- Home/
- Philippines/
- Province Of Ifugao/
- Overview
Province Of Ifugao Tender
Province Of Ifugao Tender
Costs
Summary
Rfq No. 13- 2024-svp(42 Single Projects=42 Contracts) , Construction Projects ,province Of Ifugao
Description
Description Republic Of The Philippines Province Of Ifugao Bids And Awards Committee - Infra 3rd Floor Peo Bldg., Capitol Compound Lagawe, Ifugao Email: Bacinfraifugao21@gmail.com Request For Quotation (small Value Procurement) Rfq No. 13- 2024-svp Bid Opening: October 22, 2024 Quotations Must Be Received By The Procuring Entity Not Later Than 1:00 P.m. Of October 22, 2024 To : Address : Date : October 15 2024 Subject : Request For Quotations 1) The Provincial Local Government Unit Of Ifugao Have Allocated The Following Funds Listed Below And Intends To Apply The Funds To Payments Under The Following Contracts For Which This Request Is Issued: Name Of Contract Location Source Of Fund Brief Description/major Works 1 Concreting Of Rodeo Site-ubao Road Ubao, Aguinaldo 2024-20% Df Pccp & Aggregate Base Course 2 Construction Of Butac Senior Citizen Building Butac, Aguinaldo 2024-20% Df Reinforcing Steel & Structural Concrete 3 Installation Of Halag (riverside) Solar Street Light, Aguinaldo Halag, Aguinaldo Sb No. 2-2024 Solar Led Street Light & Structural Concrete 4 Construction Of Purok 4, Ulalani Ubao Deepwell (po No. 2024-19r) Ubao, Aguinaldo 2024-20% Df Structure Excavation & Structural Concrete 5 Opening Of Lower Posnaan To Upper Amte Road, Aguinaldo Posnaan, Aguinaldo Sb No. 2-2024 Individual Remopval Of Trees & Surplus Common Excavation 6 Construction Of Box Culvert At Itab-proper-ungan, Aguinaldo Itab, Aguinaldo 2023-20% Df Structural Concrete & Grouted Riprap 7 Construction Of Erosion Namnama Water System Namnama, Alfonso Lista Sb No. 2-2024 Polythylene (pe) Plastic Pipe 8 Construction Of Kalipkip Eco-park Facilities Mp Shed Busilac, Alfonso Lista Busilac, Alfonso Lista Sb No. 2-2024 Roof Frame & Structural Concrete 9 Improvement Of Kiling Mph Compund, Alfonso Lista Kiling, Alfonso Lista Sb No. 2-2024 Aluminum Glass Window & Cement Plaster Finish 10 Construction Of Kiling Multi-purpose Hall Kiling, Alfonso Lista 2024-20% Df Formworks And False Works & Reinforcing Steel 11 Installation Of Potia Elementary And High School Powered Lightings Potia, Alfonso Lista Sb No. 2-2024 Solar Led Street Light & Reinforcing Steel Bar 12 Construction Of Mini Gymnasium At Natkak, Camandag, Asipulo (po No.- 2024-20r) Camandag, Asipulo 2023-20% Df Structural Steel & Reinforcing Steel 13 Installation Of Kablahan, Camandag Water Tank Camandag, Asipulo 2024-20% Df Structural Concrete & Formworks And Falseworks 14 Construction Of Amduntog Culture And Arts Center Amduntog, Asipulo 2024-20% Df Reinforcing Steel & Formworks And Falseworks 15 Construction Of Angadal, Poblacion Pathway Banaue Poblacion, Banaue 2024-20% Df Grouted Riprap & Pccp 16 Construction Of Cambulo River Control Banaue Cambulo, Banaue Sb No. 2-2024 Grouted Riprap & Embankment From Structure Excavation 17 Construction Of Poitan Multi-purpose Building Poitan, Banaue 2024-20% Df Carpentry And Joinerey Works & Structural Concrete 18 Continuation Of Utong Cis, Cambulo Banaue Cambulo, Banaue Sb No. 2-2024 Lined Canal & Structure Excavation 19 Construction Of Pula, Banaue Pathway Pula, Banaue Sb No. 2-2024 Pccp & Grouted Riprap 20 Construction Of Talboc Paypayan Bocos Water System, Banaue Bocos, Banaue Sb No. 2-2024 Galvanized Iron Water Pipe & Clearing And Grubbing 21 Construction Of