Electrical Fixtures Approved Budget For The Contract : P 714,703.00 Source Of Fund : Trust Fund(philhealth) 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Sixty (60) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 9, 2025 Until January 31, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of One Thousand Pesos (p 1,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On January 16, 2025, 9:00am At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before January 31, 2025, 8:59 Am At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On January 31, 2025, 9:00 Am At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 9, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Facility Enhancement/repair & Maintenance(super Health Center), With Project Identification Number Infr-01-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Trust Fund (philhealth) In The Amount Of Seven Hundred Fourteen Thousand Seven Hundred Three Pesos ( P 714,703.00). 2.2. The Source Of Funding Is: Trust Fund(philhealth) 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On January 16, 2025, 9:00am And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Facility Enhancement/repair & Maintenance(super Health Center) I.formworks Ii. Concrete And Masonry And Tile Works Iii. Plumbing Works Iv. Electrical Works V. Painting Works Vi. Doors And Windows Spl-1 Ppe’s Spl-2 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Facility Enhancement/repair & Maintenance(super Health Center) Key Personnel General Experience Relevant Experience 1. Foreman 2. Skilled Worker 3.laborer 10.5 Facility Enhancement/repair & Maintenance(super Health Center) The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.enough Hand Tools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Rehabilitation/improvement Of Brgy. Cawayan Level Ii Water System Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 60 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Completion Of Existing Constructed Building. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 120 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 60 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Rehabilitation/improvement Of Brgy. Cawayan Level Ii Water System Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Formworks Ii Concrete And Masonry And Tile Works Iii Plumbing Works Iv Electrical Works V Painting Works Vi Doors And Windows Spl-1 Ppe’s Spl-2 Project Signage 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization 2.5 Utilities(professional Fee’s For Electrical Engineers) Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-01-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Facility Enhancement/repair & Maintenance(super Health Center); (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Facility Enhancement/repair & Maintenance(super Health Center). (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-01-2025 Facility Enhancement/repair And Maintenance (super Health Center) Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Facility Enhancement/repair And Maintenance(super Health Center); 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-01-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.
Closing Date31 Jan 2025
Tender AmountPHP 714.7 K (USD 12.1 K)

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon 1. The Local Government Unit Of Irosin, Through The Lgsf-fabdp(ntf-elcac-fy 2024) Intends To Apply The Sum Of Five Million Pesos (p 5,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Construction Of Municipal Building Brgy. Cawayan, Irosin, Sorsogon, Infr-03-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Construction Of Municipal Building Brgy. Cawayan, Irosin, Sorsogon Brief Description: Construction Of 1 Unit,2-classroom School Building With A Total Of 162.00 Sq.m. Floor Area With Amenities And Grouted Rip-rap/slope Protection Approved Budget For The Contract : P 5,000,000.00 Source Of Fund : Lsgf_fabdp(ntf-elcac-fy 2024) 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Two Hundred Ten (210) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 17, 2025 Until February 10, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On January 24, 2025, 9:00am At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 10, 2025, 8:59 Am At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 10, 2025, 9:00 Am At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 17, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon, With Project Identification Number Infr-03-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Lgsf-fabdp(ntf-elcac-fy 2024) In The Amount Of Five Million Pesos ( P 5,000,000.00). 2.2. The Source Of Funding Is: Lgsf-fabdp(ntf-elcac-fy 2024) 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On January 17 , 2025, 9:00am And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon I.earthworks Ii. Rebar Works Iii. Formworks Iv. Concrete Works V. Masonry Works Vi. Trusses & Roofing Works Vii. Ceiling Works Viii. Plumbing Works Ix. Electrical Works X. Painting Works Xi. Doors And Windows Xii. Tile Works Xiii. Steel Works Spl-1 Grouted Rip-rap/slope Protection Spl-2 Amenities Spl-3 Hauling Of Materials To Jobsite Spl-4 Ppe’s Spl-5 Temporary Facilities Spl-6 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Key Personnel General Experience Relevant Experience 1. Foreman 2. Le Operator 3. Skilled Worker 4.laborer 10.5 Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.tampering Machine 2. Water Truck 3. Concrete Mixer 4. Bar Cutter 5. Welding Machine 6. Enough Hand Tools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 210 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Construction Of Two Classroom Building For Cawayan Elementary School. