Office Furniture Tenders
Office Furniture Tenders
Civil Service Commission Tender
Automobiles and Auto Parts
Philippines
Details: Description Provision Of Manpower Services (driver & Janitorial) For Csc Regional Office For Cy 2025 (lot 1) Location / Area: Csc Regional Office, No. 7 Oñate Street, Mandurriao, Iloilo City Terms Of Reference: Provision Of Manpower Services (driver & Janitor) Covering January 1, 2025 To December 31, 2025. The Agency Shall Provide One (1) Driver And (2) Janitors Reporting For Work Daily As Maybe Directed By The Entity Except Saturdays, Sundays And Holidays, Or As Needed With Approved Request For Overtime. Provided, However, That The Work Schedules Of The Assigned Personnel Will Be With The Entity Conformity Of Knowledge. Provided Further, That The Agency Obligates Itself To Increase Or Decrease The Number Of Assigned Personnel Upon Request Of The Entity. 1. General Conditions/technical Specifications: A.1 Driving Services 1. Ensure That Office Vehicles Are Road Worthy Using The Checklist Of Blow Bagets. Likewise Ensure That These Are Kept Clean Before, During, And After Use. 2. Perform On A Daily Basis, Basic Vehicle Cleaning Such As, But Not Limited To, Washing Of Windshields, Simple Body And Tire Cleaning, Wiping Of Dashboards, Ensuring That Interiors Are Free Of Food And Litter, Cleaning Of Seats And The Like. 3. Monitor And Ensure That Vehicle Preventive Maintenance Schedule Is Implemented As Scheduled And The Vehicles Are Kept Roadworthy At All Times. 4. Immediately Report To The Msd Chief Through The Designated Property Officer, In Cases Where The Vehicles Would Need Urgent Repairs For Issues Other Than The Scheduled Maintenance. 5. Perform Messengerial Services As May Be Required Such As But Not Limited To Delivery Of Mails To Courier Service Centers, Perform Simple Liaison Services To Agencies And Other Entities. 6. Vouchers And Its Supporting Documents, Complete And Correct, Should Be Endorsed To The Cashier Upon Return To The Office. Delivery Receipts And/or Receiving Copy Of Documents Should Be Returned To The Requesting Party Asap. 7. As Far As Practicable, Ensure That Vehicle Fuel Is Replenished At The End Of The Trip For The Day. 8. Prepare The Fuel Request Form And Secure Approval From The Msd Chief Through The Designated Property Officer, And Attach The Fuel Receipt To The Fuel Request Form, For Filing. 9. Prepare The Necessary Documents And Other Requirements Needed For The Processing Of Payment For Fuel Every 15th Day Of The Month Except December, The Due Of Which Is The Last Working Day Of The Year. 10. Submit The Properly Accomplished Trip Tickets To The Msd At The End Of Each Trip With Details Such As Date Of Trip, Destination, Purpose Of Trip, Time Of Departure And Arrival, Names Of Passengers, Etc. 11. Surrender The Vehicle Keys To The Guard-on-duty Before Logging Out Of The Office. A.2 Vehicle Maintenance 1. Vehicles Shall Undergo Preventive Maintenance In Accordance With The Approved Vehicle Maintenance Schedule Per Office Vehicle Or As Often As May Be Necessary. Total Distance Travelled Shall Be Monitored For Purposes Of Maintenance Reference. 2. Visual Checking Of Vehicles Should Be Done Regularly. This Includes Checking Of Engine For Leaks, Condition Of Engine Belts And Liquids, Ensure That Vehicle Is Free From Dents And Scratches, Tire Condition, Etc. 3. Renewal Of Vehicle Registration Should Be Done At Least One (1) Week Prior To Its Expiration. A.3 Use Of Office Vehicles 1. The Use Of Office Vehicles Shall Always Be Covered By A Duly Accomplished And Signed Trip Ticket, Indicating The Following: I. Date, Time, Destination, And Other Required Information; Ii. Initials Of The Msd Chief Or Designated Property Officer Affixed Below The Printed Name Of The Authorized Official Iii. Signature Of The Regional Director, Asst. Regional Director Or In Their Absence, The Officer-in-charge. 2. Requests To Avail Of Transportation Services Shall Be Submitted To The Msd At Least 3 Days Before The Scheduled Trip, Using The Prescribed Request For Utility Vehicle (ruv) Form, With A Copy Of The Approved Office Order Of The Requesting Party. 3. Approval Of The Request For The Use Of A Utility Vehicle Shall Be On A First-come-first-served Basis, Subject To Availability Of Drivers And Vehicles. 4. Vehicles May Be Used To Perform Messengerial And Support To Liaison Services. 5. In No Case Shall An Office Vehicle Be Used Without Proper Authorization From The Management Through The Msd. B. Janitorial Services 1. Washing Of Inside Windows And Doors, Frames And Screen; 2. Cleaning And Polishing Of Office Furniture And Fixtures And Counter Excluding Items Or Equipment That Require Specialized Maintenance, Furniture Such As Davenport And Chairs Showing Signs Of Spill Due To Any Caused Shall Be Washed And Cleaned; 3. Washing, Scrubbing And Polishing Of Floors; 4. Application Of Special Sanitizing And Waxing Solution To Hallways, Lobbies And Offices; 5. Dusting And/or Damp Wiping Of Glass Tops, Glass Door, Counters And Furniture; 6. Dusting Of Inside Windows, Window Ledges, Air-vents, Stair Railing And Other Horizontal And Vertical Surfaces; 7. Cleaning Of Glass Walls And Glass Partitions; 8. Cleaning Of Trash Receptacles; 9. Assist In Transferring Of Tables, Chairs, Cabinets And Counter, Etc. Upon Instruction By Authorized Officer Of The Office; 10. Daily Collection Of Garbage And Waste Materials To Be Disposed Of; 11. Frequent Spraying Of Air Fresheners In Work Areas And Other Designated Places; 12. Washing And Cleaning Of All Windows And Glasses Either By Hands Or With The Use Of Class Wiper; 13. Cleaning Of All Light Diffusers; 14. Thorough General Cleaning Of All Areas. 15. Other Services Within The Building Which May Be Assigned By The Management From Time To Time Within The Scope Of Janitorial Services. 2. Miscellaneous Services A. To Provide Extra Manpower Or Extension Of Authorized Tour Of Duty On Christmas And Other Special Occasions And In Case Of Emergencies Or Natural Calamities Necessitating Relief Operations, A Team Of Trained Personnel Within The Authorized Work Force Shall Be Provided To Undertake Such Job Receipt Of Five (5) Days Advanced Notice; B. Provide Minor Carpentry, Electrical And Plumbing Services; C. Clerical/messengerial Services. 