Hudchoh-bayninan, Kinakin Pathway, Banaue Kinakin, Banaue Sb No. 2-2024 Grouted Riprap & Pccp 22 Construction Of Napu To Lanah Footbridge At Bae, Poitan, Banaue Poitan, Banaue 2023-20% Df Grouted Riprap & Structure Excavation 23 Construction Of O-ong Tramline O-ong, Hingyon 2024-20% Df Grouted Riprap & Structural Concrete 24 Concreting Of Ilabuyya, Bangtinon Drainage System Hingyon Bangtinon, Hingyon Sb No. 2-2024 Lined Canal & Removal Of Structures And Obstruction 25 Improvement Of Bokiawan Multi-purpose Hall, Hungduan Bokiawan, Hungduan Sb No. 2-2024 Structural Steel & Prepainted Metal Sheets 26 Construction Of Hapao Water Reservoir, Hungduan Hapao, Hungduan Sb No. 2-2024 Structural Concrete & Formworks And Falseworks 27 Improvement Of Bayninan, Nagacadan Fmr, Kiangan Nagacadan, Kiangan Sb No. 2-2024 Grouted Riprap & Pccp 28 Rehabilitation/ Development Of Nursery And Other Support Structures Hucab, Kiangan Regular Trust Fund-0832-1085-53 Npc Magat Sub- Watershed Management Project Structural Steel Works & Fittings 29 Rehabilitation/ Development Of Nursery And Other Support Structures Bolog, Kiangan Regular Trust Fund-0832-1085-53 Npc Magat Sub- Watershed Management Project Structural Steel Works & Fittings 30 Construction Of Pullaan Water System Pulaan, Lagawe 2024-20% Df Structural Concrete & Galvanized Iron Water Pipe 31 Concreting Of Mappulig Cudog Pathway, Lagawe Cudog, Lagawe Sb No. 2-2024 Pccp & Structure Excavation 32 Concreting Of Poblacion West Canal Lining (castillo-dinamling Section) Poblacion West, Lagawe Sb No. 2-2024 Removal Of Actual Structures/obstruction & Lined Canal 33 Construction Of Lachat, Abinuan Water System, Lagawe Abinuan, Lagawe Sb No. 2-2024 Structural Concrete & Structure Excavation 34 Improvement Of Plaza And Monuments Poblacion South, Lagawe Sb No. 1-2018 Pipes With Fitting Connection & Glazed Tiles And Trims 35 Rehabilitation Of Vehicle Bridge At Caba Proper Caba, Lagwe 2021-5% Cf Pccp & Subgrade Preparation 36 Rehabilitation/ Development Of Nursery And Other Support Structures Sanafe, Lamut Regular Trust Fund-0832-1085-53 Npc Magat Sub- Watershed Management Project Structural Steel Works & Fittings 37 Rehabilitation/ Development Of Nursery And Other Support Structures Bimpal, Lamut Regular Trust Fund-0832-1085-53 Npc Magat Sub- Watershed Management Project Structural Steel Works & Fittings 38 Rehab Of Poblacion East Multipurpose Building Lamut Poblacion East, Lamut Sb No. 2-2024 Reinforcing Steel & Structural Concrete 39 Construction Of Bullod-ilap, Bimpal Water System Bimpal, Lamut 2024-20% Df Reinforced Concrete & Reinforcing Steel 40 Improvement Of Landing Puok To Mawanini, Hapid Road, Lamut, Ifugao Hapid, Lamut 2024-20% Df Pccp & Aggregate Base Course 41 Ground Improvement Of Generator House(riprapping) Payawan, Lamut Capital Outlay-continuing Appropriation (2023) Grouted Riprap & Excavation 42 Construction Of Vehicle Parking Space, Wangwang Wangwang, Tinoc 2022-20% Df Grouted Riprap & Embankment From Structure Excavation 2) Name Of Contract Abc Contract Duration (cd) Cost Of Bid Documents 1 Concreting Of Rodeo Site-ubao Road 99,618.75 30 500.00 2 Construction Of Butac Senior Citizen Building 985,980.61 56 1,000.00 3 Installation Of Halag (riverside) Solar Street Light, Aguinaldo 199,456.20 56 500.00 4 Construction Of Purok 4, Ulalani Ubao Deepwell (po No. 2024-19r) 97,914.42 47 500.00 5 Opening Of Lower Posnaan To Upper Amte Road, Aguinaldo 485,911.24 32 500.00 6 Construction Of Box Culvert At Itab-proper-ungan, Aguinaldo 497,765.06 46 500.00 7 Construction Of Erosion Namnama Water System 98,525.27 35 500.00 8 Construction Of Kalipkip Eco-park Facilities Mp Shed Busilac, Alfonso Lista 146,974.38 84 500.00 9 Improvement Of Kiling Mph Compund, Alfonso Lista 97,160.28 22 500.00 10 Construction Of Kiling Multi-purpose Hall 494,002.66 112 500.00 11 Installation Of Potia Elementary And High School Powered Lightings 99,829.95 63 500.00 12 Construction Of Mini Gymnasium At Natkak, Camandag, Asipulo (po No.