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 210 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 210 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Earthworks 1.00 Lot Ii Rebar Works 4,789.81 Kls Iii Formworks 1.00 Lot Iv Concrete Works 53.14 Cu.m. V Masonry Works 214.96 Sq.m. Vi Trusses & Roofing Works 172.00 Sq.m. Vii Ceiling Works 166.50 Sq.m. Viii Plumbing Works 1.00 Lot Ix Electrical Works 1.00 Lot X Painting Works 1.00 Lot Xi Doors And Windows 1.00 Lot Xii Tile Works 25.64 Sq.m. Xiii Steel Works 1.00 Lot Spl-1 Grouted Rip-rap/slope Protection 61.40 Cu.m. Spl-2 Amenities 1.00 Lot Spl-3 Hauling Of Materials To Jobsite 1.00 Lot Spl-4 Ppe’s 1.00 Lot Spl-5 Temporary Facilities 1.00 Lot Spl-6 Project Signage 1.00 Lot 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-03-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon; (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon. (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-03-2025 Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon; 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-03-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.
Closing Date10 Feb 2025
Tender AmountPHP 5 Million (USD 86.1 K)

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Irosin Memorial Park Improvement(phase Iii) 1. The Local Government Unit Of Irosin, Through The 20% Edf 2025 Intends To Apply The Sum Of Three Million Pesos (p 3,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Irosin Memorial Park Improvement, Infr-04-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Irosin Memorial Park Improvement(phase Iii) Brief Description: Excavation/backfilling/construction Of 0.15m X 460.00 Square Meters Pccp And 30.00 Linear Meters Canal/construction Of Additional Burial Apartments And Laying Of 1,400 Linear Meters Distribution Pipes Contract : P 3,000,000.00 Source Of Fund : 20% Edf 2025 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Ninety (90) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 28, 2025 Until February 18, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On February 5, 2025, 9:00am At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 18, 2025, 8:59 Am At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 18, 2025, 9:00 Am At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 28, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Improvement/upgrading Of Super Health Center, With Project Identification Number Infr-04-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 20% Edf 2025 In The Amount Of Three Million Pesos ( P 3,000,000.00). 2.2. The Source Of Funding Is: 20% Edf 2025 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On February 5, 2025, 9:00am And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Irosin Memorial Park Improvement(phase Iii) I.excavation/backfilling Ii. Sub-grade Preparation Iii. Aggregate Base-course Iv. Portland Cement Concrete Pavement V. Line Canal Vi. Covered Line Canal W/ Box Culvert Vii. Burial Apartment Viii. Plumbing Works Spl-1 Ppe’s Spl-2 Temporary Facilities Spl-3 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 Irosin Memorial Park Improvement(phase Iii) The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience 1. Foreman 2. He And Le Operator 3. Skilled Worker 4.laborer 10.5 Irosin Memorial Park Improvement(phase Iii) The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.road Grader 2. Road Roller 3. Water Truck 4. Concrete Mixer 5. Concrete Cutter 6. Bar Cutter 7. Concrete Vibrator 6. Enough Handtools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Irosin Memorial Park Improvement Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 90 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Additional Improvement Of Memorial Park. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 90 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 90 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Improvement Of Irosin Memorial Park(phase Iii) Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Excavation/backfilling 5,256.20 Cu.m. Ii Sub-grade Preparation 456.83 Sq.m. Iii Aggregate Base Course 46.00 Cu.m. Iv Portland Cement Concrete Pavement 69.00 Cu.m. V Line Canal 30.00 L.m. Vi Covered Line Canal W/ Box Culvert 18.88 L.m. Vii Burial Apartment 1.00 Lot Viii Plumbing Works 1.400.00 L.m. Spl-1 Ppe’s 1.00 Lot Spl-2 Temporary Facilities 1.00 Lot Spl-3 Project Signage 1.00 Lot 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-04-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Irosin Memorial Park Improvement(phase Iii); (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Irosin Memorial Park Improvement(phase Iii). (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-04-2025 Irosin Memorial Park Improvement(phase Iii) Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Irosin Memorial Park Improvement(phase Iii); 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-04-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.