3. Obligations Of The Agency A. Equipment And Uniform The Agency Shall Provide Complete Uniform With Proper Identification Card To Its Employees Assigned To The Entity And Shall Also Provide Standard Carpentry Small Tools Needed For Maintenance Services Such As But Not Limited To The Following: Hammer, Saw And Tape Ruler. B. Responsibilities It Is The Responsibility Of The Agency To Provide The Entity Of The Following: 1. Qualified Employees To Perform The Assigned Tasks: 2. Reliever In Case The Assigned Employee (s) Is Absent; 3. Ensure That All Employee Assigned In The Area Shall Follow House Rules And Regulations; 4. Discipline, Supervise And Control All Employees By Following Entity’s Rules And Regulations; 5. Replacement Of Any Employee (s) Assigned At The Office; 6. Conduct Inspection; 7. Monthly Meeting Of Agency With Their Personnel And Regular Check-up/supervision In Site Of The Assigned At The Office; 8. Regular Debriefing Of Personnel Assigned At The Office; 9. Duly Signed Monthly Accomplishment Report To Be Attached To Disbursement Voucher. C. Quality Assurance And Control The Agency Shall Conduct Regular Onsite Inspection And Evaluation Of The Services Performed By The Assigned Employees To The Entity To Ensure And Keep The Quality Of Work With Highest Standard Requirement. D. Human Resource Development The Agency Shall Provide Free Semi-annual Skills Development Seminar To Its Employees Assigned To The Entity To Enhance And Improve Their In-house Driving And Cleaning Skills, Maintenance Of Equipment And Use Of New Cleaning Materials And Supplies (supplied By Entity). Also, The Agency Shall Require All Their Employees Assigned To The Entity To Wear The Proper Uniform To Appear Neat And Clean In Their Work Place. Wearing Of Id Should Always Be Observed At All Times For Proper Identification And Security Purposes. 4. Timeline/schedule Of Delivery The Selected Agency Will Ensure And Deliver The Manpower Services Of One (1) Driver And Two (2) Janitors Who Meet The Qualifications As Stated In The Items Of The General Conditions. The Personnel Shall Render An Eight (8) Hour Service A Day, Five (5) Days A Week, Including Holidays To The Csc Regional Office. The Agency Shall Ensure That A Reliever Be Deployed Immediately In Case Of Changes Or Modifications To The Duty Of Its Assigned Personnel. 5. Duration Of Contract The Contract Shall Commence From The Date Of Signing Until December 31, 2025 Or Until The Execution Of A New Contract Pursuant To Government Procurement Policy Board (gppb) Resolution No. 23-2007 Dated September 28, 2007 “approving And Adopting The Revised Guidelines On The Extension Of Contracts For General Support Services”, Subject To The Agreement Of Both Parties. 6. Terms Of Payment For And In Consideration Of The Services Rendered By The Selected Agency, Cscro Vi Shall Pay The Contract Amount On A Monthly Basis. 7. Other Conditions Mode Of Payment To The Winning Security Agency Shall Be Made Via Issuance Of Mds/commercial Checks.
Closing Date2 Jan 2025
Tender AmountPHP 636 K (USD 10.9 K)
Municipality Of Talavera, Nueva Ecija Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipality Of Talavera Invitation To Apply For Eligibility And To Bid Goods 2025 - 11 The Municipal Government Unit Of Talavera, Through Its Bids And Awards Committee (bac), Invites Contractors For Suppliers For Public Bidding Of Goods To Apply For Eligibility And If Found Eligible, To Bid For The Hereunder Contract/project: Name Of Projects Location Brief Description Approved Budget For The Contract (abc) Contract Duration Price Of Bid Documents Purchase Of Ict Equipment, Office Equipment, Furniture & Fixtures Municipality Of Talavera Desktop Computer/ Laptop / Printers/digital Camera/aircon/office Table/chairs, Etc… 1,738,700.00 90 Days 5,000.00 Prospective Bidders Should Passes A Valid License Applicable To The Contract, Have Completed A Similar Contract Both Design And Construction, With A Value At Least 50% Of The Abc, And Have Key Personnel (for Construction & Design Profession) And Equipment, (listed In The Bidding Documents) Available For The Prosecution Of The Contract. The Bac Will Use Non-discretionary “pass/fail” Criteria In The Eligibility Check/screening As Well As The Preliminary Examination Of Bids. The Bid Evaluation Procedure To Be Adopted Shall Be In Accordance With The Gprb Resolution No. 22-2007 Dated September 8, 2007. The Bac Will Conduct Post-qualification Of The Lowest Calculated Bid. All Particulars Relative To Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation Of Bids, Post-qualification And Award Of Contract Shall Be Governed By The Pertinent Provision Of R.a 9184 And Its Implementing Rules And Regulations (irr) And Gprb Resolution No. 22-2007 Dated September 8, 2007. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule Issuance Of Bid Documents January 9 - 31, 2025 Deadline For Submission Of Bid And Opening Of Bids January 31, 2025 (10:00 A.m.) ` Bid Opening Shall Be Conducted At The Municipal Engineering Office, Municipal Compound, Pag-asa, Talavera Nueva Ecija. Pursuant To The Iatf Guidelines And Strict Implementation Of The Minimum Health Standard And Safety Protocol. The Bac Will Issue To Prospective Bidders Eligibility Forms At Bac Office, Engineering Office, Municipal Building, Talavera, Nueva Ecija Upon Their Submission Of A Loi. Prospective Bidders Shall Submit The Eligibility Requirements To The Bac At The Said Address. They May Also Obtain The Results Of The Eligibility Check By The Bac At The Same Address. The Bac Will Issue Bidding Documents Only To The Bidders Declared By The Bac To Be Eligible For The Bidding Upon Payment Of A Non-refundable Amount Of Bidding Documents Stated In The Implementing Rules And Regulation Of R.a. 9184 To The Municipal Treasurer’s Office Of Talavera. The Award Shall Be Made After Bid Evaluation & Post Qualification Of The Lowest Calculated Bids. The Lgu - Talavera Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of Their Bids. Contact Person: Marvin Dc. Marcial Approved By: Bac Secretariat (sgd) Alfredo S. Atraje Bac Chairman Noted: (sgd) Hon. Nerito S. Santos Jr. Municipal Mayor
Closing Date31 Jan 2025
Tender AmountPHP 1.7 Million (USD 29.6 K)
Municipality Of Talavera, Nueva Ecija Tender
Civil And Construction...+2Civil Works Others, Building Construction
Philippines
Details: Description Republic Of The Philippines Province Of Nueva Ecija Municipality Of Talavera Invitation To Apply For Eligibility And To Bid Goods 2025 - 02 The Municipal Government Unit Of Talavera, Through Its Bids And Awards Committee (bac), Invites Contractors For Suppliers For Public Bidding Of Goods To Apply For Eligibility And If Found Eligible, To Bid For The Hereunder Contract/project: Name Of Projects Location Brief Description Approved Budget For The Contract (abc) Contract Duration Price Of Bid Documents Purchase Of Ict Equipment, Office Equipment, Furniture & Fixtures Municipality Of Talavera Aircon/laptop/printers/etc… 493,750.00 90 Days 500.00 Prospective Bidders Should Passes A Valid License Applicable To The Contract, Have Completed A Similar Contract Both Design And Construction, With A Value At Least 50% Of The Abc, And Have Key Personnel (for Construction & Design Profession) And Equipment, (listed In The Bidding Documents) Available For The Prosecution Of The Contract. The Bac Will Use Non-discretionary “pass/fail” Criteria In The Eligibility Check/screening As Well As The Preliminary Examination Of Bids. The Bid Evaluation Procedure To Be Adopted Shall Be In Accordance With The Gprb Resolution No. 22-2007 Dated September 8, 2007. The Bac Will Conduct Post-qualification Of The Lowest Calculated Bid. All Particulars Relative To Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation Of Bids, Post-qualification And Award Of Contract Shall Be Governed By The Pertinent Provision Of R.a 9184 And Its Implementing Rules And Regulations (irr) And Gprb Resolution No. 22-2007 Dated September 8, 2007. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule Issuance Of Bid Documents December 23, 2024 - January 15, 2025 Deadline For Submission Of Bid And Opening Of Bids January 15, 2025 (10:00 A.m.) ` Bid Opening Shall Be Conducted At The Municipal Engineering Office, Municipal Compound, Pag-asa, Talavera Nueva Ecija. Pursuant To The Iatf Guidelines And Strict Implementation Of The Minimum Health Standard And Safety Protocol. The Bac Will Issue To Prospective Bidders Eligibility Forms At Bac Office, Engineering Office, Municipal Building, Talavera, Nueva Ecija Upon Their Submission Of A Loi. Prospective Bidders Shall Submit The Eligibility Requirements To The Bac At The Said Address. They May Also Obtain The Results Of The Eligibility Check By The Bac At The Same Address. The Bac Will Issue Bidding Documents Only To The Bidders Declared By The Bac To Be Eligible For The Bidding Upon Payment Of A Non-refundable Amount Of Bidding Documents Stated In The Implementing Rules And Regulation Of R.a. 9184 To The Municipal Treasurer’s Office Of Talavera. The Award Shall Be Made After Bid Evaluation & Post Qualification Of The Lowest Calculated Bids. The Lgu - Talavera Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of Their Bids. Contact Person: Marvin Dc. Marcial Approved By: Bac Secretariat (sgd) Alfredo S. Atraje Bac Chairman Noted: (sgd) Hon. Nerito S. Santos Jr. Municipal Mayor
Closing Date15 Jan 2025
Tender AmountPHP 493.7 K (USD 8.4 K)
Department Of Education Division Of Quezon Tender
Others
Philippines
Description: Supply And Delivery Of Various Supplies, Furniture, Ict And Office Equipment Q1 Of Fy 2025, Lot 2 (repost) , Office Supplies And Devices ,department Of Education - Division Of Quezon
Closing Date4 Feb 2025
Tender AmountPHP 1.1 Million (USD 19.1 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+1Civil Works Others
United States
Details: 5. Project Number (if Applicable)
code
7. Administered By
2. Amendment/modification Number
code
6. Issued By
8. Name And Address Of Contractor
4. Requisition/purchase Req. Number
3. Effective Date
9a. Amendment Of Solicitation Number
9b. Dated
page Of Pages
10a. Modification Of Contract/order Number
10b. Dated
bpa No.
1. Contract Id Code
facility Code
code
offers Must Acknowledge Receipt Of This Amendment Prior To The Hour And Date Specified In The Solicitation Or As Amended, By One Of The Following Methods:
the Above Numbered Solicitation Is Amended As Set Forth In Item 14. The Hour And Date Specified For Receipt Of Offers
e. Important:
is Extended,
(a) By Completing Items 8 And 15, And Returning __________ Copies Of The Amendment; (b) By Acknowledging Receipt Of This Amendment On Each Copy Of The
offer Submitted; Or (c) By Separate Letter Or Electronic Communication Which Includes A Reference To The Solicitation And Amendment Numbers. Failure Of Your
acknowledgment To Be Received At The Place Designated For The Receipt Of Offers Prior To The Hour And Date Specified May
is Not Extended.
12. Accounting And Appropriation Data
(rev. 11/2016)
is Required To Sign This Document And Return ___________ Copies To The Issuing Office.
is Not,
a. This Change Order Is Issued Pursuant To: (specify Authority) The Changes Set Forth In Item 14 Are Made In The Contract Order No. In Item 10a.
15c. Date Signed
b. The Above Numbered Contract/order Is Modified To Reflect The Administrative Changes
set Forth In Item 14, Pursuant To The Authority Of Far 43.103(b).
result In Rejection Of Your Offer. If By Virtue Of This Amendment You Desire To Change An Offer Already Submitted, Such Change May Be Made By Letter
or Electronic Communication, Provided Each Letter Or Electronic Communication Makes Reference To The Solicitation And This Amendment, And Is Received Prior To
the Opening Hour And Date Specified.
c. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
d. Other
contractor
16c. Date Signed
14. Description Of Amendment/modification
16b. United States Of America
except As Provided Herein, All Terms And Conditions Of The Document Referenced In Item 9a Or 10a, As Heretofore Changed, Remains Unchanged And In Full Force And Effect.
15a. Name And Title Of Signer
16a. Name And Title Of Contracting Officer
15b. Contractor/offeror
standard Form 30
previous Edition Not Usable
prescribed By Gsa - Far (48 Cfr) 53.243
(type Or Print)
(type Or Print)
(organized By Ucf Section Headings, Including Solicitation/contract Subject Matter Where Feasible.)
(number, Street, County, State And Zip Code)
(if Other Than Item 6)
(specify Type Of Modification And Authority)
(such As Changes In Paying Office, Appropriation Date, Etc.)
(if Required)
(see Item 11)
(see Item 13)
(x)
check
one
13. This Item Applies Only To Modifications Of Contracts/orders,
it Modifies The Contract/order No. As Described In Item 14.
11. This Item Only Applies To Amendments Of Solicitations
amendment Of Solicitation/modification Of Contract
(signature Of Person Authorized To Sign)
(signature Of Contracting Officer)
1
5
0001
01-02-2025
544-25-2-4075-0004
none
36c247
department Of Veterans Affairs
visn 7 Network Contracting Activity
central Alabama Healthcare System
215 Perry Hill Road
montgomery Al 36109
36c247
department Of Veterans Affairs
visn 7 Network Contracting Activity
215 Perry Hill Road
montgomery Al 36109
to All Offerors/bidders
36c24725q0195
x
x
x
x
1
this Amendment To Solicitation 36c24725q0195 Is To Do The Following:
(1) Add Additional Language To The Scope Of Work
(2) Provide Responses To The Request For Information (rfi) Received Prior To Due Date (see Attached).
*all Other Terms And Conditions Remain Unchanged.
quentin Deloney
contracting Officer, Nco-07
page 5 Of 5
request For Information
36c24725q0195
facility Mover And Event Set-up Services
*any Questions Received That Have Not Been Answered In This Amendment Have Already Been Addressed In The Posted Solicitation.
scope Of Work Is Amended To Add The Following: The Contractor Shall Furnish All Contract Oversight, Management; Supervisory And Technically Trained Personnel; Uniforms; Equipment, Materials, And Supplies Necessary To Provide Commercial Office Moving And Relocation Services For Cavhcs. This Includes, But Is Not Limited To The Following, Providing All Labor, Materials, And Equipment Necessary To Accomplish The Work As Stated Herein, E.g., Excess Property Pickup; Furniture Installation; Systems Furniture Installation, Breakdown And Repair; Routine Moving Services Activities; Special Event Set-ups And Breakdown; Special Furniture Cleaning And Repair; Special Moving Activities; Place Furnishing In Designated Storage Areas In An Organized Manner; And Special Handling Moving Activities. Contractor Shall Furnish All Vehicles, Insurance, Drivers, Supervision, Maintenance, Equipment, And Operating Supplies/services Required For The Safe Transport Of The Property And Performing All Services Necessary To Provide Moving And Relocation Services.