- 2024-20r) 991,774.33 98 1,000.00 13 Installation Of Kablahan, Camandag Water Tank 199,296.36 45 500.00 14 Construction Of Amduntog Culture And Arts Center 495,984.07 56 500.00 15 Construction Of Angadal, Poblacion Pathway Banaue 198,754.06 31 500.00 16 Construction Of Cambulo River Control Banaue 293,037.76 74 500.00 17 Construction Of Poitan Multi-purpose Building 397,478.79 107 500.00 18 Continuation Of Utong Cis, Cambulo Banaue 197,752.57 37 500.00 19 Construction Of Pula, Banaue Pathway 195,773.00 42 500.00 20 Construction Of Talboc Paypayan Bocos Water System, Banaue 146,705.50 28 500.00 21 Construction Of Hudchoh-bayninan, Kinakin Pathway, Banaue 198,112.25 61 500.00 22 Construction Of Napu To Lanah Footbridge At Bae, Poitan, Banaue 489,931.98 56 500.00 23 Construction Of O-ong Tramline 493,434.82 60 500.00 24 Concreting Of Ilabuyya, Bangtinon Drainage System Hingyon 198,199.72 37 500.00 25 Improvement Of Bokiawan Multi-purpose Hall, Hungduan 195,071.76 43 500.00 26 Construction Of Hapao Water Reservoir, Hungduan 144,688.99 42 500.00 27 Improvement Of Bayninan, Nagacadan Fmr, Kiangan 197,019.69 28 500.00 28 Rehabilitation/ Development Of Nursery And Other Support Structures 316,665.44 33 500.00 29 Rehabilitation/ Development Of Nursery And Other Support Structures 316,613.58 33 500.00 30 Construction Of Pullaan Water System 490,764.34 58 500.00 31 Concreting Of Mappulig Cudog Pathway, Lagawe 149,800.63 36 500.00 32 Concreting Of Poblacion West Canal Lining (castillo-dinamling Section) 148,491.81 39 500.00 33 Construction Of Lachat, Abinuan Water System, Lagawe 146,859.53 46 500.00 34 Improvement Of Plaza And Monuments 993,909.93 71 1,000.00 35 Rehabilitation Of Vehicle Bridge At Caba Proper 490,969.58 40 500.00 36 Rehabilitation/ Development Of Nursery And Other Support Structures 316,699.98 33 500.00 37 Rehabilitation/ Development Of Nursery And Other Support Structures 316,578.16 33 500.00 38 Rehab Of Poblacion East Multipurpose Building Lamut 985,570.99 56 1,000.00 39 Construction Of Bullod-ilap, Bimpal Water System 488,858.64 56 500.00 40 Improvement Of Landing Puok To Mawanini, Hapid Road, Lamut, Ifugao 489,981.90 56 500.00 41 Ground Improvement Of Generator House(riprapping) 386,903.28 24 500.00 42 Construction Of Vehicle Parking Space, Wangwang 494,144.62 57 500.00 3) The Bill Of Quantities Provides A Concise Description Of The Item And The Quantity Required Along With The Construction Schedule. A Set Of Technical Specifications And Drawings Are Attached. 4) Prices Indicated In The Bill Of Quantities Shall Include Unit Prices And The Total Price Under The Contract. 5) Prices Quoted Shall Be Fixed. Quotation Submitted With An Adjustable Price Will Be Treated As Non-responsive And Will Be Rejected. Quotations For Each Project Shall Not Exceed The Abc. 6) Quotation Must Be Hand-carried To The Address Indicated In Paragraph 15, Complete With The Following Requirements Duly Accomplished And Signed And/or Initialed. 