Closing Date18 Feb 2025
Tender AmountPHP 3 Million (USD 51.8 K)

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Improvement/upgrading Of Super Health Center 1. The Local Government Unit Of Irosin, Through The 20% Edf 2025 Intends To Apply The Sum Of One Million Eight Hundred Nine Thousand Eight Hundred Forty Five Pesos (p 1,809,845.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Improvement/upgrading Of Super Health Center, Infr-05-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Improvement/upgrading Of Super Health Center Brief Description: Fabrication/installation Of Forms & Rsb And Concrete Pouring For Concrete Counters/tile Setting For Lavatories And Counters/acp Cladding Of Cabinets/installation Of Plumbing And Electrical Fixtures And Fabrication/installation Of Canopies Approved Budget For The Contract : P 1,809,845.00 Source Of Fund : 20% Edf 2025 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Ninety (90) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 28, 2025 Until February 18, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On February 5, 2025, 2:00pm At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 18, 2025, 1:59 Pm At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 18, 2025, 2025, 2:00 Pm At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 28, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Improvement/upgrading Of Super Health Center, With Project Identification Number Infr-05-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 20% Edf 2025 In The Amount Of One Million Eight Hundred Nine Thousand Eight Hundred Forty Five Pesos (p 1,809,845.00). 2.2. The Source Of Funding Is: 20% Edf 2025 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On February 18, 2025, 9:00am And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Improvement/upgrading Of Super Health Center I.forms And Scaffolding Works Ii. Rsb Works Iii. Concrete Works Iv. Tile Works V. Ceiling Works Vi. Electrical Works Vii. Painting Works Viii. Doors And Windows Ix. Canopy Works X. Other Works Spl-1 Amenities Spl-2 Ppe’s Spl-3 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Improvement/upgrading Of Super Health Center Key Personnel General Experience Relevant Experience 1. Foreman 2. Skilled Worker 3.laborer 10.5 Improvement/upgrading Of Super Health Center The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.concrete Mixer 2. Water Truck 3.welding Machine 4. Enough Hand Tools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Rehabilitation/improvement Of Brgy. Cawayan Level Ii Water System Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 90 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Upgrading Of Super Health Center. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 90 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 90 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Improvement/upgrading Of Super Health Center Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Forms And Scaffolding Works 1.00 Lot Ii Rsb Works 166.00 Kgs Iii Concrete Works 5.00 Cu.m. Iv Tile Works 205.00 Sq.m. V Ceiling Works 335.24 Sq.m. Vi Electrical Works 1.00 Lot Vii Painting Works 1.00 Lot Viii Doors And Windows 1.00 Lot Ix Canopy Works 1.00 Lot X Other Works 1.00 Lot Spl-1 Amenities 1.00 Lot Spl-2 Ppe’s 1.00 Lot Spl-3 Project Signage 1.00 Lot 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-05-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Improvement/upgrading Of Super Health Center; (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Improvement/upgrading Of Super Health Center. (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-05-2025 Improvement/upgrading Of Super Health Center Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Improvement/upgrading Of Super Health Center; 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-05-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.
Closing Date18 Feb 2025
Tender AmountPHP 1.8 Million (USD 31.2 K)
6571-6580 of 6584 archived Tenders