1. Confirm There Are 6 Locations With 4 Being In Alabama And 2 In Ga. That Will Need To Be
covered.
-9 Possible Work Locations; 3 Georgia Locations; 6 Alabama Locations
-215 Perry Hill Road, Montgomery, Al 36109-3725 (main Work Site)
-8105 Veterans Way, Montgomery, Al 36117-3879
-2400 Hospital Road, Tuskegee, Al 36083 (main Work Site)
-3753 Ross Clark Circle, Suite 4, Dothan, Al 36303-2291
-159 Whetstone Street, Monroeville, Al 36460-2625
-301 Andrews Ave, Fort Rucker, Al 36362-5107
-6635 Bass Road, Fort Moore, Ga 31905-5602
-2100 Comer Avenue, Plaza G, Columbus, Ga 31904-8725
-6910 River Road, Columbus, Ga 61904-2316
2. In The Previous Notification We Seen 2 Locations Located On A Military Base That Were Not Listed On
the Solicitation. Will They Be Covered?
-past Solicitations/contract Awards Will Not Be Addressed
3. Will The Us Veterans Affairs Be Assisting In Obtaining Military Passes To Gain Access To The
bases?
- When Delivering To Those Locations, Contractor Must Meet All Requirements By The Base To Gain Access. A Va Representative Will Be Onsite, But This Does Not Mean Any Of The Requirements Will Be Waived. Contractor Will Know At Least A Week In Advance Of Any Deliveries Going To The Base.
4. You Stated Work Is To Be Performed Mon- Fri. But Days Can Be Changed And On Calls Can Bedone. Please Clarify?
-please Read The Solicitation In Its Entirety. Solicitation States As Needed Schedule Updates Shall Be Coordinated With And Approved By The Cor. Such Changes Will Be Coordinated In A Manner Both Parties Can Agree On.
5. Will There Be A Set Schedule Confirmed At The Beginning Of The Contract For The Duration Of
the Contract?
- No Set Schedule But Schedule Will Be Reasonable And Agreed Upon By Va And Contractor.
6. If No Set Schedule, When Will We Be Notified Services Are Needed?
-a Week In Advance
7. Will The Va Be Able To Add Days On Through The Week With Last Minute Notices?
-yes, As Long As The Hours Do Not Exceed The 860 Hours Allotted For The Year.
8. Is The Price Schedule 860 Hours?
-please Read The Solicitation In Its Entirety. The Base And Each Option Year Is Allotted 860 Hours.
9. Is 860 Hours Guaranteed For The Year?
-no; 860 Hours Worth Of Work Are Not Guaranteed To Be Used Each Year.
10. Are You Guaranteeing 8-hour Workdays?
-no
11. Are We Working 1-2 Hours, 4-5 Hours, Or Full 8-hour Days?
- Contractor Should Plan For Between 4 To 8-hour Days.
12. Will Items Be Left On The Truck From The Prior Day, Overnight, To Be Delivered The Following
day?
- The Government Does Not Expect Items To Be Left On Trucks. Contractor Is Responsible For Loading And Unloading Mover Vehicles, Therefore, It Is At The Contractor S Discretion And Cost To Store Any Items During Moving Activities And Should Be With The Approval And Proper Notification Being Made To The Cor.
13. Can You Clarify Excess Pickup? Are We Expected To Move Medical And It Equipment? Could You Give Examples Of Oversized Items?
- This Could Be Cubical Panels, White/glass Boards, Desks, Etc.. Examples Of Oversized Equipment May Include Pews, Conference Room Tables, Desks, And Storage Cabinets.
14. Confirm That You Are Aware That There Are 6-8 Services Added On That Were Not There In The
previous Years? Therefore, This Will Drive The Hourly Rate Up Tremendously.
-previous Contract Awards; Solicitations; Or Occurrences Will Not Be Addressed. Only Clarifications On The Information Presented In The Current Solicitation Will Be Made.
15. Our Hourly Rate Are To Include Pricing For Equipment, Labor, Fuel, Miles, Etc..?
-hourly Rate In Proposals Should Be All Inclusive.
16. Under Specialty Furniture Cleaning And Repair. Can You Clarify The Repair Service Needed?
- Re-attaching Doors To Furniture; Replacing Missing Screws/nuts On Furniture; Replacing Arms On Task Chairs; Or Glides On Tables/chairs.
17. If A Repair Is Performed Who Takes The Liability Of That Item Breaking Again?
- If A Repaired Item Breaks Due To The Repair Being Negligent, The Contractor Will Be Held Liable.
18. Will We Be Moving Equipment That Is Still Covered Under The Warranty?
- Yes, Some Items May Be Under Warranty Such As Desk And Chairs.
19. Will We Be Mounting Items On Walls? Provide Examples?
- Not On A Regular Basis. For Example, Some Workstations Mount To The Wall And Other Furniture Must Anchored To The Wall To Prevent Tilting.
20. Who Will Be Responsible For Holes In The Wall And Where Does That Fall Under The Lease
agreements Of These Buildings And Who Will Be Responsible?
21. Could You Provide More Details On The Specific Tasks Involved In The Relocation, Moving, And Event Set-up Services
- Please Read The Solicitation In Its Entirety
22. What Is The Expected Volume Of Items (e.g., Office Furniture, Equipment) To Be Moved And Set Up?
- Unpredictable; As Needed Basis
23. Are There Any Special Handling Requirements (e.g., Fragile Or High-value Items)?
-please Read The Solicitation In Its Entirety.
24. Can You Confirm If This Will Be A Firm-fixed-price Contract?
-yes
25. Will The 860 Hours Be Paid Regardless Of Whether They Are Utilized?
-no; Only Hours Worked Will Be Payable
26. Will This Be An On-call Contract, Or Will There Be A Confirmed Schedule?
- For On Lease Properties, Movers Will Not Be Mounting Anything To The Wall. For The Two Main Campuses (central Alabama Veterans Health Care System East Campus 2400 Hospital Road, Tuskegee, Al 36083 And Central Alabama Veterans Health Care System West Campus 215 Perry Hill Road, Montgomery, Al 36109-3725) Cor Will Work With Maintenance To Repair Holes In The Wall From Furniture Removal. The Movers Are Not Expected To Paint Or Patch Unless The Movers Have Damaged Walls Or Doors Due To Negligence And/or Accident.
27. Are There Any Penalties For Delays Or Failure To Meet Performance Standards?
-yes, Unsatisfactory Ratings; Opt-out Of Exercising Options; And Possible Termination For Cause
29. Are There Specific Quality Assurance Standards That Need To Be Adhered To?
- Please See Attached Quality Assurance Plan Posted On Page 89.
Closing Date15 Jan 2025
Tender AmountUSD 931 K
This is an estimated amount, exact amount may vary.