6.1) Proof Of Invitation (rfq) 6.2) Lump Quotation Form (document 1a) 6.3) Bill Of Quantities (document 1b) 6.4) Detailed Bid Quotation (document 1c) 6.5) Drawings/ Plans (document 2) 6.6) Technical Specifications (document 3) 6.7) Scope Of Works (document 4) 6.8) Schedule Of Construction (document 5) 6.9) Instruction In Submitting Quotations (isq) (document 6) 6.10) Site Visit Certificate (document 7) 6.11) Omnibus Sworn Statement (document 8) 7) Quotation, As Well As Correspondence And Documents Related Thereto, Shall Be Written In The English Language. 8) A Complete Set Of Quotation Documents In English May Be Purchased By Interested Bidders Upon Presentation Of The Proof Of Invitation By The Provincial Local Government Unit (plgu) And Payment Of A Non-refundable Fee Of The Corresponding Amount Stated In Paragraph 2 Except For Instances When Bidding Documents Fees May Be Refunded To The Bidder. Purchasing/ Issuance Of Bid Documents Is Available During Office Hours From October 15, 2024 To October 22, 2024 Until 1:00 P.m. The Bidding Documents Shall Be Received Personally By The Bidder Or His Authorized Representative During Office Hours At The Bac-infra Office, 3rd Floor, Peo Building, Capitol Compound, Lagawe, Ifugao. 9) Quotations Must Be Received By The Procuring Entity Not Later Than 1:00 P.m. Of October 22 2024. 10) Validity Of Quotations Should Be A Period Of One Hundred Twenty (120) Calendar Days After The Date Of The Deadline For Submission Of Quotations. 11) The Plgu Supplied Construction Schedule Should Confirm That The Works Will Be Completed Within The Period Stated In The Schedule Of Requirements And In The Quantities Specified In The Bill Of Quantities. 12) It Is The Intent Of The Procuring Entity To Evaluate Quotations And Recommend Award The Contract To The Bidder That Submitted The Lowest Calculated Responsive Quotation For Such Work. 13) The Method And Conditions Of Payment To The Contractor Under This Contract Shall Be Made Upon 100% Work Accomplishment. 14) The Procuring Entity Shall Inspect And/or Test The Works To Confirm Their Conformity To The Contract Specifications. If Any Of The Works Inspected Or Tested Failed To Conform To The Specifications, The Procuring Entity May Reject The Work(s) And The Contractor Shall Replace/remedy The Work(s) To Meet The Specifications Required. 15) Clarification On This Request For Quotations Must Be Addressed To The Procuring Entity In Writing Or By Email At The Address Below Not Later Than Five (5) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. The Procuring Entity Shall Respond In Writing Not Later Than Three (3) Days Prior To The Deadline For The Submission Of Quotations. The Chairperson Bids And Awards Committee - Infra 3rd Floor, Peo Building, Capitol Compound Lagawe, Ifugao 16) The Duly Authorized Representative Shall, At All Times, Present And Submit A Special Power Of Attorney Or Spa To The Bac Secretariat Upon The Submission Of The Bidding Documents, Otherwise Said Bidding Documents Shall Not Be Accepted. 17) The Provincial Government Of Ifugao Reserves The Right To Accept Or Reject Any Or All Bids, To Annul The Bidding Process At Any Time Prior To Contract Award, Waive Minor Defects And Accepts The Bid Most Advantageous To The Provincial Government Without Thereby Incurring Any Liability To Affected Bidder Or Bidders. Carmelita B. Buyuccan Bac Chairperson
Contact
Tender Id
2e5628e7-2984-35b7-9127-7c2ea614eefbTender No
11357934Tender Authority
Province Of Ifugao ViewPurchaser Address
-Website
notices.ps-philgeps.gov.ph