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY USA Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Details: Amendment 0001 - The Due Date For Qualifications Has Been Extended To Monday, January 13, 2025, 2:00pm Est. Government Responses To Rfi's Have Been Attached To This Notice.
description:
this Is A Request For Qualifications For Architect And Engineering (a&e) Services. This Request Is 100% Set-aside For Small Business’s Registered Under The Applicable Naics Code 541330 – Engineering Services, With A Size Standard Of $25,500,000.
the National Institute Of Standards And Technology (nist), An Agency Of The U.s., Department Of Commerce, Intends To Award Multiple Indefinite Delivery Indefinite Quantity (idiq) Contract(s) For General Architectural And Engineering (a/e) Services For The Nist Gaithersburg Campus Located At 100 Bureau Drive, Gaithersburg, Md 20899. A/e Services Under The Contract May Include The Following:
evaluation And Feasibility Studies To Include Engineering Modeling And Simulation
demolition Of Nist Structures, Utilities, And Infrastructure
repair And/or Repair By Replacement, Modification/reconfiguration, Building Additions, And Upgrades To Nist Facilities (e.g., Laboratories/scientific Research, Office, Industrial). Including But Not Limited To Architectural, Mechanical, Electrical, Communications, Structural, Fire Protection, And Building Enclosure (e.g., Roofs, Windows, Foundations).
repair And/or Repair By Replacement, Modification/reconfiguration For Campus Utility Systems And Supporting Underground Structures
comprehensive Historical Assessments For The Preservation, Rehabilitation, And Restoration Of Historic Property
interior Design Services Consisting Of Programming And Space Assessment, Fit Plans, And Office Furniture To Enhance Aesthetics, Comfort, Efficiency, And Workplace Safety.
cost Estimating For Different Levels (e.g., Concept, Detailed Program, Project)
life Cycle Cost Analysis Identifying Cost Elements From Initial Concept Through Operations, Support, And Disposal.
hazardous Material Survey And Risk Assessment (e.g., Asbestos, Mold, Lead Paint)
roofing And Waterproofing Services Such As Visual Inspections And Existing Conditions Surveys, Failure Investigation, And Design For Repairs.
commissioning Design Including Assistance Of Development Owner’s Project Requirements (opr), Design Document Reviews, Development Of Commissioning Specifications And Or Initial Commissioning Plan
program Of Requirements (por) Development By Meeting With Campus Personnel And Confirming Design Intent For Building And/or Major Systems (e.g., Mechanical, Electrical, Plumbing, Structural, Controls, Security, Fire Alarm, Etc.)
value Engineering Analysis To Achieve Design Goals While Lowering Life Cycle Costs And Maintaining The Required Performance, Quality, Reliability, And Maintainability.
record Drawings Development From Compiled As-built Set.
surveying (e.g., Alta/ascm, Boundary, Topographic, Construction, Site Planning)
roads/sidewalks Repairs And Replacement
evaluation Of Items Requiring Earthwork Such As Excavation, Grading, Ponds, Drainage, Foundation, And Footings
landscaping Design
gates, Fencing, And Related Engineering Necessary To Support A Campus Environment
permit Applications Submission To Regulatory Authorities Based On Specific Project Requirements. To Be Coordinated With Cor And Or Ahj For Acceptance And Or Approval
environmental Compliance (state Or Federal) Conforming To Laws, Regulations, Standards, And Other Requirements
construction Quality Management To Include But Not Limited To Commissioning Services
contract Information:
the Period Of Performance Of The Idiq Contract(s) Shall Be Five (5) Years. Annual Fully Burdened Labor Rates Will Be Negotiated Prior To Award. All Services Will Be Ordered Via The Issuance Of Individually Negotiated Firm-fixed-price Or Notto-exceed Task Orders, Ranging In Value From $10,000 And $2,000,000. Each Idiq Contract Shall Include A Guaranteed Minimum Order Of $5,000. The Cumulative Amount Of All Task Orders Shall Not Exceed $9,800,000.
the Government Anticipates Award Of Three (3) Or More Idiq Contracts; However, The Actual Number Of Awards Shall Be Made At The Discretion Of The Government.
submission Requirements:
consideration Will Be Limited To Professional A/e Firms Licensed And Registered In Maryland Who Provide A/e Services Primarily In The Disciplines Of Architectural, Civil, Structural, Mechanical, Electrical, And Environmental Engineering For Pre-design, Design, And Post-design Of Research Laboratory Facilities.
firms Meeting The Above Requirements And Desiring Consideration Must Submit Their Qualifications By No Later Than The Date Specified In This Announcement Via Email To The Following Addresses Using The Email Subject Line “rfq Submission – General Ae Services Idiq Nb195000-25-00009”:
Trent.stevens@nist.gov
Guzel.gufranova@nist.gov
Teresa.harris@nist.gov
qualification Submissions Shall Include One (1) Original Electronic Copy In Adobe .pdf Format Of Their Standard Form 330 (sf-330) With Appropriate Data. Ae Firms Shall Include All Subcontractor's Resumes In Part 1 Of The Sf-330. Part 2 Of The Sf-330, General Qualifications, Should Also Be Submitted For Each Subcontractor Or Consultant. Indicate The Solicitation Number On All Documentation Submitted.
along With The Sf-330, Offerors Shall Include:
a Copy Of Your Current Registration In System For Award Management (sam);
proof Of Small Business Status;
a Cover Page That Provides:
offeror’s Name And Address;
offeror’s Uei Number; And,
the Name, Title, Email, And Phone Number For The Authorized Representative Of The Offeror.
submissions Will Be Evaluated By A Source Selection Evaluation Board (sseb) And Ranked Based On The Stated Evaluation Factors. The Government Will Then Establish A Competitive Range; Firms That Fall Within This Range Will Be Invited To Present Their Capabilities To The Sseb. Formal Solicitations Requesting Fee Proposals Will Be Issued To The Highest Qualified Firms As Determined By The Government.
request For Information (rfi)
questions And Rfi's Must Be Submitted No Later Than 1:00pm Et On 12/10/2024 Via Email To The Following Addresses Using The Subject Line “rfi - General Ae Services Idiq Nb195000-25-00009” :
Trent.stevens@nist.gov
Guzel.gufranova@nist.gov.
the Contracting Officer Will Post Government Responses To Rfi’s On This Site As An Amendment To This Announcement. Firms Are Responsible For Monitoring This Site For Amendments To The Request For Qualifications.
selection Criteria:
all Work Performed Shall Be Under The Direct Control And Supervision Of A Professional And Experience Licensed Architect/engineer Employed By The Prime Contractor Assigned As The Responsible Party.
part I: Evaluation Of Sf-330
prospective A-e Firms Will Be Evaluated Based On Their Demonstrated Competence And Qualifications For The Type Of Professional Services Required. The Agency Will Evaluate Each Potential A-e Firm In Terms Of This Announcement. The Selection Criteria Are Listed Below In Descending Order Of Importance:
factor 1: Specialized Experience
page Limit – 15 Pages
firms Who Fail To Meet The Qualifications Of Factor 1 Will Not Be Evaluated On Subsequent Evaluation Factors And Will Not Be Considered For Award.
offeror Shall Demonstrate The Specialized Experience And Technical Competence Of Its Firm And Its Proposed Subcontractors Performing A/e Services Meeting The Criteria Of This Solicitation Within The Past Sixty (60) Months By Providing At Least 3 But No More Than 5 Example Projects (sections F, G, And H Of The Sf330) Addressing Each Of The Subfactors Listed Below (1a, 1b, 1c, And 1d). Offeror Shall Provide At Least One Example For Subfactor 1d. All Designs Shall Be Completed At Time Of Request For Qualifications (rfq). For The Purposes Of This Evaluations, “completed” Projects Shall Mean Projects Where Final Work Was Submitted, Approved, And Accepted By The Project Owner.
A. The Offeror Shall Describe Design For Renovations With Dates That Include Commercial Window Replacements, Masonry Repairs, And Roofing Repairs. Roofing Designs Are For Replacement Of An Existing Roofing System And Would Include Design And Specifications For New Built-up Roofs (at Least Three Ply) Of At Least 20,000 Sf Minimum, Including Drains, Coping And Flashing. Built Up Roofing Can Either Be Hot Or Cold Applied.
B. The Offeror Shall Also Describe With Dates Laboratory Design For Renovations Of At Least 2,000 Sf Which Include Replacement Or New Fume Hood Installation Of A Fume Hood At Least Four Feet In Width, New Laboratory Grade Casework, New Seamless Flooring, And Plumbing That Includes Either Eye Wash Station Or Safety Showers. Laboratories Shall Be For Commercial Facilities, Federal And State Facilities, Hospitals, And College/universities. High School And Lower School Grade Laboratories Will Not Be Considered.
C. The Offeror Shall Describe With Dates Designs That Include Laboratory Facility Mechanical, Plumbing, And Electrical Renovations, Upgrades And Alterations That Include Major Utility Systems, Facility Construction And Reconfiguration, Branch Circuits Of At Least 50 Amperes At 208v Or 480v, 3 Phase Power For Installation Of Specialized Scientific Tools, Equipment And Instrumentation (provide Amperage, Phases, And Voltages In Offer). The Contractor Shall Describe Distribution Of Manifold Specialty Gasses Utilizing At Least One Of The Following (nitrogen, Helium, Compressed Air, Or A Custom Blend) Within The Lab (note Which Gas Was In Manifold).
D. The Offeror Shall Describe, With Dates, Life Safety And Code Compliance Of The Following: Ibc And Nfpa Analyses, Access And Egress Analyses, Fire Alarm Systems And Device Designs, Nfpa 13 Fire Suppression System Modification Calculations And New Installations, And Hazardous Detection Systems (radiological Or Toxic Gas Monitoring Systems). Note Which Detection System (radiological Or Toxic Gas Monitoring System) Is Being Referenced.
factor 2: Professional Qualifications
page Limit – 17 Pages
the Offeror Shall Demonstrate The Technical Expertise And Professional Qualifications Of Its Proposed Team, Including Subcontractors And Consultants, To Perform The Required A/e Services By Providing Résumés (section E Of The Sf330) For All Of The Following Disciplines:
principle
senior Architect
senior Cost Estimator
senior Civil Engineer
senior Electrical Engineer
senior Fire Protection Engineer
senior Geo-technical Engineer
senior Laboratory Planner
mechanical Engineer (piping)
senior Mechanical Engineer (piping)
senior Mechanical Engineer (hvac)
senior Environmental Engineer
senior Scheduler
senior Surveyor
senior Water Proofing Engineer
senior Structural Engineer
2. Senior Positions Of Each Discipline Shall Have A Minimum Of Ten (10) Years Applicable Experience And Shall Be Licensed And/or Certified In Their Applicable Discipline.
3. The Offeror Shall Identify The Roles Of Its Key Personnel By Provide Resumes/sf 330s For Its Proposed Key Personnel That Include Credentials, Education, Registrations, Relevant Experience, And Their Role In Performing Requirements Outlined In Factor 1.
4. The Offeror Shall Submit An Organizational Chart Showing The Interrelations Of The Proposed Team Including All Subcontractors And Consultants.
factor 3: Geographical Location
page Limit – 1
offeror Shall Be Within 50 Miles Of The Nist Main Campus In Gaithersburg, Md. Nist Address Is 100 Bureau Drive, Gaithersburg, Md 20899. Offeror Shall Demonstrate This Distance By Submitting Information (driving) Via An Internet Mapping Program. The Driving Shall Begin At The Offeror’s Office To Nist.
factor 4: Capacity
page Limit – 2 Pages
the Offeror Shall Describe Their Team, Including Subcontractors, Capability To Complete Simultaneous Tasks Within The Required Timeframe Based On Current And Planned Workload And Expected Backlog.
the Offeror Shall Confirm That There Is Sufficient Capacity Within The Firm, Or That Additional Professional Capacity Can Be Increased As Needed In A Timely Manner To Deliver Projects That Meet The Government’s Specialized Requirements.
factor 5: Past Performance
page Limit – None
offeror Shall Provide Past Performance Information For The Relevant Projects Identified In Their Factor 1 – Specialized Experience Submission In The Form Of Either A Contractor Performance Assessment Reporting System (cpars) Report Or The Provided Past Performance Questionnaires (ppqs).
if The Project Was Completed For The Federal Government, The Offeror Shall Provide A Copy Of The Most Recently Completed Contractor Performance Assessment Reporting System (cpars) Report.
if No Cpars Is Available, Offeror Shall Use The Provided Past Performance Questionnaire (ppq). Ppqs Shall Be Completed And Signed By The Customer Identified In The Relevant Project. Limit Of One Ppq Per Project.
if An Offeror Submits Incomplete Past Performance Or Fails To Submit Any Past Performance Information, The Government May Evaluate Past Performance Based On The Information Obtained Concerning The Offerors’ Performance Relevant To Services Similar In Scope, Complexity, And Size For The Prime Contractor. Additionally, The Following Resources Will Be Used For Evaluation:
contractor Performance Assessment Reporting Systems (cpars), Or Similar Systems Of Other Government Departments And Agencies,
interviews Within Nist If Offeror Holds/held Previous Contracts,
interviews With Program Managers And Contracting Officers, And;
other Sources Known To The Government, Including Commercial Sources.
in The Case Of An Offeror Without A Cpars Record Of Relevant Past Performance Or For Whom Information On Past Performance Is Not Available, The Offeror Shall Be Rated Neither Favorably Nor Unfavorably.
part Ii: Oral Presentations
in Accordance With Far 36.602-3, The Government Will Hold Discussions With At Least Three Of The Most Highly Qualified Firms (firms Within The Competitive Range). More Details Related To The Presentations Will Be Provide To The Firms That Are Selected To Move Forward.
fee Proposal
only Those Firms Selected For Award Will Be Invited To Provide A Fee Proposal. Firms Shall Submit Along With Their Fee Proposal A Copy Of Audited Overhead Rate Statement Prepared In Accordance With The Federal Acquisition Regulation (far), Part 31 For The Prime And Their Sub-consultants. The Audit Must Be From A Federal, State, Local Government Or An Independent Third-party Auditor In Accordance With Far 31. Audit Conducted In Accordance With Generally Accepted Accounting Principles (gaap) Will Not Be Accepted.
Closing Date13 Jan 2025
Tender AmountRefer Documents
Province Of Laguna Tender
Machinery and Tools
Corrigendum : Tender Amount Updated
Philippines
Details: Description Invitation To Bid 25-073 Name Of Project : Supplies For Donation To Different Barangays And Municipalities In The Province Of Laguna Location : Sta. Cruz, Laguna Brief Description : Various Appliances, Office Equipment, Furniture, Hardware Supplies, Sporting Goods Approved Budget For The Contract : 65,992,138.00 Delivery Period : 45 Calendar Days The Provincial Government Of Laguna, With The Corresponding Budget For The Contract Approved By The Honorable Sangguniang Panlalawigan Of Laguna For The Procurement Year 2025 Intends To Apply The Above-cited Sum(s), Being The Approved Budget For The Contract (abc) To Cover Payments Under The Above-cited Contract. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Provincial Government Of Laguna Now Invites Bids For The Above-cited Services To Be Procured. It Is Understood That Suppliers, Contractors, Consultants And/or Service Providers, Etc. Must Have Duly-qualified Also And/or Have Submitted Their Eligibility “class A” And Other Requirements For Evaluation During The Appropriate Registration Undertaken In Procurement Year 2025; And, Which, Eligibility Requirements/documents Shall Be Kept On File, Updated And/or Maintained In The Permanent Registry Of Qualified Provincial Government Of Laguna Suppliers, Contractors, Providers, Etc.. Interested Parties May Secure Official Bid Documents From The Technical Working Group (twg). Delivery Of The Services Shall Be Expected Within The Above-cited Delivery Period/contract Duration. Bidders Should Have Completed As Of The Date Of Submission And Receipt Of Bids And/or Within A Period Of Five (5) Years, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. “instructions To Bidders.” Bidding Shall Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As, The “government Procurement Reform Act”. Bidding Shall Be Restricted To Filipino Citizens/sole Proprietorships, Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From The Provincial Government Of Laguna And Inspect The Bidding Documents At The Address Given Below During Regular Office Hours. The Complete Schedule Of Bac Activities Is Listed, As Follows: Activities Schedule 1. Issuance Of Bid Documents & Eligibility Requirements February 10, 2025 2. Pre-bid Conference February 12, 2025 10:00 A.m., Bac Office 3. Opening Of Bids February 24, 2025 10:00 A.m., Bac Office 4. Bid Evaluation February 24, 2025 Bac Office 5. Post-qualification February 26, 2025 10:00 A.m., Bac Office 6. Notice Of Award To Be Issued Date Of Posting: February 3 - 24, 2025 A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders On The Scheduled Date From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Stated In The Cost Of Bidding Documents. The Provincial Government Of Laguna Will Hold A Pre-bid Conference On The Scheduled Date And Venue, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. Bids Must Be Delivered To The Address Below On February 24, 2025. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms With The Corresponding Required Amount. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Scheduled Venue. Late Bids Shall Not Be Accepted. The Provincial Government Of Laguna Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Inquire From: Mrs. Ma. Nona A. Bondad / Mr. Samuel A. Fuertes, Sup. Admin. Officer/twg-bac /admin. Officer V/twg-bac, Tel. No. (049) #524862 Loc.514 (sgd.) Atty. Rodel T. Paderayon Bac Chairperson
Closing Date24 Feb 2025
Tender AmountPHP 65.9 Million (USD 1.1 Million)
Commission On Audit Tender
Others
Philippines
Details: Description Republic Of The Philippines Commission On Audit Regional Office No. Vi Ungka I, Pavia, Iloilo Invitation To Bid For The Procurement Of Supplies, Materials And Semi-expendable Items Of Cgas C, Water Districts I And Ii And Other Cgas Stand Alone Agencies For The 1st Quarter Of Fy 2025 The Commission On Audit Regional Office No. Vi, Through The 01101105 – Internally Generated Income (water District Audit Fees), Intends To Apply The Sum Of Two Hundred Twenty-eight Thousand Five Pesos Only (p228,005.00). Description Abc Office Supplies (29 Items) P 130,805.00 Ring/combed Binding Machine (1) 20,000.00 Semi-expendable Office Equipment And Furniture & Fixtures (4 Items) 77,200.00 Total Abc P 228,005.00 See Section Vii. Technical Specifications For Lot Details Being The Abc To Payments Under The Contract For The Procurement Of Supplies, Materials And Semi-expendable Items Of Cgas C, Water Districts I And Ii And Other Cgas Stand Alone Agencies For The 1st Quarter Of Fy 2025. Bids Received In Excess Of The Abc For Each Item Shall Be Automatically Rejected At Bid Opening. The Commission On Audit Regional Office No. Vi Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within Thirty (30) Days From Date Of The Notice To Proceed. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. Prospective Bidders May Obtain Further Information From Commission On Audit Regional Office No. Vi And Inspect The Bidding Documents At The Address Given Below During 9:00 A.m. To 5:00 P.m., Mondays To Thursdays. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 27, 2025 To January 30, 2025 (8:00 Am – 4:00 Pm, Mondays To Thursdays) And On February 3, 2025 (8:00 Am To 9:00 Am) From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of P500.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Through In Person Only. The Commission On Audit Regional Office No. Vi Will Not Hold A Pre-bid Conference For This Project. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. Bid Opening Shall Be On February 3, 2025 (monday), 9:30 Am At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. The Commission On Audit Regional Office No. Vi Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Gloria Melba Joy C. Payofelin Head, Bac Secretariat Coa Regional Office No. Vi Ungka I, Pavia, Iloilo 5001 Email: Coa.bac.ro6@gmail.com Tel. No. (33) 329-7416 Or 329-2353 You May Visit The Following Websites For Downloading Of Bidding Documents: Https://www.notice.philgeps.gov.ph/ Https://www.coa.gov.ph/index.php/invitations-to-bid Https://region6.coa.gov.ph/index.php?option=com_content&view=article&id=34&itemid=187 ______________________________________ Atty. Walter F. Meñez Bac Chairperson
Closing Date3 Feb 2025
Tender AmountPHP 228 K (USD 3.9 K)
Province Of Lanao Del Sur Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Republic Of The Philippines Bangsamoro Autonomous Region In Muslim Mindanao Province Of Lanao Del Sur Request For Quotation The Provincial Government Of Lanao Del Sur, Through Its Bids And Awards Committee (bac), Intends To Procure The Project/s Specified Below Through Section 53.9 Negotiated Procurement – Small Value Procurement Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184, Viz: Lot 1. Project Reference No. 25g0077b, Procurement Of Office Equipment And Furniture To Be Used By The Provincial Warden's Office, With Php 387,500.00 As Its Abc. Location: Marawi City, Lds Source Of Fund: Local Fund Please Submit Your Duly Signed Quotation Addressed To The Bac Chairperson And To The Given Address Below, On Or Before 12: 00 Pm, February 14, 2025, Subject To The Compliance With The Terms And Conditions Provided On This Request For Quotation (rfq): Engr. Dimasira D. Macabando, Jr., Ph.d. Bac Chairperson Bac Office, 2nd Floor Admin. Bldg. New Capitol Complex, Buadi Sacayo, Marawi City Interested Service Provider Shall Also Submit A Copy Of The Following Documents And Along With The Quotation On Or Before The Above Specified Deadline Of Submission Of Quotation: A. Mayor’s Permit B. Omnibus Sworn Statement C. Philgeps Reg. D. Income/business Tax Return (for Abcs Above P500k) E. Pcab License (for Infra. Project Only) F. Professional License/curriculum Vitae (for Consulting Services Only) The Head Of The Procuring Entity (hope) Of The Provincial Government Of Lanao Del Sur Reserves The Right To Reject Any And All Quotations Declare A Failure Of Procurement, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Instructions: Note: Failure To Follow These Instructions Will Disqualify Your Entire Quotation. (1) Do Not Alter The Contents Of This Form In Any Way. (2) The Use Of This Rfq Is Highly Encouraged To Minimize Errors Or Omissions Of The Required Mandatory Provisions. In Case Of Any Changes, Bidders Must Use Or Refer To The Latest Version Of The Rfq, Except When The Latest Version Of The Rfq Only Pertains To Deadline Extension. If Another Form Is Used Other Than The Latest Rfq, The Quotation Shall Contain All The Mandatory Requirements/provisions Including Manifestation On The Agreement With The Terms And Conditions Below. In Case A Prospective Supplier/service Provider Submits A Filled-out Rfq With A Supporting Document (i.e., A Price Quotation In A Different Format), Both Documents Shall Be Considered Unless There Will Be Discrepancies. In This Case, Provisions In The Rfq Shall Prevail. (3) All Technical Specifications Must Be Complied With. Failure To Comply With The Mandatory Requirements Shall Render The Quotation Ineligible/disqualified. (4) Quotations, Including Documentary Requirements, Received After The Deadline Shall Not Be Accepted. Terms And Conditions: 1. Bidders Shall Provide Correct And Accurate Information Required In This Form. 2. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. 3. Price Quotation/s, To Be Denominated In Philippine Peso, Shall Include All Taxes, Duties, And/or Levies Payable. 4. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 5. In Case Of Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated Quotation/lowest Calculated And Responsive Quotation, The Provincial Government Of Lanao Del Sur Shall Adopt And Employ “draw Lots” As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005. 6. Award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Technical Specifications, Requirements And Other Terms And Conditions Stated Herein. 7. The Item/s Shall Be Delivered According To The Accepted Offer Of The Bidder. 8. Item/s Delivered Shall Be Inspected On The Scheduled Date And Time Of The Procuring Entity. The Delivery Of The Item/s Shall Be Acknowledged Upon The Delivery To Confirm The Compliance With The Technical Specifications. 9. Payment Shall Be Made After Delivery And Upon The Submission Of The Required Supporting Documents. 10. Liquidated Damages Equivalent To One-tenth Of One Percent (0.1%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The Provincial Government Of Lanao Del Sur May Terminate The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 11. The Procuring Entity May Cancel Or Terminate The Contract At Any Time In Accordance With The Grounds Provided Under Ra No. 9184 And Its 2016 Revised Irr. 12. The Rfq, Purchase Order (po), And Other Related Documents For The Above-stated Procurement Projects Shall Be Deemed To Form Part Of The Contract. For Any Clarification, You May Contact The Bac Secretariat Head, Engr. Aliyah C. Datumanong, On Mobile Phone Number 09541827534. By The Authority Of The Bids And Awards Committee: (sgd) Engr. Dimasira D. Macabando, Jr., Ph.d. Bac Chairperson
Closing Date14 Feb 2025
Tender AmountPHP 387.5 K (USD 6.6 K)
Province Of Lanao Del Sur Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Republic Of The Philippines Bangsamoro Autonomous Region In Muslim Mindanao Province Of Lanao Del Sur Request For Quotation The Provincial Government Of Lanao Del Sur, Through Its Bids And Awards Committee (bac), Intends To Procure The Project/s Specified Below Through Section 53.9 Negotiated Procurement – Small Value Procurement Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184, Viz: Lot 1. Project Reference No. 25g0076b, Procurement Of Office Equipment And Furniture To Be Used By The Sports Office, With Php 709,484.35 As Its Abc. Location: Marawi City, Lds Source Of Fund: Local Fund Please Submit Your Duly Signed Quotation Addressed To The Bac Chairperson And To The Given Address Below, On Or Before 12: 00 Pm, February 14, 2025, Subject To The Compliance With The Terms And Conditions Provided On This Request For Quotation (rfq): Engr. Dimasira D. Macabando, Jr., Ph.d. Bac Chairperson Bac Office, 2nd Floor Admin. Bldg. New Capitol Complex, Buadi Sacayo, Marawi City Interested Service Provider Shall Also Submit A Copy Of The Following Documents And Along With The Quotation On Or Before The Above Specified Deadline Of Submission Of Quotation: A. Mayor’s Permit B. Omnibus Sworn Statement C. Philgeps Reg. D. Income/business Tax Return (for Abcs Above P500k) E. Pcab License (for Infra. Project Only) F. Professional License/curriculum Vitae (for Consulting Services Only) The Head Of The Procuring Entity (hope) Of The Provincial Government Of Lanao Del Sur Reserves The Right To Reject Any And All Quotations Declare A Failure Of Procurement, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Instructions: Note: Failure To Follow These Instructions Will Disqualify Your Entire Quotation. (1) Do Not Alter The Contents Of This Form In Any Way. (2) The Use Of This Rfq Is Highly Encouraged To Minimize Errors Or Omissions Of The Required Mandatory Provisions. In Case Of Any Changes, Bidders Must Use Or Refer To The Latest Version Of The Rfq, Except When The Latest Version Of The Rfq Only Pertains To Deadline Extension. If Another Form Is Used Other Than The Latest Rfq, The Quotation Shall Contain All The Mandatory Requirements/provisions Including Manifestation On The Agreement With The Terms And Conditions Below. In Case A Prospective Supplier/service Provider Submits A Filled-out Rfq With A Supporting Document (i.e., A Price Quotation In A Different Format), Both Documents Shall Be Considered Unless There Will Be Discrepancies. In This Case, Provisions In The Rfq Shall Prevail. (3) All Technical Specifications Must Be Complied With. Failure To Comply With The Mandatory Requirements Shall Render The Quotation Ineligible/disqualified. (4) Quotations, Including Documentary Requirements, Received After The Deadline Shall Not Be Accepted. Terms And Conditions: 1. Bidders Shall Provide Correct And Accurate Information Required In This Form. 2. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. 3. Price Quotation/s, To Be Denominated In Philippine Peso, Shall Include All Taxes, Duties, And/or Levies Payable. 4. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 5. In Case Of Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated Quotation/lowest Calculated And Responsive Quotation, The Provincial Government Of Lanao Del Sur Shall Adopt And Employ “draw Lots” As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005. 6. Award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Technical Specifications, Requirements And Other Terms And Conditions Stated Herein. 7. The Item/s Shall Be Delivered According To The Accepted Offer Of The Bidder. 8. Item/s Delivered Shall Be Inspected On The Scheduled Date And Time Of The Procuring Entity. The Delivery Of The Item/s Shall Be Acknowledged Upon The Delivery To Confirm The Compliance With The Technical Specifications. 9. Payment Shall Be Made After Delivery And Upon The Submission Of The Required Supporting Documents. 10. Liquidated Damages Equivalent To One-tenth Of One Percent (0.1%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The Provincial Government Of Lanao Del Sur May Terminate The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 11. The Procuring Entity May Cancel Or Terminate The Contract At Any Time In Accordance With The Grounds Provided Under Ra No. 9184 And Its 2016 Revised Irr. 12. The Rfq, Purchase Order (po), And Other Related Documents For The Above-stated Procurement Projects Shall Be Deemed To Form Part Of The Contract. For Any Clarification, You May Contact The Bac Secretariat Head, Engr. Aliyah C. Datumanong, On Mobile Phone Number 09541827534. By The Authority Of The Bids And Awards Committee: (sgd) Engr. Dimasira D. Macabando, Jr., Ph.d. Bac Chairperson
Closing Date14 Feb 2025
Tender AmountPHP 709.4 K (USD 12.2 K)
1551-1560 of 1566 archived Tenders